IMQ RULES. Contents. IMQ Rules - Product certification

Size: px
Start display at page:

Download "IMQ RULES. Contents. IMQ Rules - Product certification"

Transcription

1 IMQ RULES PRODUCT CERTIFICATION "ELECTRIC ENERGY METERS AND METER UNITS" PRODUCT OF NEW MANUFACTURING Contents IMQ Rules - Product certification Particular Rules for the Electric energy meters and meter units sector (products of new manufacturing) Acceptance This is a translation of the original text, which prevails in case of doubts. This bundle is made up of the Rules and Particular Rules, which, after being read carefully thoroughly, must be signed in acceptance by means of two signatures on the last page at the points marked and indicated by the same colour as this strip.

2 PARTICULAR RULES FOR THE SECTOR "ELECTRIC ENERGY METERS AND METER UNITS" PRODUCTS OF NEW MANUFACTURING Index Date of updating Art. 2 October 2006 Art. 3 March 2002 Art. 4 March 2004 Art. 5 March 2002 Art. 6 March 2004 Art. 8 March 2002 Annex 1 October 2006 Annex 2 October 2006 Annex 3 October 2006 Annex 4 October 2006 Annex 5 October 2006 Annex 6 March 2002

3 The following Particular Rules contain further details concerning the granting by IMQ of the licence to use IMQ marks in compliance with the standards or technical specifications for products belonging to the Electric energy meters and meter units relevant to products of new manufacturing and mass produced, in accordance with the provisions of point 1.2 of IMQ Rules Product Certification. The following text indicates the additions or modifications to each article of the Rules, using the same numeration. Article 2 - GENERAL CONDITIONS 2.1 Addition: Annex 1 lists the categories of electric energy meters and integrated meter units, as well as the relevant standards or specifications which these items must comply to. The conformity marks for these products are: IMQ In case one or more approved standards are applicable and such standards cover with a sufficient detail both safety and performance requirements of the product. IMQ Certificate with Surveillance In case the product is tested according to a particular specification approved by the Technical Committee, as well as one or more approved standards are partially applied. 2.6 Addition: In order to grant a constant conformity of the product, the following is required: - the applicant shall be the company responsible (*) for the product for which the licence to use the Mark is requested; - the applicant shall apply a quality system in conformity with standard UNI EN ISO 9001:2000, to ensure that the design, development and production, as well as tests and checks required for the electric energy meters and integrated meter units, subjected to these Rules, comply with the requirements of said series of standards. The conformity of the applicant s quality system shall be certified by an independent, recognized body; - the applicant and any other companies operating during the various stages of the production cycle shall comply with the requirements indicated in Annexes 2 and 3 of the Particular Rules herein. (*) company responsible for the product implies the company which assigns its own trade name to the product itself PARTICULAR RULES - October ART. 2 "Electric energy meters and meter units" Page 1 of 1

4 Article 3 - PROCEDURE TO BE FOLLOWED FOR THE APPLICATION Addition: Any manufacturing modification - relevant to standard requirements - that the applicant wishes to introduce in the model for which the approval Mark is requested must be clearly indicated on the application form. The Technical Committee shall decide, by final judgement and taking into account relevant trends in national and/or international spheres, whether the variations concerned change the product sufficiently to make it necessary for the Applicant to submit a separate application for a new model Addition: The procedures for the tests required by the standards at the end of the insulation tests, are stated in Annex 5. ARTICLE 4 - SYMBOLS 4.1 Addition: Electric energy meters and meter units allowed to use the IMQ mark shall be marked with the following symbol: Products allowed to use the IMQ Certificate with Surveillance shall be marked with the following symbol: Said mark shall be printed either on products label or on the side of at least one cap seal; in case such a seal is necessary in order to guarantee the wholeness of the energy meter or meter unit. ARTICLE 5 LICENCE CONDITIONS Addition: The tests to carry out on the product before it is put on the market are stated in Annex 2, point D. PARTICULAR RULES - March ART. 3/4/5 "Electric energy meters and meter units " Page 1 of 1

5 Article 6 - CONTINUOUS SURVEILLANCE OF THE USE OF THE MARK Addition: IMQ will periodically assess the system implemented by the licensee to grant the conformity of products to applicable standards or specifications; it will also examine the results of verifications carried out by the licensee. These assessments shall be conducted once a year Addition: IMQ shall repeat the type tests stated in paragraph 2.4, whenever it deems necessary. In case of small lot production and/or infrequent models, IMQ may request notification of said from the licensee on a case-by-case basis and, on request, the licensee shall send the final test reports to IMQ. In case of non-continuous production, on-call inspection procedures may be applied (see Annex 4 - point 4) Addition: Routine tests on the production of meters and meter units granted with the mark shall be carried out by IMQ, according to the procedures stated in Annex 4. In case the tests are carried out at the manufacturer s or at the buyer s premises, the licensee shall give evidence of the calibration status of the used testing equipment. According to the amount of production and to the specific control systems used, the Technical Committee will define, case by case, the number of samples which shall be tested at IMQ laboratories during the year. In case the licensee uses several production units, the provisions of Annex 4 are intended as being referred to each production unit. In relation to the above, when different production units are used to manufacture the same product, the production unit concerned shall be suitably specified on the product itself. ARTICLE 8 - MODIFICATIONS OF THE RULES AND/OR STANDARDS 8.1 Addition: The licensee undertakes to modify its lots of meters or meter units already approved and in stock in its warehouse according to any Amendment of relevant standards or specifications, as stated therein. PARTICULAR RULES March 2002 ART. 6/8 "Electric energy meters and meter units" Page 1 of 1

6 Annex 1 PRODUCTS CATEGORIES OF THE SECTOR ELECTRIC ENERGY METERS AND METER UNITS ALLOWED TO CERTIFICATION CATEGORIES MARK STANDARDS / SPECIFICATIONS THE PRODUCT MUST CONFORM TO 701 Single-phase energy meters IMQ CEI EN :2003 CEI EN :2003 CEI 13-15/1 st Ed. + V1: Three-phase energy meters IMQ CEI EN :2003 CEI EN :2003 CEI 13-15/1 st Ed. + V1: Three-phase energy meters with maximum power gauge IMQ CSV CEI 13-8/1 st Ed. + V1:2000 CEI EN :2003 CEI EN :2003 Technical tests specification no. IMQ-CTP-043 Edition II 704 Single-phase electric energy meter units IMQ CEI 13-26/3 rd Ed Three-phase electric energy meter units Direct insertion three-phase watt-varhour meters integrated units for lowvoltage networks without UEPB electronic unit. TA insertion three-phase watt-varhour meters integrated units for lowvoltage networks without UEPB electronic unit. IMQ CSV CSV CEI 13-26/3 rd Ed CEI 13-32/1 st Ed Technical Test Specification no. IMQ-CTP-044 Ed. I/Rev. I Technical Test Specification no. IMQ-CTP-044 Ed. I/Rev. I 720 Static watt-hour meters Watt-Var-hour meters and power limiters (integrated units (GIS)) Digital electronic maximum power indicators. IMQ IMQ CSV CEI EN :1999 CEI EN :2003 CEI EN :2003 CEI EN :2003 CEI EN :2003 CEI Technical Test Specification no. IMQ-CTP-043 Ed. II PARTICULAR RULES - October ANNEX 1 "Electric energy meters and meter units " Page 1 of 1

