Steps toward a Danish Power System with 50% Wind Energy. EcoGrid.dk Phase I. WP 1: The EcoGrid Program and Communication Activities



Similar documents
Bornholm Test Island. Jacob Østergaard Professor, Head of Center Center for Electric Power and Energy, DTU Electrical Engineering

Main ideas, methods, WPs and planned workshops. Henrik Madsen,

Development and Operation of a Wind Power Based Energy System : Experiences and Research Efforts

CONFERENCE DISTRICT HEATING AND COOLING. a main key to CO 2 reduction

D01.1 Project Management Plan

How To Run A Power Station In Danesborg

Introduction to Demand Response

DTU INTERNATIONAL ENERGY CONFERENCE. WHEN? September 2013

O Start up Input for Transnational Coordination Effectiveness Evaluation

PART 7: OVERVIEW ON PROJECT IMPLEMENTATION PRINCIPLES

Vedvarende energi, Smart Grids og Japan

Norwegian Centre for Offshore Wind Energy (NORCOWE)

SmartGrid aktiviteterne på Bornholm

ETIP Wind Steering Committee meeting Monday 7th March :00 16:45 EWEA office, Rue d Arlon 80 6th floor Bruxelles AGENDA

Bright Green Island creates growth and development on Bornholm.

Guidelines for applicants for the 1 st Transnational Call for Proposals (pre-proposal phase)

To conclude with recommendations for a second project phase, where one or more demonstration storage systems will be tested experimentally.

The development and need within education, research and innovation in the Danish Maritime Industry

ISBN: Catalogue number: IG ENC ISSN number.: Printed version: ISSN Digital version: ISSN

1. Project title PhotoSkive. Skive kommune. 5. Reporting period to Signature of authorised signatory

Strategy for energy research, technology development and demonstration in Denmark. Advisory Committee on Energy Research (ACER)

Intelligent Systems. Course Lecture 1: Introduction

URBACT III Programme Manual

PowerLabDK and ongoing research

Results scenario comparison WP 5.2

VISION FOR SMART ENERGY IN DENMARK Research, Development and Demonstration

Qualification of innovative floating substructures for 10MW wind turbines and water depths greater than 50m

THE BORNHOLM POWER SYSTEM An overview

Geothermal ERA NET. 7 th Geothermal ERA NET meeting Trieste, Italy September Guðni A Jóhannesson Director General, Orkustofnun, Iceland

FP7 Energy Information Day Work Programme 2011

International Collaboration on Research Data Infrastructure

The EU Strategic Energy Technology Plan

EcoGrid EU NEWSLETTER No 1

Skyrocketing Electricity Cost in Denmark

TRAINING APPROACH INFO:

D Overall Approach To Security Management And Emergency Preparedness

Week Calls :

Call for Proposals. Living Knowledge Conference, Copenhagen, 9-11 April 2014

Low-Temperature District Heating System. for Low-Energy Buildings

Research and Education in the Field of Wind Energy at the Technical University of Denmark

Terms of reference Call for the selection of an Expert on Indian STI

1. Title: Support for International Development Research

Project no Collaborative Project FP7-SEC Deliverable D7.4

HabEat - FP HabEat

ESCoRTS A European network for the Security of Control & Real Time Systems

UCD School of Electrical, Electronic & Communications Engineering Electricity Research Centre

Guidance notes and templates for Project Technical Review involving Independent Expert(s)

Scientific Data Infrastructure: activities in the Capacities Programme of FP7

en RESEAR erg CH DEVELOPM y ENT DEM 07 ONSTRATION

The smart grid research network Road map for Smart Grid research, development and demonstration up to 2020

Minutes from the Danish SDC board meeting, 26 June 2015, in Beijing, China

Production of Electricity with RES & CHP for Homeowners

Offshore Conference - Esbjerg. Presentation. Oil Gas Denmark. 18 June page 1

Pegaso templates. Negotiation process. Gloria Salgado WP1 Management

Vision of Jämtland and Trøndelag A living laboratory as a fossil free region

Nordiske Kompositdage Aalborg University August 2008

Press Release - April

H2020-EUJ-2016: EU-Japan Joint Call. EUJ : IoT/Cloud/Big Data platforms in social application contexts

