How To Recover From A Flood In Bundaberg



Similar documents
Bay Park Sewage Treatment Plant Super Storm Sandy Recovery

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

Toronto s Wet Weather Flow Master Plan

APT Petroleum Pipelines Limited. Queensland Floods

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Sewerage Management System for Reduction of River Pollution

After the Flush. Safe disposal of our wastewater is a valued and complex, not-for-profit municipal service.

Draft Dapto Flood Management Plan

Purpose of the water security outlook

WASTEWATER TREATMENT OBJECTIVES

Description of the Water Conserv II Facility

Analysis One Code Desc. Transaction Amount. Fiscal Period

Standard Operating Procedures for Flood Preparation and Response

Case 2:08-cv ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8

Damage to Sewage Treatment Systems caused by the Great East Japan Earthquake and the Government s Response

Responding to the challenges

San Diego Citizen s Forum. USIBWC San Diego Field Office

Flood Management and Reconstruction: the Recent Queensland Experience

Cooperative Research Centres Association 2011 Conference. An Electricity Supplier s Perspective Terry Effeney, CEO ENERGEX 19 May 2011

Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017

Level 2 Energy Audit. NRSBU Bell Island Wastewater Treatment Plant. Engineering Advisor Nelson Regional Sewerage Business Unit (NRSBU)

RETICULATED RECYCLED WATER SCHEMES OPERATIONAL CONSIDERATIONS. Duncan Wallis. RM Consulting Group

Melbourne Water s Submission. Draft Victorian Floodplain Management Strategy

The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin

OPTIMIZING BIOLOGICAL PHOSPHORUS REMOVAL FROM AN SBR SYSTEM MIDDLEBURY, VT. Paul Klebs, Senior Applications Engineer Aqua-Aerobic Systems, Inc.

History of flooding. 12 Flood Management and Drainage Strategy. Riverine flooding

Guidance on applying for approval of installation of a commercial onsite wastewater system

To provide an update on the extreme storm event that took place on July 8, 2013 and opportunities to improve future outcomes.

Jeff Haby, P.E. Director Sewer System Improvements. September 15, Agenda

CERTIFYING DRAINLAYER

Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN

Water Recycling in action in South Australia: a review of agricultural and municipal reuse schemes and innovation.

The 2011 Queensland Floods

Chapter 14 Quiz. Multiple Choice Identify the choice that best completes the statement or answers the question.

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction

New River Cleanup. Progress & Emerging Threats

Flood Facts 2F.1. Flood Facts

St. John s Harbour Clean-Up Phase 2. Project Description

Melbourne Water Flood Risk Assessment: How flood impacts are assessed in the Port Phillip and Westernport region

City of Mebane Wastewater Collection and Treatment Facility

William E. Dunn Water Reclamation Facility. Facility Overview & Information

REVISED FLOOD MAPS CAUSE WARWICK TO RECONSIDER THE SAFETY OF ITS TREATMENT PLANT

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).

Products, systems and services for water and wastewater treatment plants Enhanced plant performance, efficiency and reliability

The City of Boulder 75 th Street Wastewater Treatment Facility

Appendix B. Property Owner Questionnaire

U.S. Army Corps of Engineers Tulsa District

TOWNSVILLE WATER Customer Service Standards

BASEMENT FLOODING. Prevention Guide for. Homeowners

Victorian Floods 2011: Frequently Asked Questions

CRS Report for Congress

Shigehiko Muramoto,

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

Operational Audit and. Asset Management System Review. Shire of Coolgardie

Preparation. Preparation. Step 2 Prepare an emergency kit. Step 1 Prepare your emergency plan. Step 4 Tune into warnings

FLOOD INFORMATION SERVICE EXPLANATORY NOTES

Policy Clarifications on the Eligibility of Water and Wastewater Utility Projects for FEMA s Public Assistance and Hazard Mitigation Assistance Grants

Office of Environment, Health and Safety (EH&S) - Sanitary Sewer Overflow Incident Form (rev. 12/2014)

* NB Eligible projects include irrigation and./ or water reuse equipment damage from Cyclone Yasi & Cyclone Anthony. Guidelines

Fundamentals of Asset Management. Step 10. Build Asset Management Plan A Hands-On Approach

EXISTING WASTEWATER TREATMENT FACILITIES

Chapter 8: Common Treatment Facilities, Programs, Operational Improvements and Policies for the Recommended Plan

Wastewater Treatment System Rehabilitation Project

Addressing Declining Elevations in Lake Mead

How To Deal With A Flood In Aorere Valley

WATER / WASTEWATER & POWER PROJECTS LAST 5 YEARS. No of Staff Provided by BCE. Overall Project Value (SR)

DRAFT Public Outreach Document for What s an SSMP?

