Activity Centered Training for SharePoint



Similar documents
MS-55115: Planning, Deploying and Managing Microsoft Project Server 2013

Administering Team Foundation Server 2013

MS 50547B Microsoft SharePoint 2010 Collection and Site Administration

DottsConnected SHAREPOINT 2010 ADMIN TRAINING. Exercise 1: Create Dedicated Service Accounts in Active Directory

Course 55115: Planning, Deploying and Managing Microsoft Project Server 2013

Planning, Deploying and Managing Microsoft Project Server 2013

10231B: Designing a Microsoft SharePoint 2010 Infrastructure

Designing IT Platform Collaborative Applications with Microsoft SharePoint 2003 Workshop

Advanced IT Pro Course for Office SharePoint Server 2007 and SharePoint Services 3.0

Day 1 - Technology Introduction & Digital Asset Management

Course Syllabus. 2553A: Administering Microsoft SharePoint Portal Server Key Data. Audience. At Course Completion.

Pro/INTRALINK 9.0/9.1 Curriculum Guide

Windchill Service Information Manager Curriculum Guide

SharePoint Development for.net Developers

Intelligent Dashboards made Simple! Using Excel Services

IT Service Management with System Center Service Manager

Free Project Management Templates. Install Guide

Your 12 step plan to a successful SharePoint implementation. SharePoint Project Checklist

Microsoft Project Server 2010 Technical Boot Camp

Microsoft Enterprise Search for IT Professionals Course 10802A; 3 Days, Instructor-led

Designing a Microsoft SQL Server 2005 Infrastructure

IT Service Management with System Center Service Manager

Extending Microsoft Office and SharePoint with EMC Documentum

A brief introduction on SharePoint

Server Virtualization with Windows Server Hyper-V and System Center

Planning, Deploying, and Managing an Enterprise Project Management Solution

55034-Project Server 2013 Inside Out

Maintaining a Microsoft SQL Server 2008 Database

Server Virtualization with Windows Server Hyper-V and System Center

Arbortext Content Manager 9.0/9.1 Curriculum Guide

SHAREPOINT 2016 POWER USER BETA. Duration: 4 days

Server Virtualization with Windows Server Hyper-V and System Center

Implementing Microsoft SharePoint on NetApp Storage Systems Course MSSP; 5 Days, Instructor-led

Pro/INTRALINK Curriculum Guide

Microsoft Technology Practice Capability document. MOSS / WSS Building Portal based Information Worker Solutions. Overview

Document Management. Document Management for the Agile Enterprise. AuraTech Pte Ltd

Configuring and Managing Microsoft System Center Essentials 2010

CORRELATE for Microsoft Sharepoint Windows Services

The SharePoint Shepherd s Course for End Users

Intelligent Data Management Framework in Microsoft Dynamics AX 2012

Course 55034A: Microsoft Project Server 2013 Inside Out

Using Colligo Contributor to Migrate Lotus Notes Applications to SharePoint

Who is SharePoint Joel?

Configuring and Deploying a Private Cloud

The Nuts and Bolts of Autodesk Vault Replication Setup

Enterprise Content Management with Microsoft SharePoint

IT Academy Lesson Plan

Changing the SharePoint Backup Game: How to Backup Multi-Terabyte SharePoint Farms in Minutes

Build Your Knowledge!

MS Configure and Troubleshoot Identity Access Solutions with Windows Server 2008 Active Directory

All of the IntelliGanttt functions are accessed directly in Microsoft Project from the IntelliGanttt menu on the menu bar.

Implementing and Administering Windows Small Business Server 2008

Core Solutions of Microsoft Exchange Server 2013 Course 20341A; 5 Days

Trainer Preparation Guide for Course 10174A: Configuring and Administering Microsoft SharePoint 2010

Business process efficiency is improved with task management, alerts, notifications and automated process workflows.

126 SW 148 th Street Suite C-100, #105 Seattle, WA Tel: Fax:

MS 20341B: Core Solutions of Microsoft Exchange Server 2013

Project Server 2013 Inside Out Course 55034; 5 Days, Instructor-led

Server Virtualization with Windows Server Hyper-V and System Center

Explain how to prepare the hardware and other resources necessary to install SQL Server. Install SQL Server. Manage and configure SQL Server.