Introduction to the 2015 Horizon 2020 Energy Call for Proposals. 14 July 2014

Call topics (funding action), expected EU funding per project

Danmark satser på konvertering og lagring

How To Kick Start The Market For Energy Services By Energy Efficiency Obligations In Danish Kroner

THE FUNDRAISING AND PROJECT MANAGEMENT OFFICE

The Danish Intelligent Energy Alliance

EUROPEAN COMMISSION. CASSANDRA Common assessment and analysis of risk in global supply chains

Smart Energy Systems Energy Efficient Buildings and the Design of future Sustainable Energy Systems

The DTU PhD programme: Results from a survey among PhD graduates and recruiters. Technical University of Denmark. Report.

Danish Energy Model RE Policy Tools MAIN Asian Dialog, Bali January Mr. Henrik Breum Special Advisor

European Regional Process for the fifth World Water Forum

DEVELOPMENT AND STATUS OF THE USE OF AGRICULTURAL RESIDUES FOR ENERGY IN DENMARK HISTORY AND POLICY DRIVERS

Energy Scenario Analyses with the Balmorel model

Content. Research highlights and demonstrations

2,1 MW Solar Park Danfoss Nordborg. 1 Real Estate

IPROVE Innovation Partnership for a Roadmapon VaccinesinEurope

GEOTHERMAL ENERGY WORKSHOP

Syddansk Universitet. Publication date: Document Version Publisher final version (usually the publisher pdf) Link to publication

Nordic Master Programmes Benefits, Challenges and Good Practice for the Development of Joint Programmes

Norwegian gas to Denmark - market development and SoS

West of Waterlooville, Hampshire Ensuring a consistent approach to design quality

Wind Turbine Technology Power Smart District Energy Biofuel Production Technology

Egyptian Renewable Energy Cluster Initiative (ERECI) (Current Status Overview)

European Technology Platform Food for Life

Through creodk, I have been in contact with top researchers who have made me aware of scientific issues which should be prioritised in Horizon 2020

DK-update Emc2. Malaga 17th of October 2006

VILLUM FOUNDATION. Supporting science and technology research. CEO Kjeld Juel Petersen

Deliverable Title Development of Capacity Building Program

EFFECTS+ Clustering of Trust and Security Research Projects, Identifying Results, Impact and Future Research Roadmap Topics

WORK PROGRAMME Topic ICT 9: Tools and Methods for Software Development

Public Transportation - Accessibility for All

COMMISSION STAFF WORKING DOCUMENT. Report on the Implementation of the Communication 'Unleashing the Potential of Cloud Computing in Europe'

Fact Sheet on China s energy sector and Danish solutions

An Expert Group Meeting (EGM) On Promoting Renewable Energy for Industrial Applications

The Danish Model how energy efficiency works. Rasmus Tengvad, Economist,

Options for creating working groups, task forces and editorial boards to facilitate the implementation of the work plan. Note by the secretariat

Project Management Framework for the Guidelines for the Compilation of Water Accounts and Statistics

Policies for a transition to 100% renewable energy systems in Denmark before 2050

NOWITECH: Innovations in offshore wind technology

Cover photo credits: Torben Nielsen

Future Offshore Wind Power Sites -2025

EUROPEAN COMMISSION Employment, Social Affairs and Equal Opportunities DG COMMUNITY PROGRAMME FOR EMPLOYMENT AND SOCIAL SOLIDARITY (PROGRESS)

Transcription:

Steps toward a Danish Power System with 50% Wind Energy EcoGrid.dk Phase I WP 1: The EcoGrid Program and Communication Activities PSO ForskEL R&D-contract for project no. 2007-1-7816 Funded by Energinet.dk

