Salt Lake City Granary District. Transit Oriented, Mixed Use Development



Similar documents
RDA Development Opportunities

Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010)

Schenk-Atwood Neighborhood Business District Master Plan

METROPOLITAN REDEVELOPMENT PLAN II OLD ALBUQUERQUE HIGH SCHOOL

The Metropolitan Planning Commission. DATE: May 19, 2015

Cuyahoga County s Clean Ohio Revitalization Fund Round 5 Application Great Lakes Shipyard Expansion Project Attachment A1 Application Summary Document

Appendix C Related Studies

PLANNING COMMISSION REPORT Regular Agenda - Public Hearing Item

Downtown South Salt Lake Redevelopment City of South Salt Lake

S U S TA I N A B L E C O M M U N I T I E S : EAST NEW YORK

Philadelphia County. Land Use and Growth Management Profile

City of Tampa Zoning Districts

Site No 17 Former Weston Vinyls Site, Frome Location

Near West Side Comprehensive Plan Executive Summary (Revised) April 2004 City of Milwaukee DCD

SECTION ONE CHAPTER 2: A LAND USE PROFILE OF MANCHESTER

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop

STAFF REPORT. December 20, North District Community Council. Director of Community Planning - North

Chapter 13: Implementation Plan

CITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT

THE INTEGRATION OF FUNCTION ANALYSIS AND VIRTUAL REALITY SIMULATION

Citizen Advisory Group Meeting #1 December 8, :00 p.m.

# U N I V E R S I T Y A V E N U E S P E C I F I C P L A N Page 1-1 # 1.0 INTRODUCTION. 1.1 University Avenue, Historical Context

South Waterfront Area Dave Unsworth

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE

TOWN OF CARY CONDITIONAL USE ZONING PERMIT. 412 Rutherglen Cary, NC Rutherglen Cary, NC

Corridor Goals and Objectives

Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota. Land Use Goals:

NORTH EAST PLANNING COMMISSION North East Town Hall Meeting Room 106 South Main Street, North East, Maryland Wednesday, March 7, :00 p.m.

COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY. Staff: Claudette Grant

Volume II Recommendations January 2006 City of Madison Comprehensive Plan

Request for Qualifications

SACRAMENTO COUNTY SUMMARY OF ZONING CLASSIFICATIONS

WEST MISSION AVENUE SPECIFIC PLAN (Council Approved 11/5/03 - Resolution R)

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

3.1 Historical Considerations

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates

Request for Information

Market Analysis for Padre Boulevard Initiative in the Town of South Padre Island, TX

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014

REDEVELOPMENT PLAN CITY OF LAWRENCEVILLE TAX ALLOCATION DISTRICT #2 COLLEGE CORRIDOR DRAFT DECEMBER, October 19, 2011

COMPREHENSIVE PLAN UPDATE CITY COUNCIL ADOPTION DECEMBER 8, 2015

COMMUNITY DEVELOPMENT TOOLS AND TRENDS BRIDGING THE FINANCING GAP APRIL 2, 2015

1. Land Use. Chapter 1: Land Use 1-1 Adopted 10/2/09 Amended 3/22/11, 8/16/11

Shannon Corner Service Centre, Burlington Road, New Malden, KT3 4NP

Executive Summary. Does a Streetcar Make Sense in Anaheim

Overview of the Travel Demand Forecasting Methodology

Prepared by: Samuel Dennis Date prepared: December 21, 2011

Opal Service District Plan

PREDEVELOPMENT PLAN REVIEW OF ART CENTER COLLEGE OF DESIGN MASTER PLAN

Disposal of Surplus Property. A Roadmap to Establishing Effective Surplus Property Procedures

ECONOMIC DEVELOPMENT. in this chapter. 8.1 Overview of Economic Conditions. 8.2 Priority Economic Development Needs

Transportation Alternatives

Historic Tax Incentive For

EPA CLEANUP GRANT APPLICATIONS December 1, 2015 Anne Wallace, Deputy Director, Office of Redevelopment Sharon McKee, S&ME Inc. Rick Bruce, S&ME, Inc.

BLUE ISLAND NORTHEAST MIXED-USE COMMERCIAL PARK 119TH STREET & VINCENNES AVENUE BLUE ISLAND, COOK COUNTY, ILLINOIS

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)

SECTION 47 ORDINANCE NO IH 635 OVERLAY DISTRICT

CITY OF WINTER GARDEN

TABLE OF CONTENTS. Executive Summary 1-3. Introduction 4-6. Illustrative Site Plan 7. East-West Streets 8. Cooper Street Market Street 11-14

Downtown Core Sub-district

FUTURE LAND USE ELEMENT

Iowa Smart Planning. Legislative Guide March 2011

Executive Director s Recommendation Commission Meeting: March 5, 2015

Examples of Transportation Plan Goals, Objectives and Performance Measures

Comprehensive Plan Policies that support Infill and Mixed Use

Jess Linn Principal Planner, Development Services Division Miami-Dade Regulatory and Economic Resources

Analysis of Brownfields Cleanup Alternatives. Axles & Gears Facility 4808 South 26 th Street Omaha, Nebraska. Prepared For:

TCRP Report 153: Guidelines for Providing Access to Public Transportation Stations. Part 2: Station Typology and Mode of Access Planning Tool

The Council of the City of New York. Economic Development Corporation

28.0 Development Permit Area #2 (Neighbourhood District)

MAPPING MINNEAPOLIS URBAN TREE CANOPY. Why is Tree Canopy Important? Project Background. Mapping Minneapolis Urban Tree Canopy.

