Plumbing Method Statement



Similar documents
Electrical Method Statement. Guidance Note 8

CPC40912 Certificate IV in Plumbing and Services

Greenhouse Assembly Instructions

Policy for the Management of Asbestos in Buildings

Generic Risk Assessment: Working on Roofs (FMRA 0006)

Managing the risk of falls while working on roofs in housing construction

CONFINED SPACE PROCEDURE

WORK IN CONFINED SPACES

High Pressure Water Jetting

WHS Contractor Management Procedure

RESTRICTED ACCESS AND CONFINED SPACES

Level 2 NVQ in Warehousing and Storage (1009)

RISKSTOP CONTROLLING RISKS IN UNOCCUPIED COMMERCIAL PROPERTIES

WHS CONTRACTOR MANAGEMENT PROCEDURE

Code of Practice EST 01 Decommissioning arrangements prior to site hand over Oct 2004

Golden Safety Rules booklet. No one gets hurt, no incidents

CPCPMS3017A Install and test split system air conditioning

GHD EPCM Standard operating procedure Working at height May 2013 v1

CONTRACTOR INDUCTION HANDBOOK

FLEET ROAD RISK POLICY

Root & Contributing Causes. Site Answers & Comments: Preventative / Recommended / Accepted Steps of Risk Mitigation, Points of Interest:

Inspect and Test FPAS Units of Competencies descriptions

WHS CONTRACTOR MANAGEMENT PROCEDURE

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A TREATED WATER STORAGE POINT ON THE WATER NETWORK

Confined Spaces Safe Working Practices

it has to be Hindmarsh for Service Excellence

SAFE WORK PROCEDURE SWP 015 WORKING AT HEIGHT SEPTEMBER 2013 DOC. NO. D13/248399

MAINTENANCE MANAGEMENT

Safe Work in Confined Spaces

The Management of Asbestos containing Materials

Flat Bottom Long Ram Hydraulic Jack

AN EFFECTIVE DRIVING AT WORK POLICY AT NORTHSTONE (NI) LIMITED. By: David Luke

Level 3 NVQ Certificate in Installing and Commissioning Air Conditioning and Heat Pump Systems ( )

HR13: Workforce Development Policy

WORKING IN CONFINED SPACES GUIDELINES

Title: Confined Space Procedure

Event Management Guidelines. Month Event Management Guidelines (Month, 2011)

WHS CONTRACTOR MANAGEMENT PROCEDURE

OHSMS Implementation Guide

QUALIFICATION HANDBOOK

WHS Contractor Management Procedure

PUASES013A Undertake storm and water damage operations performed at heights

Additional Services Agreement. Part 3: Schedule of our requirements

Arrangements for the Maintenance and Testing of Laboratory Autoclaves

Training Management Guidelines

RMM 306 Lockout/Tagout (LOTO) Program for the Control of Hazardous Energy Page 2 June 2016

Bradlee Boilers Ltd. Instruction Manual for starting up Bradlee Hire Boiler from Cold

Contract Relationship Management DRAFT

Project Management Fact Sheet:

WHS DOCUMENT MANAGEMENT PROCEDURE

Asbestos Awareness Training Requirements

Application & Customer Site Management Plan to Use Recycled Water from a Standpipe

Assessment Guidance for Mentors Expert Witness Advisors (EWA) Assessors and Internal Verifiers

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue

Asset Register. 1.2 Definitions

Australian/New Zealand Standard

EA IAF/ILAC Guidance. on the Application of ISO/IEC 17020:1998

Physical Education Performance General assessment information

MEM30805 Certificate III in Locksmithing

B37: Managing Occupational Road Risk: Guidance. This document should be read in conjunction with Section B37: Managing Occupational Road Risk: Policy.

Level 3 Customer support provision for the IT professional ( / )

National Occupational Standards for Health & Safety Stand Alone Units. Unit HSS8: Review health & safety procedures in workplaces

Course Title: Safety Issues in Electronics Engineering Technology Number of Credits: 3 B.A. B.S. B.A.S A.A. A.S. Degree Type

CONTRACTOR S MANAGEMENT PROCEDURE

Document ref: MG(M)201 Version no: 01 Page no: 1 / 12. Contractor rules

Title: Confined Space Procedure

aaca NCSA 01 The National Competency Standards in Architecture aaca Architects Accreditation Council of Australia PO Box 236 Civic Square ACT 2608

Sakhalin Energy Investment Company LTD. Corporate Procedure For Lifting Operations Over Live Process Areas

MEM18084A Commission and decommission split air conditioning systems

Department of Education and Training Western Australia. RPL Assessment Tool Kit. SRF30206 Certificate III in Fitness

Complete Plumbing. Drainage Solutions Ltd. All aspects of Plumbing & Drainage work undertaken A PARTNER YOU CAN DEPEND ON.

POLICY Contents. 1.0 Introduction Statement

Reactive Maintenance Service Levels

WORKING AT HEIGHT GUIDELINES. Version II

Level 2 Certificate in Warehousing and Storage Skills (QCF)

Level 1 Award in Health and Safety in a Construction Environment

FIRE RISK ASSESSMENT SW13 0HA

Fall Protection. Office of Risk Management. uottawa.ca. Guide

Checklist for a Physical Containment Level 2 (PC2) Laboratory Facility

Guide to the Preparation of a Traffic Management Plan

Unit 4. Residential Inventory Management and Practice

PSPCRT409B Administer court fines and debt management

NZQA registered unit standard version 4 Page 1 of 6

Example Specialist Other contact

OHS Training Guidelines

Memorandum of Understanding between the NSW Ministry of Health and Sydney Water Corporation

Revision Description By Approved Date Apr 06 Change to Rilta Env. Ltd. CH 26/04/06 Jan 08 Review CH EI 18/01/08

Lifting Equipment - Work equipment for lifting or lowering loads and includes its attachments used for anchoring, fixing or supporting it.

