ERTMS - National implementation plan



Similar documents
How To Travel From Port Harvold To Kronerheim

Concept for Railway and Transportation in Southern Norway. High Speed Line Oslo Hadeland Gjøvik Moelv. with High Speed Line Oslo Trondheim / Ålesund

The Norwegian High Speed Rail Assessment Project

PSC. Subsea. l Hydraulic Distribution Systems. Photo: Norsk Hydro/Statoil. l Terminations. l Hoses and fittings

Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page:

GSM-R Transmission Planning Guidelines

Wastewater pipes in Oslo: from condition monitoring to rehabilitation planning

(25) CONCEPT STUDY OSLO HUB A MEGA PROJECT Nina Tveiten Norwegian National Rail Administration

Agenda. 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits

WO Sandnes - Stavanger Request for quotation (RFQ) Norwegian Frame Contract Signaling System

Norway High Speed Rail Assessment Study: Phase III. Estimation and Assessment of Investment Costs Final Report. 25 January 2012

EIENDOMSVERDI. The housing market update July. Copyright Eiendomsverdi

NORWAY High Speed Railway Phase III Initial Option Testing. Atkins: Warwick Lowe

Søkerliste for lokalradiokonsesjon

Wages and Working Conditions in Norway

EIENDOMSVERDI. The housing market update October. Copyright Eiendomsverdi

Coexistence between GSM-R and 3G / 4G-Systems in the 900 MHz Frequency Band - Swedish View.

Network Statement 2016

3 RBC INTERFACE TO INTERLOCKINGS IN FINLAND

EIENDOMSVERDI. The housing market update August. Copyright Eiendomsverdi

How To Know How Many Major Transport Accidents In Norway

Signaling Programme. Signaling Programme - Laboratory Test Gitte Oberbossel

National road user charging standards in Norway

ERTMS for a competitive railway

Banedanmark. TØF Jernbane i vækst. Signalprogrammet. Morten Søndergaard, Programme Director

Dominic Taylor CEng MIET MIMechE MIRSE MCMI, Invensys Rail

EIENDOMSVERDI. The housing market update April. Copyright Eiendomsverdi

COMMISSION IMPLEMENTING DECISION. of XXX

Tendering of passenger rail traffic in Norway

ERTMS deployment challenges in a deregulated market. Björn Westerberg April 25, 2012

The TESS AS organisation International Knut Jølberg

Keolis Group Safety organisation an example Fjord1 Partner in Bergen

Annual Report The Norwegian Bone Marrow Donor Registry

Market Efficient Public Transport? An analysis of developments in Oslo, Bergen, Trondheim, Kristiansand, and Tromsø

White Paper European Railway Traffic Management System - ERTMS

The Transport Infrastructure Context of Northern Sweden

Port of Narvik. The Gateway to the Arctic PORT LOGISTICS: RAIL-ROAD-SEA-AIR. No draft restrictions. Sheltered waters. Ice-free all year round

April ABB in Norway. Power and productivity for a better world ABB. Slide 1

New in Norway. Practical information from public agencies. new edition 2015

Norway High Speed Rail Assessment Study: Phase III

Energy efficiency in drivers training

ATLAS. Proven Technology & Partnership For interoperability

Directive 2001/16 - Interoperability of the trans- European conventional rail system

Financing Public Transport

Biogas and waste management in Norway. IEA Bioenergy workshop UMB Henrik Lystad Assistant director Avfall Norge

CTCS Chinese Train Control System

Business cycles, monetary policy and property markets Governor Svein Gjedrem Næringseiendom April 2005

Approval of Software & Specification of Software Presentation at Banekonferencen

Høyanger Upper Secondary School

HS line TSI Conformity Certification and Safety Assessment

Hordaland på Børs Bergen august 2015

On track GLIMPSES OF JERNBANEVERKET'S ACTIVITIES IN 2015

Nettpartner Group. Company Presentation

Entreprenørdagen 14. mars 2011

VÝZKUMNÝ ÚSTAV ŽELEZNIČNÍ, a.s.

