IFRAM Handbook on Reactor Aging Management



Similar documents
OVERVIEW OF THE OPERATING REACTORS BUSINESS LINE. July 7, 2016 Michael Johnson Deputy Executive Director for Reactor and Preparedness Programs

Safety Analysis Probabilistic Safety Assessment (PSA) for Nuclear Power Plants REGDOC-2.4.2

Improving regulatory practices through the OECD-NEA Stress Corrosion Cracking and Cable Ageing Project (SCAP)

Safety Analysis for Nuclear Power Plants

Introduction of the education and training courses to support emerging countries

Report. November 2013

DRAFT REGULATORY GUIDE DG-1154 (Proposed Revision 2 of Regulatory Guide 1.128, dated October 1978)

RENCEE SAFETY MARIES

U.S. Nuclear Regulation after Three Mile Island

Ensuring Quality Going Down the Supply Chain

IAEA INTERNATIONAL FACT FINDING EXPERT MISSION OF THE NUCLEAR ACCIDENT FOLLOWING THE GREAT EAST JAPAN EARTHQUAKE AND TSUNAMI

Overview. NRC Regulations for Seismic. Applied to San Onofre Nuclear Generating Station. NRC History. How we Regulate

ROK s Assistance Programs for New comers

Overview of Worldwide Nuclear Decommissioning

Long term operation integrated processes for delivering extended asset performance

Published in the Official State Gazette (BOE) number 166 of July 10th 2009 [1]

Technical Meeting on the Implications of the Fukushima Daiichi Accident on the Safety of Fuel Cycle Facilities. IAEA Headquarters Vienna, Austria

This occurrence is considered to be of no significance with respect to the health and safety of the public.

PROBABILISTIC RISK ASSESSMENT AND RISK MANAGEMENT OF A NUCLEAR POWER PLANT

Belgian Stress tests specifications Applicable to all nuclear plants, excluding power reactors 22 June 2011

BALLOT PREVIEW PRESENTATION P497 STANDARD CRITERIA FOR ACCIDENT MONITORING INSTRUMENTATION FOR NUCLEAR POWER GENERATING STATIONS

Introducing Catastrophe Risk man-made hazards*

Belgian Stress tests specifications Applicable to power reactors 17 May 2011

A Regulatory Approach to Cyber Security

Life-cycle cost analysis for nuclear power plants with seismic isolated system

Diablo Canyon NPP Probabilistic Risk Assessment Program. Workshop Information IAEA Workshop

How To Write A Contract For Software Quality Assurance

Long Term Operation R&D to Investigate the Technical Basis for Life Extension and License Renewal Decisions

NUCLEAR REGULATORY COMMISSION

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C June 26, 2014

HURRICANE DISASTER PREPARATION CHECKLIST AND BUSINESS CONTINUITY PLAN

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN OFFICE OF NUCLEAR REACTOR REGULATION

July 30, 2012 Nuclear Emergency Response Headquarters Government-TEPCO Med-and-long Term Response Council

( 1 ) Overview of Safety Measures ( 2 ) Overview of Measures for Attaining Greater Safety and Reliability

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH. REGULATORY GUIDE (Draft was issued as DG-1226, dated August 2009)

NEI 06-13A [Revision 0] Template for an Industry Training Program Description

Overview of the Multi-nuclide Removal Equipment (ALPS) at Fukushima Daiichi Nuclear Power Station. March 29, 2013 Tokyo Electric Power Company

By: Victor M. Delgado Jr National Power Corporation Philippines

The Role of COG in CANDU Fuel Channel Life Management

Decommissioning situation of Nuclear Power Plant in Japan

Tohoku University and the Great East Japan Earthquake Our Role, Responsibility and Mission. Susumu SATOMI President, Tohoku University

Introduction to Nuclear Fuel Cycle and Advanced Nuclear Fuels

How To Improve Safety At A Nuclear Power Plant

MDEP Generic Common Position No DICWG 02

abstract NRC Headquarters United States Nuclear Regulatory Commission

3 rd Review Meeting Convention on Nuclear Safety First Anniversary Report Status of Actions on Canada April 2006

Business Continuity Plan

DOE s Fuel Cycle Technologies Program - An Overview

Operating Performance: Accident Management: Severe Accident Management Programs for Nuclear Reactors REGDOC-2.3.2

Cyber Security and the Canadian Nuclear Industry a Canadian Regulatory Perspective

Interim Staff Guidance on Implementation of a Probabilistic Risk Assessment-Based Seismic Margin Analysis for New Reactors DC/COL-ISG-020

