The Wismut Rehabilitation Project: Present State, Outlook and Lessons Learned
|
|
|
- John Sullivan
- 9 years ago
- Views:
Transcription
1 IAEA-Workshop: Regional Training Course on Remedation Infrastructure Development at a Test Site, Chemnitz, Germany, 3 7 December 2012 The Wismut Rehabilitation Project: Present State, Outlook and Lessons Learned Dr.- Ing. Stefan Mann, Wismut GmbH, CEO, Wismut GmbH
2 Retrospect 1946 Start of uranium mining under supervision of Soviet military 1947 Establishment of the "State-ran non-ferrous metal company Wismut 1954 Establishment of the bi-national Soviet-German Stock company (SDAG) Wismut
3 3 Review - Uranium Production Until 1990 uranium ore mining and processing by SDAG Wismut 231,000 t cumulative production making Wismut the world s fourthlargest uranium producer
4 4 Situation at Termination of Uranium Mining by Wismut 1990/91 5 underground mines 1 open pit 3000 ha operational areas 48 waste rock dumps 310 million m 3 2 uranium mills w/ 75 ha operational area Tailings ponds 570 ha 160 million t
5 5 Radiological Situation at Termination of Uranium Mining by Wismut 1990/91 37 km² WISMUT mining district population density: Saxony 247 inhabitants/km², Thuringia 154 inhabitants/km² 311 M m³ waste rock dumps Bq/g (Ra-226) 30.6 M m³/a mine water 25 t/a uranium discharged into river and creek system Radioactive releases (discharges) by mine exhaust air e.g. Schlema/Alberoda mine 900 TBq Rn-222, 130 MBq long-lived alpha emitter 5.7 km² Tailings Management Areas (tailings ponds) Inventory: 1,800 TBq (Ra-226), 320 MBq (Ra-226)/m²
6 6 Sites of Wismut GmbH
7 7 State of Remediation by October 2012 Underground Achievement Abandonment of underground mines 2,821 km 99.5 % Backfilling of mine voids 6,566 Mm³ 99.6 % Flooding of underground mines 61,345 Mm³ 97.0 % Closure of mine tunnels 226,262 m 93.9 % Surface Achievement Demolition of structures 779,198 m³ 90.0 % Contouring / Profiling 337,928 Mm³ 93.0 % Covering of areas 2,551 Mm³ 72.9 % Reclaimed areas 2,067 ha 73.1 % Water treatment 387,189 Mm³ 51.5 %
8 8 Remediation Results exemplified by Reclamation of Mine Dump 366 in Bad Schlema, Aue Operations Office Mine dump 366 in Schlema 1991 Feeder road across reclaimed dump 366 in 2010 Mine dump volume: ca. 7.7 Mm³ Footprint: ca. 43 ha Excavated material: ca. 3.5 Mm³ Fill material: ca. 3.5 Mm³ Capping material: ca. 370,000 m³
9 9 Facility Deconstruction and Renaturation Plant Area of Crossen Processing Unit near Zwickau Plant Area 1991 Reclaimed Area 2011
10 10 Remedation of Tailings Management Facilities Culmitzsch Tailings Management Facility in 1991 Culmitzsch Tailings Management Facility in October 2011 Tailings surface: ca. 250 ha Tailings thicknees: max. 72 m Tailings volume: ca. 85 Mio.m³ Interim cover: ca. 3.2 Mm³ Drain drilling: ca. 2,550 km Contouring: ca.15.5 Mm³ Final cover: ca. 5.7 Mm³ Trail building: ca km
11 11 Sources of contaminated water Flow from flooded uranium mines Mill tailings pond seepage Waste dump seepage
12 12 Development and Selection of Water Treatment Strategies Selection of technique, construction and equipment have to be licensable and low-cost The plant must be able to cope with large flow variations and a wide range of constituent concentrations Generation of residues must be low
13 13 Water Treatment Plant Sites Schlema-Alberoda WTP Königstein WTP Helmsdorf WTP Pöhla WTP
14 14 Flow chart Seelingstädt water treatment plant Supernatant, pore and seepage water Mixer Flow chart of the new Seelingstädt WTP Filtration HCl Stripping Ca(OH) 2 Precipitation HCl Discharge BaCl 2 Ca(OH) 2 FeCl 3 FHM FAFF Air Solid / liquid separation FA: flocculation agent Cement Water Dewatering Thickening Immobilisation Disposal at Culmitzsch TMA, basin B
15 15 Limitation of Emissions Radon Discharges Decrease of radon discharges from ventilation shafts at the Königstein, Dresden-Gittersee, Schlema-Alberoda, Pöhla, and Ronneburg mines ( ) Rn-222 [TBq] Volume 2,25 Mio. m³ 2,100 Mio. m³ Radon TBq 98.6 TBq Königstein Dresden-Gittersee Schlema-Alberoda Pöhla Ronneburg
16 16 Safeguarding of Remedial Results and Long-Term Tasks Documentation, preservation of technological know-how and information management; Inspection, repair, care and maintenance of covers; Treatment of contaminated mine water and seepage; Safeguarding of mine workings to be maintained accessible over the long-term; Environmental monitoring; Repair of surface damages.