AGREEMENT REGARDING THE EXECUTIVE BOARD OF RAIL FREIGHT CORRIDOR RHINE-ALPINE

NORGES LUFTFARTØYREGISTER NORWEGIAN CIVIL AIRCRAFT REGISTER

English. Trapeze Rail System.

Fit for the European Rail Market Training Competence - Certification

List of translators and interpreters in NORWAY

The results of this consultation will feed into the Commission impact assessment which will accompany the proposal on an EU coordinated approach.

First step in future global sourcing. Extended partnership with Telenor: Strategic wins Application Services:

Felix Mediaa Lenning - Born as Felix Rudolf Müller

Transcription:

ERTMS Page: 2 av 9 ERTMS - National implementation plan 00E First release 09.07.2013 KLY SKEI KJENSV Revision Reason for issue Date Created by Contr. by Appr. by Title: ERTMS - National implementation plan Pages: 9 Produced by: Prod.doc.no.: Replaces: Replaced by: Jernbaneverket Project: ERTMS Document-/drawing number: Revision: Area: National ERP-00-A-00001 00E Operator s document number: Operator s rev.: NA NA

ERTMS Page: 3 av 9 Contents 1 Introduction... 4 2 Background... 4 3 Purpose... 4 4 Scope... 4 5 Financing... 5 6 Assumptions... 5 7 Migration strategy... 5 7.1 Rolling stock... 5 7.2 Infrastructure... 6 8 GSM-R network... 7 9 ERTMS plan... 8

ERTMS Page: 4 av 9 1 Introduction The Norwegian National Rail Administration (Jernbaneverket) intends to implement the European Rail Traffic Management System (ERTMS) on the Norwegian railway network. This document describes the planned ERTMS implementation. The sequence for roll-out is aligned with both the need for renewals of signalling systems and the need for new systems when new railway infrastructure is built. The planned implementation of ERTMS also includes fitting/retrofitting of trains with ERTMS. The whole Norwegian railway network will be in service with ERTMS by 2030. The speed of the rollout is aligned with the financing given in the National Transportation Plan 2014-2023 (NTP). GSM-R has been in service on the complete network from 2007. 2 Background The driving force for implementing ERTMS in Norway is the need for renewal of signalling systems more than the need for interoperability. When renewing old - or building new - signalling systems the European standard system ERTMS was chosen based on TSI requirements and cost/benefit analysis. 3 Purpose Norway has signed an agreement with the European Union named EEC (European Economic Community), which regulates the cooperation between Norway and EU. Through this agreement directives from the European Commission are implemented into Norwegian law. TSIs (Technical Specification for Interoperability) are part of EU directives. Implementation of ERTMS is in accordance with the technical specification for interoperability controlcommand and signalling (TSI CCS, Commission Decision 2012/88/EU changed by decision 2012/696/EU), implemented in Norwegian law with Forskrift om TSI-styring, kontroll og signal, jernbane. Jernbaneinfrastrukturforskriften states that new or rebuild signalling systems on the Norwegian railway network shall have interface to Class A systems (ERTMS). The implementation plan specifies both order and time period for the roll-out of ERTMS on the network. This document is an extract from Jernbaneverket s national signal plan the document Nasjonal signalplan (document number IUP-00-A-04278), which provides further details on the basis for the implementation plan. The implementation plan has been synchronized with the current Swedish ERTMS plan in order to facilitate interoperability. 4 Scope The target is to implement ERTMS on the complete national railway network. The plan presumes that ERTMS level 2 will be used, and that the existing GSM-R network will be used for communication between train and infrastructure.

