INDEPENDENT POWER PLANT (4X600MW) Vedanta Limited, Jharsuguda (Odisha)

Similar documents
Committed to make a better world

CEA PRESPECTIVE ON Energy Efficiency in Coal Fired Power Stations CHANDRA SHEKHAR DIRECTOR,CEA

Efficiency on a large scale CFB Steam Boilers

OROT RABIN POWER STATION UNITS x 350 MW

Boiler Calculations. Helsinki University of Technology Department of Mechanical Engineering. Sebastian Teir, Antto Kulla

A Review on Power Generation in Thermal Power Plant for Maximum Efficiency

Performance of the Boiler and To Improving the Boiler Efficiency Using Cfd Modeling

IMPROVING THE EFFICIENCY OF THERMAL EQUIPMENTS OF 210 MW TPS THROUGH THERMAL AUDIT

By K.K.Parthiban / Boiler specialist / Venus Energy Audit System

COGENERATION. This section briefly describes the main features of the cogeneration system or a Combined Heat & Power (CHP) system. 36 Units.

Recovery Boiler Research Needs An Industry Perspective

PERFORMANCE EVALUATION OF NGCC AND COAL-FIRED STEAM POWER PLANTS WITH INTEGRATED CCS AND ORC SYSTEMS

Current state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours:

4 th EU Sout Africa Clean Coal Working Group Meeting

Alstom Development of Oxyfuel PC and CFB Power Plants

BEST PRACTICES TOWARDS ENERGY EFFECIENCY. UltraTech Cement Limited. (Unit -Kotputli Cement Works)

INSTRUCTION MANUAL. Boil-Out TABLE OF CONTENTS SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9

BEST PRACTICES IN INDIAN POWER PLANTS

Chapter 2.2: Boilers

IMPROVING COAL PLANT EFFICIENCY

How To Reduce Coal Power Plant Emissions

OPPORTUNITIES FOR HEAT RATE REDUCTIONS IN EXISTING COAL- FIRED POWER PLANTS: A STRATEGY TO REDUCE CARBON CAPTURE COSTS

A Case Study on Coal to Natural Gas Fuel Switch

Energy Efficiency in Steam Systems

Printing and Publishing Energy Savings Guide

Small Scale Coal Power Plant in Indonesia

TRIAL CHEMICAL CLEANING OF FOULED APH BASKETS

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal.

Review of Potential Efficiency Improvements at Coal-Fired Power Plants

Study of a Supercritical CO2 Power Cycle Application in a Cogeneration Power Plant

High Efficiency Heating

Environment Impact Assessment of Thermal Power Plant for Sustainable Development

HEAT PUMPS A KEY COMPONENT IN LOW CARBON FUTURE

System Assessment Capabilities for Fossil Fuel Power Stations

Natural Gas Conversions of Existing Coal-Fired Boilers

Efficiency Assessment of Condensing Steam Turbine

The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority

Overview of Integrated Coal Gasification Combined-cycle Technology Using Low-rank Coal

Energy Efficiency Improvement in Thermal Power Plants

MODERNIZATION OF STEAM GENERATORS

Thermal efficiency of pulverized fuel boiler

Energy Efficient Operations and Maintenance Strategies for Boilers

Carbon Footprint of CMC Hospital for 2013

International Journal of Engineering Research and Development

Bio-CNG plant. Spectrum Renewable Energy Limited, Kodoli, Kolhapur

PRE-QUALIFICATION ANNOUNCEMENT

Biomass Boiler House Best Practices. Irene Coyle & Fernando Preto CanmetENERGY

Kawasaki PC Boiler (Pulverized Coal Fired Boiler) 2013 Kawasaki Heavy Industries, Ltd. All Rights Reserved

CSP- Biomass Hybrid cogeneration system offers synergistic solution for continuous process industries. 9 th May 2013 Chennai

Technology comparison of CFB versus pulverized-fuel firing for utility power generation

Skoda Supercritical Steam Turbine 660 MW

BOILER EFFICIENCY F7 Energy eco-efficiency opportunities in Queensland Foundries

JASE-world Waste to Energy Sub WG Masanori Tsukahara Hitachi Zosen Corporation

TARIFF DETERMINATION METHODOLOGY FOR THERMAL POWER PLANT

PRE-FEASIBILITY REPORT

HYBRID WAY EAF OFF GAS HEAT RECOVERY -ECORECS- MASANARI YAMAZAKI*1, YASUHIRO SATO*2, RYUTARO SEKI*3

RESIDENTIAL HEATING OIL SERVICE CONTRACT ANNUAL COST $276.00

Process Integration of Chemical Looping Combustion with Oxygen Uncoupling in a Coal-Fired Power Plant

A Truck Driver s Guide to Care and Maintenance of Diesel Particulate Filters (DPFs)

Fortum bygger Sveriges största biokraftvärmeverk i Stockholms stad. Daniel Nilsson Värme & Kraftkonferensen, Stockholm 12 november 2014

Webpage: Volume 3, Issue IV, April 2015 ISSN

LANDFILL GAS TO ENERGY- COMBINED ENGINE AND ORC-PROCESS

Energy Saving Solutions. Bob Montgomery Technical Solutions Specialist Waterloo Manufacturing

Originators of the Flexible Water Tube design

I. STEAM GENERATION, BOILER TYPES

Center for Energy Education Laboratory

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC DRAFT V0.

