MEL-DEK BRIDGE MEMBRANE INSTALLATION GUIDE

Similar documents
SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING General Materials Equipment...

SEAMS SEAMING USING SEAM TAPE

WATERPROOFING FOR CONCRETE STRUCTURES

Your guide to home maintenance. Flat Roofs

Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

How to repair your existing low slope flat roof.

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised

A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

ITEM THERMOPLASTIC MEMBRANE ROOFING

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

Chapter 9: INSTALLING ROOFING

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

Herringbone Pattern Flooring

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

BLACK JACK ALL WEATHER ROOF COATING

Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES

Minor Cracks in Horizontal Surfaces

How to Install Hardwood Flooring Over a Sub Floor

Peel & Seal Self-Stick Roofing Solutions

Installation System. Existing Resilient Sheet Floors

T R A N S F E R A B L E F U L LY

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. GeneralShale.com

LAYING BLOCK AND BRICK

GENERAL RUBBER LINING PRINCIPLES

DASH KIT INSTALLATION

RIW SHEETSEAL 226 BENEFITS APPLICATIONS APPLIED TO. CI/SfB TN6 L6813. November l Water and water vapour barrier. l Factory controlled thickness

Resurfacing Concrete. Page 1 of 5

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements

Vinyl Composition Tile Installation System

Construction of Quality Hot Mix Asphalt Pavements

MODULAR EPDM ROOFING SYSTEMS

BUILT-UP ROOF COATING SMOOTH and GRANULE SURFACE SPECIFICATION

SECTION POLISHED CONCRETE FINISHING

THINGS YOU SHOULD KNOW

Self-Stick Roofing Solutions

Shower Walls and Tub Surrounds

Distributed by: BEST MATERIALS LLC, Phoenix AZ Ph: , Fx:

Carpet Tile Installation Guidelines

Asphalt Shingle Application Requirements

How to Replace Windows in Stucco-Clad Walls

BITUMINOUS ROOF COATINGS, CEMENTS, PRIMERS AND ADHESIVES

Quality You Can Trust Since From North America s Largest Roofing Manufacturer

Please read the entire document before purchasing and installing any of these products

WATERPROOFING OF WET ROOMS

BENTLEY ELEMENTS COLLECTION LVT

Adhesive Recommendation for Altro Flooring. Porous (absorbent) subfloors (most wood subfloors and some concrete)

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H

SWEPCO HEAVY DUTY POLYMASTER ROOF SYSTEM 201

INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING

DIY CABINET REFACING INSTALLATION GUIDE

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

CHAPTER 6 ASPHALT ROLL ROOFING

The Mohawk Group Installation Guidelines for

GUIDE SPECIFICATION COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL

Although we do a fair amount of residential roofing, my family s breadand-butter. Installing a. Sealants aren t universal

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

Residential Roofing Guide

September 1, 2003 CONCRETE MANUAL CONCRETE PAVEMENT REHABILITATION

8.7 Schluter -KERDI-LINE

Pavement Patching Repair for AC and PCC Pavement Surfaces. Vern Thompson

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

RESTORE 10X Advanced Resurfacer FAQs Page 1 of 11

How to build a Pizza Oven in 4 days

DIY Poly Digester. What is Supplied in the Kit. Sketch of Arrangement

Wecryl Waterproofing System under surfacing supplied by others

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

Installation PowerPoint for Grasscrete Formers

DENSO WATERPROOFING SYSTEMS

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

2.18 INTERIOR & EXTERIOR FINISHES VAPOR & AIR BARRIERS

Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2

CertainTeed. Self-Adhering Roof Systems for Low Slope Residential Roofs

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09

Natural Thin Stone Veneer

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM

SC2000 CEMENT BONDING PROCEDURES

EPDM System Repair and Cleaning

Ubiflex. Non-lead flashing system

RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012

HERITAGE WOODGATE LAMINATED ASPHALT SHINGLES Dallas, TX

Tractor Painting Tips

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

INSTALLATION GUIDE. americanwick.com WICK (9425)

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.

