COMPANY PRESENTATION Sandvik Materials Technology Sandvik Riser Technology AS Bjørn Angeltveit Managing Director NFLB, september -11
Safety first! At safety is our top priority. EMERGENCY EXITS ALARM ASSEMBLY POINT EMERGENCY NUMBER PROTECTIVE EQUIPMENT
Sales 2010: SEK 60 billion (USD 10 bn) 40,000 employees and representation in 130 countries Products with high R&D and added value Global leader in selected areas
Sandvik Group a global leader Three business areas Sandvik Tooling Sandvik Mining and Construction Sandvik Materials Technology Invoicing MSEK Employees 23 893 35 182 17 703 15 278 15 455 9 058 31 Dec. 2010
Oil and gas related products Hydraulic control lines Wirelines Umbilical tubing Production tubing Powder metallurgy Bars and billets Tube&Pipe HX Fittings and flanges Sandvik ClikLoc
R&D Modelling Mechanical testing Welding Corrosion Material analysis e.g. FEM, Thermocalc e.g.fracture mechanics, fatigue, high T e.g. TIG, MIG various e.g.sem, TEM, GD-OES
Sandvik Riser Technology AS Head office in Tananger Office, Workshop and Testing Facility Inhouse design/engineering ClikLoc Connector approved for Topside applications First job successfully delivered to BP Skarv Subsea Riser in final development stage
Sandvik Riser Technology Sandvik ClikLoc Riser System Faster and safer connection compared to existing technology resulting in faster start up of production and reduced rig time Slim design reducing weight. Made in superduplex steel which results in increased fatigue resistance and longer life expectancy. Eliminating the need for expensive crew or sophisticated tools. Reduced maintenance cost General presentation Juni June 2011
Verification and Testing Workshop Testing Operational Testing Full Scale testing Bendig, Fatigue, temperature/pressure, interchangebility. Design Verification and testing in accordance to ISO 13628-7
Typical Top Side Applications Well completion Well Intervention
BP SKARV Project (2011) Work at Borgland Dolphin
Field activities ConocoPhillips/BJ Services CT tower at Ekofisk X Marathon Oil Company Norway Top landing string/sft connection Deep Sea Bergen at Alvheim field Statoil/Schlumberger Heave compensator system Heidrun BP Norge AS Tree Running Tool Coil tubing Lift Frame / Wirline Connection SFT/completion
Question? General presentation Juni Januar 2011 2010
Work-over Riser mode Coil Tubing Lift Frame mode TRT (Tree Running Tool) 1091-A08 (3 off) Extended Box c/w Tenaris 8-5/8 Wedge 563 Box Threads 1091-A07 (2 off) Extended Box c/w 11,5 ACME 4-TPI Threads 1091-A06 (2 off) Extended Box c/w API studded falnge 7-1/16 BX 156 1091-A11 (3 off) Extended Box c/w 5-7/8 XT57 DP BoxThreads 1091-T02 (3 off) Sdt Box c/w Lifting and Test Cap, 120 MT SWL. 1091-A09 (3 off) Extended Pin c/w Tenaris 8-5/8 Wedge 563 Pin Threads 1091-T04 (2 off) Std Pin Test Cap 1091-A05 (2 off) Std Pin c/w 7 1/16 10K API BX 156 Fllange 1091-T01 (1 off) Std Pin Test Cap c/w Foundation Plate 1091-A12 (3 off) Std Pin c/w 7 1/16 x 2 Red Bore 10K API BX 152 Flange 1091-T03 (2 off) Stabbing Guide