Standard terms and conditions

Approved Natural Disaster Recovery Round Green Army projects

Managing Stormwater in Urbanised Singapore for Flood Control

Second Place: Industrial Facilities or Processes, New

The Flow Regulator. Flow regulation

Activity Summary: Flood Protection and Control Works

HOW DOES THIS SERVICE CONTRIBUTE TO THE QUALITY OF LIFE IN THE CITY OF LONDON?

PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems

KNOWING WHEN TO GET THEM OUT - IMPROVING FLOOD EVACUATION PLANNING THROUGH FLOOD MODELLING AND STAKEHOLDER INVOLVEMENT

TALLINN WATER TREATMENT AND SEWERAGE Tuuli Myllymaa

HOUSTON-THE WOODLANDS-SUGAR LAND METROPOLITAN STATISTICAL AREA (H-W-S MSA) Visit our website at

Climate Change. Lauma M. Jurkevics - DWR, Southern Region Senior Environmental Scientist

Appendix A Flood Damages Assessment

Essential Water. Customer Charter

Ashley Institute of Training Schedule of VET Tuition Fees 2015

Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No.

List 10 different words to describe the weather in the box, below.

Compliance Guidance for Motor Vehicle Waste Disposal Wells in Oregon September 2015

Newbiggin House Farm,

International No-Dig st International Conference and Exhibition. Sydney, Australia 1-4 September Paper 2.12

Thames Water key Messages for London Borough of Ealing 25 th October 2005

River Management 2013 Colorado Flood

TOWN OF HARRISBURG FIRE DEPARTMENT 6450 Morehead Road, Harrisburg North Carolina Phone: Fax

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

lforrnation Requir C -INF lucture & OPER eraf - Drawing No Drawing No

Water Year 2001 in Northern California: Have the Good Years Ended?

Cambridge Wastewater Treatment Facility

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

Package Treatment Plant Policy and Procedure

Transcription:

BUNDABERG FLOODS NOW THE MUD HAS DRIED FLOOD RECOVERY AT MILLBANK Paper Presented by: Kym Kneebone Author: Kym Kneebone, Assistant Coastal Treatment Co-ordinator, Bundaberg Regional Council 37th Annual Qld Water Industry Operations Workshop Parklands, Gold Coast 5 June to 7 June, 2012 37 th Annual Qld Water Industry Operations Workshop Page No. 36

BUNDABERG FLOODS NOW THE MUD HAS DRIED FLOOD RECOVERY AT MILLBANK Kym Kneebone, Assistant Coastal Treatment Coordinator, Bundaberg Regional Council ABSTRACT In December - January of 2010/11, Bundaberg experienced its worst floods in 60 years with floodwaters from the Burnett River inundating hundreds of homes. The floods had major impacts on the capability of the six (6) Bundaberg Regional Council (BRC) coastal wastewater treatment plants (s) consisting of (Bargara, Coral Cove, East, North, Thabeban & Millbank). Average Dry Weather Flow for each respective is shown in Table 1. This paper focuses on the Millbank Wastewater Treatment () as it was the most affected and provides an overview of the impacts, the recovery process, costs and improvements. Table 1: Average Dry Weather Flow for Coastal s BARGARA CORAL COVE ADWF (ML/d) EAST NORTH THABEBAN MILLBANK ADWF ADWF ADWF ADWF (ML/d) (ML/d) (ML/d) (ML/d) 1.9 0.2 7.0 0.3 0.8 4.0 ADWF (ML/d) 1.0 INTRODUCTION The City of Bundaberg with a population of 48,000 is the centre of the Local Government Area of Bundaberg Regional Council (BRC) being the major centre within the broader Wide Bay-Burnett geographical region. The city lies on the Burnett River, approximately 380 km north of Brisbane and 15 km inland from the coast. Bundaberg is located in the heart of a rich sugar and horticultural belt supported by a growing manufacturing sector. The Burnett River catchment area covers approximately 33,000 km 2. The river rises close to Mount Gaeta, east of Monto, flowing in a general southerly direction past Eidsvold and Mundubbera. Downstream of Mundubbera, the river swings east, going through the townships of Gayndah and Wallaville before entering the city of Bundaberg. The river flows into the ocean at Burnett Heads, roughly 20 km from Bundaberg. Paradise Dam, also known as Burnett Dam, is located on the Burnett River. The dam is situated approximately 80 km south-west of Bundaberg. The Paradise Dam scheme supplies water for the Bundaberg Irrigation areas on the lower Burnett. The Millbank Wastewater Treatment Plant () is located on Duffy St south of Bundaberg. Treated effluent from this plant is discharged via gravity into the Burnett River. The Millbank is an extended aeration plant with an average dry weather 37 th Annual Qld Water Industry Operations Workshop Page No. 37