7 Annex 2 REQUIREMENTS CONCERNING THE DESIGN, DEVELOPMENT AND PRODUCTION OF ELECTRIC ENERGY METERS AND INTEGRATED METER UNITS A. The executive project for static watt-hour meters or the metering system (*) used for Ferraris type electric energy meters or integrated meter units, subject of the application for licence to use the IMQ mark, shall be carried out by a company whose own quality system is in conformity with the UNI EN ISO 9001:2000 standard and is certified by an independent, recognized body. This project shall include the necessary requirements for the manufacture and final test of single components and sub-sets of the static watt-hour meter or metering system, as well as the system itself. B. During the development stage, the applicant shall grant that the type tests required for the product are carried out, according to what stated in Annex 3. C. The static watt-hour meter or metering system used for Ferraris type electric energy meters or integrated meter units, subject of the application for licence to use the IMQ mark, shall be assembled at one production unit, which must have a quality system in conformity with UNI EN ISO 9001:2000 standard and be certified by an independent, recognized body. D. As concerns finished samples, the applicant shall grant that calibration and testing take place using procedures that guarantee conformity with applicable standards; said procedures shall be described in a specific document, which shall also include considerations supporting the claim that said procedures conform to applicable standards. Moreover, the above mentioned operations shall be carried out by a company having a quality system in conformity with UNI EN ISO 9001:2000 standard and certified by an independent, recognized body. The results of testing shall be made available for IMQ to consult. (*) The definition given in paragraph 2.1 of the CEI 13-26/3 rd Ed standard is applicable. PARTICULAR RULES - October ANNEX 2 "Electric energy meters and meter units " Page 1 of 2

8 Annex 2 E. Companies operating during the various stages of the production cycle, described in previous points of Annex 2 herein, shall also meet the following, additional requirements. Said requirements are intended as being in addition to those stated in the UNI EN ISO 9001:2000 series standard. E.1 Data and basic requirements of design Product design shall be based on the relevant standards, stated in Annex 1 of this Rules. E.2 Purchase data As concerns particular requirements for product traceabilty, the operating company shall keep a copy of relative purchase documents. E.3 Product identification and traceability a) Identification In case the company assembling the products also manages to revise the electric energy meters or integrated meter units, said company shall grant that products of normal production are identified and can be distinguished from revised products at all times. b) Traceability Companies operating during the various stages of the production cycle, according to their competence, shall set out, document and maintain traceability procedures. These procedures shall define the entity of traceability and facilitate corrective measures. E.4 Quality records control All companies operating during the various stages of the production cycle shall keep quality records for at least 10 years from the delivery date of the electric energy meter or integrated meter unit. Said companies shall also create and maintain a record of each lot of electric energy meters or integrated meter units so as to allow traceability and to identify the quantities produced and sent out for distribution. Records of the lots shall be checked and authorised. PARTICULAR RULES - October ANNEX 2 "Electric energy meters and meter units " Page 2 of 2

9 Annex 3 REQUIREMENTS CONCERNING TYPE TESTS TO CARRY OUT ON ELECTRIC ENERGY METERS AND INTEGRATED METER UNITS 1. TYPE TESTS TO CARRY OUT The applicant shall grant that the type tests stated in the standard specified on Annex 1 are carried out. In case of companies operating during the various stages of the production cycle, as of Annex 2, do not have the test equipment for conducting some of the type tests in question, they may contact laboratories with whom company relations are such that they can fully and freely use the equipment in question. Alternatively, the companies may refer to independent laboratories, provided they are recognized by organisations which are signatories of international agreements (for example: EA - European cooperation for Accreditation). 2. RESULTS DOCUMENTATION The results of the type tests carried out shall be recorded in test reports set out in compliance with UNI EN ISO/IEC standard. Said reports shall be kept available for IMQ to consult. PARTICULAR RULES - October ANNEX 3 "Electric energy meters and meter units " Page1 of 1 1

10 Annex 4 TESTS TO BE CARRIED OUT BY IMQ ON ELECTRIC ENERGY METERS AND INTEGRATED METER UNITS COVERED BY CERTIFICATION 1. - Number of samples to collect for sampling and tests Ferraris type meters/single-phase units: - for plants with a production equal to or above 150,000 items per year, 80 meters/units selected each month. - for plants with a production below 150,000 items per year, 80 meters/units selected every 2 months. Ferraris type meters/three-phase units: - 40 meters/units selected every 2 months. Static watt-hour meters: - for plants with a production higher than items per year, two samples, each one made up of 40 meters. - for plants with a production equal to or above 60,000 items per year, 40 meters selected every month. - for plants with a production below 60,000 items per year, 40 meters selected every 2 months. An entire packaged set of products ready for dispatch shall constitute the above samples. With the exception of static watt-hour meters, a further 5 meters/units, not yet sealed, shall be sampled in order to carry out mechanical tests. For plants with a production higher than items per year, at the beginning of the surveillance activity, the inspection visits will be carried out with a weekly frequency. After 4 inspections, if no points of non-compliances arise, the relevant frequency will be changed into a fortnightly one. Every time a non-compliance arises, the frequency will return to the one described before. Companies with non-continuous production may apply an on-call inspection procedure (see point 4 below) Tests to carry out and procedures a) Ferraris type electric meters and integrated meter units IMQ shall carry out tests from 1 to 10 of the CEI EN 60514:1997 standard, or tests from 2 to 11 of the CEI 13-15:1997 standard on each sample comprising 40 or 80 meters/units. It will also carry out test 11, or test 12 respectively of the above standards (mechanical test), on 5 meters/units which have not been sealed yet. PARTICULAR RULES - October ANNEX 4 "Electric energy meters and meter units " Page1 of 4

11 Annex 4 b) Static watt-hour meters IMQ shall carry out tests from 1 to 10 of the CEI EN 61358:1997 standard on each sample of 40 meters, following the procedures stated in these standards: CEI EN 61358:1997, for active energy meters, classes 1 and 2 (tests from 1 to 10) Technical Test Specification n. IMQ-CPT-055 Ed. I/Rev. I for all the other type of the electrical energy meters (tests from 1 to 11) For plants with a production higher than items per year, as far as the tests carried out at the manufacturer premises are concerned, if possible, the second sample shall be checked with a measurement device different from the one used on the first one Assessment of results The results of tests from 1 to 10 (or from 2 to 11) shall be assessed considering both one sample and six consecutive samples. The number of defects shown in the tables below and on the next page shall not be exceeded. If the number of defects is exceeded, the licensee shall be promptly notified and requested to visit IMQ s measurements laboratory for appropriate controls and technical assessments. The results of test 11 (or 12) shall be assessed considering the outcome of the test for a single sample of meter. In case of defects, the licensee shall be promptly notified and requested to make appropriate controls and technical assessments, as well as adopt the necessary measures to eliminate said defects. In any case, IMQ reserves the right to apply some procedures (supplementary samples, sending inspectors, random checks, issuing warnings, etc.) for the purpose of checking and ensuring that production returns to normality. Ferraris type meters and/or single-phase units Standard Test number CEI EN 60514: CEI 13-15: Test type Insulation Operation without voltage Start up Precision Constant Sample Single 80 meters/units Six consecutive 480 meters/units Number of defects admitted PARTICULAR RULES - October ANNEX 4 "Electric energy meters and meter units " Page 2 of 4