SharePoint Deployment at the FSU College of Education

No-Code SharePoint 2013 Workflows with SharePoint Designer 2013 and Visio 55048A; 3 Days, Instructor-led

Server-Virtualisierung mit Windows Server Hyper-V und System Center MOC 20409

MS-10750: Monitoring and Operating a Private Cloud with System Center Required Exam(s) Course Objectives. Price. Duration. Methods of Delivery

Outline. MCSA: Server Virtualization

Planning, Implementing and Managing a Microsoft SharePoint 2003 Infrastructure

Course Syllabus. At Course Completion

MS-10751: Configuring and Deploying a Private Cloud with System Center Required Exam(s) Course Objectives. Price. Duration. Methods of Delivery

Course 6426: Configuring and Troubleshooting Identity & Access Solutions With Windows Server 2008 Active Directory Page 1 of 6

Course Outline. Course 6419 : Configuring, Managing and Maintaining Windows Server 2008-based Servers. Duration: 5 Days

Office SharePoint Server 2007

20247D: Configuring and Deploying a Private Cloud

UOFL SHAREPOINT ADMINISTRATORS GUIDE

Windchill ProjectLink Curriculum Guide

NIIT Education and Training, Doha, Qatar - Contact: /1798;

Lab : Planning and Implementing a Virtual Machine Deployment and Management Strategy

Cloud & Datacenter Monitoring with System Center Operations Manager

NE-20247D Configuring and Deploying a Private Cloud

Administering the Web Server (IIS) Role of Windows Server 10972B; 5 Days

Implementing a Microsoft SQL Server 2005 Database

Implementing and Administering an Enterprise SharePoint Environment

20409B: Server Virtualization with Windows Server Hyper-V and System Center

Configuring, Managing and Maintaining Windows Server 2008-based Servers

Transcription:

Activity Centered Training for SharePoint Scenario Headquartered in and established in 1986, Oscar Pharmaceuticals has a current employee count of 680. The curriculum is being designed for Oscar Pharmaceuticals. Marked by rapid growth, the organization has doubled in size over the last five years. The rapid expansion of the organization has resulted in emerging concerns for Oscar Pharmaceuticals. The infrastructure has not grown at the same pace as the rest of the organization. As a result of this disparity, different divisions have now begun to encounter challenges to work collaboratively. This is beginning to deter the organization from performing at its optimal level, which has also given rise to growing misunderstandings among the various divisions. The various divisions within the organization are dispersed all over Illinois. The six departments with its corresponding locations are as follows: Division Location of the Division Management Marketing Accounting Research and Development (R&D) Urbana, IL Manufacturing Bloomington, IL Information Technology Note: The main IT division is located in Chicago; however, all the other divisions have an IT department in their respective locations The communication gap was recently addressed in the monthly board meeting. Apparently, absence of teamwork and collaboration was an issue that had remained undetected for a long time within Oscar Pharmaceuticals. As an outcome of the discussion that ensued, the Board decided to conduct a comprehensive analysis of the problem. In order to assist the organization remedy the problem, the Board decided to recruit a consulting organization. Arbutas Inc. is recruited to analyze Oscar s workflow and culture. The following problems were unearthed: Communication gap among the divisions Absence of infrastructure that would enable collaboration between various divisions Cultures differed among divisions located in Bloomington, Chicago and Urbana Absence of accurate practice of project management methods Page 1 of 6

The findings of the analysis conducted by Arbutas Inc. revealed that the groups were not located within the same area. The outcome of the analysis is as follows: 1. A need for an effective medium to collaborate long distance 2. Better project management tool In order to address these issues, Arbutas proposes Microsoft SharePoint Server 2010 as a solution to address Oscar s concerns. MS SharePoint Also known as Microsoft SharePoint Products and Technologies, it is a collection of products and software elements that includes, among a growing selection of components, web browser based collaboration functions, process management modules, search modules and a documentmanagement platform. SharePoint can be used to host web sites that allows the user to access shared workspaces, information stores and documents, as well as host defined applications such as wikis and blogs. Users can manipulate proprietary controls called "web parts" or interact with pieces of content such as lists and document libraries. Oscar Pharmaceuticals is unfamiliar with SharePoint. All employees within the organization require product training. The System Implementation will be conducted by Oscar s IT team and the training will be led by an external organization that specializes in Technology Instructions. Curriculum The following curriculum has been developed to conduct a training session on SharePoint for Oscar employees: Learning Objectives: 1. Learn how to login into the SharePoint System 2. Learn how to find document in the Document Library 3. Learn how to check assigned tasks for a group 4. Learn how to find contacts 5. Learn how to reserve resources on SharePoint 6. Learn how to use the message board Page 2 of 6