EcoGrid.dk Phase 1 Summary Report Page 2 of 7 This project is funded by Energinet.dk via the PSO ForskEL program. PSO ForskEL R&D-contract no. 2007-1-7816 Project responsible: Teknologisk Institut Kongsvang Allé 29 8000 Århus C. (CVR.nr. 56976116) Contributors: Jeanette Møller Jørgensen, R&D Coordinator, Energinet.dk (Work Package leader)

EcoGrid.dk Phase 1 Summary Report Page 3 of 7 The EcoGrid research program and organisation Background and objective In 2005 and 2006 several research project applications regarding control of power systems with large share of renewable energy sources have been submitted to the PSO research programme, ForskEL. Energinet.dk decided to pull out these applications from the PSO programme to form the basis of EcoGrid.dk. The EcoGrid.dk program has the objective to develop new long term technologies and market solutions for power grid and systems, with reference to the Danish power system. The program is divided into phases, from phase 0 to phase 3. The focus of the phases is: Phase 0: Preparation of project description to the ForskEL program, including terms of reference (December 2006 April 2007) Phase I: General description and analyses of demand and development of the Danish power system with increased volumes of renewable energy (Maj 2007 March 2009) Phase II: Specific projects, analyses and recommendations to Energinet.dk with main focus on research activities Phase III: Technologies are implemented in real environment and demonstrated with subsequent adoption and implementation in Energinet.dk. Figure 1 The Phase I EcoGrid report Steps Toward a Future with 50 % Wind Energy was finalized in March 2009. The research activities in phase I has been made independently of Energinet.dk s own research

EcoGrid.dk Phase 1 Summary Report Page 4 of 7 activities. The next phase of EcoGrid (Phase II) is expected to begin 2009/2010. Phase II and III is intended to be financed primarily under Energinet.dk s own ForskIN programme, which involve participation from Energinet.dk. Phase 3 is expected to run into 2012. Planned phase III activities regarding technologies and methodology are implemented and demonstrated with subsequent adoption and implementation in Energinet.dk. The time schedule and final project wording of phases 2 and 3 can be adjusted during the project course to ensure the optimum result of EcoGrid.dk. Furthermore, the phases must be flexible and designed for application in accordance with the EU FP7 Energy theme. Examples of adjustments. Organisation of the EcoGrid programme, Phase I Figure 2 gives an overview of the organisation of the first phase of the Ecogrid. The Phase I of the EcoGrid program is made up of Energinet.dk as chairman of the group and one representative from each participating enterprise/organisation. According to requirement the steering group can continuously adjust time schedule and objectives to ensure optimum outcome of Ecogrid.dk and only the steering group can accept new participants in EcoGrid.dk. A reference group was established as a consultative body with no powers in relation to the project. The reference group is besides Energinet.dk made up of selected players from the energy sector: To ensure the overall progress and coordination of the project work, a project coordinator was appointed to decide the need for meeting activities and ensure that deadlines are met. Energinet.dk has appointed Danish Technological Institute to project manager (Kjeld Nørregaard). To secure the consortium idea, an editorial group was set up consisting of Project Manager and key contributors (work packages leaders and editors). The purpose is to guarantee that vision, objectives and results for the respective work packages are described as one joint output instead of individual results from the various project parties. Members are approved by Energinet.dk and from phase II Energinet.dk will be included in the editorial group. Secretariat This function is handled solely by Energinet.dk and is primarily located at section for environment and PSO R&D. According to requirement Corporate Communications will also be involved. The function involves: - Coordination of notice of meetings including meetings in the reference group - Assisting the working committee, working group, steering group and editorial group - Coordinating publishing of results etc. from the different WP and participants - Updating www.ecogrid.dk The secretariat is not a secretariat for the individual participants. Work Packages (WP) The various work packages that in total constitute EcoGrid.dk: WP 1: The EcoGrid program and communication activities (Work Package leader: Jeanette Møller Jørgensen, R&D Coordinator, Energinet.dk) WP 2: System Architecture (Work Package leader: Morten Lind, Professor, Centre for Electric Technology at DTU) WP 3: International scenarios (Work Package leader: Berit Tennbakk, Director Econ Pöyry AS) WP 4: Survey of new measures (Work Package leader: Poul Ejnar Sørensen, Senior Scientist, Risø at DTU)