12 Annex 4 Ferraris type meters and/or three-phase units Standard Test number CEI EN 60514: CEI 13-15: Test type Insulation Operation without voltage Start up Precision Constant Sample Single 40 meters/units Six consecutive 240 meters/units Number of defects admitted Static watt-hour meters Standard CEI EN 61358:1997 Test number CPT-055 Ed. 1/Rev Test Type Insulation Operation without voltage Start up Precision Constant Visual check Sample Single 40 meters/units Six consecutive 240 meters/units Number of defects admitted PARTICULAR RULES - October ANNEX 4 "Electric energy meters and meter units " Page 3 of 4

13 Annex On-call inspection procedure During on-call inspections, the following tests and inspections shall be carried out: a) inspection to ensure that conditions for licence to use the Mark are maintained; b) check of final inspection records, according to paragraph ; c) for test see point 2 of this annex ; d) control of the overall metering system, using a certified metering device which can be referred to nationally or internationally recognised samples; e) mechanical test (test 11 of the CEI EN standard; test 12 of the CEI standard; not applicable to static watt-hour meters). The tests shall be carried out on 80 items for each lot, in case of Ferraris type meters/single-phase units, and on 40 items, in case of Ferraris type meters/three-phase units and static electric meters. The lot may only be handed over if all tests and inspections are successful. PARTICULAR RULES - October ANNEX 4 "Electric energy meters and meter units " Page 4 of 4

14 Annex 5 TESTS TO CARRY OUT ON METERS/METER UNITS AT THE END OF INSULATION TESTS a) Ferraris type electric meters and integrated meter units The tests as indicated in the 7 sub-section of paragraph of the CEI EN :2003 standard are carried out with 100% cosϕ = 1 and cosϕ = 0.5 inductive The tests as indicated in the last sub-section of paragraph of the CEI EN 13-15, standard are carried out with: 100% cosϕ = 1 and cosϕ = 0.5 inductive. In order to rate the insulation tests, the limit due to measurement uncertainties which shall not be exceeded by the error variation percentage is ± 0.5%. b) Static watt-hour meters The tests as indicated in the 7 sub-section of paragraph of the CEI EN :2003 standard are carried out with 100% cosϕ = 1 and cosϕ = 0.5 inductive In order to rate the insulation tests, the limit due to measurement uncertainties which shall not be exceeded by the error variation percentage is: ± 0.5% for static watt-hours meters, classes 2 and 3 ± 0.2% for static watt-hours meters, classes 0.2S, 0.5S and 1. PARTICULAR RULES - October ANNEX 5 "Electric energy meters and meter units " Page 1 of 1

15 Annex 6 Firm A Name... Address... We declare that we produce the products of the following category:... with the trade mark... of firm B Name... Address... We are aware that company B applied for the IMQ Mark for the above mentioned products; we also know the IMQ Rules - Product Certification and, as far as we are concerned, we undertake to comply with these. In particular, we undertake to: - (art )... allow IMQ to inspect us in order to verify if we have the means of production, testing or control (i.e. personnel, facilities and equipment) specified in clause 2.6; - (art )... manufacture a product covered by each approval according to the approved prototype and, if we intend to make changes in the product bearing the Mark, we must notify IMQ and explain these changes in advance; IMQ may require to repeat all or some of the admission tests, at our own expense. In this case, IMQ may request us to change the type reference or the model designation; - (art )... avoid using components not bearing the Mark, without express permission from IMQ, whether they are manufactured by us or not, if the product for which the Mark licence has been granted includes components that, at the time of the application, were admitted to the IMQ Mark system. PARTICULAR RULES - March ANNEX 6 "Electric energy meters and meter units " Page 1 of 2

16 Annex 6 - (art )... assure that our stores and laboratories are open to IMQ inspectors, who can appear at any time during working hours, even without warning; - (art )... consider that IMQ inspectors have the authority to carry out all the verifications they consider useful in order to control that we meet our obligations and, especially, to examine and, if necessary, remark the results of tests performed in accordance with sub-clause ; - (art )... consider that the inspectors have the right to pick up free samples, in a measure strictly essential, of the marked products or their components in our plants or stores, in order to carry out particular tests in our laboratories or in IMQ s laboratories; - (art )... enable IMQ to pick up these samples; - (art )... deliver these samples to IMQ free of charge, on request of the inspector and to take all necessary precautions in order to ensure that they reach destination in a good condition within a maximum of 2 months from the date of sampling. Stamp and signature (*) Date: (*) Firm A PARTICULAR RULES - March ANNEX 6 "Electric energy meters and meter units " Page 2 of 2 ACCEPTANCE

17 The Applicant declares to have carefully read and to approve the IMQ Rules - Product Certification and the relevant Particular Rules for Electric energy meter and meter units - products of new manufacturing - that are an integral part of these Rules. Rules approved by the IMQ Board on March 27, 2002 comprising the Particular Rules updated on October Date: Signature of the legal representative* and stamp: * Legible, full signature According to the provisions of articles 1341 and 1342 of the Italian Civil Code, the Applicant hereby expressly approves articles Nos 5 (Licensee rights and duties), 6 (Continuous surveillance of the use of the Mark), 7 (Renunciation or withdrawal of the Licence for the use of the Mark), 8 (Modifications of the Rules and/or Standards), 9 (Fees), 10 (Misuse of the Mark), 11 (Claims) and 12 (Conciliation and Arbitration) of the Rules, as well as article No 3 (Application for certification) of the Particular Rules. Date: Signature of the legal representative* and stamp: * Legible, full signature This document comprises 28 pages

General Rules for the certification of Management Systems

General Rules for the certification of Management Systems General Rules for the certification of Management Systems Effective from 19/11/2015 RINA Via Corsica 12 16128 Genova - Italy tel. +39 010 53851 fax +39 010 5351000 website : www.rina.org Technical rules

More information

EA IAF/ILAC Guidance. on the Application of ISO/IEC 17020:1998

EA IAF/ILAC Guidance. on the Application of ISO/IEC 17020:1998 Publication Reference EA IAF/ILAC-A4: 2004 EA IAF/ILAC Guidance on the Application of ISO/IEC 17020:1998 PURPOSE This guidance document is for ISO/IEC 17020: General Criteria for the operation of various

More information

NABL NATIONAL ACCREDITATION

NABL NATIONAL ACCREDITATION NABL 160 NABL NATIONAL ACCREDITATION BOARD FOR TESTING AND CALIBRATION LABORATORIES GUIDE for PREPARING A QUALITY MANUAL ISSUE NO. : 05 AMENDMENT NO : 00 ISSUE DATE: 27.06.2012 AMENDMENT DATE: -- Amendment

More information

Rules for the certification of event sustainability management system

Rules for the certification of event sustainability management system Rules for the certification of event sustainability management system In force from 10/09/2014 RINA Services S.p.A. Via Corsica, 12 16128 Genova Tel. +39 010 53851 Fax +39 010 5351000 E-MAIL: info@rina.org,

