SUPPLIER EVALUATION QUESTIONNAIRE

Similar documents
SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE

Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E

Generic CMMS Quality Assurance Plan

INTRODUCTION: PURPOSE:

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division

EVALUATION AND ACCREDITATION OF SUPPLIER TEST FACILITIES GP 10

GLOBAL AEROSPACE PROCEDURE

Helical Products Co., Inc.

Self-Audit Checklist

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements

Surgi Manufacturing Quality Manual

Supplier Quality Requirements and Clauses

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

Purchase Order Clauses and Conditions

Bogue Machine Company, Inc. Business Instruction

QUALITY CONTROL MANUAL

How To Ensure Quality Assurance

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

LinkTech LLC 3000 Bunsen Ave. #A Ventura, CA 93003

Quality Management System Manual

Standard Practice for Quality Control Systems for Nondestructive Testing Agencies 1

L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3

Quality Management System Manual ISO9001:2008

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ

ISO 9001:2008 Audit Checklist

PERFORMANCE EXCELLENCE Procurement Standards

UNCONTROLLED COPY FOR REFERENCE ONLY

BASE CONSTRUCTION INC

ONTIC UK SUPPLIER QUALITY SURVEY

DOCUMENT CS/1: SCHEME DESCRIPTION AND BENEFITS

PITT COMMUNITY COLLEGE Appendix D

ISO 9001:2008 Requirements Explained - An Adobe PDF File for Use on a Network System

QUALITY MANUAL REVISION RECORD

ISO 9000 Introduction and Support Package: Guidance on the Documentation Requirements of ISO 9001:2008

ACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) June 2014

ISO/IEC QUALITY MANUAL

Chapter 4: Contractor Quality Control

Quality Control Procedures QCP 5.4 Page 1 of 5

PHENIX OF IDAHO, INC. SUBCONTRACTOR QUALITY ASSURANCE PLAN

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM

PPG AEROSPACE SUPPLIER QUALITY CONTROL REQUIREMENTS

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

QUALITY MANUAL ISO Quality Management System

Supplier Quality Requirements F16 Program

Quality Assurance Manual January 2008 Revision I Revision date of 01/17/13. Pi Tape Corporation. 344 North Vinewood St. Escondido CA USA

Change Healthcare Claims Provider Information Form *This form is to ensure accuracy in updating the appropriate account

Rev. ECO Description Author Approved Date A Initial Release B. Klatt W. Mayer 04/07/93 B General Editorial Update B. Klatt M.

Quality Management System Manual

STEEL fabrication quality SySTEmS guideline

Chandler-Arrow Division Arrow Supplier Quality Requirements

EXPORT AIRWORTHINESS APPROVALS

Supplier Quality Assurance Requirements Manual

QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park

The President of Inductors Inc. is the senior executive responsible for operations.

DEC STD ISO Quality Systems - Model for Quality Assurance in Production and Installation

Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22

Quality Management System Manual

MEAT GRADING AND CERTIFICATION BRANCH QUALITY MANUAL

ISO 9001:2015 QUALITY MANAGEMENT SYSTEM ***** ISO 14001:2015 ENVIRONMENTAL MANAGEMENT SYSTEM

Business Management System Manual. Context, Scope and Responsibilities

Quality Assurance QUALITY ASSURANCE PLAN

Supplier Quality Assurance

Quality Manual ISO9001:2008

HP SUPPLIER ENVIRONMENTAL PERFORMANCE REVIEW QUESTIONNAIRE

Quality Supplier Requirements for Beckwith Electric Co., Inc.

Contents. Foreword 2. Appendix 1: Excerpts from definitions and certificates of material deliveries in accordance with EN / January 2005

Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011

Quality Manual SE Morning Way Suite 102 Clackamas OR 97015

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

Owner-User Pressure Equipment Integrity Management Requirements

ISO/TS 16949:2002 Guidance Document

Supplier/ Vendor Evaluation Form

Document Management Operations Audit Checklist

SUPPLIER FIRST ARTICLE INSPECTION INSTRUCTIONS AND FORMS

Page 1 of 7 Effective Date: 12/18/03 Software Supplier Process Requirements

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables

Implementing ISO 9001

Q2A First Article Inspection (FAI) AS9102 * Revised ** Added

AS9100 Quality Manual

SUPPLIER QUALITY SELF AUDIT & QUESTIONNAIRE FORM

QUALITY POLICY MANUAL Document: Revision: E Effective Date: January 15, 2010

NABL NATIONAL ACCREDITATION

When printed the document is for reference only and is considered uncontrolled - refer to the Document Control System for the most current version

KOLLMORGEN. Title: Standard Operating Procedure Counterfeit Parts

QP-740. Supplier Management Handbook

Doc Edition Section Question Answer Q1 9th /

THE KOCOUR COMPANY 4800 S. St. Louis Avenue, Chicago, IL 60632

IMQ RULES. Contents. IMQ Rules - Product certification

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008

Forth Engineering (Cumbria) Limited QUALITY MANUAL. Quality Manual Issue 4 Updated April Authorised by: Managing Director.

EXHIBIT MATERIALS MANAGEMENT REQUIREMENTS FOR CONTRACTED STORAGE PROVIDERS

Distributors In addition to the requirements noted herein, Distributors shall have a Quality System

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059

Quality Manual ALABAMA RESEARCH & DEVELOPMENT. This Quality Manual complies with the Requirements of ISO 9001:2008.