17 17 Long- Term Costs (Estimate) with Focus on Key Operations (2010 Remedation Programme) 3% 5% 4% 2% Post-closure maintenance 12% Mine dump and area reclamation Tailings ponds Surface subsidence repair Monitoring 74% Water treatment
18 18 Funding
19 19 Corporate Structural Adjustment Current Scenario Transition Scenario Target Scenario Administrative structure Location-based structure Transitional structure Functional structure Range of tasks Remediation Remediation Long-term Long-term Workforce Blue collar jobs White collar jobs ca. 956 ca. 839 ca. 590 ca. 608 ca. 498 ca. 236 Personnel structure Qualification, requirements, capabilities, role, responsibility,
20 20 Educational Policy Public Relations R & D Projects Information System Publications
21 21 Summary Overall remediation volume complete > 85 %; 5.6 billion Euro spent so far for this effort; Sustainable limitation of radioactive and other emissions in compliance with licences; Following land reclamation, some 1,100 ha sold or leased out of a total of ca. 3,700 ha appropriated land; Development of state-of-the-art remedial technologies for water treatment, remediation of tailings management facilities and of mine dumps; Important economic factor; Internationally recognized reference object; Core remediation tasks to be completed by ca. 2020; Long-term tasks dominated by water treatment, maintenance, and environmental monitoring.
22 Thank you very much for your kind attention. Glückauf Dr.-Ing. Stefan Mann, CEO Wismut GmbH
Stakeholder Involvement in Rehabilitation of Former Uranium Mining Sites International Case Studies
IAEA Training Course on Development of Remediation Infrastructures at WISMUT, Chemnitz, Germany, 3-7 December 2012 Stakeholder Involvement in Rehabilitation of Former Uranium Mining Sites International
Mine Plan of Operations Reclamation Bond Checklist
Mine Plan of Operations Reclamation Bond Checklist NOTE: This checklist is provided to assist the operator in calculating the engineering and environmental costs required to properly stabilize, reclaim,
Case study from Ukraine
Case study from Ukraine Uranium Mining Facilities at the Pridneprovsky Chemical Plant Rodolfo Avila Outline Overview of the situation Monitoring programs Examples of monitoring results Modelling work Examples
SURFACE REMEDIATION AND MANAGEMENT OVERVIEW
SURFACE REMEDIATION AND MANAGEMENT OVERVIEW Giant Mine Remediation Project Environmental Assessment Public Hearings September 10-14, 2012 Adrian Paradis (AANDC) Mike Nahir (AANDC) Bruce Halbert (Technical
Historical Background of the Operation, Closure and Monitoring of Andra s CSM Disposal Facility
Historical Background of the Operation, Closure and Monitoring of Andra s CSM Disposal Facility Jean-Pierre VERVIALLE Director, Andra s Centre de Stockage de la Manche IAEA-Andra International Workshop,
UPDATE ON MANAGEMENT OF LEGACY ENVIRONMENTAL ISSUES IN GHANA
UPDATE ON MANAGEMENT OF LEGACY ENVIRONMENTAL ISSUES IN GHANA UPDATE ON MANAGEMENT OF LEGACY ENVIRONMENTAL ISSUES IN GHANA AUGUST 2015 AngloGold Ashanti acknowledges that there are some legacy environmental
The Closure of the Asse Research Mine
The Closure of the Asse Research Mine Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Second Review Meeting May 17th 2006 Dr. Helmut Bossy Federal
WORK BREAKDOWN STRUCTURE FOR A TYPICAL MINE
WORK BREAKDOWN STRUCTURE FOR A TYPICAL MINE LEGEND [GeoMine] = Technology Sites [Exploration-Geology-Reserves] = Edumine Courses [GEOCHEMISTRY] = State-of-the-Art Review (SOAR) 1 EXPLORATION [GEOMINE]
* 765 million tons of recoverable reserves as of 1970; W.E. Edmonds, Pennsylvania Geologic Survey