More information

Guidance from the Group of Notified Bodies for the Construction Products Directive 89/106/EEC. GNB-CPD position paper from SG17 - EN 1090-1:2009

Guidance from the Group of Notified Bodies for the Construction Products Directive 89/106/EEC. GNB-CPD position paper from SG17 - EN 1090-1:2009 GNB-CPD SG17 Guidance from the Group of Notified Bodies for the Construction Products Directive 89/106/EEC NB-CPD/SG17/09/069 Issued: 7 September 2009 APPROVED GUIDANCE GNB-CPD position paper from SG17

More information

Rules for the certification of asset management systems

Rules for the certification of asset management systems Rules for the certification of asset management systems In force from 8/09/2014 RINA Services S.p.A. Via Corsica, 12 16128 Genova Tel. +39 010 53851 Fax +39 010 5351000 E-MAIL: info@rina.org, web: www.rina.org

More information

TERMS AND CONDITIONS FOR THE NATIONAL MANAGEMENT SYSTEMS CERTIFICATION SCHEME

TERMS AND CONDITIONS FOR THE NATIONAL MANAGEMENT SYSTEMS CERTIFICATION SCHEME TERMS AND CONDITIONS FOR THE NATIONAL MANAGEMENT SYSTEMS CERTIFICATION SCHEME CONTENTS Page 1 Introduction 2 2 Definitions 3 3 Certification Services 5 4 Certificates of Registration 5 5 Obligations of

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system

Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system Published in the Official State Gazette (BOE) number 270 of November

More information

Qualified Electronic Signatures Act (SFS 2000:832)

Qualified Electronic Signatures Act (SFS 2000:832) Qualified Electronic Signatures Act (SFS 2000:832) The following is hereby enacted 1 Introductory provision 1 The purpose of this Act is to facilitate the use of electronic signatures, through provisions

More information

FMC Technologies Measurement Solutions Inc.

FMC Technologies Measurement Solutions Inc. Table of Contents 1 Revision History... 4 2 Company... 5 2.1 Introduction... 5 2.2 Quality Policy... 6 2.3 Quality Organization... 6 2.4 Company Processes... 7 3 Scope and Exclusions... 8 3.1 Scope...

More information

Audit of the control body through the monitoring of compliance with control plan. Measures for the irregularities

Audit of the control body through the monitoring of compliance with control plan. Measures for the irregularities Workshop on verification of compliance with product specification for PDO, PGI and TSG Audit of the control body through the monitoring of compliance with control plan Measures for the irregularities Viktorija

More information

Supplier Quality Requirements and Clauses

Supplier Quality Requirements and Clauses Supplier Quality Requirements and Clauses Supplier Quality Requirements General The following Quality Notes (QN01 through QN19) apply to and form a part of all Purchase Orders issued by Advanced Conversion

More information

REGULATIONS FOR THE CERTIFICATION OF MANAGEMENT SYSTEMS

REGULATIONS FOR THE CERTIFICATION OF MANAGEMENT SYSTEMS CONTENTS 1. PURPOSE AND SCOPE 2. GENERAL PRINCIPLES AND GUARANTEES FOR THE CLIENT 3. STATUTORY AND REGULATORY REQUIREMENTS AND LEGALITY CONTROL LIMITS 4. ACCESS REQUIREMENTS FOR CERTIFICATION 5. CERTIFICATION

More information

EA-7/01. EA Guidelines. on the application. Of EN 45012. Publication Reference PURPOSE

EA-7/01. EA Guidelines. on the application. Of EN 45012. Publication Reference PURPOSE Publication Reference EA-7/01 EA Guidelines on the application Of EN 45012 PURPOSE The purpose of the document is to provide explanations with a view to harmonise the application of ISO/IEC Guide 62/EN

More information

Article 1: Subject. Article 2: Orders - Order Confirmation

Article 1: Subject. Article 2: Orders - Order Confirmation GENERAL CONDITIONS OF PURCHASE Article 1: Subject 1.1 The following general conditions of purchase (the "General Conditions") establish the contractual conditions governing the purchase of raw materials,

More information

Working Party on Control of Medicines and Inspections. Final Version of Annex 16 to the EU Guide to Good Manufacturing Practice

Working Party on Control of Medicines and Inspections. Final Version of Annex 16 to the EU Guide to Good Manufacturing Practice Version 8 (final) EUROPEAN COMMISSION ENTERPRISE DIRECTORATE-GENERAL Single market, regulatory environment, industries under vertical legislation Pharmaceuticals and cosmetics Brussels, July 2001 S\common\legal-legislation\75-319nd81-851\91-356\eudralexvol4\Annex

More information

Frequently Asked Questions. Unannounced audits for manufacturers of CE-marked medical devices. 720 DM 0701-53a Rev 1 2014/10/02

Frequently Asked Questions. Unannounced audits for manufacturers of CE-marked medical devices. 720 DM 0701-53a Rev 1 2014/10/02 Frequently Asked Questions Unannounced audits for manufacturers of CE-marked medical devices 720 DM 0701-53a Rev 1 2014/10/02 What is an unannounced audit?... 6 Are unannounced audits part of a new requirement?...

More information

RG 7 Accreditation for Inspection Bodies Performing Non-Destructive Testing

RG 7 Accreditation for Inspection Bodies Performing Non-Destructive Testing This publication contains policy, recommendations and guidance applicable to UKAS accredited inspection bodies RG 7 Accreditation for Inspection Bodies Performing Non-Destructive Testing Contents Section

More information

Rules for the certification of Food Safety Management Systems

Rules for the certification of Food Safety Management Systems Rules for the certification of Food Safety Management Systems Effective from 19/11/2014 RINA Services S.p.A. Via Corsica, 12-16128 Genova - Italy Tel. +39 01053851 Fax: +39 0105351000 www.rina.org Technical

More information

PLANT VARIETIES PROTECTION ACT (CHAPTER 232A, SECTION 54) PLANT VARIETIES PROTECTION RULES

PLANT VARIETIES PROTECTION ACT (CHAPTER 232A, SECTION 54) PLANT VARIETIES PROTECTION RULES CAP. 232A, R 1] Plant Varieties Protection Rules [2006 Ed. p. 1 PLANT VARIETIES PROTECTION ACT (CHAPTER 232A, SECTION 54) PLANT VARIETIES PROTECTION RULES Rule 1. Citation 2. Definitions 3. Fees 4. Forms

More information

UNCONTROLLED COPY FOR REFERENCE ONLY

UNCONTROLLED COPY FOR REFERENCE ONLY CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President

More information

Application for Approved (Overseas/Local) Third Party Inspection Agency for Lifting Equipment

Application for Approved (Overseas/Local) Third Party Inspection Agency for Lifting Equipment Occupational Safety and Health Division 18 Havelock Road #03-02 Singapore 059764 Tel: 64385122 www.mom.gov.sg mom_oshd@mom.gov.sg Application for Approved (Overseas/Local) Third Party Inspection Agency

More information

Regulations for certification of quality management systems

Regulations for certification of quality management systems Regulations for certification of quality management systems 00 24/04/2013 Annulla e sostituisce il documento Regulations for certification of quality management systems in rev. 14 SG DIR AD Rev. Data Descrizione

More information

INTRODUCTION OF PHASE 2 OF AN GARDA SÍOCHÁNA POLICY ON MONITORED INTRUDER ALARMS.