Release: 2. UEENEEJ194A Solve problems in low voltage refrigeration circuits

EUSNCO309 (SQA Unit Code - FA9F 04) Monitor the installation process for Network Construction Operations

EUROPEAN INDUSTRIAL GASES ASSOCIATION

(NOTE: ALL BS7799 REFERENCES IN THIS DOCUMENT ARE FROM BS7799-2:1999 and SHOULD BE AMENDED TO REFLECT BS7799-2:2002)

Corporate Standard. Contractor Management

Key Steps to Implementing a Performance Management Process

BUILDING A WORLD OF DIFFERENCE. Safe work in confined spaces

ASBESTOS MATERIALS IN SCHOOLS

Transcription:

Plumbing Method Statement Guidance Note 23 Jan 14 1

Plumbing Method Statement A Basic Guide to preparation Introduction This Guidance Note gives practical information about creating a method statement. A completed sample template has been included in Appendix 1 and a blank template in Appendix 2. If you wish to use the template in Appendix 2 to construct your own documents, you must ensure that all references to Santia Accreditation have been removed and the final documents are clearly incorporated into your existing safety management system. A method statement is an ideal way of recording the hazards involved in a specific work activity and communicating the risk and precautions required to all those involved in the work, including those undertaking the work and their immediate managers. A method statement should be developed in conjunction with a risk assessment and together these demonstrate a safe system of work. The method statement needs be clear, no longer than necessary, and not over complicated. The document should avoid ambiguities or generalisations, which could lead to confusion, and layout a step-by-step sequence of work to describe how the activity is to be carried out safely. Format The actual format is dependent on the work being undertaken and the organisational arrangements in place but generally the following headings should be present: Organisation/company in control of the operation Named individual responsible for the activity and its safety Name of method statement originator and authorisation date Arrangements for changing/deviating from method statement General description of activity Location of activity including access and restrictions General working environment considerations, e.g. temperature and wind speed Protection of others, e.g. members of the public Emergency procedures, including location of emergency equipment Identity of operatives (and any specific training or certification required) Requirements for Personal Protective Equipment Plant and equipment used, including safety precautions and restrictions Materials information e.g. hazard information and storage/transport requirements Work sequence, including associated risks and required control measures for each stage Safety checks/clearances at specific stages Final clearance that activity is completed to specification Any other additional information that may be relevant. 2

The list above is not exhaustive and a method statement may or may not include each and every item. However, as a minimum it must achieve the following objectives: It should be up to date, identifiable and its source accountable. It should contain the sequence of works. It should identify the associated risks and control measures. It should state actions/authorisation required to deviate from method statement. Appendix 1 is a sample method statement. It can be as simple or as detailed as the job/risk requires, so long as it meets the four main objectives. 3

Appendix 1 Plumbing Method Statement Contract Manager: Joe Bloggs Site Supervisor: David Jones Originator: Joe Bloggs Position: Contracts Manager Date: 01/11/2013 Strict adherence to this method statement is critical to the health and safety of all engaged in the work. Any deviation must first be authorised by the Site Supervisor. Planned Task/Activity Description: Replace Ball Valve to Water Tank. Location and Access: (attached plan as appropriate) Located on flat roof through access door into plant room. Working Environment & Restrictions: Flat roof accessed through locked door. Mandatory use of Mansafe system required. Protection of others: Men at work sign attached to roof access door, additional signage displayed at work area. Emergency Procedures: Normal site emergency procedures will apply. Operatives/Competence: 1x City and Guilds trained Plumber with safe use of harness training. Personal Protective Equipment: Overalls, Safety Harness, Gloves, Goggles, Safety Footwear Plant & Equipment: Isolation lock and general hand tools Materials Handling/Storage & Safety Information: All material in manageable individual lengths 4

Critical Stages: (must be undertaken in correct sequence) 1. Attend Induction, sign for permit and obtain access door key 2. If no information is available on the site water treatment regime/water quality checks, contact office for further clearance to work 3. Access to roof through locked door 4. Once on roof attach harness to fixed safety restraint system 5. Follow set walkway to plant room 6. Isolate supply to Water Tank using Isolation Lock 7. Drain tank 8. Remove defective Ball Valve and replace 9. Remove Isolation 10. Re-Fill Water Tank and test new Ball Valve 11. Return to access door via set walkway 12. Return key and sign off permit. Final Clearance: (Work/Activity completed to satisfaction). Name Position: Date: 5

Appendix 2 Blank Method Statement Template Contract Manager: Site Supervisor: Originator: Position: Date: Strict adherence to this method statement is critical to the health and safety of all engaged in the work. Any deviation must first be authorised by the Site Supervisor. Planned Task/Activity Description: Location and Access: (attached plan as appropriate) Working Environment & Restrictions: Protection of others: Emergency Procedures: Operatives/Competence: Personal Protective Equipment: Plant & Equipment: Materials Handling/Storage & Safety Information: Critical Stages: (must be undertaken in correct sequence) Final Clearance: (Work/Activity completed to satisfaction). Name Position: Date: 6

Copyright Santia 2014 This publication may be freely reproduced, except for advertising, endorsement or commercial purposes. 7