Financing the European Mobility Network with the Connecting Europe Facility

Similar documents
Financing the European Mobility Network with the Connecting Europe Facility

TEN-T guidelines and CEF

The implementation of the TEN-T policy

The key elements of the TEN-T guidelines

CEF Transport (TEN-T) 2014: EU funding to improve cross-border transport connections

New Financial Instruments for Europe

ANNEX Removing bottlenecks and bridging missing links; Ensuring sustainable and efficient transport in the long run;

2015 CEF Transport Calls for Proposals COUNTRY FICHE. Czech Republic

Economic and Social Council

Trans-European Network (TEN-T) Multi-modal Corridors & Innovation. COTER

COMMISSION IMPLEMENTING DECISION. of XXX

SOUTH EAST EUROPE TRANSNATIONAL CO-OPERATION PROGRAMME. Terms of reference

European Strategy 2050 TEN-T Methodology: Italian TEN-T network proposal

1. Towards the Baltic-Adriatic corridor work plan

Trade & Transport Corridors. European Projects & Initiatives

BUILDING INFRASTRUCTURE TO STRENGTHEN EUROPE'S ECONOMY. Table of contents

Airports, Intermodal and Intelligent Transport Systems (ITS) projects: Recommendations to Project Beneficiaries

The results of studies drawn up for the development of the Scandinavian-Mediterranean Core Network Corridor

2015 CEF Transport Calls for Proposals COUNTRY FICHE. Germany

NETWORK INDUSTRIES TRANSPORT

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. establishing the Connecting Europe Facility {SEC(2011) 1262} {SEC(2011) 1263}

High Speed Rail in Poland plans & activities

How To Make Money From Shipping

1. Towards the North Sea-Baltic Corridor work plan

Ministry of Infrastructure Warsaw, r..

THE ROUTE MAP TO A CONNECTED EUROPE

Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page:

Council of the European Union Brussels, 20 May 2016 (OR. en)

Investment projects on PKP Polish Railway Lines network

Prefeasibility Study for the High Speed Line HU-RO Border Bucharest - Constanta Description and Objectives

Prime Ministers Council of the Baltic Council of Ministers Joint Statement

I. Objectives and political priorities

THE CONTENT OF PRESENTATION. CETC Rout 65. What does it mean?

Possibilities and benefits for Poznan as part of TEN-T core network corridor

The logistics sector s view on the infrastructure in Central-Eastern European Member States Dr László Mosóczi Chairman of HUNGRAIL

Railway Reform in Europe: from endangered species to sustainable systems?

Promoting Economic and Social Cohesion in Europe

MIBE 2015 Overview of H2020. Louise Mothersole Innovate UK

IMPROVING THE CONCEPT OF MOTORWAYS OF THE SEA

A Competitive European Shipping Industry

BaltMet Network. Mayors of major metropolises in the Baltic Sea Region unified for the competitiveness and innovation of the Region

Project TALSINKIFIX. Pre-Feasibility study of Helsinki-Tallinn fixed link project. Part-financed by European Union

This is why the Swedish Transport Administration was formed

How To Improve The Rail Transport System In European Union

Application Form Part A

Grahame Mansell-Grace Business Development Manager

EU Finance for Innovators and Growth Companies in Poland. Warsaw, Thursday 6 November 2014

TransBaltic. Deployment of ICT toolbox supporting companies in optimal modal choice. TransBaltic

The SESAR programme: Making air travel safer, cheaper and more efficient

Fit for the European Rail Market Training Competence - Certification

AGREEMENT REGARDING THE EXECUTIVE BOARD OF RAIL FREIGHT CORRIDOR RHINE-ALPINE

TEN-T Motorways of the Sea The North Europe LNG Infrastructure Project - Finalizing Conference Copenhagen 14 June 2012

What does mandatory shore power in EU mean?

European GNSS Applications in Horizon 2020

COMMISSION STAFF WORKING DOCUMENT. A call to action on urban logistics. Accompanying the document

White Paper on transport

Appendix I. Description of Work

ehealth in support of safety, quality and continuity of care within and across borders

SESAR. Luftfahrttechnologie - Auftaktveranstaltung zum 7. EU-Forschungsrahmenprogramm Wien, 4 Dezember 2006

Role of seaports as a link between inland and maritime transport

TransBaltic. Deployment of ICT toolbox supporting companies in optimal modal choice. TransBaltic

1. INTRODUCTION RESPONDENTS:

IQ-C Action plan for rail freight corridor Rotterdam-Genoa

WAREHOUSE SPACE AVAILABLE & 93,600 M 2 BTS OPPORTUNITIES

Study on development potentials for long-distance passenger rail transport along TEN-T Corridor III

Notification of an Open Call for tender. for Motorways of the Sea projects in the North Sea Region

