PREPARATION FOR PAINT. B. Sheet Metal Parts Such as fenders, engine and transmission covers, doors, cabs, etc.

Similar documents
Tractor Painting Tips

Note: Minor color change may occur in exposed service, but corrosion protection will not be compromised

3.8 HSP (High Solids Polyurethane)

SIGMACOVER 280. PRODUCT DATA SHEET December 10, 2014 (Revision of March 1, 2014) DESCRIPTION

SC2000 CEMENT BONDING PROCEDURES

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

SIGMACOVER 300. PRODUCT DATA SHEET December 12, 2014 (Revision of November 1, 2013) DESCRIPTION

RAPTOR TRUCK BED LINER - BLACK

10P20-44 High Solids Epoxy Primer

PHOENIX Product Data Sheet (Updated on 14-Jan-2012)

Product Information. D8115 Matte and D8117 Semi-Gloss Clearcoat System

SIGMAFAST 210. PRODUCT DATA SHEET December 12, 2014 (Revision of April 1, 2013) DESCRIPTION

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 27 C calculated IED (2010/75/EU) (calculated)

Imron 1.2 HG High Gloss Waterborne Polyurethane (WG Quality)

Additional Information. Paint Application

Pictorial Surface Preparation Standards For Painting Steel Surfaces

Property Test/Standard Description. gloss (70-85) Flash point ISO 3679 Method F (100 C) calculated VOC-US/Hong Kong. US EPA method 24 (tested)

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 28 C calculated VOC-US/Hong Kong. US EPA method 24 (tested)

DuPont ChromaOne Acrylic Urethane Single Stage

TECHNICAL DATA SHEET HAMMERITE METAL PAINT. Smooth Hammered Satin Aerosol

SECTION WATER STORAGE TANK PAINTING

3M Scotchkote Urethane Coating 165HB

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

MARTIN TESTING LABORATORIES (MTL) PAINTS AND COATINGS TESTING CAPABILITIES

TECHNICAL DATA RS European Clear EZ N. Webster Street Dayton, OH Phone Toll Free Fax

VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised

The Application Guide offers product details and recommended practices for the use of the product.

SECTION 560 COATING NEW STRUCTURAL STEEL

Material Product Data Sheet Sealers for Thermal Spray Coatings

Property Test/Standard Description. semi gloss (35-70) Flash point ISO 3679 Method 1 34 C IED (2010/75/EU) (calculated)

Acrylic Enamel Topcoat

Training Course Catalog

3 Scotch-Weld TM. Urethane Adhesives 3532 B/A 3535 B/A 3549 B/A. Technical Data March, 2002

PRODUCT DATA SHEET DESCRIPTION:

Intercoastal Paint Company

( II ) INDUSTRIAL & PROTECTIVE SYSTEM

2014 SPECIFICATION GUIDE Conveyor Equipment

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

Eclipse. Technical Data Sheet. Polyurethane topcoat. Product Group

You have just purchased the most portable and economical spray chrome system in the world!

SSPC-SP 6/NACE NO. 3

Approved. Property Test/Standard Description. gloss (70-85) Flash point ISO 3679 Method 1 30 C calculated VOC-US/Hong Kong. US EPA method 24 (tested)

Scotch-Weld TM. Epoxy Adhesive 1838 B/A Green 1838 B/A Tan 1838-L B/A Translucent. Technical Data February, Product Description

PRETREATMENT TECHNICAL DATA SHEET WATER EMULSIFIABLE RUST PREVENTATIVE PRODUCT DESCRIPTION

POLYURETHANE LINING AND COATING ON PIPE RAW WATER

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

Cold trichloroethylene degreasing Film Thickness 70± 10 µm 10 minutes at 170 C (PZ 770 alone) 5 minutes 30 sec. at 220 C (maximum curing conditions)

Technical Data Sheet L Top coats. Mat Clear

COATING & WRAPPING OF UNDERGROUND PIPING

Joint Surface Preparation Standard. NACE No. 1/SSPC-SP 5 White Metal Blast Cleaning

3 Scotch-Weld TM. Urethane Adhesives 3532 B/A 3535 B/A 3549 B/A. Technical Data January, 2010

Scotch-Weld TM. DP410 Off-White. Product Data Sheet. Product Description. Key Features Rapid cure at room temperature; cure rate may be accelerated

Scotch-Weld TM. Acrylic Adhesives. DP8405NS Green. Product Data Sheet. Date: March 2014 Supersedes: August 2013

How To Test A Base Axe

Solvent Cementing Instructions For Plastic Pipe & Fittings

Autobody/Collision and Repair Technology/Technician CIP Task Grid

Epoxy Floor Coating Problem Solving Guide

Infrastructure Services Department. Design & Construction Buildings & Parks SPECIFICATIONS. Walter Baker Sports Centre. Pool Column Repairs

AUTO COLLISION REPAIR CERTIFICATE I COURSE DESCRIPTIONS. Total: 18 Credit Hours

PLAS-STICK 2330S PLASTIC ADHESION PROMOTER

Guidelines. Applica. Interzinc 22. Protective. Coatings. Rev. Date ID 22_UK. Paint Ltd. International. tional-pc.com.

