STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date



Similar documents
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

Activity Yes No N/A Notes

City of Shelbyville Site Inspection Checklist

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

SECTION A: LOCAL STORM WATER POLLUTION PREVENTION PLAN


SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

CONSTRUCTION PERMIT SUBMITTAL CHECKLIST

STANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

Storm Water Management Requirements for Construction Projects Less than One Acre

Low Impact Development Checklist

SAMPLE COPY. Stormwater Pollution Prevention Plan. A site map must be developed and must contain, at a minimum, the following information:

State of Florida. Department of Environmental Protection. Generic Permit. For. Stormwater Discharge from Large and Small Construction Activities

SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Waste Handling & Disposal

TCEQ TPDES CGP EPA NPDES GCP Inspection of Controls Report

Developing Your Stormwater Pollution Prevention Plan A Guide for Construction Sites

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

COMMONWEALTH OF KENTUCKY CITY OF LONDON ORDINANCE NO AN ORDINANCE ESTABLISHING EROSION AND STORM WATER CONTROL

Outlet stabilization structure

TABLE OF CONTENTS. Page 2 of 37 Ohio EPA Permit No.: OHC000004

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY STORMWATER MANAGEMENT PLAN PREPARATION GUIDANCE. Revised 4/2011. Contact information

Operations and Maintenance Plan The Residences at Johnson Farm 189 Landham Road Sudbury, Massachusetts. Submitted to: Town of Sudbury

City of Beaumont, Texas Grading Permit Information

CHAPTER 2 CONSTRUCTION STORMWATER POLLUTION PREVENTION

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

NPDES Industrial Stormwater Inspection Worksheet

Module 6: Pollution Prevention Plans and SWPPP Overview

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

STORM WATER MANAGEMENT HANDBOOK FOR CONSTRUCTION ACTIVITIES

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

Definition of Tower from the Bradley County Zoning Resolution

MONTANA Water Quality & Storm Water Management Training Programs For Construction Activities

Construction Site Inspection. Inspecting to Keep You in Compliance

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

GENESEE COUNTY DRAIN COMMISSIONER S OFFICE

Carlton Fields Memorandum

SECTION SITE PREPARATION

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN

STATEMENT OF ACKNOWLEDGMENT

CITY UTILITIES DESIGN STANDARDS MANUAL

APPLICATION PROCESS FOR LAND DISTURBING PERMIT

Storm Drain System Operation and Maintenance

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

A Developer s Guide: Watershed-Wise Development

Concrete Waste Management

Florida Department of Environmental Protection

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

C. Storm Water Pollution Prevention Plan (SWPPP) Yes No Response / Comment. D. Good Site Management Housekeeping Yes No Response / Comment

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

Block and Gravel Inlet Protection (BIP)

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

Storm Drain Inlet Protection - IP

Preventing Storm Water Pollution: What We Can Do

CITY AND COUNTY OF DENVER CONSTRUCTION ACTIVITIES STORMWATER MANUAL. Wastewater Management Division Department of Public Works

SE-10 STORM DRAIN INLET PROTECTION. Objectives

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

Temporary Batch Plants

STORMWATER MANAGEMENT CHECKLIST

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses

1.7.0 Floodplain Modification Criteria

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

SUSTAINABLE URBAN DRAINAGE SYSTEMS

BEST MANAGEMENT PRACTICES (BMPs)... What are They? GOOD HOUSEKEEPING PRACTICES Your Business Should Employ

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Outdoor Storage of Raw Materials SC-33

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12

Post Construction and Redevelopment Inspection Manual

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

Annual Standards and Specifications. Erosion and Sediment Control

Storm Drain Inlet Protection

III. Relying on another Governmental Entity

Sustainable Drainage Systems (SUDS) A guide for developers

SECTION 5. Sediment Control Measures

WORKERS COMPENSATION REQUIREMENTS UNDER WORKERS COMPENSATION LAW 57

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Spill Prevention, Control & Cleanup SC-11

Standard Operating Procedures Storm Drain System Maintenance

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

APPENDIX A: STORMWATER MANAGEMENT CHECKLIST

City of San Diego Urban Runoff Management Program. Appendix XI. Minimum BMPs for Mobile Businesses

Exhibit A-7.III. Water Quality Management Plan (WQMP) Checklist

SECTION TEMPORARY ENVIRONMENTAL CONTROLS

Applicable Rules - Air 30 TAC Permits All facilities must be authorized by a permit, a standard permit, or a permit by rule. Small mixers unde

Transcription:

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local requirements. Completion of this template is not a requirement for permit authorization and is not intended to be used as a substitute for professional review. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date Project Name Address NDEQ NOI Number City County Latitude Longitude State Zip Code 1.2 Construction Project Description Describe the nature/function of the construction project and its impact on the surrounding environment 1.3 Name of Receiving Waters Identify and name any receiving waters within one mile of the site. Include drains and ditches that lead to streams or rivers.

