APT Petroleum Pipelines Limited. Queensland Floods
|
|
|
- Mervin Clarke
- 10 years ago
- Views:
Transcription
1 APT Petroleum Pipelines Limited Queensland Floods Attachment 8.1 Attachment 8.1 Queensland Floods.doc
2 Contents 1 Flood Impact December 2010 Floods January 2011 Floods Impact on system APTPPL response Toowoomba escarpment Rocky Creek washout repair Arubial and Redbank stations Other washout repairs Costs associated with the damage Minden Range 2011/12 7
3 1 Flood Impact The period from July to December 2010 was the wettest on record for Australia, while December 2010 was the wettest on record for Queensland December 2010 Floods By mid-december 2010, many rivers were already at or near flood level as a result of the rains in the preceding weeks. Heavy rain from 23 to 28 December, on top of the pre-existing wet conditions, resulted in exceptional flooding in many parts of central and southern Queensland. Some of the most extreme flooding in late December occurred in the Condamine- Balonne catchment with record flood levels at a number of locations, including the township of Condamine. The Arubial inlet station connects the Peat Lateral to the RBP DN250 mainline and is located on the outskirts of Condamine, in close vicinity to the Condamine River. It was submerged when the Condamine River flooded but continued to operate on pneumatic run at 70% capacity. However, all electrical equipment had to be replaced, including flow computers, RTUs, communications equipment and air conditioners. 1.2 January 2011 Floods The most destructive floods during the period occurred during the second week of January in the southeast corner of Queensland. There was major flooding through most of the Brisbane River catchment, most severely in the Lockyer and Bremer catchments where numerous flood height records were set along with the Toowoomba area just outside the Brisbane catchment. In Brisbane it was the second-highest flood of the last 100 years, after January The flooding caused substantial loss of life, and thousands of properties were inundated in metropolitan Brisbane and elsewhere. Major flooding with inundation of properties also extended inland to the upper Condamine-Balonne catchment, with Chinchilla and Dalby being severely affected for the second time in less than a month 2. On 10 January, two severe thunderstorms combined into one concentrated storm, delivering intense rainfall across the Great Dividing Range. 1 Australian Bureau of Meteorology, Special Climate Statement 24: Frequent heavy rain events in late 2010/early 2011 lead to widespread flooding across eastern Australia, Australian Bureau of Meteorology, Special Climate Statement 24: Frequent heavy rain events in late 2010/early 2011 lead to widespread flooding across eastern Australia, 2011.
4 1.3 Impact on system Four sites suffered major damage, requiring an immediate response, due to submersion or washout by floodwaters. This included two stations, Arubial and Redbank, that were submerged and two large areas of exposure of the pipeline. At one of these sites, on the Toowoomba escarpment, a landslip required a section of the pipeline to be taken out of service due to a loss of containment. A further six sites experienced significant washouts, exposing the pipeline and there was substantial erosion across multiple smaller sites along the pipeline. Operating pressures in both the DN400 and DN250 pipelines were reduced while damage was being assessed however sufficient supply to meet customer demand was maintained during this time. 1.4 APTPPL response In accordance with AS2885.3, APTPPL deployed resources as required in response to the floods, including; An initial, immediate response to ensure safety and security of supply; Temporary compressor modifications to provide continuity of supply to meet contracted customer demand; Performed engineering assessments in accordance with AS to ensure integrity of the pipeline; Safety management study conducted to systematically assess and address the risks associated with the flood damage; and Substantial remedial works were required at several sites during January to June Further remedial works continued through to September 2011 to address erosion issues along the pipeline Toowoomba escarpment The RBP runs down the Toowoomba escarpment at an acute angle. There was a significant washout of the DN400 pipeline approximately 200m from the top of the Toowoomba range where the pipeline crosses under a dual railway line. There was also a loss of containment on the DN250, 20m further down the slope, due to land slippage. A brief summary of key actions follows: Stabilisation of the pipelines;
5 DN250 pipeline was shut-in between Oakey and Withcott; DN400 pipeline supported and stabilised; Unstable land mass removed; and Exposed DN250pipeline to locate leak site. Repair to DN250 pipeline Blowdown pipeline; Performed cold cut to remove defect including upstream and downstream of defect; Surveyed and constructed field bend for new pipeline section; New pipeline section tie-in aligned and weld certified; Pipeline purged and re-pressurised to 150kpa, then increased by 2,000kpa increments and with foot leak survey conducted down escarpment at each increment; Coating repair and site re-instated; Intelligent pigging to confirm integrity of pipelines; and Repair completed and restricted gas flow to 6000kpa until pipeline integrity confirmed. Return to normal operations Intelligent pigging to confirm integrity of pipelines; Coating repair and trench remediation for DN400 pipeline, completed; Analysis of pigging data; and Pressure restriction lifted Rocky Creek washout repair The RBP runs under Rocky Creek, approximately 5km east of Toowoomba. Prior to the January flood event the pipeline was approximately 1.2m below the surface. There was a major washout of both DN400 and DN250 pipelines resulting in exposure of approximately 80m of DN400 and 10m of the DN250. Repairs to both the pipelines were completed during April 2011.
