Stove-boiler for solid fuels 12-30 KW Directions for use and assembling



Similar documents
STOVE-BOILER FOR SOLID FUELS Directions for use and assembling

1 DESCRIPTION OF THE APPLIANCE

ECOCIAT. Domestic hot water heat recovery unit

Electric Flow Boiler

Link-Up. Solid Fuel Association Guide to Central Heating.

Laddomat Charging unit


OPTIONS. for. Replacing Boiler Plant. Sussex Lodge London W2 & 16 Stanhope Terrace London W2

Blowdown vessels Meeting the requirements of HSE PM60

Attack Gasification Boiler Installation and Service Manual

1. Geo Vertical 2. Geo Horizontal

UNDERSTANDING CENTRAL HEATING SYSTEMS

For installation guide see reverse of book

Ergo-Pro Single Line Solar Station Installation and Operating Instructions

Vaillant s plain English guide to. simple, concise and precise

(This report is endorsed) Industrivej 20, 9900 Frederikshavn, Danmark

INNOVATIVE SOLUTION OF DOMESTIC HEATING SPLIT TYPE SPLIT DHW INTEGRATED TYPE MONOBLOC TYPE

ITE. Indirect calorifier ITE - 400/500/600/750/1000. Installation, User and Service Manual. Innovation has a name.

USERS GUIDE. LOGIC Combi 24, 30, 35. For installation guide see reverse of book

High Output Boiler Systems

Session 2: Hot Water Supply

UDSA - UDSBD unit heater

Condensing Boiler Efficiency

Description of functions

Laddomat 21 Charging Unit

Select Radiators Installation Guide

TECHNICAL INSTRUCTIONS FOR CONCEPT 2 AND CONCEPT 2 MINI CENTRAL HEATING COOKERS

CHAPTER 10 BOILERS, WATER HEATERS AND PRESSURE VESSELS

HEAVY DUTY STORAGE GAS

ELECTRIC CENTRAL HEATING FLOW BOILER

StainlessLite. Unvented mains pressure and vented water storage in Duplex stainless steel SUPPLIERS TO THE MERCHANT TRADE FOR OVER 40 YEARS

ecomax Instructions for use Wall hung room sealed fan assisted condensing boilers For the user

Laddomat 21 Charging package

Technical data. Danfoss DHP-A

Power consumption (kw)

Cooking at the Speed of light!

Solar SOLARMAX ELECTRIC BOOSTED SPECIFICATIONS ALL AUSSIE GAS & ELECTRIC BOOSTED SOLAR WATER HEATERS

SPARE PARTS EXPLODED VIEW GAS WALL BOILERS Model GENUS PREMIUM FS CUENOD. R EN - Edition 01-26/10/2009

Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS

HIGH QUALITY COMPONENTS

PELLEXIA COMFORT ENVIRONMENT COMPATIBLE

E-gas Instant Gas Water Heaters

Installation and User Instructions Unvented Electric Storage Water Heater Models: S10UNV, S15UNV.

Operating instructions

Frequently Asked Questions. Air Top Diesel Heaters. 2000STC, Evo 40 & Evo 55

Instructions for designing heating systems.

USERS GUIDE. LOGIC Heat 12, 15, 18, 24, 30. For installation guide see reverse of book

SF15K SF05KSS, SF10KSS

Itho Products for Hot and Boiling water. product-

TANKLESS WATER HEATER INSTALLATION DIAGRAMS

Guidance Notes For Provision Of Water Expansion For 10 & 15 Litre Unvented Hot Water Heaters

Response: The combi boiler. Response: The fit anywhere combi

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard

building engineering services association specification for: Domestic Heating

Max primary circuit temperature 90ºC Max primary circuit temp. 90ºC Max secondary circuit temperature 45ºC Max secondary circuit temp.