IV. PROPOSED PLAN FOR AMD ABATEMENT GOALS AND OBJECTIVES Although the major natural resource in the Wyoming Valley is anthracite coal*, its importance to the present and future economy of the area is limited
ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :
ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : Determining the cost associated with closure and accruing these costs during the life of the mining operation
Status, responsibilities and missions of ANDRA (France)
Status, responsibilities and missions of ANDRA (France) Marie-Claude DUPUIS ANDRA - CEO Contents 1. Legal framework, organization and general information 2. ANDRA today: An Industrial Operator An Innovating
CREATING A GREEN FUTURE THROUGH WATER REMEDIATION
CREATING A GREEN FUTURE THROUGH WATER REMEDIATION Cornerstone Principles for Conducting Business Active Treatment Systems, Inc. goes to great lengths to instill in every employee the importance of ethical
Incident Reporting Requirements
Incident Reporting Requirements Directive PNG014 February 2016 Revision 1.0 Governing Legislation: Acts: The Oil and Gas Conservation Act The Pipelines Act, 1998 Regulations: The Oil and Gas Conservation
Regulatory Requirements and Licensing of OPG s DGR Project
Regulatory Requirements and Licensing of OPG s DGR Project OPG s Deep Geologic Repository Project for Low and Intermediate Level Radioactive Waste Presentation to Joint Review Panel July 18, 2012 nuclearsafety.gc.ca
The company is listed on the Australian Securities Exchange (ASX code: ILU) and employs approximately 850 people, the majority in Australia.
Iluka Resources Limited Murray Basin Operations Radiation Management Plan and Radioactive Waste Management Plan Overview 2014 Purpose In accordance with legislative requirements, Iluka Resources conducts
Minerals Regulatory Guidelines MG5. Guidelines for miners: tailings and tailings storage facilities in South Australia
Minerals Regulatory Guidelines MG5 Guidelines for miners: tailings and tailings storage facilities in South Australia Mineral Resources Group Division of Minerals and Energy Resources Primary Industries
Glenorchy City Council Asset Management Strategy for Infrastructure Assets
Glenorchy City Council Asset Strategy for Infrastructure Assets 2014/15 to 2017/18 Version 1.3 June 2014 Glenorchy City Council Asset Strategy for Infrastructure Assets Document Control Document Control
Role and tasks of Arpa Piemonte in controlling and monitoring of ionizing and non ionizing radiation. G.. d Amored
Sino-Italian Cooperation Project Role and tasks of Arpa Piemonte in controlling and monitoring of ionizing and non ionizing radiation G.. d Amored Environmental Protection Agency of Piedmont Region (ARPA
AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES
AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES Question1 Read the following article from the Fremont Gazette and answer the questions that follow. (a) Identify and describe TWO water-related environmental
Radioactive Waste Management at Paks NPP
1 Radioactive Waste Management at Paks NPP Content Introduction WAC in Hungary Waste classification and characterization Data collection Transport and Final disposal 2 Facilities and Activities in Hungary
STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
Annex 6 Recommendation on Safety Requirements for Contaminated Sites in Flood Risk Areas
Support for the Extension of Accident Risk Spots Inventory and Preventive Measures / Final Report Annex 6 Recommendation on Safety Requirements for Contaminated Sites in Flood Risk Areas Final Draft International
Ontario Mining Act Fact Sheet Mine Closure Plans Your Right to Know!