6 A summary of key actions follows: Initial stabilisation in January 2011, including pipe supports and re-diversion of creek bed; For exposed pipeline sections of both DN250 and DN400 pipelines, in accordance with Appendix U3 of AS stresses in unrestrained pipelines confirmed stress limits were acceptable; Commenced preparations including collecting data, surveying pipe levels, assessing repair options, engineering design stress analysis and pipe lowering profile, prepare execution plan, work method development, construction safety management plan and logistics; Expose pipeline and install skids every 15m to hold weight of pipeline; 400m of the DN400 pipeline needed to be exposed; Prepare pipeline; defect assessment and coating repair; Prepare trench for lowering; Support pipeline for lowering; Lower pipeline in service; and Backfill and remediate site Arubial and Redbank stations Arubial Station is located near Condamine on the Condamine River. It was partially submerged in December 2010; at the peak of the floods the water level was about 2m above ground level. Arubial Station was again partially submerged two weeks later. A summary of key actions follows: Once water receded enough, clean up commenced in compound; Following second flooding, local technician sent to site via helicopter to assess damage; Once water receded enough again, clean up compound; Access track was re-built; Control hut opened and all equipment removed to enable clean up;
7 Control equipment checked to ensure flow through station was suitable and that control equipment was functional; Pneumatic controller installed on the DN400 run to control pressure; Over-pressure trip units tested by technicians to ensure operation; Compound fence removed and erosion repairs carried out around station; Control room and panel cleaned to remove silt/mud and water; Design new RTU system; Commenced stripping of cables/field devices/control panel; Power supply to site moved into new switchboard; Field equipment replaced, wired up and tested; Engage contractor to raise & relocate Control Room; Install re-built control panel and terminate field cables; Re-instated power and new air-conditioner; and Site communications, phone lines and communications lines to SCADA reinstated. The Redbank Meter Station is located in Redbank, Ipswich, and was completely submerged at the flooding peak in January A summary of key actions follows: Once water receded enough, clean up commenced in compound; Control hut opened and all equipment removed to enable clean up; Control equipment checked to ensure flow through station was suitable and that control equipment was functional; Control Panel rebuilt on site with new parts; Power supply installed; Site communications, phone lines and communications lines to SCADA reinstated; and Builders completely stripped out control room and re-lined.
8 1.4.4 Other washout repairs Aerial pipeline patrols conducted to identify locations with potential damage and visual inspection performed; Detailed foot patrols performed from Oakey compressor station to Ellengrove gate station; Significant washouts requiring repair located at MP s 12, 155.5, 179.2, 185 & and and photographed for later repair; Visual examination and depthing to determine remaining cover over pipeline; Re-instatement of appropriate depth of cover over erosion sites; and Pipeline history and characteristics. 1.5 Costs associated with the damage It is anticipated that the majority of costs incurred as a result of flooding damage will be recovered through insurance except for those of related ordinary time labour costs. The following table summarises the cost impact of the flood damage in 2010/11. Table 1.1: Summary of Flood Repair Costs Repair Sites Total Cost ($ 000) Toowoomba Escarpment 1,736 Rocky Creek 968 Redbank and Arubial Station 786 Other washouts repairs 837 Total 4,327 Adjustments to base year costs Taking out: Emergency flood response costs. Actual costs - $3.487M including labour ($1.12M), contractors ($1.449M), P&E ($454k), materials ($282k) and other costs ($182k).