DuPont Cromax Pro PAINTER S GUIDE

Panel Bonding Adhesive

Colorado State University. Durrell Center Roof Repair

SMOOTHMOVE INSTRUCTIONS FURNITURE VAN EPOXY FLOOR FINISH KIT VOC-FREE - NO SOLVENT GENERAL INFORMATION KEY 87269AB

Summit Racing Equipment s Paint and Auto Refinishing System was developed specifically for the home enthusiast and small shop owner wanting a

Araldite AV 170. Advanced Materials. One component epoxy adhesive. Structural Adhesives. Key properties. Description. Product data.

PRISM Low VOC Single Stage Color Flat (76), Satin (77), Semi-Gloss (78), & Gloss (79)

GRIP-GARD BC BASECOAT CHROME

3M Thermally Conductive Adhesive Transfer Tapes

Technical Data Sheet February 2014

Metal Rescue Rust Remover Technical Data

AIRLESS SPRAY SYSTEMS

SURFACE PREPARATION. High pressure fresh water cleaning.

SURFACE PREPARATION STANDARDS

RTV162. Electronic Grade Silicone Adhesive Sealant

Blister Repair with Binding Resin for Spas, Marine and Gel Coat Structures

BLACK JACK ALL WEATHER ROOF COATING

COATINGS MANUAL HRSD 9.0 THIRD PARTY INSPECTION GUIDELINES. 9.1 The Value of Third Party Inspection. 9.2 When to Use Third Party Inspection

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

PAINTING OVER HOT DIP GALVANIZED STEEL

SECTION POLISHED CONCRETE FINISHING

2K P422- Basecoat System. P Solid colour basecoat converter P Basecoat flip controller P High aluminium flip controller

SECTION FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL

GigaCrete Specification PlasterMax

Colours to stand the test of time. paint range

Installation System. Existing Resilient Sheet Floors

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

CHROME FX PUMP SYSTEM APPLICATION GUIDE

DuraTex Waterbased Speaker Cabinet Texture Coating

SECTION FIRE HYDRANTS

K2 STONE NATURAL VENEER

IS800 Series. Technical Data Sheet IS802, IS803, IS808, IS Description. Key Features and Benefits. Typical Physical Properties

TIGER Drylac U.S.A., Inc Swenson Avenue St Charles, IL T F office.us@tiger-coatings.us

Vinyl Composition Tile Installation System

Construction. Sikadur-Combiflex. Sealing system for cracks and problem joints with large movements DESCRIPTION

SCENIC VIEW SV 10 SECTION SOLAR CONTROL FILMS

REFLECTIT. Reflectit Application Instructions Spray and Roller DS % Acrylic Coating Providing a Pearlescent Appearance

ArcticSkills Task 1: VW Golf front bumper, preparation and painting

PLAS-STICK 2322S GENERAL MIXING. DESCRIPTION An adhesion COMPONENTS. MIX RATIO Ready to Spray. POT LIFE Indefinite. ADDITIVES Accelerator:

Transcription:

PREPARATION FOR PAINT 1. Metal preparation is the first step in ensuring both the adhesion and appearance of the finishing top coat of paint will meet our customer expectations and Liftking s quality objectives. Therefore it is mandatory for all personnel involved in the preparation of material for painting, understand and adhere, to the following instructions. 2. All materials processed for painting at Liftking are fabricated using steel of various grades depending on design criteria. 3. Materials to be processed for painting include A. Heavy Steel Metal Parts Such as frames, masts, carriages, booms overhead guards, wheel bogey assemblies, cab frame assemblies etc. B. Sheet Metal Parts Such as fenders, engine and transmission covers, doors, cabs, etc. C. Component Parts Such as cylinders, axles transmissions etc D. Vehicles A. HEAVY STEEL METAL PARTS 1. All heavy metal parts are to be grit blasted to remove all mill-scale, rust, slag, laser scale and weld spatter. 2. After completion of grit blasting material to be moved to grinding area for removal of remaining weld spatter, grinding of sharp edges and blending of weld joints as required. 3. On completion of grinding Paint Shop foreman to inspect parts for a. Completeness of Assembly b. mark any areas where body filler is required c. mark parts okay for primer 4. If required fill marked areas with body filler let dry and grind smooth and have foreman re-inspect and mark parts okay for primer. Work Inst # PS 001 Revision # 03 Page 1 of 2 Approved By: Mark Pemberton 11Nov. 2016