Aspect Metal Peel & Stick Tile Installation Guide

BEST PRACTICE GUIDE. Fibrelime Premixed Universal Plaster and Render

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling

SECTION 4Aggegate Subbase

Transcription:

This document has been created as an addendum to the MEL-DEK technical data sheet to provide the recommended procedure to use when installing MEL-DEK bridge deck membrane from W. R. MEADOWS. The guide will cover recommended tools to use, deck preparation before membrane installation, the membrane installation, and the procedures to follow when placing the asphalt wearing course on the membrane. TOOLS RECOMMENDED Application tools or equipment to apply the adhesive. (See adhesive application section.) Material can be applied with a medium nap lambswool paint roller. Utility knife Chalk Line Stiff Bristle Broom 6 (1.8 m) broom handle or equivalent 1.5 (38.1 mm) or 2 (50.8 mm) margin trowel Medium nap (3/8 1/2 ) lambswool paint roller Tape measure Gloves (solvent-resistant) Screwdriver Small diamond point trowel 35 lb or heavier Linoleum Roller Hammer Rags Cleanup solvent similar to xylene or toluene or SEALTIGHT CLEANER or SEALTIGHT SOLVENT from W. R. MEADOWS The above tools are enough to perform a proper installation; however, more tools may be used during installation. W. R. MEADOWS MATERIALS NEEDED MEL-DEK Bridge Deck Membrane MEL-PRIME, MEL-PRIME N.E, or MEL-PRIME W/B adhesive DETAIL STRIP from W. R. MEADOWS POINTING MASTIC from W. R. MEADOWS BEM or HYDRALASTIC 836 from W. R. MEADOWS MEADOW-CRETE GPS MEADOW-PATCH 20 from W. R. MEADOWS PACKAGING AND STORAGE MEL-DEK is packaged in a box that provides protection from ultraviolet light during storage. However, it is recommended that the product be stored in a cool, dry place away from direct sunlight. Storing the membrane in the sun on a hot day may make the membrane very sticky and hard to work with. On cooler days, the membrane can be kept in the sun to enhance the tackiness. MEL-PRIME, DETAIL STRIP, and POINTING MASTIC should be stored in a cool, dry place until time of use. DECK PREPARATION MEL-DEK can be placed over many types of new or old deck surfaces. The decks can be concrete, asphalt, timber or steel. The basics are the same for most. If a particular deck type calls for something different, the proper procedure will be explained. DECK TYPES 1. New concrete decks must be properly cured before membrane is applied. That curing time will be a minimum of 14 days or otherwise, as specified by the engineer. The surface texture must be smooth enough [less than ¼ (6.4 mm) grooves], so that tenting of the membrane does not occur. Remove all traces of contaminants that will adversely affect the adhesion of the membrane. This would include any curing compounds that have been used.

2. Old concrete decks must be in good structural shape. Remove all sharp projections, repair all broken concrete, and fill cracks and holes over ¼ (6.4 mm). Use MEADOW-CRETE GPS or an approved equivalent patching material, and proper patching methods to accomplish a long-term, successful waterproofing job. 3. Old concrete decks with a membrane and asphalt overlay will require that the existing systems be removed prior to MEL-DEK being applied. All of the old membrane must be removed, exposing the concrete deck. If milling is used to remove the old asphalt and membrane, a surface with less than ¼ (6.4 mm) grooves needs to be left so the membrane does not tent over the deck surface. If the milled surface is not smooth enough, then a thin scratch/ leveling course of asphalt using 1/8 (3.2 mm) to 3/8 (9.5 mm) aggregate can be used to provide a surface that is acceptable for membrane installation. This levelling course is to be compacted and cooled for a minimum of 6 hours prior to placement of the membrane. The leveling course needs to be adhered solidly to the existing deck prior to membrane installation. No solvent based adhesives shall be used over the asphalt scratch/levelling course. Alternatively, a cementitious patching overlay material can be used. If this option is utilized, MEL- PRIME is required to be used prior to installation of MEL-DEK. 5. Steel bridge decks require waterproofing. If the deck is new, the steel surface will require a scratch/ leveling course of asphalt applied to it. If the deck is old with a waterproofing system already installed, some or all of the old system needs to be removed and a scratch/leveling course must be placed. It is not recommended to mill the old material all the way to the steel because the cutters will gouge the steel, causing sharp protrusions that can puncture the membrane. The scratch/leveling course will cover any fasteners that hold the steel deck in place and/or provide a good surface for the membrane to bond to. MEL-PRIME will not be required over the scratch/leveling course. 6. Laminated Treated Timber Decks requiring waterproofing. Depending on the chemical used to treat the timbers, MEL-DEK may be used. Check with the timber manufacturer for compatibility of the membrane with the chemical used to treat the timbers. Use a MEL-PRIME adhesive prior to placement of the membrane. Note: It is not necessary to apply MEL-PRIME ADHESIVE to any asphalt surface that is less than one year old. This includes scratch/leveling courses that have been applied. Surface must be clean prior to application of MEL-DEK. 4. Asphalt bridge decks are not common. If you encounter one, please call W. R. MEADOWS technical services at (800) 342-5976 for assistance.

