GDC S GEOTHERMAL DEVELOPMENT STRATEGY FOR KENYA: PROGRESS & OPPORTUNITIES BY RUTH MUSEMBI HEAD OF CORPORATE COMMUNICATION & MARKETING

Similar documents
Benefits of Geothermal Energy By Dr. Silas Simiyu

KenGen and Renewable Energy Partnership in Electro-Technical Innovation to Generate Sustainable Power

Arab Republic of Egypt Ministry of Electricity & Energy New & Renewable Energy Authority (NREA)

Current and expected contribution of RES-E in NA countries

PRIVATE FINANCING OF GEOTHERMAL DEVELOPMENT

Hot Rocks Geothermal Drilling, Operations and Insurance Implications

Project Management for electrical Generation: Geothermal Energy in Combination with other Sources of Renewable Energy

MENENGAI GEOTHERMAL DEVELOPMENT PROJECT

Renewable Energy in Egypt

World Geothermal Market & Outlook

Eng. Samir Hassan, Arab Republic of Egypt Ministry of Electricity & Energy New & Renewable Energy Authority (NREA)

GEOTHERMAL RESOURCE OPTIMIZATION: A CASE OF THE GEOTHERMAL HEALTH SPA AND DEMONSTRATION CENTRE AT THE OLKARIA GEOTHERMAL PROJECT

EXPLORATION RISK INSURANCE IFC AND MUNICH RE S EXPERIENCE IN TURKEY

ORGANIZATION CHART OF MINISTRY OF ELECTRICITY & RENEWABLE ENERGY MoERE

Renewable Energy market in Egypt

Analysis of Risk Mitigation Strategies for Geothermal Development

Geysir Green Energy. Iceland. March 2008

Renewable Energy in Egypt. October 2013

Renewable Energy. Contributing Proven Solutions to the World

GEOTHERMAL ENERGY UTILISATION

Financing Renewables and Energy Efficiency Projects in Developing Countries

Technology and Climate Change International Flows, Barriers and Frameworks

GEOTHERMAL POWER GENERATION A PRIMER ON LOW-TEMPERATURE, SMALL-SCALE APPLICATIONS

DEVELOPMENT OF DIRECT-USE GEOTHERMAL PROJECTS

RENEWABLE ENERGY IN EGYPT

SEA SOLAR POWER INTERNATIONAL LLC OTEC BRIEFING

Eng.Mostafa. Ibrahim Khamis. Dr. Shaher Anis Mahmoud. Eng.Ehab. Ehab Ismaeel Amin. Acc. Hazem Ahmed Abdelhalim

Alternative Energy Made in Florida. Solar Power Plants for Commercial, Government, and Utility

Building on +60 GW of experience. Track record as of 31 December 2013

Prospects of the Renewable Energy in Egypt

KfW Experience in Financing Grid- Connected Renewable Energy

Three main techniques are used to exploit the heat available: geothermal aquifers, hot dry rocks and ground-source heat pumps.

Annex 5A Trends in international carbon dioxide emissions

PPPs in Renewable Energy: IFC Advisory Perspective. April 2012

ARP Food Industry, Portugal

Energy Finance in the Middle East: Uncertainties and Opportunities Maamari Auditorium, OSB AUB, 22 January 2016

Geothermal Drilling in Enel Green Power. October 2013

OVERVIEW OF GEOTHERMAL RESOURCE EXPLORATION AND DEVELOPMENT IN THE EAST AFRICAN RIFT SYSTEM

Advanced systems for power production from geothermal low-enthalpy resources

Engineering and Construction for Sustainability Solar Concentration Workshop World Bank November 5th, 2008

Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Comparing Levels of Development

Financing Environmental Exports

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Investment Opportunities Solar Energy Applications in Egypt

Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency

Perspective on Geothermal Energy in Japan: Beyond Great East Japan Earthquake & Beyond Brittle Project

OVERCOMING BARRIERS TO GEOTHERMAL ENERGY PROJECTS FOR QUEENSLAND COUNCILS

MOBILISING FINANCE FOR INFRASTRUCTURE A STUDY FOR THE UK DEPARTMENT FOR INTERNATIONAL DEVELOPMENT (DFID)

An Overview of Landfill Gas Energy in the United States

AREVA is Clean Energy and American Jobs Ohio Manufacturers Association April 28, 2010 Columbus, OH

Energy: renewable sources of energy. Renewable Energy Sources

The Investor s Guide to Geothermal Energy. How to capitalize on

Schedule of Accreditation issued by United Kingdom Accreditation Service High Street, Feltham, Middlesex, TW13 4UN, UK