flow (ADWF) of 4 ML per day. The old biological trickling system was decommissioned in April 2005. All biosolids produced from the Millbank are beneficially used on agricultural land for soil conditioning under a beneficial use authority. The ADWF for the Millbank just prior and preceding the 2010/2011 flood is shown in Table 2. Table 2: Millbank ADWF July 2010 to Jun 2011 Flow (ML) Total Flow Max Day Min Day Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun 109 116 115 112 108 292 189 101 137 111 106 95 4.6 6.8 9.5 4.8 4.3 36.4 13.1 4.1 11.9 6.2 4.2 3.4 3.1 3.3 2.9 2.8 3.3 3.7 3.7 2.8 3.1 3.0 3.0 2.8 2.0 BEFORE THE FLOODS Emergency counter disaster planning commenced when the Burnett River height data from the Bureau of Meteorology activated the Bundaberg Emergency Disaster Group. Initial counter disaster planning meetings where held with treatment plant staff, trade services and management to discuss actions and priorities. The first actions where based on the removal of equipment from the low lying areas where flood waters would affect those parts of the Millbank. Strategies were put in place such as the removal of electrical motors on Return Activated Sludge (RAS) pumps and all pump motors at the chlorination chamber. Initial flood warning modelling information suggested that only the low lying areas of the Millbank would be affected. Initial removal actions were completed on the 24/12/2010 just prior to first minor inundation. The Millbank electrical supply and associated electrical equipment was isolated. The 920kg chlorine drums were isolated and chained down as at that time the peak of the flood was only going to affect that area of the plant. The final effluent coliform counts where high during this time of no chlorination however all other final effluent quality parameters were compliant to the authority release limits. Little did anybody know at this time, what were we in-store for? What height the flood waters would peak? Or what damage to infrastructure would occur? Due to these events occurring right on the Christmas break along with the expected flood peak to be a lot higher there was concern in relation to having adequate staff available. Contact was made with all BRC treatment & trade services staff to nominate their availability to be on standby, ready to come back to work when and if required. Response was so outstanding to the callback request that Council concerns in relation to having available staff where totally allayed. Then the perfect storm hit with heavy rainfall throughout most of waterlogged Burnett catchment where over 300 mm was recorded in some parts between 9am on 26/12/2010 and 9am on 29/12/2010. The southern part of the Burnett catchment later received further heavy rains between 9am on 07/01/2011 and 9am on 13/01/2011 causing a second flood 37 th Annual Qld Water Industry Operations Workshop Page No. 38

peak resulting with inundation of the chlorination chamber area. Millbank locality is shown in Figure 1. Figure 1: Millbank Site 3.0 FLOOD HISTORY Major floods have been recorded in Bundaberg since 1875 with the most recent event in December 2010 when the river rose to 7.92 metres which is about 5.7 metres above the Highest Astronomical Tide level. Major flooding in the Burnett River is relatively rare but as we experienced, can occur under favourable meteorological conditions from tropical low pressure systems resulting in heavy rain throughout the catchment area. Bundaberg flood peaks as recorded are shown in Figure 2. 37 th Annual Qld Water Industry Operations Workshop Page No. 39