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

BEST PRACTICES ADOPTED IN JINDAL STEEL & POWER LTD., RAIGARH TO ACHIEVE ENERGY EFFICIENCY. Presented By : Kumar Rohit Sudhanshu Rometra

BIOPOWER 5 CEX. 1 Wärtsilä 10 January 2012 Presentation name / Author

IMPROVING BOILER EFFICIENCY BY USING AIR PREHEATER

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district

The STudSTrupværkeT CHP Plant

Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant:

Energy Conservation Opportunities in Carbonated Soft Drink Canning/Bottling Facilities. Ahmad R. Ganji, Ph.D., P.E. + Bryan Hackett and Sandra Chow

APPLIED THERMODYNAMICS TUTORIAL 1 REVISION OF ISENTROPIC EFFICIENCY ADVANCED STEAM CYCLES

EFFICIENCY WITH DIFFERENT GCV OF COAL AND EFFICIENCY IMPROVEMENT OPPORTUNITY IN BOILER

V. ENERGY SAVINGS IN INDUSTRY

Performance Analysis of Thermal Power Station: Case Study of Egbin Power Station, Nigeria

University of Iowa Power Plant

Waste to Energy in Düsseldorf. for a clean city.

of 11,000 households Steam temperature, boiler 400 C Steam pressure, boiler Incineration temperature 1,100 C

NAWTEC CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED BOILER AND INCINERATION TECHNOLOGY

Development of Coal Gasification System for Producing Chemical Synthesis Source Gas

Columbia University Master Planning & Optimization

Södra Näs Vimmerby Energi AB Biomass District Heating Plant, Sweden

Energy Saving Ideas for Your Box Plant

Energy and Cost Analysis in Pulp and Paper Industry by Auditing Techniques: A Case Study

Assessment of Solar-Coal Hybrid Electricity Power Generating Systems 13

TASK: OPEN/CLOSE PRODUCT ACID VALVE...5 DIP IPA AND FINAL PUMP TANKS...6 CATCH ACID SAMPLES AT PUMP TANKS...7

POLYCITY. Technical measures and experiences at a 6 MW cogeneration plant with wood chip furnace POLYCITY

Renewable Solid Fuel Boiler Project

Hot Water. Heat pump water heaters. Residential and Commercial R410a

912 MW Supercritical Boiler for the next Coal Fired Plant Generation

MC (Multi-Circulation) f o r S A G D a n d I n d u s t r i a l A p p l i c a t i o n s

MAINTENANCE INSTRUCTIONS. Thermia Robust heat pump

Advanced Steam Parameters in a Large Scale CFB Application Operating on REF and Biofuels background and experiences

Well Positioned for the Future

Thermodynamical aspects of the passage to hybrid nuclear power plants

Solar Thermal Systems

Transcription:

First Prize Thermal Power Stations (Coal Fired Plants > 100 MW Capacity) INDEPENDENT POWER PLANT (4X600MW) Vedanta Limited, Jharsuguda (Odisha) Unit Profile Vedanta Ltd. power operations include a 2,400 MW. It is an Independent Power Plant with 4X600MW unit configuration. Boiler is a subcritical reheat, single furnace, single reheat forced circulation, balance draft, dry bottom, suspension type coal fired boiler. The furnace is tangential firing type with one layer of light oil gun and three layers of heavy oil guns in every corners of boiler. The boiler is designed to produce 2028 tons/hour steam at 17.5 MPa pressure and 541deg.C at MCR capacity with coal having high heating value of 3300 kcal/kg. The turbine type is: sub-critical, primary reheat.single shaft.three cylinder and four-flow, and condensing type and its design rated power is 600MW,which characteristics include: Combination of the HP& IP cylinder, double-flow reverse arrangement of the LP cylinder. Plant is equipped with state of art Hybrid ESP(ESP with Bag filter) to reduce the emission level below 50mg/NM 3.High concentrated slurry discharge system(hcsd) installed to reduce water consumption as well as optimum use of resources for ash storage. 477