INDONESIA S COUNTRY REPORT ENCOURAGING CLEAN ENERGY INITIATIVE

POWER AFRICA GEOTHERMAL ROADSHOW. Presented by Mekuria Lemma Ethiopian Electric Power Strategy & Investment Head SEP 28 Oct 3, 2014

Main areas of services are:

Geodynamics A Diversified Clean Energy Company

Options for financing biogas plants

CAREER OPPORTUNITIY IN THE ENERGY SECTOR

International Energy Agency (IEA) Geothermal Implementing Agreement (GIA)

RES in Egypt: state of the art and future developments

Overview of Solar Guidebook and Knowledge Management Project Sustainable Business Advisory

ENEL research activities on low enthalpy geothermal resources

PROJECT FINANCE & PPPs

Developing Power Projects in Southern Africa. Annual General Meeting Presentation 20 th November 2015

Post Graduate Diploma Program

ACCELERATING RE DEPLOYMENT ON SIDS Accessing Financing for Projects

Foreign Direct Investment in the United States 2013 Report

Investing in Sustainable Food Security

Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Pros:

GEOCHEMISTRY IN GEOTHERMAL EXPLORATION

Hydropower in Rwanda: Ongoing Initiatives & New Investment Opportunities. Yves Muyange Director General Energy Water & Sanitation Authority

Best Practice Examples

TARGET IPP: 500 MW ENERGY DEVELOPER TARGET: 2.5 GW WIP INDEPENDENT POWER PRODUCER ENERGY DEVELOPER

List of tables. I. World Trade Developments

POTENTIAL FOR DIRECT UTILISATION OF GEOTHERMAL ENERGY AT THE LAKE BOGORIA GEOTHERMAL RESOURCE

Sixth Annual Conference on Carbon Capture & Sequestration

Electricity & Gas Energy & Energy Services

PROMOTING RENEWABLE ENERGY THROUGH THE PRIVATE SECTOR

JOINT PRESS RELEASE. ERA and GET FiT announce the first 20 MW of Solar Photovoltaic (PV) projects to be developed in Uganda

AFRICA ENERGY S.A. SENEGAL

Exhibitor Product Groups

TOTAL FDI Inflow to KSA (Millions of dollars) FDI by Source :

Schedule of Accreditation issued by United Kingdom Accreditation Service High Street, Feltham, Middlesex, TW13 4UN, UK

GreEnergy. Power Plants. ELECTRICAL POWER from CEMENT PLANT WASTE HEAT. for the Cement Industry

Natural Gas / Electricity and the Industrial Sector. The Dismantling of US Manufacturing

DIVISION D ELECTRICITY, GAS, WATER AND WASTE SERVICES

Geothermal energy for residential buildings: Italian state of the art and case studies

Regulation in the UAE Authority of Energy Regulators and competition rules

Press Release. During the third quarter of 2013/14

Foreign Taxes Paid and Foreign Source Income INTECH Global Income Managed Volatility Fund

6 18 A steam power plant receives heat from a furnace at a rate of 280 GJ/h. Heat losses to the surrounding air from the steam as it passes through

The Global Chemical Industry: US, China and Global Status and Opportunities, 2015

Olympic Park & Stratford Energy Schemes Marketing. Kevin McDonald. District Energy Delivery Models the Concession Approach

OFFSHORE FIELD DEVELOPMENT

GEOTHERMAL POWER: THE BEDROCK OF RENEWABLE ENERGY ENERGIE GEOTHERMIQUE, SEULE SOURCE ALTERNATIVE FOURNISSANT LA CHARGE DE BASE

Photovoltaic Energy in Mozambique Present and Future Outlook

Utilization of geothermal energy in Iceland

Transcription:

GDC S GEOTHERMAL DEVELOPMENT STRATEGY FOR KENYA: PROGRESS & OPPORTUNITIES BY RUTH MUSEMBI HEAD OF CORPORATE COMMUNICATION & MARKETING DURING THE POWER AFRICA-AFRICA UNION COMMISSION GEOTHERMAL ROADSHOW SEPTEMBER - OCTOBER 2014

GDC Geothermal Development Strategy 2

GDC s Role in Geothermal Development KPLC(Off-Taker) Off-Taker 2 Off-Taker 3 Power Purchase Agreement KenGen/IPPs Geothermal Prospects Olkaria Mene-ngai Paka Silali Bogoria Geothermal Resource Exploration & Assessment Geothermal Development Company* 3