Nuclear Safety Regulation Reform in Japan

A Reviewof AkkuyuNPP Project in Turkey After Fukushima Daiichi Accident

ANTEP 2015 Needs from China (NNSA)

Chernobyl and Fukushima Lessons for Nuclear Power Plants Instrumentation and Control Systems

Science, Values and Stakeholder Dialogue: NEA Experience in Fukushima. Dr Ted Lazo Radiation Protection and Radioactive Waste Management Division

This document is the property of and contains Proprietary Information owned by Westinghouse Electric Company LLC and/or its subcontractors and

APPENDIX CC NUCLEAR WASTE STORAGE

Chemical and Isotopic Signatures for Environmental Remediation and Nuclear Forensic Analysis

EMERGENCY PREPAREDNESS PLAN Business Continuity Plan

P. G. DIPLOMA IN DISASTER RELIEF & REHABILITATION

License Application Package Overview MOX Fuel Fabrication Facility 27 September 2006

REGULATORY GUIDE 5.29 (Draft was issued as DG 5028, dated May 2012) SPECIAL NUCLEAR MATERIAL CONTROL AND ACCOUNTING SYSTEMS FOR NUCLEAR POWER PLANTS

NUCLEAR SECURITY CULTURE IN PRACTICE: IAEA GLOBAL APPROACH 20 March 2014, Amsterdam

Nuclear Risk and Public Decision Marking Scientific Conference

APPENDIX B SUPPLEMENTAL INSPECTION PROGRAM A. OBJECTIVES AND PHILOSOPHY OF THE SUPPLEMENTAL INSPECTION PROGRAM

The integrity evaluation of the reactor building at unit4 in the Fukushima Daiichi nuclear power station

Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants

EQUIPMENT QUALIFICATION

CRITICAL INFRASTRUCTURE PROTECTION BUILDING ORGANIZATIONAL RESILIENCE

Risk management for external beam radiotherapy Recommendations (draft)

WMD Terrorism Risk Assessment in the Department of Homeland Security. Why Risk Assessment? Probabilistic Risk Assessment

How To Write A Cyber Security Risk Analysis Model For Research Reactor

MATERIALS LICENSE. Docket or Reference Number Maximum Amount that Licensee May Possess at Any One Time Under This License: Source

QUANTITATIVE RISK ASSESSMENT AND MODELING: FIRE RISKS OF CNG-POWERED BUSES

IAEA Action Plan on Nuclear Safety 1

Post- Fukushima accident. Spain. Peer review country report. Stress tests performed on European nuclear power plants. Stress Test Peer Review Board

EDUCATION AND TRAINING OF OPERATORS AND MAINTENANCE STAFF AT COMMERCIAL NUCLEAR POWER STATIONS IN JAPAN

Current Status of NP Program & Planning in Malaysia. Mohd Yusof Mohd Ali Malaysian Nuclear Agency

APPENDIX C. Accident Cleanup

Introductions: Dr. Stephen P. Schultz

Chapter 4 Natural Hazards and Emergency Management

Prospect of Hitachi Nuclear Business (Boiling Water Reactor)

Self-Insured Coverage Document Auto Physical Damage

May 23, 2011 Tokyo Electric Power Company

Sustainable Environment, Health and Safety as Competitive Differentiator

Current Status and Future Challenges in Korean Nuclear HRD

Rosatom Investment Projects. Perspective in Europe and in the world

Transcription:

IFRAM Handbook on Reactor Aging Management I.S. Hwang a, T. Shoji b, E.H. Han c, C.E. Carpenter d a Seoul National University, Seoul, Korea b Tohoku University, Tohoku, Japan c Institute of Metal Research, Chinese Academy of Sciences, Shenyang, China d US Nuclear Regulatory Commission, Washington, DC. USA IAEA PLiM Meeting May 14-19, 2012 Salt Lake City, USA

Outlines: IFRAM Handbook 1. Problem Statement 2. Development Goals 3 Rationale and Approach 4. Work Plan and Issues 5. Summary and Future Work

1. Problem Statement Risk Mismanagement Surprises and/or Accident Media/Public Uproar Financial Loss Earthquake Corrosion Oxidation Fatigue Fretting Mihama Davis Besse Fukushima K-Kariwa Radiation Emb. Yankee Rowe NPP Creep Sagging Pickering TMI Clogging Plugging Many Kori Mistake Counterfeit Sabotage HLW Production Storm Tornado Regulatory Countermeasure Tsunami Flooding IP-3 Fukushima Browns Hamaoka Ferry Chernobyl Kori UlJin Missiles Terror Poor Materials &Fab. Political Drive to Slump Chem. Explosion Fire MUF Selected Examples