Figure 2: Bundaberg Flood Peaks 4.0 DURING THE FLOODS By 28/12/2010 flood waters had cut-off vehicle access to the Millbank. As a result, the removal of further equipment and assets could not be undertaken. The main sub-board that was located on higher ground at the plant was turned off at this time. On 29/12/2010, Council received revised estimates for the flood peak estimated to reach between 7.0 to 7.5 metres. At this time it was decided to have Ergon disconnect the main power supply to Millbank and the Duffy St Sewerage Pumping Station (SPS). The Duffy St (SPS) is located on the access road to the Millbank. The Millbank catchment sewerage pumping stations were all experiencing large inflows with associated high inflow to the Millbank. It was considered that there was capacity to catch gross solids at the Millbank as well as to limit sewerage overflows in Bundaberg suburbs. On 30/12/2010, the Parks & Gardens boat was used to undertake visual inspections and take photos where possible of the Millbank. During the floods the approximate flows were around 37ML per day. By this time the river had peaked at 7.92 metres. The Millbank during this flood peak is shown in Figure 3. Figure 3: Millbank at Flood Peak 5.0 AFTER THE FLOODS As soon as the flood waters had receded enough to allow vehicle access the treatment plant, clean-up started. All the assets affected by the floods were accessed and all work was prioritised. The prioritisation was captured on a decision matrix to assist the process. The prioritisation matrix is shown in Table 3. As expected, the main flood damage was to the electrical switchboards and electrical motors that could not be removed prior to the flood. Clean up, inspections of assets along with cost estimation for emergent repairs and overall cost of repairs was undertaken. Emergent repairs to get the plant back on-line included-: replacement of relays, contactors, circuit breakers, momentum I/O blocks, hour meters, timers, protection 37 th Annual Qld Water Industry Operations Workshop Page No. 40

equipment, reinstating electrical motors, repacking bearings and replacing oil in gear boxes. The emergent repairs effectively had the plant operating the main process equipment such as aerators and pumps. BRC s Trade Services electrical and metal trades section performed all the repairs. Treatment plant operations staff assisted in the repairs and all the clean-up of the mud and debris on the site as well as the secondary sedimentation tank, chlorine tanks, buildings and around the grounds of the plant. Table 3: Millbank Emergent Work Prioritisation Table Priority List Coastal Group Priority 1= Immediate Millbank 2 = High Aerators 1 3 = Medium Sec Sed Tanks 1 4 = Low RAS Pumps 1 Wash Water Pumps 2 Recirc Pumps 2 Cl2 Dosing 2 Millbank - Oxygen Injection 3 After the initial emergency work was completed and the treatment plant was operating, the next stage was the restoration work that was needed such as flow meters, replacement of panel equipment, transmitters, on-line chlorine dosing equipment and replacement of damaged fencing to secure the treatment plant site. Improvements works are still ongoing as these items are budgetary such as complete replacement of switchboards and relocating to the top of the aeration basin, raising switchboards and relocating the RAS - VSD s so they are above flood levels. The overall cost of emergent repairs to electrical equipment only was approximately $180,000, replacement of fencing $30,000, labour cost for clean up approximately $24,000. The overall flood damage bill for the Bundaberg area was approximately $60M. 6.0 CONCLUSION Considering the devastation the floods had caused and the timeframe to have the Millbank up and working again in such a short time, whilst also attending to other infrastructure in the Bundaberg Region has demonstrated that having welled trained dedicated staff and equipment in place made the recovery after the floods a lot easier. It also highlighted where improvements can be made in the planning of a disaster such as -: carrying essential spares and where possible, installing equipment such as electrical items above flood levels. The devastating floods in December 2010 and January 2011 and the subsequent cost of repairs has placed a strain on Councils resources. These repair costs will continue due to shortened asset life of many passive and active assets resulting in unexpected and increased costs for many years. 37 th Annual Qld Water Industry Operations Workshop Page No. 41

7.0 ACKNOWLEDGEMENTS The author would like to acknowledge Bundaberg Regional Council for their contribution to this paper and all staff that were on standby and willing to come back from annual leave, not only to get all services up and running but also helping with the clean up around the Bundaberg Region. 37 th Annual Qld Water Industry Operations Workshop Page No. 42