ERTMS Page: 5 av 9 When ERTMS is implemented in Norway, the existing rolling stock will have to be modified. A total of approximately 600 vehicles of 83 types will have to be equipped. 5 Financing The total cost of the Norwegian ERTMS implementation is estimated to be between 1,7 and 2,2 billion Euros. In the period 2014-2023, a total of 6 billion NOK (750 million Euros) has been allocated in the National Transportation Plan to the ERTM implementation. The Norwegian implementation plan is not based on any EU subsidies. The existing rolling stock will have to be modified. The modification cost represents a burden for the railway companies. It is not yet decided how the financing of the modification work of the rolling stock will be done. 6 Assumptions The plan is built on the following assumptions: It is assumed that the ERTMS suppliers are able to meet Jernbaneverkets stated implementation scope, progress and cost targets given that contracts are signed in due time to deliver. The financing and contract/procurement strategy for on-board equipment are assumed not to influence the implementation order. Currently planned new infrastructure projects are carried out according to existing plans. 7 Migration strategy There are two possible strategies for implementing ERTMS. Either trains or infrastructure can be double equipped with both ERTMS and the national Class B system at the same time. The two strategies are named the rolling stock strategy and the infrastructure strategy. Jernbaneverket has concluded that the rolling stock strategy will be the most suitable and resource efficient solution for implementing ERTMS in Norway. 7.1 Rolling stock The rolling stock strategy has the impact that all trains that operate on a line equipped with ERTMS must be fitted with ERTMS. If the same trains also operate on lines equipped with the national Class B system, a Specific Transmission Module (STM) will be required in the train. The national Class B system in Norway is Ebicab 700. To ensure that lines can be put into service with ERTMS as planned, fitting/retrofitting of trains with ERTMS/STM and training of drivers has to be coordinated with this implementation plan.

ERTMS Page: 6 av 9 7.2 Infrastructure Frequent changes between different operational modes (ERTMS/STM) should be limited to minimize stress on train drivers. The plan regards this by implementing ERTMS line by line and continuous. To minimize impact on the railways customers when putting ERTMS into service, a detailed migration plan will be made available.

8 GSM-R network ERTMS Page: 7 av 9 The Norwegian railway network in use is already equipped with GSM-R. The Norwegian GSM-R network is shown in Figure 1. Figure 1: The Norwegian GSM-R network.

ERTMS Page: 8 av 9 9 ERTMS plan The figure below shows the Norwegian ERTMS implementation plan. Figure 2: Norwegian ERTMS implementation plan.

ERTMS Page: 9 av 9 A more detailed time plan is shown in the table below. Due to the high level of detail, adjustments to this table must be expected. Railway line Section 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Ofotbanen Narvik - Bjørnfjell Nordlandsbanen N Mosjøen - Bodø Nordlandsbanen M (Steinkjer) - (Mosjøen) Nordlandsbanen S (Trondheim) - Steinkjer Dovrebanen N (Dombås) - Trondheim Dovrebanen S (Lillehammer) - Dombås Rørosbanen (Støren) - (Hamar) Eid Lhmr S Eidsvoll - (Kleverud) Eid Lhmr N Kleverud - Hamar Eid Lhmr N (Hamar) - Lillehammer Vestfoldbanen N (Drammen) - Nykirke Vestfoldbanen M (Nykirke) - Tønsberg Vestfoldbanen S (Tønsberg) - Skien Gjøvikbanen N (Roa) - Gjøvik Gjøvikbanen S Grefsen - Roa Bergensbanen Ø Roa/Hokksund - Ål Bergensbanen M Ål - (Myrdal) Bergensbanen V Myrdal - Bergen Sørlandsbanen Ø (Drammen) - Hokksund Sørlandsbanen M (Hokksund) - Kristiansand Sørlandsbanen V (Kristiansand) - Stavanger Kongsvingerbanen (Lillestrøm) - Charlottenberg Østfoldbanen N (Oslo) - Ski Østfoldbanen M (Ski) - Fredrikstad Østfoldbanen S (Fredrikstad) - Kornsjø Gardermobanen Lillestrøm - Eidsvoll Hovedbanen Bryn - (Lillestrøm) - (Eidsvoll) Oslo S Oslo S - Skøyen Askerbanen Lysaker - Asker Drammenbanen N (Lysaker) - (Sandvika) - (Asker) Drammenbanen S (Asker) - Drammen Spikkestadbanen (Asker) - Spikkestad