Upper Workings. Waste Rock. Adit. Millsite



Similar documents
CHAPTER 7. Conclusions

Rapid Thermophilic Digestion Technology

The ground water region in the area of the proposed Project site is made-up of sedimentary rocks (Figure 5.6-1)

Appendix B: Water Treatment Scenarios from AMD Treat

Neutralization of Acid Mine Drainage Using Stabilized Flue Gas Desulfurization Material

Compliance Guidance for Motor Vehicle Waste Disposal Wells in Oregon September 2015

PMR EXPLORATION, LLC CHERRY CLAIMS PROJECT MONARCH MINE GOLDEN IDOL MINE (HILLSIDE) CHERRY KING MINE GOLD EAGLE MINE

Wastewater Collection Practice Test #3 Page 1 of 15

SECTION ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section Submittals.

SECTION ABANDONMENT OF SEWER MAINS

AQUIFER STORAGE RECOVERY

Section 402. STORM SEWERS

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

Marcellus Fast Facts

Environmental Technology March/April 1998

Practice Problems on Pumps. Answer(s): Q 2 = 1850 gpm H 2 = 41.7 ft W = 24.1 hp. C. Wassgren, Purdue University Page 1 of 16 Last Updated: 2010 Oct 29

Dewatering - Time and Cost Relief by way of Trenchless Construction

Chalcophile and Key Element Distribution in the Eastern Goldfields: seismic traverse EGF01. Aleks Kalinowski Geoscience Australia, pmdcrc Y2 project

MILWAUKEE CITY HALL FOUNDATION RESTORATION. Project Update November 12, 2014

Remediation Weekly Activity Summary Report Ameren LaSalle Former MGP - Soil Removal Action

Determination of Metals in a 3% Sodium Chloride (NaCl) Matrix by Axially-Viewed ICP-OES

SECTION STORM DRAIN SYSTEM

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Produced water from oil and gas production

A Guide for Private Domestic Well Owners

Innovative Removal of Agricultural Related Water Pollutants in the Chesapeake Bay Watershed

GALVANIC CATHODIC PROTECTION 1.0 CONTENTS. 1.1 Aluminium Anodes. 1.2 Zinc Anodes. 1.3 Magnesium Anodes SECTION

Trip to Pulacayo. Pulacayo - Paca

SANITARY SEWER SPECIFICATIONS

Impact of utilised bottom ash

Christopher Harto Argonne National Laboratory

GOLD RESOURCE CORPORATION INTERCEPTS ADDITIONAL MULTIPLE HIGH-GRADE PARALLEL VEINS AT SWITCHBACK INCLUDING 6.32 METERS OF 5.

Lead Testing and On Site Calibration for Water Testing Detection Range: 2 100ppb

SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING

How To Remove Selenium From Water

Module 9: Basics of Pumps and Hydraulics Instructor Guide

A Guide for Private Domestic Well Owners

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

Material Expansion Coefficients

University of Arizona Bulletin

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

This example of a completed sampling plan worksheet has been included to illustrate the information

Swamp Area Passive Treatment System Kettle Creek Watershed, Clinton County, PA

Foundation Code compliance and Best Practices By Michael Coello

Types of Mining - Expert Table

Applications of Bauxsol in Reclamation, Remediation, and Water Treatment. James M. Castro, Ph.D.

A History of Non-ferrous Metal Mining and Exploration in Maine. By Frederick M. Beck F. M. Beck, Inc. Yarmouth, Maine

How To Use The Nexion 300

Mining with Paste Fill

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

The Wismut Rehabilitation Project: Present State, Outlook and Lessons Learned

Mine Water Treatment Solutions for Discharge and Re-Use

Characterizing Beauty Salon Wastewater for the Purpose of Regulating Onsite Disposal Systems

COST AND PERFORMANCE REPORT

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C.

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Secondary Lead Smelting

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

Illinois Environmental Protection Agency Division of Water Pollution Control Class K Study Guide Industrial Wastewater Operator Certification

Section SEWER PIPE INSTALLATION AND TESTING

812-3 LIMITATIONS: b. No fire hydrant shall be obstructed or used when there is a fire in the area.

Removing Heavy Metals from Wastewater

1332 CHAPTER 18 Sample Questions

Chapter 20. MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

SILVERCORP REPORTS RESULTS FROM ITS 2012 EXPLORATION PROGRAM AT THE SGX MINE, YING MINING DISTRICT, CHINA

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

Corrosivity of Water Supplies

Copper and Copper Alloy Tube, Pipe and Fittings

Life After Getting a BS and MS Degree Working as a Professional in PA

Coast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

City of Largo Environmental Services Department Environmental Control Program th Avenue North Clearwater, FL Phone: (727)

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

Outokumpu Oyj. Mining Business. Stainless Steel Business Area AvestaPolarit Chrome Oy Kemi Mine. Base Metals Mines Tara Mines Ltd Hitura Mine

CHAPTER 3 STORM DRAINAGE SYSTEMS

A MINING ENGINEER: A GLOBAL CITIZEN

SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH Purpose and Application.