The soot and scale problems

Commercial Gas Furnace Upflow

Heating and Domestic Hot Water Systems for dwellings Achieving compliance with Part L 2008

PRO-CLEAN. Technical Description. Specifications. Space-saving design with minimum heat loss (melamine resin insulation)

Hot Water Boilers and Controls Why Condensing Boilers are Different. Presented Oct. 14, 2008 Long Island Chapter, ASHRAE

Replacement parts. WM97+ gas-fired water boiler Boiler Manual. OBTAIN PARTS ONLY THROUGH WEIL-McLAIN THE BOILER CONTAINS CERAMIC FIBER MATERIALS

MY HOME IN A HOUSING BLOCK A GUIDE FOR RESIDENTS

User's Instructions. Alpha HE CB25/33 and HE SY25

Knürr CoolAdd The universal retrofit solution against overheating in server racks. Rack & Enclosure Systems

O. Gas boiler. Gaz 6000 W WBN H-E-N/L-S2400. Operating instructions for the end customer (2014/07) en

Automatic Bypass Control AVDO

DIESEL-FUELED, BLOWN AIR, DUCTABLE HEATERS

HEATING OF DOMESTIC OUTDOOR SWIMMING POOLS

Baxi Combi 80e & 105e

Qualification Guide. BPEC 601/2514/7 - Level 1 Diploma in Plumbing Foundation. BPEC 600/9432/1 - Level 2 Diploma in Plumbing Foundation

Residential/Commercial Gas Condensing High Efficiency Tankless Water Heaters

Elegant ECM. ELEGANT ECM air conditioners allow. The range is made up of 12 models: Ceiling Air Conditioner

Troubleshoot resources for homeowner

Brochure EX

Data Sheet VITOSOL 100. Flat collectors for the utilisation of solar energy. Vitosol 100. Part nos. and prices: see price list

Solar Hot Water Heaters

Hydraulic control unit series

FIELD TESTS OF FUEL EFFICIENCY MAGNETS J A CRABB JULY 1997 SWEEG REPORT 80

STATIONARY WATER HEATERS

HSQ. Heuston South Quarter Community Heating System User Guide

WC flushing cistern single or dual flush to fill in 2 minutes WC trough cistern 0.15 per WC Wash basin tap size 1 2

Installation and Operation Instructions Domestic hot water modules: FriwaMidi DN 20 FriwaMaxi DN 25

2010 Residential Water Heater Replacement Check List

Installation User and Service Manual A DIVISION OF A. O. SMITH CORPORATION

TOBY DVR5 OIL CONTROL & SAFETY VALVE

BFC. High Efficient Condensing Water Heater BFC - 28/30/50/60/80/100/120. Installation, User and Service Manual. Innovation has a name.

Duo-tec Combi HE A Range. User s Operating Instructions & Important Warranty Information. Gas Fired Wall Mounted Condensing Combination Boiler

Operating instructions

Light Duty Commercial Electric Water Heater

Hot water supply, distribution and use

High-efficient gas boiler CompactGas

Continuous flow direct water heating for potable hot water

M SERIES REFRIGERANT COIL MODULE REFRIGERANT COILS for R-22, R-407C, R-410A

Centauri. Condensing Fire Tube Water Boiler 399 to 1000 MBH

1-Way Chilled Water Cassettes KCO 60, 90 & 120. Technical Brochure. TM KCO-W.1GB Date : November 2005 Supersedes : None

This section gives you some helpful information and tips on running your home and the equipment in it.

ECOplus Solar Cylinder

Art.S001-S002 SOLAR MODULE WITH DELIVERY AND RETURN CONNECTIONS

HERZ-Thermal Actuators

THE BOILING WATER DISPENSER INSTALLATION & OPERATING INSTRUCTIONS

Transcription:

Stove-boiler for solid fuels 12-30 KW Directions for use and assembling February 7, 2012

Contents 1 Technical data 2 1.1 Boiler properties TEMY PLUS 12-30 KW......................... 3 1.2 On Product............................................ 3 1.3 Boiler shipment and storage................................... 4 1.4 Delivery.............................................. 4 2 Boiler installation 4 2.1 Fitting the boiler to a closed central heating system..................... 4 2.1.1 Installation method 1.................................. 4 2.1.2 Installation method 2.................................. 6 2.2 Fitting the boiler to an open central heating system...................... 6 2.3 Filling up the boiler and installation with water........................ 7 3 Boiler operation 7 4 Chimney 8 5 Summer Mode 9 6 Overheat protection using the thermostatic valve (closed system) 10 7 Boiler cleaning and maintenance 10 A Declaration Of Conformity 11 1