EcoGrid.dk Phase 1 Summary Report Page 5 of 7 WP 5: Activities for EcoGrid phase II (Work Package leader: Jacob Østergaard, Professor, Centre for Electric Technology at DTU) Figure 2: Organisation of EcoGrid Phase I Energinet.dk Steering Reference Project Editorial Secretariat WP 1 WP 2 WP 3 WP 4 WP 5 Table 1. Members of the Steering Group and Reference Group Steering Group Reference Group - Aalborg University, Institute of Energy Technology - Danfoss - Danish Technological Institute - Dong Energy - DTU, CET and IMM - EA Energy Analyses - EC Power - ECON - Energinet.dk - KK Electronic - Paul-Frederik Bach, extern evaluator for Energinet.dk - PowerLynx - Risø National Laboratory, System Analysis and Wind Energy - Vattenfall Thermal Power - Vestas - Danish District Heating Association - Danish Energy Association - Danish Energy Authority - Danish Wind Industry Association - DONG Energy - FDKV (Foreningen danske Kraftvarmeværker) - RE-Net (VE-Net: Det højteknologiske netværk for vedvarende energi) - The Association of Danish Energy Companies - Vattenfall Financing

EcoGrid.dk Phase 1 Summary Report Page 6 of 7 Phase 1 was supported by the ForskEL programme, app. DKK 3.5 4 million. Self-financing from the participating parties in form of hours spent and other contributions was app. DKK 1.5 2 million. In Phase 2 and 3 The ForskIN programme more than DKK 10 million. Self-financing from the participating parties in form of hours spent and other contributions app. DKK 5-6 million. Expected EU application under the EU FP7 Energy theme with Energinet.dk or the university as main applicant, at least DKK 25-40 million. Total amount for EcoGrid.dk will be more than DKK 50 million. Internal work shops and meetings within the EcoGrid phase I team During the project period work shops has been held both within the work package groups and mutual meetings including work package leaders and the project coordinator. The discussions and dialogues constitutes an important part of the results in the EcoGrid phase 1 report. Example of internal work shops/activities : Each of the work packages has held a number of internal workshops to coordinate their contributions. E.g. WP 3 group has held five internal workshops during 2007/2008 in which the international scenarios have been developed. A representative from Energinet.dk has assisted the group with the understanding and discussion of the scenario drivers. The resulting international scenarios presented in the phase I report are result of the common work in the work group. In puts from stakeholders have also been collected During November 2008 to March 2009 seven one days work shops and several phone conferences was held between the project coordinator, work package leaders and other main contributors. The purpose of these activities was to ensure that vision, objectives and results for the respective work packages was coordinated and cross referenced as one joint output. Common conclusions and recommendations has been evaluated and agreed. From January April an external editor attends on the editorial meetings to assist with writing of the the final phase I summary report, which includes seven interviews of work package leaders and main contributors. EcoGrid.dk has been presented publicly as an ongoing project by Energinet.dk and project participants at relevant opportunities throughout the project period.

EcoGrid.dk Phase 1 Summary Report Page 7 of 7 Energinet.dk s international and external communication activities The following major EcoGrid phase 1 work shops and activities with external representation: May 15, 2007: Kick off Work Shop (Phas I project start) November 15 2007, Mid-way status May 15, 2008, Result from Phase I with focus on WP 2, WP 3 and WP 4 External evaluation of first draft report ( from xx xx 2008?) November 21, Works shop discussion of external and Energinet.dk evaluation results May, 13 Final Ecogrid.dk phase 1 report presentation EcoGrid.dk Conference? Publication and dissemination of results: August 2008, EcoGrid Phase 1, Draft report for evaluation. Work shop presentation published on web-site www.ecogrid.dk Final summary report with interviews Summary report (power point presentation)