9 Provision of $840k including contractors ($736k) and materials ($104k). Increase in contractor costs ($56k) relating to backfilling of operation staff during flood response and repairs. This estimate was based on a listing of preventative maintenance activities (extracted from the asset maintenance system), using current rates charged by associated contractors. Adding in: Normal operational costs not incurred due to flood response. Labour actual ordinary time costs that would have been incurred in normal operations ($701k), including cap overtime which is paid as ordinary. The figure is reduced by $125k to reflect ordinary time costs of staff involved in the flood response that are from other areas of the APA Group. These works undertaken by APTPPL on flood damage repairs meant that the proportion of fixed labour resources allocated to the operation and maintenance of the RBP was below normal levels. The high level of labour allocation to flood repair work is not expected to continue in the access arrangement period, due to the exceptional nature of the event. 1.6 Minden Range 2011/12 In late September 2011, during flood easement rectification works, it was identified that a land slip on the Minden Range, approximately 25km west of Ipswich had impacted on the DN250 pipeline. It is thought that this slippage may be related to the January 2011 flooding event. At the time of submitting this Access Arrangement proposal, there is limited information available to know definitively the nature and extent of any repair works required. In order to provide an accurate forecast of 2011/12 operating expenditure, a provisional amount of $750k, based on the recent flood repair experience detailed above, has been included in 2011/12 forecast costs. It must be stressed that this is only a best estimate, based on professional judgement and interpretation of the limited information to hand at this time.
How To Recover From A Flood In Bundaberg
BUNDABERG FLOODS NOW THE MUD HAS DRIED FLOOD RECOVERY AT MILLBANK Paper Presented by: Kym Kneebone Author: Kym Kneebone, Assistant Coastal Treatment Co-ordinator, Bundaberg Regional Council 37th Annual
Draft Dapto Flood Management Plan
NATURE OF HAZARD Draft Dapto Flood Management Plan Since Dapto school has been established on the current site there have been two floods. The SES is responsible for responding to floods in NSW. During
General Insurance - Domestic Insurance - Home Contents Storm water damage policy exclusion flood damage
Determination Case number: 227307 General Insurance - Domestic Insurance - Home Contents Storm water damage policy exclusion flood damage 4 April 2011 Background 1. The Applicants insured their home contents
OSU Extension FACT SHEET
OHIO STATE UNIVERSITY EXTENSION! OSU Extension FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Shale Oil and Gas Development Fact Sheet Series A Landowner s Guide to Understanding
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN
Historic Flood Impact on the Nashville Drinking Water System Scott Potter, Director Metro Water Services, Nashville, TN Historic Event = 13.53 /48 Hours May 1 6.32 of Rain = 3rd greatest one-day rainfall
Flooding in Brisbane
Flooding in Brisbane A guide for residents photo provided by Conan Whitehouse Brisbane is a thriving, world-class city, enjoyed by residents and visitors. Like many cities around the world, Brisbane has
Standard Operating Procedures for Flood Preparation and Response
Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than
Trenching and Excavation Safety
1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking
NSW Licensed Pipeline Performance Reporting Guidelines
NSW Licensed Pipeline Performance Reporting Guidelines NSW Trade & Investment Resources and Energy Division GPO Box 3889 Sydney NSW 2001 Rev Jan 2012 NSW T & I Division of Resources and Energy Contents
Initial Assessment of Potential Flood Mitigation for Communities Downstream of Googong Dam
Initial Assessment of Potential Flood Mitigation for Communities Downstream of Googong Dam ICON WATER AND QUEANBEYAN CITY COUNCIL Summary Report 8006314 25 June 2015 Initial Asssessment of Potential Flood
CHAPTER 3 STORM DRAINAGE SYSTEMS
CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next
IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION
IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION 199 9.1(479,479B) General information. 9.1(1) Authority. The standards contained herein
Economic benefits of flood mitigation investments
Economic benefits of flood mitigation investments 09 October 2014 URBIS STAFF RESPONSIBLE FOR THIS REPORT: Director Associate Director Consultant Job Code Nicki Hutley Chris Nadarajah Ivan Giang SPOL-0017
Engineering Policy 146. Severe Weather Management Plans
Engineering Policy 146 Severe Weather Management Plans January 2014 Contents Engineering Policy... 1 1 Policy statement... 1 2 Applicability... 1 3 Context... 1 4 Objectives and benefits... 1 5 Consultation...
NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: [email protected]. Task Number Item Date(s) Recorded By
NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: [email protected] PIPELINE MAINTENANCE On-the-Job Training Level One MODULE 66101-02 INTRODUCTION TO THE PIPELINE INDUSTRY This is
Management of flooding downstream of dams
Management of flooding downstream of dams Attachment to Victoria State Flood Emergency Plan Version 1.0 (6 February 2013) This plan is produced by the Victoria State Emergency Service and Department of
Eagle Ford Oilfield Services, LLC 150 Port Royal, Aransas Pass, Texas 78336
Eagle Ford Oilfield Services, LLC 150 Port Royal, Aransas Pass, Texas 78336 www.efofs.com (361) 212-0883 (361) 526-2332 MEMBER # 400-193088 Mission Statement Eagle Ford Oilfield Services, LLC. is a company
Appendix C Asset Risk Model Data
Appendix C Asset Risk Model Data S:\ADV JOBS\48305 ENV WAIKATO\027 THAMES COAST FLOOD RISK\6000 - DELIVERABLES\FINAL REPORT\APPENDIX C.DOC\16-JUL-03 Contents Appendix C Asset Risk Model Data Asset Risk
City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events
City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events May 29, 2014 Presented by: Berta Krichker M.Eng., FEC, P.Eng. Manager of Stormwater Unit Environmental and Engineering
water ISSN 2073-4441 www.mdpi.com/journal/water
Water 2011, 3, 1149-1173; doi:10.3390/w3041149 Article OPEN ACCESS water ISSN 2073-4441 www.mdpi.com/journal/water The 2011 Brisbane Floods: Causes, Impacts and Implications Robin C. van den Honert * and
BC-23 APPLICATION FOR GAS COST ALLOWANCE
Province of British Columbia BC-23 APPLICATION FOR GAS COST ALLOWANCE Freedom of Information and Protection of Privacy Act - The personal information requested on this form is collected under the authority
The Cover. Additional Increase in Cost of Working. BIGRNP(SI)_7 Ace Package Policy 2013 ix.12
Section 2 - Business Interruption Fire and Specified Perils If any building or other property used by the Insured at the Premises for the purpose of the Business is lost, destroyed or damaged by any Specified
Town House 11265 Center Highway North Huntingdon, PA 15642
APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House
Final. Contact person: Colin Whittemore Aurecon Centre 1 Century City Drive Waterford Precinct, Century City Cape Town, South Africa
Review Report and Recommendations for the Remediation of Flood Damage at the Berg River Causeway and the Dam Bypass Channel on Portion of Farms 1646 and 1014, Franschhoek Contact person: Colin Whittemore
Sanitary Sewer Overflow (SSO) Incident Report Form
Submit completed form to EHS. Date of SSO spill: Sanitary Sewer Overflow (SSO) Incident Report Form Identify the SSO category (check one): Category 1 SSO Spills of any volume that reach surface water Category
OURIMBAH FLOOD RESPONSE PLAN
OURIMBAH FLOOD RESPONSE PLAN February 2014 2 EMERGENCY CONTACT DETAILS Security Services for all Emergencies (24 Hours) Ourimbah 4348 4222 If not able to be reached please call Newcastle on Newcastle 4921
VILLAS OF TRADITIONS AT GREY OAKS
Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard
History of flooding. 12 Flood Management and Drainage Strategy. Riverine flooding
History of flooding Riverine flooding The original settlement of Melbourne was situated in a basin intersected by the paths of the Yarra and Maribyrnong Rivers. Many of the early recorded floods occurred
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
1.3.2 Method of construction and restoration of existing water service connections. This shall include:
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
SACOS INSURANCE COMPANY LTD
SACOS INSURANCE COMPANY LTD P.O Box 636 Republic of Seychelles Telephone: 295000 Fax: 224495 E-mail: [email protected] Website: www.sacos.sc YOU SHOULD FULLY AND FAITHFULLY GIVE THE FACTS YOU KNOW OR
BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY
MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near
The Pipelines Regulations, 2000
PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21. NOTE: This consolidation is not
MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.
MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade
SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
Prattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
The AIR Inland Flood Model for the United States In Spring 2011, heavy rainfall and snowmelt produced massive flooding along the Mississippi River,
The AIR Inland Flood Model for the United States In Spring 2011, heavy rainfall and snowmelt produced massive flooding along the Mississippi River, inundating huge swaths of land across seven states. As
Swannanoa River Flood Risk Management Study
Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River
Flood Checklist ACTION TO BE TAKEN BEFORE THE FLOOD SEASON
Flood Checklist The following may serve as a checklist when preparing for a flood. This checklist should be tailored to processes/operations, flood protection equipment and flood potentials at your specific
SOCALGAS APROACH TO PIPELINE INTEGRITY
SUMMER 2011 SOCALGAS APROACH TO PIPELINE INTEGRITY Southern California Gas Company (SoCalGas ) is committed to providing clean, safe and reliable natural gas to its customers and takes important steps
Integrated Local Flood Management and Drainage Strategy OVERVIEW
Integrated Local Flood Management and Drainage Strategy OVERVIEW Flooding is a natural phenomenon. In urban areas where drainage relies on pipe networks, open channels and creeks, flooding can cause infrastructure
ALBERTA ENERGY AND UTILITIES BOARD Calgary Alberta
ALBERTA ENERGY AND UTILITIES BOARD Calgary Alberta HUNT OIL COMPANY OF CANADA INC. APPLICATION FOR A SWEET NATURAL GAS PIPELINE HARMATTAN-ELKTON, RICINUS, Examiner Report 2001-3 AND CAROLINE FIELDS Application
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank
DIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
Beacon Hill Sewer District Standard Specifications
Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email [email protected]
Newbiggin House Farm,
Newbiggin House Farm, Near Waberthwaite Flood Investigation Report 32 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane
City of Hilshire Village Pine Creek Ln Reconstruction
City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project
Application for the Alteration of a Gas Supply
Application for the Alteration of a Gas Supply SSE Enterprise Utilities is a trading name of SSE Utility Solutions Limited which is part of the SSE Group. The Registered Office of SSE Utility Solutions
CONFIRMING WET WEATHER TREATMENT FACILITY HYDRAULIC DESIGN WITH PHYSICAL MODEL STUDY
CONFIRMING WET WEATHER TREATMENT FACILITY HYDRAULIC DESIGN WITH PHYSICAL MODEL STUDY TONY YEE, PE JARED HUTCHINS, PE METROPOLITAN SEWER DISTRICT OF GREATER CINCINNATI BLACK & VEATCH WET WEATHER TREATMENT
CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH 44039 (440) 353-0819 WWW.NRIDGEVILLE.ORG
CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH 44039 (440) 353-0819 WWW.NRIDGEVILLE.ORG WHY IS THERE WATER IN MY BASEMENT? There are two major sources of water in a basement as the
WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION.