Lesson plan for lectures: Introduction to MOSS 2007 (2-3 hrs) Page 3 of 6 Topic Details Audience 1. Introduction & 2. Enterprise Content Management Features 3. Document Management 4. Workflow 5. Records Management 6. Web Content Management 7. Organizing and Searching Content Track 1: Web Publishing (2-3 hrs) Track 2: Operations (2-3 hrs) Track 3: Production Support (2-3 hrs) 1. Introduction & 2. MOSS for WCPs: Introduction & 3. Web Content Templates 4. Content Types 5. Simple Workflows: Approvals, Feedback, Signatures 6. Web Content Publishing & Deployment 7. Search 8. Security 1. MOSS for Server Admins & DBAs: Introduction & 2. Infrastructure 3. Installation 4. Capacity Planning & Performance Tuning, Caching 5. Disaster Recovery 6. Backup & Restore Strategies 7. Best Practices and Maintenance 1. MOSS for Production Support: Introduction & 2. Capacity Management 3. User & Site Administration 4. Using Central Administration 5. Troubleshooting Best Practices Entire organization (all of the six divisions within Oscar Pharmaceuticals) All divisions will be responsible for publishing content to MOSS 2007 sites The IT division is responsible for maintaining the infrastructure that will support a MOSS 2007 deployment IT professionals who will be responsible for maintaining and administering a MOSS 2007 deployment

6. Content Deployment 7. Security 8. Enterprise Search & Index Management Activity Plan: Motivate Students Learning Objective Activity 1. Whoever completes these classes will get time off work for their time invested in the training. 2. Laptop raffle draw at the end of each day of training; with a chance for one employee to win a laptop each day of training (For instance, 5 day = 5 employees have a chance to win a laptop). Learn how to login into SharePoint Learn how to upload documents on Document Library and check-in & check-out as required. First 10 people to login into the system everyday of the training session will get a free massage coupon. Show how to upload, check-in and check-out document in the class. Learn how to check assigned tasks for a group Find Contacts Learn how to reserve resources on SharePoint At the beginning of every training session, the participant will see another person s name in assigned task and would need to find his/her contact to complete the given assignment of the day. This would facilitate participants to exchange their information. The participants of the training program would need to reserve equipments online using Page 4 of 6

SharePoint. Each day an equipment will be picked as the lucky one, whoever reserves that particular equipment will win a small gift. Learn how to use the blog Apply all skills to solve a problem Use SharePoint other than business purpose Make an interesting comment for a blog entry. Whoever makes the most interesting entry, his/her blog entry will be published on the company newsletter. ARG (Alternative Reality Game): Problem based learning, use all the skills to finish an Alternative Reality Game 1. Assigned task, locate the people you need to find using the passphrase 2. Go to contacts, to find the person s email address 3. Email that person with the passphrase, and he will get back to you about the equipment that needs to be reserved. 4. Use the equipment (For instance, take a photo of the company s parking garage and upload this photo to message board) Members within a department to finish the game first will be rewarded. At the end of the training, the employees will have a potluck and each member will use SharePoint to inform others of what they are going to bring, so overlaps can be avoided. Page 5 of 6

Activity Centered Training for SharePoint There are 8 activities in this list. Please rank them (1-8) during the presentation and we will share the result at the end of the class. Thank you. David & Tanzil Whoever takes training classes they will get time off for the time they spent in the class room. End of the each day of training there will be a raffle draw and one person will be winning a Laptop each day. (5 days = 5 laptops) Company will provide the laptop specification early on, and end of the day they will find out about the raffle draw on SharePoint site. First 10 people login into the system everyday will get free massage coupon. At the beginning of the day, you can see another person s name in your assigned task and you need to find his/her contact to email him/her to find your assignment today. The learner need to reserve equipments online using SharePoint. Every day, one equipment will be picked as the lucky one, who reserves the lucky one will win a small gift. Whoever makes the most interesting entry, his/her blog entry will be published on the newsletter. ARG (Alternative Reality Game): Assigned task, see the people you need to find and the passphrase Go to contacts, to find that people s email address Email that person with the passphrase, and he will tell you the equipment you need to reserve. Use that equipment to do something (e.g. Use camera to take a photo of the company s parking garage and upload this photo to message board) All the members in the department finishes the game first will win an award. End of the training, the employee will have potluck and they will use Sharepoint to tell others what they are going to bring, so the learner need to avoid bringing the same kind of food. Page 6 of 6