Salient Features of Independent Power Plant Sl. No. Features Details 1 Capacity 2400 MW 2 Configuration 4 x 600 MW 3 Type of boilers Pulverized coal fired boilers 4 Power evacuation Power transmission through 400 KV lines to National & State grid 5 Fuel Coal 6 Source of Coal Mahanadi Coal Fields (45-km from proposed site) 7 Coal Requirement 14 Million MT 8 Sulphur content 0.3 to 0.5 % (Max) 9 Ash Content in Coal 41.6 % (Max) 10 Ash generation 16700 TPD (Based on 100% PLF) 11 ESP efficiency 99.95% 12 Stack Two twin Flue stacks of 275-m height 13 Water Requirement 6146 m3/hr. from Hirakud & Source Plant Operating Parameters Sl Operating Parameter UOM F.Y F.Y F.Y F.Y 2011-2012- 2013-2014- 12 13 14 15 1 Plant Loading Factor % 44% 40% 40% 39% 2 Availability % 64% 60% 58% 56% 3 Utilisation % 69% 66% 69% 70% 4 Aux Power % 10.45% 9.89% 8.55% 8.08% 5 Station Heat Rate Kcal/kWh 2444 2431 2429 2338 6 Specific Coal @ 3000 GCV gms/kwh 815 810 810 779 7 Specific Oil Consumption ml/kwh 2.29 1.12 0.56 0.38 478

479

Energy Efficiency Projects Achievement of Annual energy savings in 2014-15 Year of Project Description Electricity Fuels* Investment Commis- (Lacs Coal F.Oil Gas Total Total incurred sioning kwh) (ton (kl) (Lac fuel savings on the of the nes) Nm 3 ) (MTOE) (Rs. project projects Lacs) (Rs.Lacs) CW P/P modification- Speed 6 1 0 0 0 0.000005 123 0 reduction by increasing the no. of poles from 16 to 18 Loading reduce on ID Fan by 5 7 0 0 0 0.000005 114 0 replacing APH seal with soft seal Replacement of FF bags to 3 8 0 0 0 0.000003 76 100 reduce ID Fan loading CEP modification by De-staging 1 8 0 0 0 0.000002 35 0 Stopping of One CW pump 7 0 0 0 0 0.000006 140 0 Arresting of air leakage 1 1 0 0 0 0.000001 23 0 PA header. Power saving in Mills by 5 7 0 0 0 0.000005 114 0 decreasing the no of balls. FY 2014-15 Retrofitting of VFD in Bottom 8 0 0 0.000001 15 30 ash slurry pump Stopping of DP transfer pump 1 3 0 0 0 0.000001 26 0 (taking hot-well makeup through vacuum) Vacuum pump running 1 6 0 0 0 0.000001 32 0 hours optimization During unit Start-up use 6 0 0 0 0.000001 12 0 TDBFP instead of MDBFP installation of dozing line in 8 0 0 0 0.000001 16 0 DP pump to boiler filling line Mill Optimization on part loads 1 0 0 0 0 0.000001 21 0 Running Optimization of 2 2 0 0 0 0.000002 44 0 service water pump stopping of 2 compressor 3 1 0 0 0 0.000003 62 0 Geho pump running 2 0 0 0 0.000000 4 0 hour reduction Belt utilization for bunkering 1 1 0 0 0 0.000001 23 0 from 37% to 58% Isolation of standby cooler 2 0.000000 5 0 of OCCW Saturated steam washing 0 87600 0 0 0.030099 1822 0 of Unit#1 turbine deposits Optimization of Excess Oxygen 0 32938 0 0 0.011317 685 0 by defined oxygen control limits near to 3% Furnace Cleaning-Optimization 0 1226 0 0 0.000421 26 0 in Soot Blowing operation SH & RH spray auto loop tuning 0 2453 0 0 0.000843 51 0 480

SADC controlling for control 0 7 0 1 0 0 0.000241 15 0 the drift and RH steam temperature on higher side. Monitoring of losses impacting 0 23687 0 0 0.008139 493 0 on Heat rate and corrective action Boiler modification. 0 24528 0 0 0.008428 510 0 Re-heater temperature 0 15768 0 0 0.005418 328 0 improvement Condenser performance 0 2628 0 0 0.000903 55 0 improvement methods. Turbine offline washing 0 25200 0 0 0.008659 524 0 in Unit#2 Reduction in Un-burnt carbon% 0 5256 0 0 0.001806 109 0 DM make up reduction. 0 26280 0 0 0.009030 547 0 CBD flash tank optimal usage 0 5 2 6 0 0 0.000181 11 0 Charging of auxiliary header with ext-4 when unit load is 0 2102 0 0 0.000722 44 0 greater than 400MW Start-up time reduction 6 0 1 9 8 0 0.000183 127 0 Reduction in number of tripping 1 4 0 1340 0 0.001240 806 0 Energy Policy 481