A Revolution for Telecom, Electric, Gas, & Water"

FY08 SEWER POINT REPAIRS BID TABULATION

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

Distribution of Chemical Elements In Urban Sediments in Slovenia (Extended Abstract)

South Dakota s Statewide Ground Water Quality Monitoring Network

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

2. Write the chemical formula(s) of the product(s) and balance the following spontaneous reactions.

LOS ANGELES UNIFIED SCHOOL DISTRICT INDUSTRIAL WASTEWATER MANAGEMENT PROCEDURES

Sewer Rehabilitation Design Requirements

Water Supply, Distribution and Storage Sabana Grande, Nicaragua

Transcription:

Hydraulic Adit Plug Closure World s Fair Mine, Patagonia, Arizona Region 3 Coronado NF Mine Design, Operations & Closure Conference May 1-5, 2011 Allan Kirk Matt Wetter Nathan Stormzand Eli Curiel, USFS

General Location Map

1915 Photo by F.C. Schrader, USGS Bulletin 191

World s Fair Mine Overview Today Upper Workings Adit Waste Rock Waste Rock Millsite

World s Fair Mine Harshaw Mining District in the Patagonia Mountains Mined from 1879 1957 Ag - Pb - Cu - mine Produced 30,000 tons of 58 opt Ag, 6.6 % Pb, 0.7% Cu, minor gold /zinc. North-south trending vein system dips at about 80 o to SW. Occurs at contact of quartz diorite intrusive and rhyolitic volcanic flows

Mined along strike for about 600 feet Mine Workings Plan Map Over a dip-slope distance of about 1,000 feet 15,000 ft of drifts, tunnels, stopes, shafts, and winzes

Mine Workings 3-D Model Developed to a depth of 450 feet below the main haulage level adit

Site Visit to Adit Portal All you could see in 2009 30-feet to drop-out and thigh deep water ph = 3.0 Elevated metals

The (1.8) Million Dollar Question Given what you see - can you provide us with a firm fixed price for the cost to reopen this mine, set two hydraulic plugs, and reclaim the site? Simple answer: No Consultant s answer:.well Sure!

Water Quality Table 1. Dissolved metal concentrations (mg/l) from monitoring locations 1. World s Fair Mine Metal Arsenic Barium Cadmium Chromium (III) Copper Iron Lead Manganese Mercury Nickel Selenium Silver Zinc Alum Gulch Upstream Adit Discharge Alum Gulch Downstream N/R N/R 0.0005 0.0089 0.0062 0.0064 0.117 0.0543 0.1576 0.007 0.008 0.002 1.483 0.66 1.563 0.79 35.84 3.655 0.024 0.027 0.135 56.392 91.94 102.25 <0.0002 <0.0002 <0.0002 0.2 0.219 0.214 0.002 0.0032 0.0036 N/R N/R N/R 31.423 34.02 40.866 1 Adapted from USGS (2003). Data are believed to be means from 16 monitoring events. N/R = Not reported Red font = exceeds human health standards

Metals Loading (1) 0.25 Concentration (mg/l) 0.2 0.15 0.1 0.05 Barium Cadmium Lead Nickel 0 Alum Gulch Upstream Adit Discharge Alum Gulch Downstream

Metals Loading (2) 120 Concentration (mg/l) 100 80 60 40 20 Iron Manganese Zinc 0 Alum Gulch Upstream Adit Discharge Alum Gulch Downstream

World s Fair Adit Flow and Water Quality Flow typically 3-5 gpm, maximum 18 gpm ph 2.9 3.7 Geochemically degraded waters with respect to Cd, Cu, Fe, Pb, Mn, Ni, and Zn Significant source of loading to Alum Gulch However, sources other than the World s Fair Mine adit are responsible for the majority of metal loading to Alum Gulch

Reasons to Conduct Evaluation and Construct Closure Water quality - Low ph and metals concentration and loading to Alum Gulch Closure principally to eliminate a point source discharge from the adit portal.

RFP to stem the flow of water from the Adit Tetra Tech chose to - Evaluate possibility of using two hydraulic, water tight plugs to stem the flow. Objectives: Eliminate or reduce the flow of contaminated water from adit Eliminate or reduce metals loading to Alum Gulch from adit Elimination of a point source discharge in exceedence of water quality standards and in volition of the Clean Water Act (for discharging without a permit)

Schematic Sketch of Two-Plug System

Infrastructure to Support Project

Eli Curiel, USFS OSC and a TT Exploration (?) Geologist

Nathan Stormzand TT Civil Engineer

Rich Dombrouski TT Geotechnical Engineer

Closure Plan

Adit Closure Plan Map

Adit Plug Details (after Bogert, 2003)

6-inch steel H-beams

Faced with 2 x 6 Nailing Strip

Nailer faced with 3 lagging on inside of Bulkhead

Jimmy Hoffa Window

Cement pumping lines and grout pumping lines

Perimeter of lagging packed with burlap and grouted

Atlas-Fausett Contracting, Inc. Frank Fausett Ron Short

Pumper and Concrete Trucks

After the Concrete Pour ~ 30 cubic yards Prior to grouting the interior plug station arch

Greatest Job Safety Risk

Adit Closure Plan and Infiltration Basin

Constructing Dam near Portal

Piping Through Dam

Mixing Cement for Dam - Atlas Fausett Mobile Mixer (just kidding)

Dam Partway Through Pour

Piping Behind Dam Not Perforated yet

Beginning of Adit Surface - Closure Looking from Portal

Goin Back for More Rocks

Final Underground Portal Closure

Infiltration Basin

Reclaimed Portal Site

Reclaimed Waste Rock Dump

Closure Effectiveness and Cost Reduction in flow 100% No metal loading from adit source Uses existing engineering technology Cost of: Engineering design Rehabilitating the adit Construction of plugs and closure of site - Relatively high - but one time cost of $1,105,000

Comparison Glengarry Mine vs. World s Fair Mine World s Fair Mine, AZ Mine rehab to 500 Two hydraulic plugs Limited plug backfill Portal closure Infiltration basin 100% flow reduction Cost = $1,105,000 Glengarry Mine, MT Mine Rehab to 1900 Shaft rehab to 290 Shaft collar grout curtain Shaft Plug and backfill Four hydraulic plugs Extensive plug backfill Underground fault grouting Portal Closure 98% flow reduction Cost = $2,900,000

Most Importantly Hydraulic Plug Mine Closures Can Provide A Walk-Away Solution

Questions?