1.3 Existing Site Conditions Describe the existing site conditions, including the storm drainage system. Include quantities of flow and site conditions around all points of surface water discharge from the site. 1.3 Sequence of Major Construction Activities Describe the intended sequence and timing of activities that disturb soil on the site. Include the following: Clearing and grubbing for areas necessary for installation of perimeter erosion control devices Construction of perimeter erosion control devices Remaining interior site clearing and grubbing Installation of permanent and temporary stabilization measures Road grading Grading for the remainder of the site Utility installation and whether storm drains will be used or blocked after construction Building, parking lot, and site construction Final grading, landscaping, or stabilization Implementation and maintenance of final erosion control structures Removal of temporary erosion control devices

1.4 Site Data Estimates of the total area expected to be disturbed by excavation, grading, or other construction activities, including dedicated off-site borrow and fill areas. 1.5 Industrial Activities Indicate the location of any stormwater discharges associated with industrial activity other than at the site (e.g., dedicated asphalt, concrete plants, etc). 1.6 Pollution Sources Identify all potential sources of pollution that might affect the quality of storm water discharge from the site.

1.7 OPERATORS Identify the types of OPERATORS (e.g. grading contractor, residential and commercial lot builders, public improvement contractor, subcontractors, suppliers, trades people, etc.) who will be at the site, and the areas over which OPERATOR has control. 2.0 CONTROLS TO REDUCE POLLUTANTS 2.1 Control Measures For each major activity identified (see section 1.3), describe all control measures, the timing during construction when measures will be installed, and the OPERATOR responsible for accomplishing the installation.

2.2 Interim and Permanent Stabilization Practices Describe all interim and permanent stabilization practices with the associated installation schedule. 2.3 Construction Activity Record Keeping Maintaining a record of the dates when major grading activity occurs, when construction activity has been temporarily or permanently ceased on a portion of a site, and when stabilization practices are initiated is an integral part of the SWPPP. Explain how the construction activity record keeping will be accomplished for the duration of the permit. 2.4 Structural Practices Describe any structural practices used to divert flows from exposed soils, retain/detain flows, or otherwise limit runoff/pollutants from exposed areas, 2.5 Post-Construction Storm Water Management Controls Describe any post-construction storm water management controls to be installed at the site, and identify any applicable federal, state, local, and/or tribal requirements for design or installation. Include maintenance plans of permanent management measures.

2.6 Measures/Waste Disposal Practices Describe all measures/waste disposal practices to prevent discharge of solid material, including building materials and cement truck washout, to waters of the state. 2.7 Sediment Track-Out Prevention Practices Describe measures to minimize off-site tracking of sediments to paved surfaces and the generation of dust. 2.8 Waste or Construction Materials Storage Practices Describe any waste or construction materials to be stored onsite, and list all measures to limit exposure, including storage, spill prevention and response practices. 2.9 Pollutants From Sources other than Construction Describe controls to minimize pollutants from sources other than construction (e.g., dedicated asphalt, concrete plants, etc.)

3.0 NON-STORM WATER DISCHARGE MANAGEMENT Identify and list pollution prevention measure for any allowable non-storm water discharges. (For a list of allowable non-storm water discharges, see CSW General Permit Part I.C.2) 4.0 PERMIT ELIGIBILITY RELATED TO ENDANGERED SPECIES Document your project s eligibility for permit coverage with regard to endangered species. 5.0 PERMIT ELIGIBILITY RELATED TO MAXIMUM DAILY LOADS Document your project s eligibility for permit coverage with regard to discharging to water bodies with an approved TMDL.

6.0 APPLICABLE STATE, TRIBAL, OR LOCAL REQUIREMENTS Document your project s compliance with any applicable state, local, and/or tribal requirements for erosion control and stormwater management. 7.0 INSPECTIONS 7.1 Inspection Schedule, Procedures, and Frequency Proposed conditions inspections must be conducted at least once every fourteen calendar days, and within 24 hours of storms that have occurred in a 24 hour period with an accumulation of precipitation that measures.5 inches or greater. A rain gauge will be maintained on site to measure precipitation. Describe routine inspection schedules, procedures, and frequency to ensure control measures are operating effectively. 7.2 Personnel Performing Inspections Indicate who will be to perform inspections and describe the person s qualifications.

7.3 Report Format Describe the format for the inspection reports documenting each inspection, including documentation of incidents of noncompliance or certifying full compliance, and indicating who will be authorized to sign the report. 8.0 OPERATOR RESPONSIBILITY AND NOTIFICATION 8.1 Responsibility Describe in detail each OPERTOR S (see section 1.7 for a list of OPERATORS) responsibility for implementing and maintaining the SWPPP in the APPLICANT S behalf. 8.2 Notification Describe in detail how each OPERATOR (see section 1.7 for a list of OPERATORS) will be informed of the existence of the SWPPP and requirements.

9.0 MAINTENANCE OF CONTROLS 9.1 Procedures and Activities Describe the procedures and activities that will be used to maintain all best management practices in an effective operational condition. 9.2 Modifications Describe in detail a protocol for modifying the SWPPP whenever there is a change in design, construction, operation, or maintenance at the site, or if during inspections or investigations it is determined that the SWPPP is ineffective in minimizing pollutant discharge fromo the site.

10.0 MANAGEMENT PRACTICES 10.1 Control Measure Management Practices Describe the protocol for insuring that all controls will be properly selected, installed, and maintained in accordance with manufacturer specifications and good engineering practices. 10.2 Off-Site Management Practices Describe the protocol for ensuring off-site accumulations of sediment will be removed as necessary. 10.3 Litter, Debris, and Chemical Management Practices Describe the protocols for ensuring the prevention of stormwater contamination associated with pollutants such as litter, debris, and chemicals.

10.4 Stabilization Management Practices Following initial soil disturbance or redisturbance, permanent or temporary stabilization shall be completed within seven (7) calendar days on all perimeter dikes, swales, ditches, perimeter slopes, and all slopes greater than 3 horizontal to 1 vertical (3:1); embankments of ponds, basins, and traps; and within fourteen (14) days on all other disturbed or graded areas. The requirements of this section do not apply to those areas which are shown on the plan and are currently being used for material storage or for those areas on which actual construction activities are currently being performed. Describe the protocol for ensuring the implementation of stabilization measures. 10.5 Maximum Pollutant Removal Management Practices Describe the protocol for ensuring a combination of sediment and erosion control measures will be used to achieve a maximum pollutant removal. Also, document any factors considered when determining whether to use sediment basin(s) as a control measure. 10.6 Velocity Dissipation Management Practices Describe the protocol for ensuring velocity dissipation devices will be used at discharge locations and along outfall channels to provide non-erosive flow.

11.0 CONTACT INFORMATION Owner/Developer Phone number Address City State Zip 12.0 MAPS AND ATTACHMENTS The following must be included with the SWPPP: 1. General Location Map (e.g., USGS quadrangle map, a portion of a city or county map, or other map) with enough detail to identify the location of the construction site and waters of the state within one mile of the site 2. Site map(s) showing the entire site during grading, construction, and post-construction phases, identifying a. Direction(s) of storm water flow and approximate slopes anticipated after major grading events b. Areas of soil disturbance and areas that will not be disturbed c. Locations of major structural and nonstructural Best Management Practices (BMPs) identified in the SWPPP d. Locations where stabilization practices are expected to occur e. Locations of off-site material, waste, borrow, or equipment storage areas f. Location of all Waters of the State g. Location of any wetlands, natural or artificial water storage detention areas, and drainage ditches on the site h. Locations where storm water discharges to a surface water i. Areas where final stabilization have been accomplished and no further construction-phase permit requirements apply j. An indication of the scale used k. Suitable contours for the existing and proposed topography l. A clear and definite delineation of any areas of vegetation or trees to be saved m. A clear and definite delineation of any one hundred (100) year floodplain on or near the site n. Location of rain gauge to be maintained on site o. The location on site where the SWPPP will be kept 3. Design details for both temporary and permanent erosion control structures 4. A statement noting that the contractor, developer, and owner shall request the Stormwater Pollution Prevention Plan Inspector to inspect and approve work completed at the following stages: a. Upon completion of installation of perimeter erosion and sediment controls, prior to proceeding with any other land disturbance or grading b. Upon the completion of stripping, the stockpiling of topsoil, the construction of temporary erosion and sediment control facilities, disposal of all waste material, and preparation of the ground and completion of rough grading, but prior to placing top soil, permanent drainage, or other site development improvements and ground covers c. Upon completion of final grading, permanent drainage, and erosion control facilities including established ground covers and planting, and all other work of the permit 5. A signed statement by the owner, developer, and contractor that any clearing, grading, construction, or development, or all of these, will be done pursuant to the plan. 6. Inspection reports must include the following: a. Inspection time and date b. Name, titles, and qualifications of personnel making the inspection c. Weather information for the period since the last inspection including a best estimate of the beginning of each storm event, duration of each storm event, approximate amount of rainfall for each storm event (in inches), and whether any discharges occurred d. Weather information and a description of any discharges occurring at the time of the inspection e. Location(s) of discharges of sediment or other pollutants from the site

f. Location(s) of BMPs that need to be maintained g. Location(s) of BMPs that failed to operate as designed or proved inadequate for a particular location h. Monitoring results if requested i. Records of the last grading activity j. Location(s) where additional BMPs are needed that did not exist at the time of inspection k. Corrective action required including any changes to the SWPPP necessary and implementation dates