1 Technical data Boiler part description: 1. Heating chamber 2. Water cooled grid 3. Hot water 4. Flue ap 5. Flow line 6. Return line 7. Flue 8. Automatic draught regulator 9. Temperature and pressure meter 10. Mountaing place for thermal safety device 11. Opening for cleaning 12. Fill and drain tap 13. Secondary air inlet 2

1.1 Boiler properties TEMY PLUS 12-30 KW 1. Overall nominal power (kw) 12 18 30 2. Necessary draught (Pa) 13 14 15 3. Water content (l) 31 40 65 4. Max working temperature 90 C 90 C 90 C 5. Max working pressure 3 bar 3 bar 3 bar 6. Weight (kg) 185 210 230 7. Flue diameter (mm) 118 128 148 8. Width 705 705 705 9. Height 770 865 865 10. Depth 600 660 710 11. Upper door (mm) 258x196 258x196 258x196 12. Lower door (mm) 258x196 258x196 258x196 13. Flow 1" 1" 1" 14. Return 1" 1" 1" 1.2 On Product TEMY PLUS is a steel hot-water stove-boiler for central heating with possibility to cook in the same time, produced according to EN 12809 and EN 303/5. It is very easy to use and maintain. Boiler chamber is entirely made of steel, while the front parts are made of stainless steel AISI 314. The door frames are made of cast-iron. The upper door is made of reproof glass, while the lower door is made of steel. The lower door has secondary air inlet for better combustion. The ue opening is placed both on the upper side and on the lateral side of the boiler, so the customer can chose which one to use and which one to close. It is thus very easy to place the stove at the desired position in the kitchen and to align it with other household appliances. Hot-water volume inside the boiler is high (up to 65 l) - the fact which guarantees functionality of the product as a central heating boiler. It has no insulation coating around, so that the heat radiation is spreaded toward the ambience directly (around 1 kw). The heat radiation toward the cooking plate is 1-2 KW. The rest is given to the central heating system. TEMY PLUS P has the embedded automatic draught regulator (Rathgeber, made in Germany) provided: Automatic draught regulator is to be found on the front side of the boiler. Boiler can work only as a stove during the summer time (the grid to be set up on higher position inside the chamber, which is done easily and within a few minutes). An embedded heat exchanger for 3

thermal safety valve connection is provided (for devices such as Cale, Danfoss BVTS or Watts). 1.3 Boiler shipment and storage The boiler must always stand in its vertical position. The rotation of the boiler during the shipment or installation represents a serious risk and can lead to damaging the boiler. It is forbidden to place one boiler onto another. The boiler can be stored only in closed rooms with no atmospheric inuence. The humidity in the storing room also must not exceed the critical value of 80%, so as not to create any condensate. The temperature of the storing room must be in the range of +/- 40 C. When unpacking the boiler, you must check whether the paint on the boiler coating has been scratched somewhere and whether all parts of the boiler stand in their proper position. 1.4 Delivery Boiler is delivered with the housing premounted on the boiler body. Together with the boiler, also the following parts are supplied: Boiler thermo-manometer Cleaning kit Boiler guarantee and certicate 2 Boiler installation 2.1 Fitting the boiler to a closed central heating system Depending on the position of the boiler in relation to the pipe-work and the radiators the installation can be carried out using one of two methods. 2.1.1 Installation method 1 If the boiler is positioned on the same level or higher than the pipe-work and radiators. Each of the following items of equipment shall be tted along the ow line: 1. Aeration vessel. 2. Safety valve (spring valve is recommended). 3. Expansion vessel. 4. Boiler valve. 4