B. SHEET METAL PARTS 1. Grind as required to remove sharp edges and corners 2. Grit blast all sheet metal parts 3. Clean all welds to remove weld spatter and blend weld joints if required 4. On completion of grinding Paint Shop foreman to inspect parts for a. any unfinished or unacceptable welds (and have repaired as required) b. mark any areas where body filler is required c. mark parts okay for primer 5. If required fill marked areas with body filler let dry and grind smooth and have foreman re-inspect and mark parts okay for primer 6. If re-welding is required ensure area is properly ground and cleaned and have foreman re-inspect and mark parts okay for primer. C. COMPONENT PARTS 1. All component parts are to be checked 2. Clean all welds to remove weld spatter and blend weld joints if required 3. On completion of grinding Paint Shop foreman to inspect parts for any unfinished or unacceptable areas (and have repaired) D.VEHICLES 1. Vehicles shall be washed and cleaned of all dirt, grease and oil 2. All area s requiring body fill will be ground, filled and sanded smooth 3. All previously painted area s shall be sanded to remove gloss. 4. On completion of preparation the foreman will inspect and when acceptable have the vehicle masked for painting. Work Inst # PS 001 Revision # 03 Page 2 of 2 Approved By: Mark Pemberton 11Nov. 2016

MASKING AND NON PAINTED SURFACES 1. Surfaces of components and assemblies not normally painted with a finish coat shall be cleaned and protected in accordance with good commercial practice. 2. Lift chains, sprockets, rollers, plastics, fabric hoses, hydraulic hoses and drive belts shall not be painted, except that slight overspray will be accepted provided there is no interference with the proper functioning of the component. 3. Paint must be kept off working surfaces where interference with working parts would result. 4. Engines and engine accessories, such as radiator, drive belts, instruments and chrome plating shall not be painted and shall be adequately protected or masked from overspray 5. Similarly all glass, mirrors, interior insulation and upholstery shall be protected or masked from overspray Work Inst # PS 002 Revision # 03 Page 1 of 1 Approved By: Mark Pemberton 11Nov 2016

PAINTING (653 Series 2C Acrycote 3:1) 1. All truck surfaces shall be painted to prevent rusting. 2. All surfaces to be painted shall be thoroughly cleaned and free of all contamination by abrasive blasting. All surfaces shall be dry and free from mil scale, oil, grease, dirt and rust and shall be painted as soon as practicable after cleaning. 3. All bare metals must have a good coat of primer of no less than 2 mils 4. All topcoats should have a finish of 3 mils. Higher film builds may be required to ensure an acceptable color match to standard. Always check color to supplied color standard. 5. Total paint coverage should be a minimum of 5 5.5 mils. 6. The finish coat when dry shall be a smooth even surface, free from runs, sags peels, chips, blisters, areas of thin film and areas of no film. 7. Mixing and application of primer and paint will be in accordance with PPG recommendations. 8. On completion of painting, parts/vehicle will be inspected. 9. All rework will be recorded on the Paint Shop Rework Report (RR 008) Work Inst # PS 003 Revision # 04 Page 1 of 1 Approved By: Mark Pemberton 11 Nov 2016

TWO COMPONENT ISOCYANATE-FREE TOPCOAT PAINT PROCEDURE 1. Metal Preparation a. Metal preparation shall be carried out as outlined in PS001 for all new metal parts b. Items that are being repainted shall be steam cleaned and blown dry to ensure all grease and oil are removed. c. All previously painted surfaces shall be sanded to ensure adhesion of primer coating. 2. Primer a. All bare metal surfaces shall be primed using PPG Spectracron Fleetprime Epoxy Primer Series 634 b. Primer shall be mixed in accordance with PPG s mix ratio of Blend 1:1 c. Induction Period: None d. Recommended Wet Film: 3.0 6.0 mils e. Recommended Dry Film: 2mils minimum 2.2 mils f. Recommended Thinner: 89 Thinner Slower, 66 Epoxy Thinner g. Number of Coats: 1-2 h. Clean up: MEK, Lacquer or Recommended Thinners i. Application shall be air spray j. Air Dry @ 25oC k. Dry to touch: 15 to 60 min depending on air temperature l. Dry to handle: 60 min with 734001, 3 hrs with TX7068 m. To topcoat recoat: 45 min n. Force dry: Flash 10 min @ ambient, 20 min @ 160oF 3. Paint a. Top coat shall be 653 Series 2C Acrycote 3:1 b. Top coat shall be mixed in accordance with PPG s mix ratio of 3:1 c. Recommended Preparation: Properly prepared substrate coated with corrosion resistant primer. Recommended primer is a two component epoxy primer. d. Atmospheric Conditions: Surface and product temperatures must be at least 10 deg C (50 F) and at least 3 deg C (5F) above dew point. Apply in dry weather when relative humidity is less than 85%. e. Induction Period: None @ 21 deg C (70F) f. Thinning Ratio: (if required)airless 10-20%, A.A.Airless 20-30%, Conventional 25-40% g. Application Procedure: Prior to and immediately following application, rinse all equipment clean with 87 or 89 Thinner. When application is made by airless or air assisted airless, use an Work Inst # PS 005 Revision # 03 Page 1 of 2 Approved By: Mark Pemberton 11Nov 2016