INSTALLATION MEL-PRIME ADHESIVE APPLICATION Apply MEL-PRIME adhesive to all surfaces to receive MEL-DEK or DETAIL STRIP at a coverage rate of approximately 250-350 square feet per gallon. Allow adhesive to dry until tack-free. Areas that are not covered with membrane within 24 hours must be re-applied. W. R. MEADOWS offers both water- based and solvent-based adhesives that are VOC-compliant. The major difference between the two is that the solvent-based adhesives will tack up quicker than the water-based adhesives. The adhesives need to be tacky in order for the membrane to adhere properly. Please read the appropriate product data sheet for the application procedure. The drying time varies dependent on the amount of moisture in the air and the temperature. These variables will speed up or slow down the drying time. JOINTS AND SLAB DRAINAGE Apply a reinforcing strip of DETAIL STRIP from W. R. MEADOWS over all non-working joints or cracks over 3/16 (4.76 mm) wide before applying finished membrane. Seal terminations of MEL-DEK with POINTING MASTIC by W. R. MEADOWS. Deck surface must provide proper pitch to gutters and drains. Drainage openings should be provided at the structural deck level to drain any water that penetrates the asphaltic concrete surface. EDGE JOINT TERMINATION 1. Preparation of the transition from the concrete deck to the curb (horizontal to vertical transitions) needs to be addressed. A chamfer material may need to be applied to give solid backing to the detail strip. This backing can be a cement and sand mortar mix, such as MEADOW-PATCH 20 repair mortar from W. R. MEADOWS. Alternatively, BEM, or POINTING MASTIC can be utilized. Form a 45 slope between the vertical and horizontal planes. 2. Strike a chalk line at the top of asphalt elevation. Apply one of the adhesives from the chalk line out across the deck with medium nap lambswool roller. Note: Do not apply membrane to adhesive that is not dry.

3. After the adhesive has dried to a tack-free condition, DETAIL STRIP should be applied to the curb face from the lowest point on the bridge and other protrusions at this time. Fold DETAIL STRIP at the vertical height and remove the backing. Carefully place DETAIL STRIP and smooth it out using hand pressure or a brush. Try to avoid wrinkling and forming air bubbles. Seal terminations of MEL-DEK with POINTING MASTIC by W. R. MEADOWS. MEL-DEK MEMBRANE APPLICATION 1. Application of the membrane can start once DETAIL STRIP and adhesives are in place and dry. On crowned deck surfaces, place the membrane 2. Once you have decided the number of runs that it takes, put a chalk line 38 ½ (977.9 mm) from the curb. The first sheet should be as straight as possible to allow the following rows to lay easily. Start the roll laying the strip edge release on the chalk line. 3. The manual placement of the membrane requires four people. One person holds the beginning of the roll in place at the beginning of the deck. Two workers roll out the membrane using a broom handle or similar device, guiding the edge so that it follows the chalk line. The fourth person will remove the release film from the bottom. That person pulls the film off at a 45 angle to the placing direction. This helps keep tension on the membrane as it is laid, minimizing the wrinkles. sheets from low point to high point in both the longitudinal and transverse directions. On flat deck surfaces, start at one curb and proceed across to the other. Measure the width of the deck (in feet) in at least three places and divide the widest number by three feet (the width of a sheet minus the overlap) to get the number of sheets it will take to cover the deck width.