Cefic Position on Intermodal Transport Network Development

New financial schemes for European transport infrastructure projects. Interim Report

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMISSION STAFF WORKING DOCUMENT EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT. Accompanying the document. Proposal for a COUNCIL REGULATION

Wojciech Rybak Dyrektor Biura Realizacji Inwestycji. INVESTMENT PLANS CONCERNING MODERNISATION OF THE PAN-EUROPEAN TRANSPORT CORRIDOR no VI

INTERREG V-A SLOVAKIA HUNGARY COOPERATION PROGRAMME

The impact of globalisation on international road and rail freight transport activity Past trends and future perspectives

SHIFT2RAIL JOINT UNDERTAKING DECISION OF THE GOVERNING BOARD. on the Annual Work Plan for 2015 Nº 16/2015

COMMISSION STAFF WORKING DOCUMENT Accompanying the document

the EU framework programme for research and innovation

usage of these types of fuels with production price far higher then diesel and petrol, is also a measure. We can say that in Bulgaria there are

For over 20 years, we have specialized in complex implementation of projects in the field of transport construction.

Guidelines of Rīgassatiksme an up-to-date and socially responsible company

ANNUAL ACTIVITY REPORT. July 2005 July European Coordinator. Pavel Telička. PRIORITY PROJECT No 27. «Rail Baltica»

EU support for Innovation Procurement

VBB Cross-border railcars Core Output INTER-Regio-Rail Removing barriers to regional rail transport

Financial instruments - opportunities offered by the framework. Key novelties and Commission guidance Bratislava, 2 October 2015

.Policy framework. .Themes and Actions.Civitas and EU funding instrumens.future vision. Overview. Plan on Urban Mobility

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

Khalil ROUHANA Director. Directorate-General for Information Society European Commission

Matthijs SOEDE Research Programme Officer Unit G3 Renewable Energy Sources DG Research and Innovation

HORIZON 2020 for SMEs An Overview

GNSS for Train Control Systems

The sum Of Structural And Investment Funds allocated For 2014 To 2020

MARCO POLO II CALL FOR PROPOSALS 2011

The Norwegian Point of View

APPROVAL OF AGREEMENT. TEN-T Guidelines MANDATE FOR NEGOTIATIONS. Roadworthiness Package (3 proposals) ADOPTION OF DRAFT REPORT

TRANSPORT CHALLENGE IN HORIZON ECTRI SUGGESTIONS FOR THE SECOND WORK PROGRAMME ( ) in the field of TRANSPORT ECONOMICS AND POLICY

EU Finance for Innovators in the Nordics. Oslo, Thursday 11 December 2014

Smart and sustainable logistics. Transport Research. Portal. for a competitive Europe. and Innovation COMMUNICATING TRANSPORT RESEARCH AND INNOVATION

Maritime spatial planning in BSR and in Poland

High speed railway principles

Supporting Innovation in Slovenia. Ljubljana, 12 June 2015

Rolling out eidas Regulation (EU) 910/2014. Boosting trust & security in the Digital Single Market

Transcription:

Financing the European Mobility Network with the Connecting Europe Facility Stéphane Ouaki, Head of Unit DG MOVE, European Commission Brussels, 19 February 2014

The new TEN-T maps A core and comprehensive network based on a single European methodology Comprehensive network to ensure accessibility to all regions Core network focussing on strategically most important parts Maps are contained in Annex I to the Regulation

TEN-T: deadlines by 2030: replace the patchwork of priority projects by a single European core network by 2050: develop the comprehensive network as ground layer to ensure accessibility and common standards Core Network: RAIL

TEN-T standards Rail Comprehensive Network Electrification ERTMS 1435mm gauge Connection with freight terminals Core Network [see Comprehensive network plus] freight lines (>100 km/h, 750m train length, 22,5t axle load)

TEN-T standards Roads Comprehensive Network High quality roads i.e. motorways, expressways, conventional strategic roads Core Network [see Comprehensive network plus] Rest areas on motorways all 100 km including appropriate parking space for commercial road users Availability of clean fuels

TEN-T standards Other modes Comprehensive Network Implementation and deployment of telematic applications (RIS, VTMIS, e- maritime services, SESAR) Connection of airports and ports to TEN- T network Core Network [see Comprehensive network plus] Availability of clean fuels at airports and ports Connection of ANNEX II ports and airports to TEN-T network by 2030/2050

TEN-T Network Comprehensive and Core Network Inland waterways and ports

TEN-T Network Comprehensive and Core Network Railways (freight), ports and rail-road terminals

TEN-T Network Comprehensive and Core Network Railways (passengers), airports

TEN-T Network Comprehensive and Core Network Roads, ports, rail-road terminals and airports

The implementation tools Coordinators and Core Network Corridors 9 Core Network Corridors defined until 2020 Support the implementation of the core network Synchronise investments in order to optimise network benefits Multimodal, involving at least 3 Member States Flexible governance structures Involvement of stakeholders Coordinators for ERTMS and Motorways of the Sea

The 9 core network corridors defined in the CEF

Connecting Europe Facility One instrument three sectors Connecting Europe Facility Financing framework 2014-2020 Guidelines Energy Guidelines Telecom Guidelines The "European Infrastructure Package" (European Commission proposal, October 2011) Sectoral policy frameworks (setting priorities for 2020, 2030, 2050)

Connecting Europe Facility New funding framework: Exploitation of cross-sectoral synergies Stronger concentration of financial support on EU added-value projects Higher emphasis on the use of innovative financial instruments Flexibility: midterm revision of amounts between three sectors based on performance and absorption of funds Complementarity (and not duplication) with other EU instruments (ESIF and Horizon 2020)

CEF: budget 33.2 billion in current prices 26.250 billion for transport (Vs ~ 8bn for 2007 2013) 14 945 billion for all 28 MS 11 305 billion for the MS eligible to the Cohesion Fund 1.141 billion for broadband and digital services 5.850 billion for energy infrastructure

CEF : 11.3 bn transfer from the Cohesion Fund - specific elements Exclusively for transport projects in Member States (MS) eligible for the Cohesion Fund Aim: to finance difficult projects that the MS would not finance with the Cohesion Fund Projects of high EU added value Rail and Inland Waterways, cross-border (including road) and main bottlenecks on main European routes Road: max. 10% of the budget Only for projects listed in Annex and projects on the Core Network Common project pipeline for Cohesion Fund and CEF, in line with the transport strategy Need to ensure network effect, notably on Core Network Corridors

Co-funding rates Types of Projects All Member States Member States eligible for Cohesion Fund (a) Studies (all modes) 50% 85% (b)works on Cross border 40% 85% Rail Bottleneck 30% 85% Other projects of common interest 20% 85% Cross border 40% 85% Inland waterways Bottleneck 40% 85% Other projects of common interest 20% 85% Inland transport connections to ports and airports (rail and road) Development of ports Development of multi-modal platforms Reduce rail freight noise by retrofitting of existing rolling stock 20% 85% 20% 85% 20% 85% 20% 20% Freight transport services Secure parkings on road core network Motorways of the sea Traffic management systems Cross border road sections 20% 20% 20% 20% 30% 85% SESAR, RIS, VTMIS (ground/onboard) 50/20% 85% ERTMS 50% 85% ITS for road 20% 85% 10% 85%

CEF: eligibility 80 85 % of available budget (~ 22bn) for preidentified projects listed in Annex 1 Horizontal priorities (TMS, innovation & new technologies focusing on decarbonisation, safe and secure infrastructure, Core Network Ports and airports) 9 core network corridors and other important cross-border and bottleneck sections 15 20 % (~ 5bn) for Other projects of the core network Projects of comprehensive network (max 5%) For financial instruments (10%)

CEF in Poland Horizontal Priorities Innovative Management & Services Single European Sky SESAR Innovative Management & Services Innovative Management & Services New technologies and innovation Telematic Applications Systems for Road, Rail, Inland Waterways and Vessels (ITS, ERTMS, RIS and VTMIS) Baltic Adriatic Corridor Gdynia - Katowice Rail Works Core Network Maritime Ports, Motorways of the Sea (MoS) and Airports, safe and secure infrastructure New technologies and innovation in accordance with points (a) to (d) of Article 39 of TEN-T Guidelines Gdynia, Gdańsk Ports port interconnections, (further) development of multimodal platforms Warszawa - Katowice Rail Works Wroclaw Poznań Szczecin/Świnoujście Rail Works Świnoujście, Szczecin Port port interconnections Bielsko Biala Žilina Road Works Katowice - Ostrava - Brno - Wien & Katowice - Žilina - Bratislava - Wien Rail works, in particular cross-border sections PL-CZ, CZ-AT, PL-SK and SK-AT, Brno-Přerov line; (further) development of multimodal platforms and airport-rail interconnections North Sea Baltic Corridor (detailed) studies for new UIC gauge fully interoperable line; works for new line to Tallinn - Riga - Kaunas - Warszawa Rail start before 2020; upgrading and new line on PL territory; rail airports/ports interconnections, rail-road terminals, MoS Via Baltica Corridor Road works for cross-border sections (EE, LV, LT, PL) BY border - Warszawa - Poznań - DE border Rail works on existing line, studies for high speed rail Other core network sections Wrocław Praha Cross-Border Rail studies Nowa Sól Hradec Králové Cross-Border Road works Kędzierzyn Koźle Chałupki-granica Cross-Border Rail Works UA Border Kraków Katowice Wrocław Dresden Other Core Network Rail works

CEF: Priorities Political priorities: Commission Communication COM(2013)940 Major Cross-Border projects on the Corridors Other cross-border, bottlenecks and multimodal projects on the Core Network and the Corridors SESAR ERTMS Other Telematic Application systems (RIS, ITS, e-maritime...) Motorways of the Sea, including LNG New technologies and innovation Horizontal priorities to be deployed in priority along the Core Network Corridors The Communication gives an estimate of financial support for each priority, actual spending depends on project selection!