INTRODUCTION OF PHASE 2 OF AN GARDA SÍOCHÁNA POLICY ON MONITORED INTRUDER ALARMS. INTRODUCTION OF PHASE 2 OF AN GARDA SÍOCHÁNA POLICY ON MONITORED INTRUDER ALARMS. The Garda Siochana Intruder Alarm Policy is aimed at keeping to a minimum the number of false alarm calls passed to An

More information

ISO/IEC 17025 QUALITY MANUAL

ISO/IEC 17025 QUALITY MANUAL 1800 NW 169 th Pl, Beaverton, OR 97006 Revision F Date: 9/18/06 PAGE 1 OF 18 TABLE OF CONTENTS Quality Manual Section Applicable ISO/IEC 17025:2005 clause(s) Page Quality Policy 4.2.2 3 Introduction 4

More information

Appendix 1 ATTACHMENT A REVISED OPERATIONAL CERTIFICATION PROCEDURES (OCP) FOR THE RULES OF ORIGIN OF THE ASEAN-CHINA FREE TRADE AREA

Appendix 1 ATTACHMENT A REVISED OPERATIONAL CERTIFICATION PROCEDURES (OCP) FOR THE RULES OF ORIGIN OF THE ASEAN-CHINA FREE TRADE AREA Appendix 1 ATTACHMENT A REVISED OPERATIONAL CERTIFICATION PROCEDURES (OCP) FOR THE RULES OF ORIGIN OF THE ASEAN-CHINA FREE TRADE AREA For the purpose of implementing the Rules of Origin for the ASEAN-China

More information

General Description of The CMC- Services

General Description of The CMC- Services STANDARD FOR CERTIFICATION No.1.1 General Description of The CMC- Services JANUARY 2013 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version The

More information

PRCP CE. Version 5.0 of 16 June 2013. Date of entry into force: 1 July 2013

PRCP CE. Version 5.0 of 16 June 2013. Date of entry into force: 1 July 2013 npo Founded by SECO and BBRI PARTICULAR RULES FOR THE CERTIFICATION OF PRODUCTS AND PRODUCTION CONTROL SYSTEMS WITHIN DE FRAMEWORK OF THE EUROPEAN CONSTRUCTION PRODUCTS REGULATION N 305/2011 PRCP CE Version

More information

ΗΜΟΣΙΑ ΕΠΙΧΕΙΡΗΣΗ ΗΛΕΚΤΡΙΣΜΟΥ ΑΕ ΑΡΙΘ. ΙΑΚΗΡΥΞΗΣ :401102 ΙΕΥΘΥΝΣΗ YΛΙΚΟΥ & ΠΡΟΜΗΘΕΙΩΝ ΜΕΤΑΦΟΡΑΣ Οδός ΥΡΡΑΧΙΟΥ 89 & ΚΗΦΙΣΟΥ

ΗΜΟΣΙΑ ΕΠΙΧΕΙΡΗΣΗ ΗΛΕΚΤΡΙΣΜΟΥ ΑΕ ΑΡΙΘ. ΙΑΚΗΡΥΞΗΣ :401102 ΙΕΥΘΥΝΣΗ YΛΙΚΟΥ & ΠΡΟΜΗΘΕΙΩΝ ΜΕΤΑΦΟΡΑΣ Οδός ΥΡΡΑΧΙΟΥ 89 & ΚΗΦΙΣΟΥ Σελίδα 1 από 9 1. FORMULATION OF THE BIDS 1.1 All offers shall have to be complete and include all typical and technical evidence required by the bidding. 1.2. It is stressed that after the unsealing of

More information

MTS GUI LICENCE SCHEDULE TO. MTS Data Terms & Conditions End Customer; or. MTS and EuroMTS Membership Documentation; or. MTS Registered ISV Agreement

MTS GUI LICENCE SCHEDULE TO. MTS Data Terms & Conditions End Customer; or. MTS and EuroMTS Membership Documentation; or. MTS Registered ISV Agreement MTS GUI LICENCE SCHEDULE TO MTS Data Terms & Conditions End Customer; or MTS and EuroMTS Membership Documentation; or MTS Registered ISV Agreement * * * * * TERMS AND CONDITIONS 1. INTERPRETATION 1.1 The

More information

General Rules for the Certification of Management Systems Code: RG

General Rules for the Certification of Management Systems Code: RG General Rules for the Certification of Management Systems Code: RG Drafted on: 1 April 2012 Effective from: 1 October 2012 TABLE OF CONTENTS CHAPTER TITLE PAGE CHAPTER 1 GENERAL 3 CHAPTER 2 REFERENCE STANDARD

More information

Example of a food company quality

Example of a food company quality Appendix A manual Example of a food company quality Contents Date: 13/03/95 RME-QLMN-OO Page 1 of 3 Section Title ISO 9001 reference 01 In trod uction 02 Purpose 03 Scope 04 Definitions 05 Management responsibility

More information

ICCS Convention No. 28 Only the French original is authentic

ICCS Convention No. 28 Only the French original is authentic ICCS Convention No. 28 Convention on the issue of a certificate of nationality adopted at an Extraordinary General Assembly in Strasbourg on 25 March 1999 signed at Lisbon on 14 September 1999 The signatory

More information

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems Date(s) of Evaluation: CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems Assessor(s) & Observer(s): Organization: Area/Field

More information

Federal law on certification services in the area of the electronic signature

Federal law on certification services in the area of the electronic signature Law on the electronic signature 94.0 Notice This English translation has no official character. The only authentic texts are the German, French and Italian versions published in the Official Compendium

More information

GRTGAZ NETWORK TRANSMISSION CONTRACT

GRTGAZ NETWORK TRANSMISSION CONTRACT Page 1 of 9 GRTGAZ NETWORK TRANSMISSION CONTRACT APPENDIX A3 STANDARD EVIDENCE AGREEMENT English translation for information. Disclaimer The present translation is not binding and is provided by GRTgaz

More information

NATURAL GAS STORAGE LICENCE GRANTED TO [MARATHON OIL IRELAND LIMITED]

NATURAL GAS STORAGE LICENCE GRANTED TO [MARATHON OIL IRELAND LIMITED] NATURAL GAS STORAGE LICENCE GRANTED TO [MARATHON OIL IRELAND LIMITED] TABLE OF CONTENTS PART I: PART II: TERMS OF THE LICENCE CONDITIONS OF THE LICENCE Condition 1: Condition 2: Condition 3: Condition

More information

Chapter 3 - Additional rules for the certification program: Organic Production Methods (USDA NOP)

Chapter 3 - Additional rules for the certification program: Organic Production Methods (USDA NOP) Chapter 3 - Additional rules for the certification program: Organic Production Methods (USDA NOP) TABLE OF CONTENTS Article 3.1 Samples for USDA NOP... 2 Article 3.2 Classification of non-conformities

More information

Memorandum of Understanding

Memorandum of Understanding Memorandum of Understanding between Department for Business, Innovation and Skills and United Kingdom Accreditation Service Page 1 of 13 Contents 1 Purpose... 3 2 Background... 3 3 Scope of activity...