WET/DAMP BASEMENTS PROBLEM. IS THIS BASEMENT LEAKING OR COULD WE HAVE ANOTHER PROBLEM? Water line arching up on wall in corners of basement. Water collecting on concrete floor starting in corners. ANSWER:
Melbourne Water s Submission. Draft Victorian Floodplain Management Strategy
Melbourne Water s Submission Draft Victorian Floodplain Management Strategy Waterways, drainage and floodplains are essential to life and liveability. The rivers, creeks, estuaries, wetlands and floodplains
Unit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
Certificate of Registration
Certificate of Registration This is to certify that Clancy Docwra Limited Supplier Number: 061973 are now fully registered as a supplier on UVDB for the following products/services 1.4.25 Communication
The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:
Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section
Section 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
Prevention. Cause. Causes: Groundwater seepage through the basement walls. Prevention: OPEN 24 Hours. Surface runoff. Sanitary sewer backup
U n d e r s t a n d i n g B a s e m e n t F l o o d i n g Cause hen a basement floods, it is a source of stress and frustration for everyone involved. The City of Lansing wants to be a resource of information
Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014
Guideline: Works that interfere with water in a watercourse watercourse diversions September 2014 This publication has been compiled by the Department of Natural Resources and Mines. State of Queensland,
Flood Protection & control works
Flood Protection & control works Whakamarumaru i ngā waipuke Environment Canterbury is the joint lead agency with territorial authorities for flood risk reduction. Under changes to the Local Government
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN. Presentation to Insurance Companies 19 January 2012
JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN Presentation to Insurance Companies 19 January 2012 Topics of Discussion Investigation Levels of Service Cause of Flooding Analysis Undertaken
Sewer Line Rehabilitation
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing sanitary sewers using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS
2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS Water system improvements proposed for inclusion into Western s service area shall be designed in accordance with all appropriate AWWA standards, include
Sample Micro Hydro Initial Report
Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Introduction The Hydro Burn at Glen Water was visited by Richard Haworth of Glen Hydro to assess its suitability for a micro hydro installation.
SANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction
ACE GLOBAL RISK ENGINEERING INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE Introduction The most common cause of flooding is due to established water storage areas (natural and man-made)
Weeping Tile Disconnection to Reduce the Impact of Basement Flooding London, Ontario
Weeping Tile Disconnection to Reduce the Impact of Basement Flooding London, Ontario September 19, 2013 Kyle Chambers, P.Eng. City of London Environmental and Engineering Services Department Today s presentation
Roof Condition Report. Academy International School 8550 Charity Drive. Colorado Springs, Colorado
Roof Condition Report Academy International School 8550 Charity Drive Colorado Springs, Colorado FOR Mr. Robert Thompson Academy School District 20 10221 Lexington Drive Colorado Springs, Colorado July
Negotiating Pipeline Easements
FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Introduction Shale Oil and Gas Development Fact Sheet Series Negotiating Pipeline Easements Peggy Kirk Hall Director, OSU
FIBER-OPTIC CABLE PLAN CHECK
Engineering Division 201 North Broadway, Escondido, CA 92025 (760) 839-4651, FAX (760) 839-4597 FIBER-OPTIC CABLE PLAN CHECK To: Date: Project: Project No. Address: Check No. Attn: Via: The attached plans
Sewerage Operation and Maintenance. Tokyo Metropolitan Government Bureau of Sewerage Facilities Management Division, Pipeline Management Section
Sewerage Operation and Maintenance Tokyo Metropolitan Government Bureau of Sewerage Facilities Management Division, Pipeline Management Section About the sewer system facilities About the operation and
2. The costs of natural disasters
2. The costs of natural disasters Key Points Without action, the forecast annual cost in real terms of natural disasters (across government, business and communities) in Australia is expected to reach
qbcc Insurance Policy Conditions Edition 8 1 queensland building and construction commission
qbcc queensland building and construction commission Insurance Policy Conditions Edition 8 1 Effective 1 July 2009 Dear Homeowner, These documents are your Home Warranty Insurance Policy and Insurance
Emergency repair of Bridge B421
Emergency repair of Bridge B421 over the Olifants River after fl ood damage INTRODUCTION AND BACKGROUND Bridge B421 is located on the R555 at km 5.03 on Section 01E between Witbank (now known as emalahleni)
PUASES013A Undertake storm and water damage operations performed at heights
PUASES013A Undertake storm and water damage operations performed at heights Revision Number: 2 PUASES013A Undertake storm and water damage operations performed at heights Modification History Release TP
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN
S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain
CLEANING, INSPECTION, AND TESTING OF SEWERS
CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and
Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects
Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental