MARQUETTE UNIVERSITY: McCabe Hall



Similar documents
Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

CASE STUDY: The EVERGREEN

Building Condition Assessment Report

Building Condition Assessment Report

REFERENCES-COMMERCIAL. Montgomery County Community College. 60,000 Sq. Ft. Montgomery County Community College 12,000 Sq. Ft.

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

Our Triple Bottom Line...

Vista Condominiums. VISTA SALES OFFICE Telephone: Fax:

17,280 square feet Overview:

GENERAL PROVISIONS

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

CONDITION OF QUALITY ITEMS

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES

I. AMFITEATRU HOTEL ** For more details visit :

Self-Home Inspection Checklist

303 5 th Avenue, Suite 1702 New York, NY (212)

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf

125 Mount Auburn Second Floor Office Renovation LEED-CI Silver, September 2008

Green House, Hungary

Saint Cloud Business Center

47 Levencourt Way London SW8 1HR. Tenant: Eric Stevenson Prepared for: Elizabeth Collins

CONDUIT MAYFAIR READY FOR OCCUPATION SPRING 2014 GLINSMANWELLER.CO.UK A DEVELOPMENT BY LONDON PROPERTY PARTNERSHIP LTD

ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY

Open House and Home Tour Checklist

This report presents the findings and recommendations of the assessment of energy use and

50 St Mary Axe London EC3

Damage Charge Lists. FLOORING Replace Repair Carpet per square foot (Mohwak heat carpet tile)

101 Congress Parkway Federal Building

PROPOSAL. Prepared for: Craig Mottram & Family, 118 Rangoon Rd. Prepared by: Carlos Andrade, Owner & Operator. Brandon Andrade, Project Coordinator

Richmond Memorial Civic Center Rehabilitation Project

Historic Preservation Certification Application Part Main Street West South Haven, Vermont NPS Project No

POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Klosterenga, Oslo, Norway, page - 1

Innovation in Affordable Housing Incorporating GREEN in Development

HOUSING QUALITY STANDARDS (HQS)

GREEN DEVELOPMENT PLAN Developer Name: Project Name: Address (Street/City/State) Description of Process. Goals. Design & Development Team Members Name

3rd Annual Design Drafting Contest

BROWNSVILLE STRUCTURES STUDY. July Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania

NORTH PENN HIGH SCHOOL RENOVATIONS

you haven t seen sawgrass until you ve seen old landing & coronado drive, rehoboth beach, de

Stanley Neighborhood Series

Guide to Improving Your Home

46 Sylvan Avenue BITTERNE, SOUTHAMPTON, SO19 5JU

Board Seminar Facilities. School Year Submitted by Joseph L. Lisa-Director of Facilities

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy

SUMMARY OF WORK FOR GENERAL CONTRACTOR

Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure

Exhibit B. Property Acquisition and Disposition Division Residential Design & Performance Standards

P r o j e c t C a s e S t u d y

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

BOMA BESt Assessment Overview

DESIGN GUIDELINES FOR SUBSTANTIAL REHABILITATION.

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings

Going for LEED Gold: SUSTAINABLE DESIGN IN THE RICHARD IVEY BUILDING

SECTION XI OPINION OF PROBABLE COST

Proudly Presenting Twinflower Crescent

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University.

COLLEGE HILL RESIDENCE A Complete Mid-Century Remodel

case studies Safely applied, Environmentally creative and effective engineering solutions

TENANT MOVE-OUT GUIDELINES

BATHS REMODELED. The following pages show master bathrooms that were remodeled by Rogers Residential Remodeling.

Spring Valley Trails Quick Move In & Inventory Towns Colours have been selected for some of these unit. See Agent for details.

Minimum Housing and Health Standards

LONDON BOROUGH OF BROMLEY STANDARDS FOR HOUSES IN MULTIPLE OCCUPATION (HMO) INTRODUCTION

Master Bathroom Design Tips

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

305 MILNER AVENUE LEASE OFFICE SPACE

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

R432. Health, Health Systems Improvement, Licensing. R Nursing Facility Construction. R Legal Authority. R Purpose.

Case Studies in Existing Building Audits

Schedule of Maintenance Fees

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

1..GENERAL DATA 2. CLIMATIC DATA. Location

New York, Dean. Price 182,500

The Roosevelt Triangle

City of Peterborough

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

How to report a repair

Your Basement Remodeling Specialist LLC

UNIQUE LIVE/WORK LOFT

TENANT AND LANDLORD REPAIR RESPONSIBILITIES

Holiday Cottage / Live Work Home

S t e p h e n A l e x a n d e r

Transcription:

MARQUETTE UNIVERSITY: McCabe Hall THE SITE Newly acquired by Marquette, the vintage 1920 s building is located on the northeast corner of Wisconsin and 17th Streets. The urban setting offers immediate access to the heart of the campus, public transportation, service resources and restaurants.

THE BUILDING The 1920 s building has a structural steel frame, brick veneer, and stone detailing. It rises 8 floors tall with 1 subterranean level. Each floor is just over 10,000 gsf serviced by 2 staircases, 1 passenger and 1 freight elevator. The building was originally designed as a 93 unit apartment building with a first floor retail component.

THE PROJECT Marquette commissioned the team to perform a Level 1 renovation of the upper floors to convert the apartments into suite style living arrangements for 2-3 students each. The end result houses 225 students and 2 full time staff members in 91 units. Additionally, the team performed a Level 2 renovation at the first floor to create study, community, service and support spaces for the residents.

Exterior: Before and After CHALLENGES Project challenges included schedule, existing retail tenants and complex constraints that commanded focused design strategies. Schedule: The entire process was executed in 12 months with a requirement of opening August of 2009 for incoming sophomore students. At the onset of the project, existing tenant lease buy outs left plans for the first floor in flux for months, challenging the project schedule.