Ontario Mining Act Fact Sheet Mine Closure Plans Your Right to Know! Part VII Rehabilitation of Mining Lands In Ontario, a mining company cannot (re)commence mining operations until a certified Closure
Physical flow accounts: principles and general concepts
Physical flow accounts: principles and general concepts Julian Chow United Nations Statistics Division 1 st Sub-Regional Course on SEEA 23-27 September 2013 Malaysia SEEA Conceptual Framework Outside territory
NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY
NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY November 2009 Completion Audit November 2009 Terms of Reference Environmental, Health and
Minerals production in Hungary 1990-2006 (Mtons) - source: Hungarian Office for Mining and Geology
MINING In the last twenty years the mining industry experienced dramatic changes. In the fossil fuel and metallic ores sector the big state-owned mining companies collapsed and/or transformed into private
News release. No. 7/2015 KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS
No. 7/2015 News release KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS BAAR, SWITZERLAND, August 12, 2015 Katanga Mining Limited (TSX: KAT) ("Katanga" or the "Company") today announces its financial
COVER SYSTEMS FOR MINE CLOSURE AND REHABILITATION TWO CASE STUDIES
COVER SYSTEMS FOR MINE CLOSURE AND REHABILITATION TWO CASE STUDIES Jason Song 1 and Mike O Kane 2 1 O Kane Consultants Inc., 200 1121 Centre Street N.W., Calgary, AB T2E 7K6, Canada Email: [email protected]
Upper Workings. Waste Rock. Adit. Millsite
Hydraulic Adit Plug Closure World s Fair Mine, Patagonia, Arizona Region 3 Coronado NF Mine Design, Operations & Closure Conference May 1-5, 2011 Allan Kirk Matt Wetter Nathan Stormzand Eli Curiel, USFS
Appendix B: Water Treatment Scenarios from AMD Treat
Appendix B: Water Treatment Scenarios from AMD Treat 103 of 104 Jeddo Tunnel Abandoned Mine Drainage Passive vs. Active Treatment Cost Estimates Provided by Office of Surface Mining AMD Treat Software
NRC s Program for Remediating Polluted Sites J.T. Greeves, D.A. Orlando, J.T. Buckley, G.N. Gnugnoli, R.L. Johnson US Nuclear Regulatory Commission
NRC s Program for Remediating Polluted Sites J.T. Greeves, D.A. Orlando, J.T. Buckley, G.N. Gnugnoli, R.L. Johnson US Nuclear Regulatory Commission Background The U.S. Nuclear Regulatory Commission (NRC)
WNU School of Uranium Production
International Training Centre WNU School of Uranium Production Three years experience Jan Trojacek DIAMO, s.e. Straz pod Ralskem HISTORY 2004 IAEA/OECD/NEA Uranium Group meeting, Straz p. R., Czech Republic
NETL Life Cycle Inventory Data Process Documentation File
NETL Life Cycle Inventory Data Process Documentation File Process Name: Uranium Open Pit Mining and Milling, Operations Reference Flow: 1 kg of Uranium Yellowcake (U 3 O 8 ) Brief Description: This process
The Navajo Nation Environmental Protection Agency (NNEPA) Superfund Program and Community Involvement
The Navajo Nation Environmental Protection Agency (NNEPA) Superfund Program and Community Involvement Presented By: Freida S. White, Environmental Program Supervisor NNEPA Superfund Insert Slide Title
Appendix B. Kensington Project Tailings Storage Facility Consolidation Testing & Modeling
Appendix B Kensington Project Tailings Storage Facility Consolidation Testing & Modeling Reclamation and Closure Plan April 2013 For the Kensington Gold Project Memorandum Date: February 21, 2005 Our Ref:
Questionnaire for NORM service providers
Questionnaire for NORM service providers This questionnaire is intended for institutes and companies providing services relevant for NORM industries in Belgium. Its objective is to give to Belgian NORM
Pollution Incident Response Management Plan
Pollution Incident Response Management Plan POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN 1. Introduction This Pollution Incident Response Management Plan (PIRMP) has been prepared to describe the processes
RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES MEXICO [2005] NATIONAL NUCLEAR ENERGY CONTEXT
RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES MEXICO [2005] NATIONAL NUCLEAR ENERGY CONTEXT Commercial utilisation of nuclear power in Mexico started in 1990 and by 2002 there were
This Chapter was compiled by GCS (2014) as part of the EMP Consolidation for MP 30/5/1/2/2/133MR and remains pertinent.