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

Transcription:

SUPPLIER EVALUATION QUESTIONNAIRE COMPANY NAME: DATE: ADDRESS CITY STATE PHONE: FAX EMAIL If a division of subsidiary, please list name and address of parent organization: INTRODUCTION The attached questionnaire will be used by Quality Assurance personnel to evaluate your Quality Assurance capabilities. Submittal of this questionnaire, by itself, does not constitute an approval of your company as an approved source. MSI may, after receipt of the completed questionnaire, Conduct an on-site survey of our facility. Since Quality Assurance approval is necessary before a Procurement award can be made, it is to your benefit to return this form as soon as possible. INSTRUCTIONS 1. All questions should be answered. If questions are not applicable, they should be identified N/A. If the answer is none, state NONE. Enter an X in appropriate spaces on yes /no questions. 2. If supplemental data is submitted, check with an asterisk (*) and identify the attachments by the applicable paragraph number. A supplemental data sheet is attached for your convenience. 3. Answers should reflect you current status. Do not reflect procedures or capabilities which are anticipated or proposed. 4. Questionnaire should be returned with ten (10) days. 5. Completed questionnaires should be directed to: Vice President Quality Assurance McCormick Selph, Inc. 3601 Union Road P.O. Box 6 Hollister, California 95024-0006 The information contained in this questionnaire is certified to be complete and accurate. Supplier s Signature (Authorized Official) Title Date Page 1 of 6

Section I Organization 1. Key Personnel: President/Owner(s) General Manager Quality Control Manager Chief Inspector 2. To whom does Quality Control Manager report (title) 3. To whom does the Chief Inspector report? (title) 4. Present number of employees: a. Engineering b. Manufacturing c. Quality Assurance (1) Inspection (2) Test d. Other e. Total Number 6. Company Particulars: a. How long has company been in business as presently organized? b. What is principal product(s)? c. List principal customers for whom you have supplied work in the past two (2) years. d. List principal companies and/or Government agencies which have surveyed and approved our Quality Control system: Company/Government Agencies Date Name of Surveying Representative Page 2 of 6

Section II Quality Assurance Systems and Procedures 1. Is a written Manual of Quality Procedures available and maintained for use by quality personnel? Yes No 2. The Quality Control System is derived to comply with the following system specifications(s): ISO 9001 ISO 9002 NHB 5300.4(C) ANSI 2540-1 Other 3. If your Quality System has been certified to an ISO Standard complete to following; Level of ISO 9000 certified ISO-9001 ISO-9002 Registrar s Name: Registration Number: 4. Is your Government surveillance or source inspection by: Itinerant Inspector Resident Inspector None 5. Name and address of Cognizant Government Inspection Agency: 6. Is a current copy of your Quality Manual available to MSI upon request? Yes No Section III Special Processes List all Special Processes performed at this location: (include additional sheets is necessary) Special Process To Mil-Std? Page 3 of 6

Section IV Quality Control System Elements 1. INSPECTION a. Is a check list used by Receiving Inspection indicating the degree and extent of inspection for incoming material? b. Are statistical Quality Assurance procedures employed for items not 100% inspected? c. If statistical sampling is employed, what Military Specification is employed? Yes No d. Are inspections performed on all work received for vendors? e. Is objective evidence of receiving inspection results maintained on file? f. Are procedures established to certify personnel and/or equipment for special processes as may be required contractually? g. Are nonconforming materials removed from the production areas and permanently identified or destroyed to preclude further usage? h. Are acceptable parts and materials positively identified? i. Are inspectors issued controlled inspection stamps? j. Are procedures for in-plant corrective action written and operative? k. Are procedures for supplier s corrective action written and operative? 2. INSPECTION RECORDS a. Are inspection acceptance records maintained which display identification of the item, quality of units, identification of inspector, quantity of units accepted/rejected? b. Will records be kept on file for the duration contractually required 3. MATERIAL CONTROL a. Is each piece, batch, lot or group of raw material identified by, or traceable to: kind of material, type, condition, source of supply, heat number and lot number? b. Is type and condition of material verified upon receipt and /or issuance? c. Are material analysis and process verification performed at your facility? d. Are certifications, analyses and verification of test results traceable to specific lots of batches of material? e. Is purchased material identified by stamp, tag or color code to show inspection status? f. Are time sensitive or age control materials properly identified and stored? Page 4 of 6

Section IV Quality Control System Elements (Continued) 4. MEASURING AND TEST EQUIPMENT a. Are procedures in affect which describe the method and frequency of calibration of measuring and test equipment to master stages or standards? b. Are records maintained on periodic re-calibration? c. Is measuring and test equipment marked to designate certification and to indicate date next calibration is due? d. Are calibrations performed within your facility? e. If yes, are master gages and standards (1) traceable to National Bureau of Standards? (2) periodically certified as to accuracy? f. If no, are certifications on file indicating: (1) name of company performing calibration? (2) equipment used for calibration? (3) traceability of equipment used for calibration to National Bureau of Standards? g. Is equipment stored so as to prevent damage or loss of calibration when not in use? 5. PROCUREMENT CONTROL a. Are quality capabilities of sources evaluated prior to procurement? b. Are applicable drawings and specifications referenced or included on purchase orders to lower-tier sources c. Do Quality Assurance personnel review purchase orders to assure the incorporation of quality requirements? d. Are certified test reports and /or certifications of conformance obtained on purchased materials? 6. INSPECTION STATUS a. Are parts and assemblies identified to indicate the extent of in-process inspection status? b. Does material accepted show evidence of final inspection acceptance? 7. PACKAGING/SHIPPING a. Are parts and assemblies identified to indicate the extent of in-process inspection status? b. Is packaging and marking monitored by inspection? Page 5 of 6

Section IV Quality Control System Elements 8. SUPPLEMENTAL INFORMATION You are invited to include any additional or supplemental information which would be pertinent to this application and the evaluation of your capabilities. (Use continuation sheets or attachments as necessary) Page 6 of 6