Once the roll is down, the first person needs to push the membrane into good contact with the deck using a push broom or a hand/push roller. It is important not to trap air under the membrane and to work out all air that may be trapped. 4. If more than one roll is needed to cross the deck, start the second roll overlapping the first roll by 6 (152.4 mm). 5. Once the first row of membrane is completed, start the second, overlapping the leading edge of the first row in shingle fashion 2 1/2 (63.5 mm) after removing the polyethylene strip that exposes the 3/4 (19.1 mm) rubberized asphalt. Use the edge of the release film as your guide. Do not remove the release film until the complete roll is in place on the deck. Start at one end of the roll and pull the release film from between the overlapped rolls. 6. The longitudinal joints must be staggered and overlapped a minimum of 6 (152.4 mm). 7. Continue to place rows until the crown of the bridge is reached. If the bridge is closed completely then start laying membrane from the opposite curb to the crown. Overlay the two sides with a center strip as a house roof is overlapped at its peak. If the bridge must be opened to traffic on one side before the other side can be waterproofed, then leave a minimum of 8 (203.2 mm) of membrane sticking out from the asphalt. When overlapping longitudinal seams that do not have a 2.5 (63.5 mm) selvedge edge, allow 6 (152.4 mm) of overlap to ensure a good seal. This longitudinal joint must be pointed with POINTING MASTIC prior to asphalt placing. 8. Once all the membrane is in place, or all the membrane for that day, remove the plastic strip from the transverse edge (if not previously removed) and roll the joints with a hand/push roller or stiff broom. Next, as previously stated, seal all the transverse joints (if required by DOT) and any longitudinal ones at crown. The sealing of all exposed joints, terminations, including the ends of the rolls, along the curb line and tops of protrusions must be done at the end of the day to prevent possible leaking under the membrane if it should rain. 9. Patches: There is always a chance to trap a small stone under the membrane when placing it. The stones must be removed so that they do not puncture the membrane when the asphalt is placed. To remove the stone, make a C shaped cut around the stone. Peel back the membrane, remove the stone, then push the membrane back into place. Cut a 6 x 6 (152.4 mm x 152.4 mm) patch from a piece of membrane to cover the cut. Apply some MEL-PRIME adhesive and allow it to set up to a tack-free consistency. Place membrane patch over

the cut, roll or brush, and then seal the patch edges with POINTING MASTIC. Similarly, air bubbles, nicks, gouges, rips, tears, etc. are repaired using the same procedure. Note: In the event, there are wrinkles in the membrane following installation, anything over ½ needs to be addressed. To accomplish this, cut out the wrinkle and following the same patching procedure as above. 10. The Asphalt Overlay (minimum 2 compacted thickness) needs to be applied as soon as possible after the membrane installation to avoid damage to the membrane. The asphalt temperature, at point of placement, needs to be above 290 F (143.3 C) and less than 340 F (171.1 C). All areas need to be compacted to specification to develop a bond between the asphalt and membrane. A compatible tack coat must be applied to the membrane surface prior to the placement of the asphalt overlay. The reason for this tack coat is to address potential concern with decreased asphalt content in overlays that is essential for good adhesion to the membrane. In the event of rain, the membrane surface must be dried prior to asphalt placement. Minimize the paving equipment turning on the membrane, which may cause damage. It is preferable that paving equipment have flat tracks or pneumatic tires to limit the potential of membrane damage. This covers the entire general requirements for MEL-DEK membrane installation. If you have any questions on the guideline or on an issue not covered, please contact W. R. MEADOWS technical services at (800) 342-5976 or contact your local W. R. MEADOWS representative. 9/16