11 ENVIRONMENTAL REHABILITATION PLAN The overall land use vision for the MR133 area is to ensure that the operations are safe, stable and non-polluting over the long-term in order to be integrated into
Inventory of Performance Monitoring Tools for Subsurface Monitoring of Radionuclide Contamination
Inventory of Performance Monitoring Tools for Subsurface Monitoring of Radionuclide Contamination H. Keith Moo-Young, Professor, Villanova University Ronald Wilhelm, Senior Scientist, U.S. EPA, Office
For personal use only
Korab Resources Limited Gold Operations Update November 2012 Andrej K. Karpinski Executive Chairman Korab Projects BOBRIKOVO MELROSE 1 Korab Gold Projects Other Korab Projects Robust Undervalued Gold Portfolio
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local
Environmental Remediation of Uranium Production Facilities
Nuclear Development Environmental Remediation of Uranium Production Facilities A Joint Report by the OECD Nuclear Energy Agency and the International Atomic Energy Agency NUCLEAR ENERGY AGENCY ORGANISATION
RC-17. Alejandro V. Nader National Regulatory Authority Montevideo - Uruguay
RC-17 Radiation Protection in Waste Management and Disposal Implementing the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Alejandro V. Nader
EHP Financial Assurance Calculator. User guide
User guide Prepared by: Energy Regulation & Implementation, State of Queensland, 2014. The Queensland Government supports and encourages the dissemination and exchange of its information. The copyright
Title 27A. Environment and Natural Resources Chapter 1 - Oklahoma Environmental Quality Act Article III - Jurisdiction of Environmental Agencies
ODAFF AEMS Reference Date March 1, 2014 Title 27A. Environment and Natural Resources Chapter 1 - Oklahoma Environmental Quality Act Article III - Jurisdiction of Environmental Agencies 1-3-101. Responsibilities
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF
Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM
PRESS RELEASE Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM SILVERCORP ANNOUNCES POSITIVE PRELIMINARY ASSESSMENT FOR THE SILVERTIP SILVER-LEAD-ZINC PROJECT, BRITISH COLUMBIA, CANADA VANCOUVER, British
NRC INSPECTION MANUAL
NRC INSPECTION MANUAL INSPECTION PROCEDURE 88001 LLUR ON-SITE CONSTRUCTION PROGRAM APPLICABILITY: 2600, 2801 88001-01 INSPECTION OBJECTIVES 01.01 To determine by direct observation if on-site construction
ENVIRONMENTAL MANAGEMENT PLAN :-
ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for
ENVIRONMENTAL MANAGEMENT: CLEAN WATER RESEARCH AS RELATED TO ACID MINE DRAINAGE
ENVIRONMENTAL MANAGEMENT: CLEAN WATER RESEARCH AS RELATED TO ACID MINE DRAINAGE LESSON PLAN CREATED BY: Todd Mills (Grades 9 12) Lois Morris (Grades 6-8) Terry Rostcheck (Grades 6 8) Susan Tegi (Grades
RESUME Lee A. Knuppel, P.E.