Multiannual work programmes (80 to 85%) Priority Specific objective concerned Min - Max for 14.9bn (in million EUR) Min - Max for 11.3bn (in million EUR) Major Projects on the Corridors bottleneck, missing links, cross-border and rail interoperability 4,000-5,000 Other projects of the Core Network and its corridors, incl. rail interoperability, inland connections to ports & airports bottleneck, missing links, cross-border and rail interoperability 3,500-4,500 10,000-11,000 SESAR integration - interoperability 2,000-2,500 300-500 ERTMS bottleneck, missing links, cross-border and rail interoperability 600-700 200-400 Other TMS, including ITS for road, RIS and VTMIS Motorways of the Sea (incl. LNG projects and development of ports) integration - interoperability 250-400 integration - interoperability 400-600 100-300 New technologies & innovation sustainability - innovation 200-300 50-100

Annual Work Programmes (15 to 20%) Priorities Specific objective concerned Min - Max for 14.9bn (in million EUR) Min - Max for 11.3bn (in million EUR) Projects on the comprehensive network (cap of 5%) bottleneck, missing links, cross-border, rail interoperability 600-1000 Projects to connect the trans-european transport network with infrastructure networks of neighbouring countries bottleneck, missing links, cross-border 50-100 For freight transport services sustainability - innovation 150-200 For actions to reduce freight noise sustainability - innovation 200-260 Financial instruments All 1,300-2,400 Programme support actions 150-150 110-110

Complementarity (and not duplication) between CEF and ESIF Strategic framework for Cohesion Policy support to investments in transport Focus on TEN-T Consistency with the comprehensive national transport strategy CEF: 11.3bn EUR transferred from the Cohesion Fund To be spent exclusively in Member States eligible for the Cohesion Fund Co-funding rates applicable for the Cohesion Fund A common and complementary list of projects aiming at the network effect

CEF: Centralised management Project evaluation and selection Direct management by Commission, assisted by INEA Same criteria for project proposals coming from all Member States Quality, maturity, EU added value, socio-eco-environmental impacts Concentration on projects with high EU added value cross-border missing links, boosting multimodality, ensuring interoperability of networks across borders and modes Increased efficiency of EU budget spending competition, "use-it-or-lose-it" principle

CEF : 11.3 bn transfer from the Cohesion Fund Respect of national allocations under the Cohesion Fund until end 2016 Binding national envelopes between 2014 2016: no MS can be allocated more funding for projects than its corresponding allocation European Commission targets to allocate the totality before 2017m through calls for proposals in 2014, 2015, 2016 If the 11.3bn are not all spent after the last call in 2016, new calls from 2017 to absorb the remainder, without national allocations

Financial instruments Why? Limited available: 26bn to cover 250bn needs! Limited eligibility of grants under CEF Mostly Core Network (5% can go on the comprehensive network when cross-border) Rail, Inland Waterways, Connections to ports and airports, Traffic Management systems, MoS Full eligibility for Financial Instruments The whole TEN-T network, Core & Comprehensive All projects eligible under TEN-T Guidelines All modes of transport Ground and on-board components of traffic management systems or alternative propulsion systems

Financial instruments How? Projects targeted for financial instruments under CEF: Projects with identifiable revenue streams or commercial benefits and long-term repayment: Motorways with tolls, shadow-tolling, availability schemes Airports development (e.g. New terminal) Ports development (capacity extension) Alternative fuelling infrastructure and on-board equipment (e.g. LNG in boats) Traffic Management Systems on-board equipment (e.g. SESAR) Types of financial instruments Equity intruments - Risk-capital, e.g. Marguerite Fund Debt instruments - Guarantees and risk-sharing instruments, e.g. LGTT and Project Bonds

CEF: Programme Support Actions (1) Art.11 CEF: Particular attention given to Programme Support Actions aimed at strengthening administrative capacity for Member States eligible for the Cohesion Fund to develop the project pipeline

CEF: Programme Support Actions (2) Several types of Programme Support Actions: Grants for preparatory studies for projects Member States can choose to use the help of the Joint Assistance to Support Projects in European Regions (JASPERS) for preparation of project proposals Targeted technical assistance to potential beneficiaries (e.g. railway infrastructure managers) for preparation of project proposals

Thank you for your attention! stephane.ouaki@ec.europa.eu