DETAILED SURFACE STUDIES INFRASTRUCTURE DEVELOPMENT GDC PUBLIC PRIVATE PARTNERSHIP - OPTIONS POWER GEN. OPTION JOINT STEAM DEV. GDC PROD. DRILLING & POWER GEN STEAM DEV. & GEN. GDC FULL CONCESSI ON EXPLORATION DRILLING GDC APPRAISAL DRILLING GDC FEASIBILITY STUDY PRODUCTION DRILLING IPP STEAM GATHERING IPP POWER PLANT CONSTRUCTION OPERATION AND MAITENANCE IPP IPP IPP STEAM FIELD MANAGEMENT GDC

Development Model Option I MENENGAI 460MW INFRASTRUCTURE AND EXPLORATION DRILLING APPRAISAL DRILLING GDC FEASIBILITY STUDY PRODUCTION DRILLING STEAM GATHERING SYSTEM EPC Sale of steam CONSTRUCTION & OPERATION OF POWER PLANT IPP GDC ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN 5

Development Model Option II GDC INFRASTRUCTURE DEVELOPMENT/ EXPLORATION DRILLING APPRAISAL DRILLING AND FEASIBILITY STUDY USAID is offering Technical Assistance for the Development of the JDA document GDC (20 40%) IPP PRODUCTION DRILLING CONSTRUCTION AND MANAGEMENT OF STEAM GATHERING SYSTEM Sale of steam CONSTRUCTION & OPERATION OF POWER PLANT Joint Development partner (60%) GDC & JDP ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN 6

Cost, Time and Risk Reduction 7

Hypothetical: An IPP with RoE = 25% Entering BEFORE Test Drilling 14 17 US cents per kwh Much higher levelized tariff (LT) is required because: Lead time is longer by 3 years Required rate of return on equity (RoE) is higher (25%) due to high risk premium of early entry The $30m cost of exploration is still ahead Result: LT >14 US cents/kwh (for 50 MWe power plant!)! 8

Illustration: An IPP with RoE = 25% Entering After Test Drilling (Example: 50 MWe power plant) 6.5 10.5 US cents per kwh Available infrastructure, Size of Wells, Environment & Community Issues, Reservoir (Chemistry) quality, Choice of Technology, and Commercial Risk mitigation measures 9

FUNDING STATUS NO PARTNER Amount (MUSD) PURPOSE 1 AFDB 120 3 rigs, 90 wells materials, 1 wellhead, consultancies & 2 SREP 25 training Status Rigs and consultancies under procurement 15 Drilling services Awaiting feasibility study report 3 AFD 70 2 rigs and business and strategic plan update 4 World Bank 100 Steam field, rig spares, drilling and pipeline consultancies Rigs commissioned, business and strategic plans update ongoing Pledged Awaiting feasibility study report 2 Feasibility study Consultancy ongoing 120 Steam field development Pledged Awaiting feasibility study report 10

FUNDING STATUS cont. NO PARTNER Amount PURPOSE Status (MUSD) 5 GRMF 6 Drilling of 2 wells Effective 6 KfW 100 Infrastructure development, Drilling services and consultancies Committed 7 USAID 3 Capacity Building and technical Effective assistance 8 JICA 18.5 Capacity building Effective 2 Master Plan 9 NDF 1.98 Capacity Building Awaiting agreement signing 10 JSDF 0.03 Community engagement for Effective Menengai 11 UNEP 0.5 Capacity building, equipment, conceptual model for Silali Effective 11

FUNDING STATUS Cont. NO PARTNER Amount (MUSD) PURPOSE Status 12 US Exim Bank 300 Drilling equipment, Pledge wellheads, and materials 13 India Exim Bank 200 Drilling services and Pledge materials, civil equipment 14 EIB 36 Drilling services for Complete Menengai 15 USTDA 0.641 Technical assistance Complete 16 PPIAF 0.05 Financial management appraisal 17 China Exim Bank 95.4 Drilling of 26 wells at Olkaria Complete Complete 12

PROGRESS/SCORE CARD Wells Drilled Olkaria 59 wells Menengai 25 wells Steam available Olkaria 409MW Menengai 90MW Drilling rigs 3 drilling rigs hired and have drilled at Olkaria 7 GDC owned drilling rigs procured. Funds raised (MUSD) Commited GoK-445 Development Partners-512 Pledges Development Partners-754 Drill 30 wells 13

100MW MENENGAI PROJECT 3 IPP s already contrated to finance, procure and operate three modular power plants, on a build-own-operate basis, to be commissioned in Sept. 2015 o Ormat International o Quantum Power EA o Sosian Energy PSSAs and PPAs submitted to ERC 2 IPPs have applied for generation licence from ERC 14

60MW MENENGAI PROJECT (30MW x 2) To be commissioned in Dec 2015 Approval from PPP Secretariat obtained Tendering for 60MW closed 15