RESUME Lee A. Knuppel, P.E. OFFICE: EDUCATION: LEE A. KNUPPEL AND ASSOCIATES, Inc. 7770 Cooper Road, Suite 7 Montgomery, Ohio 45242 (513) 793-4222 Graduate: UCLA, Los Angeles, CA M.S. in Civil Engineering,
Carson River Mercury Superfund Site Management Strategies and Goals. May 2011
Carson River Mercury Superfund Site Management Strategies and Goals May 2011 Staff at NDEP Responsible for CRMS Jeff Collins - Supervisor Over 21 years experience as environmental consultant working on
District of Columbia Municipal Regulations UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS 5500 COMPLIANCE WITH OTHER DISTRICT LAWS
CHAPTER 55 UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS Section 5500 Compliance with Other District Laws 5501 Applicability of UST Regulations 5502 Partial Applicability of UST Regulations to Particular
2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited
(IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]
KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section 24.0. Summary of Commitments
KITSAULT MINE PROJT ENVIRONMENTAL ASSESSMENT Section 24.0 Summary of s VE51988 KITSAULT MINE PROJT ENVIRONMENTAL ASSESSMENT SUMMARY OF COMMITMENTS TABLE OF CONTENTS TABLE OF CONTENTS... 24-I 24.0 SUMMARY
Environmental Law Enforcement in Zimbabwe. Farai Michael Nyahwa
Environmental Law Enforcement in Zimbabwe By Farai Michael Nyahwa Presentation Breakdown Institutional Arrangement for Environmental Law Enforcement in Zimbabwe Major Environmental Issues of Concern In
RECLAMATION BONDS FROM THE SURETY PERSPECTIVE
RECLAMATION BONDS FROM THE SURETY PERSPECTIVE Presented By William T. Gorton III, Esq. Stites & Harbison, PLLC 250 West Main Street, Suite 2300 Lexington, Kentucky 40507 INTRODUCTION Financial guarantees,
Plan Requirement Guidance for Quartz Mining Projects
Plan Requirement Guidance for Quartz Mining Projects Executive Summary A quartz mining project requires the submission of environmental protection plans and operational plans for the development, operation,
German Approach to Integrated Urban Development within the EU
German Approach to Integrated Urban Development within the EU - Results from previous (current) programming period (2007-2013) - Goals for the future (2014-2020) Dr Mario Kremling, isw Institute by order
PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions
PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue
INDUSTRIAL FABRICS Dewatering Systems
INDUSTRIAL FABRICS Dewatering Systems Protective Fabrics Space Composites Aerospace Composites Advanced Armour Geosynthetics Industrial Fabrics Grass The Low Cost, High Volume Dewatering Solution TenCate
ASSET MANAGEMENT STRATEGY
ASSET MANAGEMENT STRATEGY Version 3 - Final Adopted 19 February 2013 NAMS.PLUS Burnie City Council Asset Strategy Document Control Document Control NAMS.PLUS Asset www.ipwea.org.au/namsplus Document ID:
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government
Endeavour Management Presentation
Endeavour Management Presentation June 2014 GOLD PRODUCER WEST AFRICA CASH FLOW Disclaimer & Forward Looking Statements This presentation contains forward-looking statements including but not limited to,
Site Description and History
1300 Northwest 31 st Avenue Fort Lauderdale, Florida County: Broward District: Southeast Site Lead: EPA Placed on National Priorities List: October 4, 1989 HWC # 085 Site Description and History The Wingate
The formation of polluted mine water
The formation of polluted mine water Abandoned Mine Drainage How it happens How we can fix it Bruce Golden Western PA Coalition for Abandoned Mine Reclamation What we ll cover Brief Discussion about Mining
How To Know If Your Well Water Is Safe
Bernalillo County Office of Environmental Health A comprehensive guide to help maintain your well and keep your drinking water safe Bernalillo County Office of Environmental Health Bernalillo County Commission
February 4, 2011. [email protected]. Report Recommendations and NIPSCO Responses. 4.3 Maintaining and Controlling Vegetation Growth
February 4, 2011 VIA E-MAIL AND CERTIFIED MAIL #7010 0290 0002 0577 6226 Mr. Stephen Hoffman US Environmental Protection Agency (5304P) 1200 Pennsylvania Avenue, NW Washington, DC 20460 [email protected]
Using SPE Technology to Develop a New Rare Earth Production Paradigm at Bokan, Alaska
Using SPE Technology to Develop a New Rare Earth Production Paradigm at Bokan, Alaska Authors: John Hammen, Chris Hammen, Richard Hammen Presented by: Richard Hammen Metals US, Inc. IntelliMet LLC 425
WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES
WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES Who Should Read This Guide? Home Buyers/Owners Lending Institutions Landowners Developers Local Officials Construction Design Realtors Companies