More information

VELUX General Quality Requirements

VELUX General Quality Requirements VELUX General Quality Requirements Introduction In VELUX we want to work towards zero defects and it is our belief that the quality of the products is best secured at our suppliers thereby enabling ship

More information

Trading Rules of the Georgian Stock Exchange

Trading Rules of the Georgian Stock Exchange A p p r o v e d : by the General Meeting of JSC Georgian Stock Exchange Minutes # 4, September 26, 1999 Changes and amendments are made: by the Supervisory Board of JSC Georgian Stock Exchange Minutes

More information

Comparison ISO/TS 16949 (1999) to VDA 6.1 (1998)

Comparison ISO/TS 16949 (1999) to VDA 6.1 (1998) 1 APPLICABILITY VDA 6.1: Section: 3.1; 7 new: In addition to the applicability for supplier sites for production, services and their subcontractors for: products and production materials, or services like

More information

3.3 Recording of Requests for Inspection and Inspection Certificates

3.3 Recording of Requests for Inspection and Inspection Certificates Section 3: Inspection Preparation and Document Control 3.1 Objective of Section 3 3.2 Request for Inspection 3.3 Recording of Requests for Inspection and Inspection Certificates 3.4 Responding to Inspection

More information

VdS Guidelines for the Certification of quality management systems

VdS Guidelines for the Certification of quality management systems VdS Guidelines for the Certification of quality management systems VdS 2343en : 2015-09 (11) VdS 2343en : 2015-09 (11) Certification of quality management systems VdS Guidelines VdS Guidelines for the

More information

Quality Management System

Quality Management System LH Sleightholme Ltd, Westfield Works, Helperthorpe, Malton, North Yorkshire YO17 8TQ Quality Management System MANUAL ISO 9001:2008 This Quality Management System Manual has been issued on the authority

More information

Criminal Justice Offender Tracking System Certification Program Requirements

Criminal Justice Offender Tracking System Certification Program Requirements U.S. Department of Justice Office of Justice Programs National Institute of Justice Criminal Justice Offender Tracking System Certification Program Requirements NIJ CR-1004.00.00 June 2012 NCJ xxxxxx National

More information

DECISIONS ADOPTED JOINTLY BY THE EUROPEAN PARLIAMENT AND THE COUNCIL

DECISIONS ADOPTED JOINTLY BY THE EUROPEAN PARLIAMENT AND THE COUNCIL L 218/82 EN Official Journal of the European Union 13.8.2008 DECISIONS ADOPTED JOINTLY BY THE EUROPEAN PARLIAMENT AND THE COUNCIL DECISION No 768/2008/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of

More information

Regulations for the certification of environmental management systems in conformity with UNI EN ISO 14001:2004

Regulations for the certification of environmental management systems in conformity with UNI EN ISO 14001:2004 Regulations for the certification of environmental management systems in conformity with UNI EN ISO 14001:2004 00 24/04/2013 Annulla e sostituisce il documento Regulations for the certification of environmental

More information

Electronic Documents Law

Electronic Documents Law Disclaimer: The English language text below is provided by the Translation and Terminology Centre for information only; it confers no rights and imposes no obligations separate from those conferred or

More information

INTEROPERABILITY UNIT

INTEROPERABILITY UNIT INTEROPERABILITY UNIT MODULES FOR THE PROCEDURES FOR ASSESSMENT OF CONFORMITY, SUITABILITY FOR USE AND EC VERIFICATION TO BE USED IN THE TECHNICAL SPECIFICATIONS FOR INTEROPERABILITY Reference: Version

More information

How To Ensure Quality Assurance

How To Ensure Quality Assurance 1001 Robb Hill Road Oakdale, PA 15071-3200 412/923-2670 PROCUREMENT SPECIFICATION: SUPPLIER QUALITY MANAGEMENT SYSTEM REQUIREMENTS Specification Number: ATI-QA-703, Rev 4 Date: 11/12/13 Page: 1 of 7 Written

More information

PRODUCT CERTIFICATION REQUIREMENTS

PRODUCT CERTIFICATION REQUIREMENTS PRODUCT CERTIFICATION REQUIREMENTS SIRIM QAS International Product Certification Page 1 of 14 QUALITY SYSTEM 1. GENERAL 1.1 This document defines the responsibilities and obligations of the Licensee with

More information

Section IX. Annex to the Particular Conditions - Contract Forms

Section IX. Annex to the Particular Conditions - Contract Forms Section IX. Annex to the Particular Conditions - Contract Forms Table of Forms Notification of Award Contract Agreement Performance Security Advance Payment Security Retention Money Security - 2 - Notification

More information

Guide for Custom-Made Dental Device Manufacturers on Compliance with European Communities (Medical Devices) Regulations, 1994

Guide for Custom-Made Dental Device Manufacturers on Compliance with European Communities (Medical Devices) Regulations, 1994 Guide for Custom-Made Dental Device Manufacturers on Compliance with European Communities (Medical SUR-G0014-1 12 NOVEMBER 2013 This guide does not purport to be an interpretation of law and/or regulations

More information

THIRD SUPPLEMENT TO THE GIBRALTAR GAZETTE No. 4,167 of 7th May, 2015

THIRD SUPPLEMENT TO THE GIBRALTAR GAZETTE No. 4,167 of 7th May, 2015 THIRD SUPPLEMENT TO THE GIBRALTAR GAZETTE No. 4,167 of 7th May, 2015 B. 13/15 Clause PRIVATE TRUST COMPANIES BILL 2015 1. Short title and commencement. 2. Interpretation. 3. Registration of Private Trust

More information

Generic CMMS Quality Assurance Plan

Generic CMMS Quality Assurance Plan Generic CMMS Quality Assurance Plan Scope In accordance with the Quality Policy, the Quality System of CMMS is based upon the requirements and structure of ISO (the International Organization for Standardization)

More information

23. The quality management system

23. The quality management system 23. The quality management system Version 2.0 On this page: Mandatory requirements: Extracts from the HFE Act Extracts from licence conditions HFEA guidance: Definition of the quality management system

More information

GUIDANCE NOTE FOR MANUFACTURERS OF CUSTOM-MADE MEDICAL DEVICES

GUIDANCE NOTE FOR MANUFACTURERS OF CUSTOM-MADE MEDICAL DEVICES GUIDANCE NOTE FOR MANUFACTURERS OF CUSTOM-MADE MEDICAL DEVICES Foreword This guidance document is informative and advisory and has no legal authority. Individual national enforcement authorities are bound

More information

Self-Audit Checklist

Self-Audit Checklist Page 1 Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature: Name of person responsible for quality system: Signature: Number of non-compliances: Page

More information

Office for Nuclear Regulation

Office for Nuclear Regulation ONR GUIDE LC17 Management Systems Document Type: ONR Nuclear Safety Technical Inspection Guide Unique Document ID and Revision No: NS-INSP-GD-017 Revision 2 Date Issued: November 2012 Review Date: November