BIDS RECEIVED 60MW MENENGAI POWER PLANT SHORTLIST NO. FIRM COUNTRY OF ORIGIN 1 Trans century Limited Kenya 2 Power Machines OJSC Russia 3 SOSIAN ENERGY CONSORTIUM Kenya 4 Allan Dick &Co East Africa Ltd And Arabian Bemco Kenya/Saudi Arabia Contracting Company Limited 5 Toyota Tsusho Corporation Japan 6 Daewoo International Korea 7 Lantech (Africa) Ltd/China National Cable Engineering Kenya/China Corporation 8 Shandong Zhongkai Heavy Industry Group Co. Ltd China 9 The Mirambo Energy Consortium Tanzania 16

60MW MENENGAI POWER PLANT SHORTLIST (2) No. Firm Country of Origin 10 11 12 13 14 15 16 17 18 International Power S.A, Dubai Branch AEE Power S.A & GDA Centum-SEDC JV Rocky Africa Limited Traxis Energy Consortium Pisu & Company Limited Ormat Technologies Inc. East Gate Power Limited Consortium Of Africon Limited, Punj Lloyd Limited, Oserian Development Company Limited United Arab Emirates Spain/Usa Kenya/China Kenya Kenya/Denmark Kenya Usa Kenya Kenya 17

SUSWA PROJECT Potential 750MW Development of 150MW by 2016 ESIA in progress Community engagement ongoing Joint equity investors already invited to express interest for Joint development 18

300MW SUSWA JDA EOI SHORTLIST 1 GLOBELEQ England 2 MAYIRA LTD/ PATH FINDER/ HARBEL ELETRIC Kenya 3 FUJIAN INVESTMENTS China 4 BINXIAN COAL LTD China 5 RAM ENERGY USA 6 INTERNATIONAL POWER S.SA-GDF SUEZ Belgium 7 MARUBENI CORPORATION Japan 8 ENEL GREEN POWER S.P.A Italy 9 TRANS AFRICA POWER CONSORTIUM Kenya 10 SOSIAN ENERGY Consortium Kenya 11 SALWAN K LTD Kenya 12 TOYOTA TSUSHO CORP Kenya 23 RUSHYDRO INTERNATIONAL Russia 24 TRANSCENTURY LTD Kenya 19

300MW SUSWA JDA EOI SHORTLIST 13 CAPE GRACE INVESTMENTS Kenya 14 CHINA MACHINERY COOPERATION China 15 ENERGY DEVELOPMENT CORPORATION Philippines 16 MITSUBISHI CORPORATION Japan 17 MELEC POWERGEN & AMERICAN CAPITAL ENERGY & British Virgin Islands INFRASTRUCTURE 18 DAEWOO INTERNATIONAL CORPORATION Korea 19 TERRASOL PTY LTD South Africa 20 ORMAT INTERNATIONAL INC. U.S.A 21 CHINA STATE CONSTRUCTION ENGINEERING LTD China 22 PX INTERNATIONAL/ CAMS/ FIELDSTONE/ PUNJ LLOYD/ England RSM/ STANDARD MUTUAL 23 RUSHYDRO INTERNATIONAL Russia 24 TRANSCENTURY LTD Kenya 20

BARINGO SILALI PROJECT Potential 3000MW 200MW to be developed by December 2016 Environmental License and Land approval obtained Community engagement framework established GDC has advertised for equity investors to jointly develop the steam field with GDC 21

800MW BARINGO SILALI JDA SHORTLIST NO FIRM COUNTRY 1 RAM ENERGY USA 2 SOSIAN ENERGY Consortium KENYA 3 GREATWALL Drilling Company CHINA 4 TERRASOL PTY LTD SOUTH AFRICA 5 ORMAT INTERNATIONAL INC. U.S.A 6 TRANSCENTURY LTD KENYA 22

Additional investment opportunities direct use Electric power generation Temp. Steam Industry Dyeing 200 180 Refrigeration by ammonia absorption Geothermal Resources Hot Water Production of H 2 SO 4 for scale prevention Agriculture and foresty Live stock Therapeutics Public welfare Hotel and sightseeing Production of H 2 for fuel cell Extraction of chemical materials Na, K (Mexico) fertilizer Zinc (USA) Silica, Li (Japan) Boron (Japan, Turkey) Saturated steam Hot water 160 140 120 100 80 60 40 20 0 Digestion in paper pulp Drying of fish meal Alumina via Bayer's process Canning of food Evaporation in sugar refining Evaporation Drying and curing of cement blocks Drying of agricultural products Drying of stock fish Space heating (buildings and greenhouses) Cold storage Air conditioning Animal husbandry Soil warming Swimming pools, de-icing Fish farming Conventional Electric Generation Binary fluid Electric Generation Space heating With heat pumps 23

THANK YOU