Sewerage Operation and Maintenance. Tokyo Metropolitan Government Bureau of Sewerage Facilities Management Division, Pipeline Management Section
Sewerage Operation and Maintenance Tokyo Metropolitan Government Bureau of Sewerage Facilities Management Division, Pipeline Management Section About the sewer system facilities About the operation and
Liquid Effluent Treatment Plant (LETP) Land Clean-Up
Liquid Effluent Treatment Plant (LETP) Land Clean-Up Frequently Asked Questions What is proposed? Magnox Ltd is proposing to remove the redundant Liquid Effluent Treatment Plant (LETP) at Harwell and to
Short Course: Paste Fill System Design, Operation and Management
17th International Seminar on Paste and Thickened Tailings Short Course: Paste Fill System Design, Operation and Management Instructors Rob Brown, Principal,, Maureen McGuinness, Senior Process Engineer,,
Outokumpu Oyj. Mining Business. Stainless Steel Business Area AvestaPolarit Chrome Oy Kemi Mine. Base Metals Mines Tara Mines Ltd Hitura Mine
Outokumpu Oyj Mining Business Stainless Steel Business Area AvestaPolarit Chrome Oy Kemi Mine Base Metals Mines Tara Mines Ltd Hitura Mine Precious Metals Mines Orivesi Mine Vammala Plant Exploration for
A Guide to the Management of Tailings Facilities. Second Edition, 2011
A Guide to the Management of Tailings Facilities Second Edition, 2011 A Guide to the Management of Tailings Facilities 2011 Mining Association of Canada 1105-350 Sparks Street Ottawa, Ontario K1R 7S8 www.mining.ca
CHAPTER 7. Conclusions
CHAPTER 7 Conclusions 7.1 Environmental conclusions The conclusions in this section incorporate the work that was carried out to examine the chemical characteristics of each of the mine sites and their
Trip to Pulacayo. Pulacayo - Paca
Disclaimer This Presentation contains forward-looking information as defined under applicable securities law in Canada. Forward-looking information can be identified by the use of words such as "anticipated",
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email [email protected]
Meeting Challenges to Optimize Ground Water Remediation as Part of the Moab Uranium Mill Tailings Remedial Action Project - 10481
ABSTRACT Meeting Challenges to Optimize Ground Water Remediation as Part of the Moab Uranium Mill Tailings Remedial Action Project - 10481 Joseph Ritchey*, Donald Metzler**, Ken Pill*, and Elizabeth Glowiak*
Red Water Pond Road Community History through Pictures Past and Present of the Red House People April 2012, revised September 2012
Red Water Pond Road Community History through Pictures Past and Present of the Red House People April 2012, revised September 2012 Compiled by Red Water Pond Road Community Association And Southwest Research
Town of New Castle Utility Department Introduction
Town of New Castle Utility Department Introduction Town of New Castle Utility Department Mission Statement Our commitment is to ensure that our customers receive high quality water and wastewater treatment
Water remediation: Passive Treatment Technologies
Presenter: Jacques Meyer Project design: Adrian Haagner, Piet Smit & Jacques Meyer Water remediation: Passive Treatment Technologies Using a sub-surface flow wetland on a rehabilitated decommissioned coal
El cinturón de oro del río Narcea: el futuro de la minería de oro en España. Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp.
El cinturón de oro del río Narcea: el futuro de la minería de oro en España Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp. CORPORATE PRESENTATION JUNE 16, 2009 TARGETED TO BECOME ONE OF WESTERN
Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA
Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA 7471 Travel agency and tour operator services Services rendered for passenger travel by
Sä Dena Hes Tailings Management Facility Decommissioning Design Report
Sä Dena Hes Tailings Management Facility Decommissioning Design Report Prepared for Teck Resources Limited Prepared by SRK Consulting (Canada) Inc. 1CT008.035 March 2014 Sä Dena Hes Tailings Management
Case Study: Zinc International
Case Study: Zinc International Sustainability in New Project Management Gamsberg, South Africa Sustainability in Mine Closure Lisheen, Ireland 1 July 2015 Deshnee Naidoo CEO, Zinc International Introduction
Urban Environmental Management in Singapore. Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency
Urban Environmental Management in Singapore Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency Introduction City state comprising a main island and some islets Land
SCORPIO MINING REPORTS FIRST QUARTER 2015 FINANCIAL RESULTS
SCORPIO MINING REPORTS FIRST QUARTER 015 FINANCIAL RESULTS TORONTO, ONTARIO May 13, 015 Scorpio Mining Corporation (TSX: SPM)(OTCQX: SMNPF) ( Scorpio Mining or the Company ) today reported financial and