Aeration vessel to be tted at highest point of the system at top of boiler outlet. This should include an overow system with valve to discharge air from the boiler to prevent overheating. A oat operated valve allows water into a cistern tted with an overow pipe. When the system is lling, the valve remains open. When the system is full the valve closes. Temperature of hot water within a storage system. Irrespective of the type of fuel used for heating, the temperature of the water at any point within a hot water storage system should not exceed 100 C and appropriate vent pipes, temperature control devices and other safety devices should be provided to prevent this occurring. Safety Pressure Valve (PSV). The safety pressure valve must always be positioned and mounted close to the boiler. It must be easily identiable and allow for easy access. The safety pressure valve must be set to a nominal pressure of 2.5 bar. The valve must open and operate smoothly at 2.5 bar. Diameter for the aperture at the seat of the valve must be at least 15mm. Connecting pipe- work to the boiler must be as short as possible. Welds, joints or any possible blockage to this pipe-work must be prevented. Bends in the pipe-work should be avoided if possible. Unavoidable bends should be at diameter r>3d (D = radius of curvature) and less than α > 90 C. Closed expansion vessel. The closed expansion vessel shall be tted close to the boiler. Connecting pipe-work should be as short as possible. Fit the expansion vessel in horizontal alignment to the pipe to ensure equal distribution of pressure. The volume of the expansion vessel is determined by the output/capacity of the boiler. A ratio of 1 kw:1 litre should be used. The safety pressure valve and the expansion vessel should be tted in close proximity to each other, in the following order: expansion vessel closest to the boiler, followed by the safety pressure valve. It is also recommended to mount a dirt remover on the RETURN line. In the event of power failure and the boiler fails to operate correctly any sudden increase of pressure will be controlled rst by the expansion vessel, on any further increase in pressure the safety pressure valve will open. Great care must be taken to ensure air does not enter the boiler. 5

2.1.2 Installation method 2 To be used in the case of the boiler being positioned and installed at a lower level than the installed pipe-work and radiators. As shown on Figure, following elements are connected along the FLOW: 1. Automatic air vent 2. Safety valve 3. Circulation pump (separated with ball valves on each side so that it can be easily replaced if necessary). For safe operation info on additional equipment such as expansion vessel and safety valve please refer to manuals to be delivered with such products. This air vent valve must be open when rst lling the boiler on installation completion. 2.2 Fitting the boiler to an open central heating system. The connecting scheme of an open central heating system is depicted on the gure. Open expansion vessel is connected to the hot-water distribution pipes (FLOW and RETURN) as shown on Figure with an additional OVERFLOW pipe output plus CIRCULATION pipe (to prevent freeze during winter months). Please note that no additional items shall be connected to the open expansion vessel especially not valves. The size of expansion vessel is deducted from the following equation: V = 0, 07V water (l) V water (l) is the water volume in the entire installation. Open expansion vessel is to be positioned vertically above the highest heating element. 6

2.3 Filling up the boiler and installation with water Filling is done using the drain tap valve (to be found on the return line close to boiler). The lling process is done when no air is coming out through automatic air vent and pressure gauge is showing the value between 1,5 and 2,5 bar (closed systems). Air vent is to be set at the highest point of the (closed) central heating system. If the pressure is below 1,5 bar the lling process must be repeated. For open systems, working pressure depends on the overall height of the system and the open expansion vessel (1 bar for each 10 m is an estimate). After the lling process is done, it is obligatory to close the drain tap valve, close the water supply to the water-lling pipe and detach the water-lling pipe. An expert should be entrusted with the mounting of the heating and the initial operation. This must be a person who will take over the responsibility and guarantee the correct operation of the boiler and of the complete central heating system. In the case of an incorrectly planned system with manifesting deciencies caused by the respective person's incorrect installation of the system, which can again lead to an incorrect operation of the boiler, the complete liability for the material damage and potential new costs arising in relation to it is borne exclusively by the person who was entrusted with the mounting of the central heating system, and not by the boiler manufacturer, sales representative or seller. 3 Boiler operation First putting into operation is performed exclusively by a skilled person. Before putting in operation please make sure that: boiler is connected on central heating installation properly there is no air in the central heating installation and pressure is within range proper working cycle for circulation pump is chosen. Heating by solid fuel (manual operation) can be performed in two ways: 1. Heating from above put coal (or wood) over the replace pipes (grid) (no ash should be present). The draught regulator is at the maximum position. Using a tiny piece of wood or coal, light a re on the top. When the re begins to burn, draught regulator is set on desired temperature / position. 7