1. Problem Statement 10CFR50 Appendix A, GDC The principal design criteria establish the necessary design, fabrication, construction, testing, and performance requirements for structures, systems, and components important to safety; that is, structures, systems, and components that provide reasonable assurance that the facility can be operated without undue risk to the health and safety of the public. Annual sales electronics+information food energy Ten Trillion USD

2. Development Goals Spectrum of Proactive Aging Management Materials Safety and Security Configuration Natural Forces Materials Incompatibility Proactive Aging Management Degradation of SSC and Materials Degradation of Safety Security Configuration Safety Confidence Against Man-made Damages Uncertainty in Safety Margin Against Natural Forces

3. Rationale and Approach Proactive Risk Management SSC Risk Configuration Risk Human Error andterrorism Natural Forces Proactive Strategy Experience and Knowledge Database Fundamental Understanding Knowledge Confidence Building Risk Assessment & Prioritization IFRAM Handbook Experience, Understanding & Regulations Strategy & Tools Preventive Measure Preventive Measures Strategy Tools Experience Understanding Regulations

3. Rationale and Approach Proactive Aging Management Dissemination of Experiences and LTO Issues Prediction of Failures and Related Symptoms Prediction of Potential Sequence of Event & Consequences Assessment of Confidence of Prediction Identification of Gaps and Action Priorities Interfacing with Plant Operation and Maintenance Interfacing with IFRAM Programs Updating Knowledge on Risk and Confidence Materials Aging and Degradation Configuration Aging and Degradation Risk-Confidence Knowledge Aging

3, Rationale and Approach Experience, Understanding & Regulations Regulatory Process & System Licensing Basis for Aging Management Code, Standards, Guidelines and Database Strategy & Tools Organizational Structure Proactive Management Procedures Quality and Culture Assurance Confidence Building Review of Aging Management Review of Aging Mechanism and Effect Preventive Measures Strategy Tools Plant Specific Approach Common Aging Issues for R&D Experience Understanding Regulations

4. Work Plan and Issues IFRAM Handbook Task Force Plan Phased Approach Phase 1: Focused on SSC Management, by Dec. 2014 Proactive Aging Management Degradation of SSC and Materials Old-dating of Plant Configuration Safety Confidence Against Man-made Damages Uncertainty in Safety Margin Against Natural Forces Phase 1 Phase 2 Phase 3 Phase 4

4. Work Plan and Issues IFRAM Task Force Plan for Handbook Version 0 Introduction (Hwang/Shoji-10 pages) Background (TBD, Shoji/Bond-20 pages) Structures, Systems and Components (Hwang) Aging mechanisms and effects (Shoji, Busby, Han) Regulatory framework (Carpenter, Gott) Aging management programs (Hwang) Organizational structures (Kanno) Case studies (Tsuruga) Summary (Hwang/Shoji) Expert Analysis Expert Author Chapter Leader User Feedback

4. Work Plan and Issues INL/EXT-11-23452

4. Work Plan and Issues

4. Work Plan and Issues Confidence and Vigilance

4. Work Plan and Issues: Risk-informed System Approach MRP-75 as an Example Procedure Proactive Workflow & Goals Inspection & EAC Discovery Mechanism Identification Growth Rate Modeling Growth Prediction Failure Probability Next Inspection Deterministic -> Prob. Microscopic-> Atomistic K-based -> K- and ECP-based Deterministic -> Prob. Deterministic -> Prob. Deterministic -> Prob.

4. Work Plan and Issues: Challenges of IFRAM TF Time and Resources Phased Scope of Coverage Avoid Duplication Risk Quantification Assure Consistency Assure Accuracy Proof of Validity R&D Identification Expert Analysis Expert Author Chapter Leader User Feedback Dedication of Task Force Members Support of IFRAM Members User Group & Feedback User Group Feedback & Maintenance Public Access

5. Summary and Future Work IFRAM Handbook on Aging Management (IHBRAM) Proactive Management Handbook Phase One: SSC Phase Two: Configuration Phase Three: Man-made Impact Phase Four: Natural Impact In-house Handbook Public Sourcebook Future Work on Phase One Proactive Weld Reliability Proactive SG Tube Reliability Proactive Pressure Tube Reliability Risk-informed Integrity Assessment