Study: Before and After Lounge: Before and After CHALLENGES Complex Parameter Set: Existing building constraints, desire for high reuse while inserting modernized systems, partial occupancy during demolition, top down phasing, winter conditions and LEED aspirations.

THE EXTERIOR ENVELOPE Reuse and rehabilitation of the building s original brick veneer and stone detailing. Complete replacement of window units to improve thermal properties of the building. Replacement of all roof surfaces to improve thermal and performance properties of the building.

TV LOUNGE FACILITY SUPPORT CAFÉ SEATING MAIN ENTRY RESIDENT LOUNGE PUBLIC LOUNGE STUDENT RESOURCES FIRST FLOOR PLAN Service Level: Administration, Student Services, and Facility Support

THE PUBLIC LOBBY Features: Multiple types of seating and levels of engagement. Finishes: Modular flooring has 35% recycled content, water based adhesive, and is easily maintained with mild cleaners. Furniture: Selections have recycled content and are designed to be broken down for recycling at the end of their useful life. Lighting: Day lighting opportunities were maximized and high efficiency light fixtures installed in all areas.

THE RECEPTION AREA Finishes: Solid surface countertop is made of 40% recycled content. Back wall surface is a tack-able, self-healing wall covering made of natural, highly renewable elements such as cork.

THE RESIDENT LOUNGE Finishes: Building s original terrazzo floors were reused and reconditioned. Low VOC paint was used throughout. Furniture: Selections have recycled content and are designed to be broken down for recycling at the end of their useful life. Lighting: Day lighting opportunities were maximized by renovating an existing sky light. High efficiency, fluorescent light fixtures were installed throughout.

THE RESIDENT LOUNGE Finishes: Reuse and renovation of original wood beams. Carpeting with recycled content backing installed. Furniture: Selections have recycled content and are designed to be broken down for recycling at the end of their useful life. Lighting: High efficiency, fluorescent light fixtures were installed throughout.

CIRCULATION AND STAIRS Finishes: Reuse and reconditioning of existing terrazzo stairs and brass handrails maintains the historic character of the building while minimizing the environmental impact of installing new elements.

FLOORS 2 THROUGH 8 FLOOR PLAN Resident Levels: 13 Living Units per Level and Support Spaces

THE RESIDENT CORRIDOR Finishes: Reuse and reconditioning of existing woodwork. Low VOC paint applied. Carpeting installed with recycled content. Doors: New doors installed with recycled content cores and low emission adhesives. Lighting: LED light fixtures to achieve a low energy consumption rate for the building.

KITCHENETTE CLOSET CLOSET BEDROOM STUDY AREA BATH FLOORS 2 THROUGH 8 TYPICAL UNIT PLAN Suite Style Unit: Accommodates 3 students.

THE RESIDENT UNIT STUDY AREA FEATURES Finishes: Reconditioned terrazzo floors and wood work. Low VOC paint used throughout. Furniture: Pieces have recycled content and durable construction for a long useable life. Lighting: Day lighting opportunities were maximized and high efficiency light fixtures installed in all areas.

THE RESIDENT UNIT KITCHENETTE FEATURES Finishes: Reconditioned terrazzo floors and wood work. Low VOC paint used throughout. Cabinetry: Cabinets and counters have recycled content cores bound by low emission / water based adhesives.

THE RESIDENT UNIT - BATHROOM FEATURES Finishes: Floor and wall tile was reused and reconditioned where possible. Low VOC paint applied throughout. Fixtures: Water efficiency was achieved with new low-flow shower heads and dual flush toilets reducing water use by 20%. Lighting: Efficient fluorescent light fixtures were installed.

THE RESIDENT UNIT BEDROOM FEATURES Finishes: Carpeting has recycled content. Low VOC paint applied throughout. Furniture: Selections have recycled content and are designed to be broken down for recycling at the end of their useful life. Lighting: Day lighting opportunities were maximized and high efficiency light fixtures installed in all areas.

BUILDING SYSTEMS McCabe Hall utilizes a ventilation energy recovery unit to transfer energy from the exhaust air stream to the outside air stream, saving the energy that would otherwise be required to heat and cool the raw outside air. High efficiency steam-to-water heat exchangers are used to heat the building s heating and domestic hot water using steam from the city. Energy efficient variable frequency pumps are used to circulate the water throughout the building. A high efficiency, air cooled condensing unit is used to provide cooling for the ground floor area. All of the heating and lighting systems were commissioned at the end of the project to ensure they were working properly and using the least amount of energy possible.

TEAMWORK Marquette fosters a team approach that involves all parties early on in the design process, an approach often talked about, but rarely executed. This allowed the team to make informed and holistic decisions on how to maintain a simple and elegant aesthetic while inserting modern technology into this 1920 s building. Additionally, a balanced leadership effort was put forth by the design team (KTA) and construction team (KBS) throughout the process to ensure a single objective.

INNOVATION The major innovation that this project brought about is the project delivery approach as mentioned earlier. The entire team was involved early and the leadership team established a highly collaborative environment to foster creative problem solving in the face of a complex parameter set. The complexity of each decision demonstrated to the team that each member had an equally important role to play.

Example of LEED Education Poster CONTRIBUTIONS The McCabe Hall project presented opportunities to contribute to the MU community and overall neighborhood. The process and job site became an extension of the classroom for multiple engineering courses on campus. Additionally, the project became a demonstration piece of sustainable renovation practices and will continue to do so as students live and study within it. The exterior improvements further establish the neighborhood as re-emerging.