More information

Keywords: inspection; nuclear material control and accountancy (NMC&A); quality management system

Keywords: inspection; nuclear material control and accountancy (NMC&A); quality management system French Domestic Safeguards inspections with regard to quality management system of the operators, in the field of nuclear material control and accountancy Julie LASNEL-PAYAN, Flavien LEMOINE, Bruno AUTRUSSON,

More information

ELECTRONIC COMMERCE AND ELECTRONIC SIGNATURE ACT (ZEPEP-UPB1) (Official consolidated text)

ELECTRONIC COMMERCE AND ELECTRONIC SIGNATURE ACT (ZEPEP-UPB1) (Official consolidated text) ELECTRONIC COMMERCE AND ELECTRONIC SIGNATURE ACT (ZEPEP-UPB1) (Official consolidated text) On basis of article 153 of the National Assembly of Slovenia Rules of Procedure the National Assembly of the Republic

More information

LAB 37 Edition 3 June 2013

LAB 37 Edition 3 June 2013 LAB 37 Edition 3 June 2013 Accreditation Requirements for Sampling and Testing in Accordance with the Drinking Water Testing Specification (DWTS) CONTENTS SECTION PAGE 1 Introduction 2 2 Regulatory requirements

More information

General Regulations. Part Ⅱ - Quality Management System Rules ENGLISH VERSION 5.0

General Regulations. Part Ⅱ - Quality Management System Rules ENGLISH VERSION 5.0 General Regulations Part Ⅱ - Quality Management System Rules ENGLISH VERSION 5.0 VALID FROM: 1 JULY 2015 OBLIGATORY FROM: 1 JULY 2016 TABLE OF CONTENTS 1. LEGALITY, ADMINISTRATION AND STRUCTURE... 3 1.1

More information

ANGUS COUNCIL SUPPLEMENTARY CONDITIONS OF CONTRACT. SC 01 - Contract Performance Guarantee Insurance

ANGUS COUNCIL SUPPLEMENTARY CONDITIONS OF CONTRACT. SC 01 - Contract Performance Guarantee Insurance SC 01 - Contract Performance Guarantee Insurance For contracts equal to or exceeding 750,000 in value the Contractor shall, within 28 days of the date of the award of the Contract, obtain and provide to

More information

Supplier Quality Assurance

Supplier Quality Assurance Supplier Quality Assurance Preface We strive to continually improve our process performance by meeting quality objectives. It is imperative that our suppliers operate under the zero defects and 100% on

More information

PRODUCT CERTIFICATION RULES GOVERNING THE SCHEME JANUARY 2006

PRODUCT CERTIFICATION RULES GOVERNING THE SCHEME JANUARY 2006 THE GAS SAFETY CERTIFICATION FOR GAS APPLIANCES AND COMPONENTS PRODUCT CERTIFICATION RULES GOVERNING THE SCHEME JANUARY 2006 MKP220.01 Issue Date: 2007-Oct-09 SAI Global Limited Copyright 2007 - ABN 67

More information

NOTICE. Re: GD210: ISO 13485:2003 Quality Management System Audits Performed by Health Canada Recognized Registrars

NOTICE. Re: GD210: ISO 13485:2003 Quality Management System Audits Performed by Health Canada Recognized Registrars February 8, 2007 NOTICE Our file number: 07-103218-349 Re: Performed by Health Canada Recognized Registrars Health Canada is pleased to announce the release of the revised guidance document GD210: ISO

More information

being subordinated to the interests of the Firm's other clients (other than clients which are insurance undertakings when acting as such).

being subordinated to the interests of the Firm's other clients (other than clients which are insurance undertakings when acting as such). being subordinated to the interests of the Firm's other clients (other than clients which are insurance undertakings when acting as such). 2)This Deed will become effective only on and with effect from

More information

GENERAL CONDITIONS OF SALE 1/6

GENERAL CONDITIONS OF SALE 1/6 , 43044 Collecchio (PR) GENERAL CONDITIONS OF SALE 1/6 1. OFFERS 1.1. Offers are not binding for the Seller, unless expressly derogated in writing, and in any case only for the period of time mentioned.

More information

APPLICATION TO OPEN AN ACCOUNT COMPANY / NGO / EMBASSY / GOVERNMENT / REGISTERED ASSOCIATION

APPLICATION TO OPEN AN ACCOUNT COMPANY / NGO / EMBASSY / GOVERNMENT / REGISTERED ASSOCIATION APPLICATION TO OPEN AN ACCOUNT COMPANY / NGO / EMBASSY / GOVERNMENT / REGISTERED ASSOCIATION To: Ecobank (Indicate country name) For bank use only Account Nº: Please read carefully and complete all relevant

More information

PERMANENT COURT OF ARBITRATION OPTIONAL RULES FOR ARBITRATING DISPUTES BETWEEN TWO STATES

PERMANENT COURT OF ARBITRATION OPTIONAL RULES FOR ARBITRATING DISPUTES BETWEEN TWO STATES PERMANENT COURT OF ARBITRATION OPTIONAL RULES FOR ARBITRATING DISPUTES BETWEEN TWO STATES 39 OPTIONAL ARBITRATION RULES TWO STATES CONTENTS Introduction 43 Section I. Introductory Rules 45 Scope of Application

More information

Terms and Conditions of Sale

Terms and Conditions of Sale Broadberry Data Systems Limited ("The Company") Terms and Conditions of Sale 1. General a) Unless otherwise expressly agreed in writing by a Director (or authorised executive) of the Company all goods

More information

COMMISSION IMPLEMENTING DECISION

COMMISSION IMPLEMENTING DECISION 20.3.2014 Official Journal of the European Union L 82/29 COMMISSION IMPLEMENTING DECISION of 18 March 2014 on the organisation of a temporary experiment providing for certain derogations for the marketing

More information

TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION

TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION ACCREDITATION SCHEME FOR INSPECTION BODIES TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION Technical Note SI 01: 3 February 2016 The SAC Accreditation

More information

Guide to Distribution of Cosmetic Products in Ireland

Guide to Distribution of Cosmetic Products in Ireland Guide to Distribution of Cosmetic Products in Ireland ADV-G0012-2 17 JUNE 2013 This guide does not purport to be an interpretation of law and/or regulations and is for guidance purposes only. CONTENTS

More information

EA-04/15. Accreditation. For Non-Destructive. Testing. Publication. Reference. EA - 4/15 Accreditation for Non-Destructive Testing PURPOSE

EA-04/15. Accreditation. For Non-Destructive. Testing. Publication. Reference. EA - 4/15 Accreditation for Non-Destructive Testing PURPOSE Publication Reference EA-04/15 Accreditation For Non-Destructive Testing PURPOSE This publication provides detailed guidance for organisations carrying out non-destructive testing as an accredited activity

More information

Scheme rules for thermal insulation products for building equipment and industrial installations - VDI certification scheme

Scheme rules for thermal insulation products for building equipment and industrial installations - VDI certification scheme Scheme rules for thermal insulation products for building equipment and industrial installations - certification scheme April 6, 2011 1. Introduction This document presents the rules of the product certification