inbound pressure approx. 10-15 lbs above the level at which "fingering" occurs. Apply material in one wet coat overlapping each pass 50%. Special attention should be given to all edges, pits, welds, corners, rivets and other rough spots to ensure complete coverage. INSPECTION Inspections and checks are to be completed for each layer.(primer & topcoat). FleetPrime 634 Epoxy Mixing Instructions SUBSTRATE PREPARATION The surface must be clean and free of all contamination by abrasive blasting or chemical cleaning. Blast to white metal SSPC #10 with a blast profile not exceeding 25% of total DFT. Non blasted substrates should be degreased and properly cleaned (preferably phosphate treated) for maximum adhesion. MIXING INSTRUCTIONS Mix well with mechanical agitation prior to use Mixing Ratio 1:1 634xxxx : 734004 1 : 1 Pot Life @ 70 F/ 50% RH APPLICATION PARAMETERS 8 hours as supplied High Heat will shorten Pot Life. Store paints at room temperature Spray Viscosity 30-35 seconds #2 EZ Zahn Cup. Thin with 85 if required Spray gun set up Fluid tip Air Pressure HVLP 1.5 mm 45 55 psi Number of coats 2 coats WFT DFT 4.5-6.0 mils 2.0 2.5 mils Fluid Flow 10 16 oz/min NOTE: Metal temperature should be above 50 F for consistent application and drying BAKING PARAMETERS Flash time 10 minutes minimum Air dry 3 hours Bake 20 minutes above 160F substrate temperature RECOAT INSTRUCTIONS Work Inst # PS 005 Revision # 03 Page 1 of 2 Approved By: Mark Pemberton 11Nov 2016

Recoat 1 hour minimum 30 days maximum Additional Information: This epoxy primer shows excellent adhesion properties to Acrycote beyond 7 days. However, a light scuffing is generally recommended to ensure removal of surface dust and contaminants and ensure optimum adhesion after 30 days. Cold metal or paint temperature will impact application and appearance issues as well as dry times Consult MSDS for proper protective equipment. Note: Statements and methods described herein are based upon the best information and practices known to PPG Industries, Inc. However, procedures for applications mentioned are suggestions only and are not to be construed as representations or warrantees as to performance or results, nor does PPG Industries, Inc., warrant freedom from patent infringement in the use of any formula or process herein. Work Inst # PS 005 Revision # 03 Page 1 of 2 Approved By: Mark Pemberton 11Nov 2016

PAINT TOUCH-UP 1. Metal preparation is the first step in ensuring both the adhesion and appearance of the finishing top coat of paint to meet our customer expectations and LIFTKING s quality objectives. Therefore it is mandatory for all personnel involved in the preparation of material for painting, understand and adhere, to the following instructions. 2. All materials processed for paint touch ups at Liftking are fabricated using steel of various grades depending on design criteria. 3. Materials to be processed for paint touch ups include A. Heavy Steel Metal Parts Such as frames, masts, carriages, booms overhead guards, wheel bogey assemblies, cab frame assemblies etc. B. Sheet Metal Parts Such as fenders, engine and transmission covers, doors, cabs, etc. C. Component Parts Such as cylinders, axles transmissions etc. A. ALL SURFACES 1. Grind or Sand all surfaces in preparation for primer and top coat. 2. Grind, or Sand as required to remove sharp edges and corners. 3. If overspray is present clean off with a wet rag. If it does not come off, sand surface to remove gloss and to prepare surface for painting 3. All previously painted area s shall be sanded to remove gloss. 4. All bare metals must have a good coat of primer of at least (2-3 mils) 5. All top coat should have a finish of 3mils 6. total paint coverage should be a minimum of 5-5.5mils. B. COMPONENT PARTS 1.All component parts must be cleaned with a nonoil base solvent C. TOOLS 1. A small gravity feed touch up gun should be used for surface areas greater than one inch squared. 2. All area s smaller than one inch square a brush can be used. D. MIXING 1. Primer packets and paint packets should be mixed together as per instructions on the packet. 2. Liquid paint cans must be mixed as per manufactures instructions. See attached separate instructions Work Inst # PS 008 Revision # 02 Page 1 of 1 Approved By: Mark Pemberton 17 January 2017