2. Heating from below put small amount of solid fuel over the replace pipes (grid) (no ash should be present) and set up a re. The draught regulator is at the maximum position. When the re begins to burn, add larger amount of fuel and set draught regulator on desired temperature / position. Make sure that lower boiler doors are closed during boiler use. In case of an uncontrolled increase of pressure and temperature of the water in the boiler, due to various reasons (such as power failure causing interruption of the circulation pump operation, circulation pump defect, uncontrolled entry of air into system) close all air supply to the boiler or eventually take the re out if the safety conditions allow that (there are no inammable materials in the area). In case of power failure put the draught regulator in the zero position and the ap on the boiler chimney take-up in the closed position. It is obligatory to pay special attention that the pressure inside the installation is within range (> 1,5 bar for closed systems). If the pressure is below the critical value, stop the boiler operation and rell the system when the boiler is cold. The water hardness may not exceed the recommended value. If you heat the boiler using coal, depending on the kind of coal and quality of combustion, boiler is to be cleaned at least every 30 days. Dirtier the boiler, the eciency of the system is smaller. It is not allowed to extinguish the re in the boiler articially, it is forbidden to sprinkle the water inside the heating chamber. After the heating season boiler should cleaned from ash and soot and the chamber should be treated with some protection agent against corrosion. In case of any mechanical problem (the draught regulator is blocked, or the circulation pump is defect) stop the boiler operation rst only when the boiler is cold, reparation action can be undertaken. 4 Chimney The purpose of the chimney is to take out the products of combustion but also to secure necessary air draught in the boiler. The graph shows how to chose the necessary height for the chimney as a function of chimney opening. For instance, if we have a 160 mm diameter of the chimney, minimum chimney height would be 8 m for a 25 KW boiler or 11 m for a 30 KW boiler. For a 180 mm diameter chimney should be at least 6 meter high for a 25 KW model, 7,5 m for 30 KW on the other side. 8

5 Summer Mode During the summer the removable grid inside the heating chamber should be put in its upper position as depicted below: 9

6 Overheat protection using the thermostatic valve (closed system) TEMY PLUS has an embedded heat exchanger inside the heating chamber (position 12) which has to be connected to the thermostatic overheat protection valve (such as Danfoss BVTS, Cale or Watts). If the water temperature rises, the valve will open and let cold water through the heat exchanger system; thus quickly and eciently lowering the temperature. The valve will operate safely regardless of the ambient temperature, and the self-acting technology means that the valve does not recquire electricity or other forms of energy in order to work. Description of the parts: 1. Cold water entrance toward the heat exchanger 2. Sensor of the thermostatic valve 3. Exit for hot water from the heat exchanger How to connect the valve: First connect the sensor (male thread 1/2) on the marked position on the boiler - female thread 1/2 Now connect the cold water supply to the valve - female thread 3/4, then connect the valve to the position 1 (cold water entrance), the boiler should have the prepared reduction 3/4-1/2 Connect the hot water exit toward the sewerage. 7 Boiler cleaning and maintenance It is recommended that the boiler is cleansed from ash once to two times weekly. A detailed cleansing of the boiler should be done once a month and also when the heating season ends. Regular maintenance extends the service life of the boiler. 10

A Declaration Of Conformity Hereby we, Termomont d.o.o. with legal seat in Prhovacka bb, 22310 Simanovci, Serbia, declare under our sole responsibilty that the following product(s): Heating stove-boilers for solid fuel (wood, coal) TEMY PLUS 12, TEMY PLUS 18, TEMY PLUS 30 manufactured in the following period: 2010-2011 to which this declaration relates, are in conformity with the following standard(s), or other normative document(s): EN 12809:2001 following the provisions of the directive: 97/23 WE certied by notied body: Technicky Skusobny Ustav Piestany, Slovak republic Test report: No.93000021 Authorized person.................................... 11