More information

Pharmaceutical Wholesaler Site Inspection Checklist

Pharmaceutical Wholesaler Site Inspection Checklist Pharmaceutical Wholesaler Site Inspection Checklist Date and time of inspection: Legal business name and plant name: Location (address): Phone number: Fax number: Email address: Web site URL: Contact Person:

More information

Surgi Manufacturing Quality Manual

Surgi Manufacturing Quality Manual Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6

More information

Standard conditions of purchase

Standard conditions of purchase Standard conditions of purchase 1 OFFER AND ACCEPTANCE 2 PROPERTY, RISK & DELIVERY 3 PRICES & RATES The Supplier shall provide all Goods and Services in accordance with the terms and conditions set out

More information

APPLICATION TO OPEN AN ACCOUNT COMPANY / NGO / EMBASSY / GOVERNMENT / REGISTERED ASSOCIATION

APPLICATION TO OPEN AN ACCOUNT COMPANY / NGO / EMBASSY / GOVERNMENT / REGISTERED ASSOCIATION APPLICATION TO OPEN AN ACCOUNT COMPANY / NGO / EMBASSY / GOVERNMENT / REGISTERED ASSOCIATION To: Ecobank (Indicate country name) For bank use only Account Nº: Please read carefully and complete all relevant

More information

Rules for the certification of IT (Information Technology) Service Management Systems

Rules for the certification of IT (Information Technology) Service Management Systems Rules for the certification of IT (Information Technology) Service Management Systems Effective from 1 July 2010 RINA Via Corsica 12 16128 Genova - Italia tel +39 010 53851 fax +39 010 5351000 web site:

More information

LAW FOR THE ELECTRONIC DOCUMENT AND ELECTRONIC SIGNATURE. Chapter two. ELECTRONIC DOCUMENT AND ELECTRONIC SIGNATURE

LAW FOR THE ELECTRONIC DOCUMENT AND ELECTRONIC SIGNATURE. Chapter two. ELECTRONIC DOCUMENT AND ELECTRONIC SIGNATURE LAW FOR THE ELECTRONIC DOCUMENT AND ELECTRONIC SIGNATURE Prom. SG. 34/6 Apr 2001, amend. SG. 112/29 Dec 2001, amend. SG. 30/11 Apr 2006, amend. SG. 34/25 Apr 2006, amend. SG. 38/11 May 2007 Chapter one.

More information

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev

More information

Authorised Supplier, who will either deal with Royal Mail on the User's behalf or instruct the User to apply for a Licence directly from Royal Mail.

Authorised Supplier, who will either deal with Royal Mail on the User's behalf or instruct the User to apply for a Licence directly from Royal Mail. ROYAL MAIL SCHEME FOR FRANKING LETTERS AND PARCELS 2014 This Scheme is made by Royal Mail under section 89 of Postal Services Act 2000. 1. APPLICATION, COMMENCEMENT, REVOCATION AND CITATION 1.1 This Scheme

More information

ISO/IEC 17020 Inspection Standard Application Document

ISO/IEC 17020 Inspection Standard Application Document ISO/IEC 17020 Inspection Standard Application Document August 2015 Copyright National Association of Testing Authorities, Australia 2015 This publication is protected by copyright under the Commonwealth

More information

QSS 0: Products and Services without Bespoke Contracts.

QSS 0: Products and Services without Bespoke Contracts. QSS 0: Products and Services without Bespoke Contracts. Amendment History Version Date Status v.1 Dec 2014 Updated For 2015 deployment Table of Contents 1. DEFINITIONS 3 2. INTRODUCTION 3 3. WORKING WITH

More information

Certification process ECOCERT Ecological & Recycled Textile Standard

Certification process ECOCERT Ecological & Recycled Textile Standard Certification process ECOCERT Ecological & Recycled Textile Standard Annex 5 - Ecological & Recycled Textiles Standard - ERTS 1 Contents 1/ Ecological & Recycled Textile Standard... p3 2/ ERTS certification

More information

Australian Transport Council. National Standard for the Administration of Marine Safety SECTION 4 SURVEYS OF VESSELS

Australian Transport Council. National Standard for the Administration of Marine Safety SECTION 4 SURVEYS OF VESSELS Australian Transport Council National Standard for the Administration of Marine Safety SECTION 4 SURVEYS OF VESSELS Edition 1 Draft for comment issued 20 December 2005 Endorsed by the Australian Transport

More information

5.2.7.4 CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN

5.2.7.4 CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN 5.2.7.4 CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN NOTE: This document is generally written in the imperative mood. The subject, "the Contractor" is implied. Also implied in this language are "shall",

More information

JRI S STANDARD TERMS OF PURCHASE. Business Day: a day (other than a Saturday, Sunday or public holiday) when banks in London are open for business.

JRI S STANDARD TERMS OF PURCHASE. Business Day: a day (other than a Saturday, Sunday or public holiday) when banks in London are open for business. JRI S STANDARD TERMS OF PURCHASE 1. INTERPRETATION 1.1 Definitions. In these Conditions, the following definitions apply: Business Day: a day (other than a Saturday, Sunday or public holiday) when banks

More information

GENERAL TERMS AND CONDITIONS OF SUPPLY OF MONT.EL APPARECCHIATURE ELETTROELETTRONICHE S.R.L. PRODUCTS

GENERAL TERMS AND CONDITIONS OF SUPPLY OF MONT.EL APPARECCHIATURE ELETTROELETTRONICHE S.R.L. PRODUCTS GENERAL TERMS AND CONDITIONS OF SUPPLY OF MONT.EL APPARECCHIATURE ELETTROELETTRONICHE S.R.L. PRODUCTS 1) Nature, validity and effectiveness of the General Terms and Conditions 1.1 These General Terms and

More information

Measuring instruments in industry.

Measuring instruments in industry. Measuring instruments in industry. Measuring instruments that are present in any branch of industry, are subject to different levels of supervision, like in case of laboratories. Supervision relates to

More information

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of

More information

Contractor Connect Scheme Electrical Contractor and Worker Handbook

Contractor Connect Scheme Electrical Contractor and Worker Handbook Contractor Connect Scheme Electrical Contractor and Worker Handbook January 2016 Document release information Document number 13553681 Document title Revision status Contractor Connect Scheme handbook

More information

GUIDELINES FOR FOOD IMPORT CONTROL SYSTEMS

GUIDELINES FOR FOOD IMPORT CONTROL SYSTEMS GUIDELINES FOR FOOD IMPORT CONTROL SYSTEMS SECTION 1 SCOPE CAC/GL 47-2003 1. This document provides a framework for the development and operation of an import control system to protect consumers and facilitate

More information

Network Certification Body

Network Certification Body Network Certification Body Scheme rules for assessment of railway projects to requirements of the Railways Interoperability Regulations as a Notified and Designated Body 1 NCB_MS_56 Contents 1 Normative

More information

1 For more information T: +1.847.664.1499 / E: DAP@ul.com / W: ul.com/dap

1 For more information T: +1.847.664.1499 / E: DAP@ul.com / W: ul.com/dap DATA ACCEPTANCE PROGRAM UL Client Test Data Program Investigations of products by UL typically involve the testing of product samples. While UL maintains extensive facilities for these purposes, customers

More information