Application No.: Steve Rush, representing Rocky Mountain Power Rocky Mountain Power Project Location: approximately 1600 N E.

Rezoning case no. RZ15-08: Adam Development Properties, LP

PUBLIC SCHOOL FACILITIES ELEMENT

Hidden Vine Apartment Development Proposal Investment Presentation - April 12, 2013

VANDERBILT COMPARISON

Transcription:

Salt Lake City Granary District Transit Oriented, Mixed Use Development

Introduction Matt Dahl, Project Manager Redevelopment Agency of Salt Lake City The mission of the Redevelopment Agency of Salt Lake City is to improve blighted areas of Salt Lake City, encourage economic development of Salt Lake City and encourage compliance with and implementation of the Salt Lake City master plan. The Agency will participate with Salt Lake City, Salt Lake County, the State of Utah and other public entities, as appropriate, in implementing its mission.

The Layout History Key Issues and Information Objectives

Granary District The Granary District is located on the southern end of the Salt Lake City s Gateway District. The Granary District is generally bound by 600 South, 300 West, the 900 South I-15 I Off Ramp and I-15. I The Gateway District is comprise of 99 acres.

History Late 1800 s: The arrival of the railroad changed the nature of the Gateway District from residential to a melting pot of land uses ranging from single family homes to heavy industry. 1960 s: The construction of I-15 I further isolated the Granary District through the creation of a no-man s s land occupied by railroad tracks, freeway ramps, overpasses and heavy industrial uses.

History 1960 s 1990 s: The impact of the railroad and I-15 I lead to the deterioration of much of the area, but allowed industrial and warehousing/distribution businesses to flourish as a result of the low land cost and proximity to downtown. 1998: The adoption of the Gateway District Master Plan laid out goals for the Granary District that emphasized land uses which complemented and supported Salt Lake City s Central Business District.

History 1999: The Redevelopment Agency of Salt Lake City created the Granary District Project Area to implement the Gateway Master Plan and eliminate blight.

Environmental Issues: History of industrial and railroad uses. Land near railroad tracks has a tendency to contain PAH s in shallow soils. Scrap metal yards and metal fabrication facilities tend to have heavy metals present in the top layer of soil covering the sites. The entire Gateway District has background levels of natural arsenic. It is estimated that 10% of the parcels have been identified as having or potentially having environmental concerns.

Street Issues: Streets are generally in pour condition. Due to I-15 I and its off ramps 400 West, 500 West and 700 South dead end within the project area. 400 West is pivotal to the development of the area, but it is in the worst condition.

Rail Spurs and Irregular Parcels 400 West rail spur is no longer in use, but the right-of of-way may be used by UTA in the future. The 400 West rail spur has two branches that begin on 900 South. The path of the branches creates irregular parcels that may not be developable on their own.

TRAX Issues The close proximity of the 900 South TRAX station creates opportunities for transit oriented development within the Granary District. The draft Downtown Transportation Master Plan for Salt Lake City calls for TRAX to expand its rail line along 400 West and 700 South. This eventuality needs to be considered as the blocks adjacent to the new TRAX line is developed.

Fleet Block Issues The Fleet Block will be available for development in the next three years. The site provides 10 acres for development. The Fleet Block will require rezoning prior to development. Environmental remediation will be required prior to developing the Fleet Block. Development along 300 West will impact the reuse of the Fleet Block. The development of the Fleet Block needs to maximize the utility of the 900 South TRAX Station. The condition of 400 West may hinder development.

Land Use Issues: Melting Pot of Uses 400 West is a natural boundary for the current zoning.

Housing Issues Granary District Housing: Less than 20 single family homes. Housing East of 300 West: Primarily single family homes. 900 South TRAX Station Impact: Following the construction of the 900 South TRAX station there have been increase in the number of higher density multifamily developments and the number of single family homes that are owner occupied.

Ownership Privately owned. Large single owner assemblages. Smaller parcels are typically single family homes and irregular parcels created by the rail spurs.

Plans Gateway Specific Plan: The Gateway Specific Plan was adopted in 1998. The plan lists numerous objectives for the Gateway District. In general, the plan seeks to provide for the development of a diverse mixture of uses that complement downtown, encourage a variety of housing opportunities, and facilitate the enhancement and revitalization of the Gateway district.

Plans: Downtown in Motion Downtown Transportation Master Plan (Draft): The Downtown Transportation Master Plan is intended to develop and coordinate a transportation strategy that will guide Salt Lake City over the next 25 years or more. The plan is broken down into goals for each mode of transportation: Pedestrian/Bicycle, Bus, Rail and Automobile.

Development Trends Granary District: No recent construction and only limited renovation of existing buildings. To the North: Significant growth in downtown Salt Lake City. To the East: Higher density multifamily developments. To the South: Big box retail development.

Zoning: A rezone for the Granary District and adjacent neighborhoods is being contemplated. The Granary District is currently comprised of three zones: General Commercial (CG), Downtown Support District (D-2), and Public Lands.

Objectives Determine what zoning requirements should be implemented to provide for the development of a diverse mixture of uses that complement downtown, encourage a variety of housing opportunities, and facilitate the enhancement and revitalization of the Granary District. Determine the most effective reuse of the Fleet Block upon its vacation by Salt Lake City. Determine how to create strong neighborhoods with diversity in housing type, tenure, and cost. Determine how to reconstruct 400 West for multiple forms of transportation, yet maintain the railway corridor for future light rail use. Determine what parcels and types of development should be used to t maximize the utility of the 900 South TRAX Station.