COLLECTION AND DISTRIBUTION OF WATER

Similar documents
DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST

Design Criteria & Service Goals

NFPA31FuelOilPiping 1 Revised

Theory, Application, and Sizing of Air Valves

2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

HYDRAULICS. H91.8D/C - Computerized Open Surface Tilting Flow Channel - 10, 12.5, 15 and 20 m long

SANITARY SEWER BACKUP. Causes & Prevention

Water Supply. Simulation of Water Distribution Networks. Mohammad N. Almasri. Optimal Design of Water Distribution Networks Mohammad N.

SECTION GROUND WATER STORAGE TANKS

SANITARY SEWER SPECIFICATIONS

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

Fire Pump Plan Review March 2010

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains

Water hammering in fire fighting installation

WATER SUPPLY SYSTEMS FOR 150/5220-4B AAS-100 AIRCRAFT FIRE AND RESCUE PROTECTION

Guidelines for Precast Concrete Grease Interceptors

Emerging Technologies in Wastewater Collection Systems

Practice Problems on Pumps. Answer(s): Q 2 = 1850 gpm H 2 = 41.7 ft W = 24.1 hp. C. Wassgren, Purdue University Page 1 of 16 Last Updated: 2010 Oct 29

HYDRAULIC ANALYSIS OF PIPE LINED WITH MADISON S 100% SOLIDS STRUCTURAL POLYURETHANE COATINGS

PREVENTING GROUNDWATER POLLUTION: SECONDARY CONTAINMENT

Smart Electromagnetic Flowmeter Open channel Flowmeter Detector

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

Prepare a drainage system layout and specification notes for a low- rise building.

Module 9: Basics of Pumps and Hydraulics Instructor Guide

Practice Tests Answer Keys

Outlet stabilization structure

VXT. Open Cooling Towers. Open Cooling Towers. Product Detail VXT - B 1. Engineering Data... B2. Structural Support... B6

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses

RESERVOIR DESIGN AND STORAGE VOLUME

PRIVATE WELL SEPARATION

BLADDER SURGE CONTROL SYSTEM

Revised April (May) 2015

Pacific Pump and Power

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

Waste Oil Handling, Spill Containment & Lighting

Introduction. Contents. General. Materials and workmanship. Diagrams. Other regulations. References

How To Build A Road Into A Lake In The North Of The Korean Island Of Hongkoon

Cross-Connection Control. Protecting the potable water supply from contamination.

Module 3: Sewer Material Lecture 3: Sewer Material

Lecture 24 Flumes & Channel Transitions. I. General Characteristics of Flumes. Flumes are often used:

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

REHABILITATION METHOD FOR INCREASING FLOW VELOCITY AND REDUCING SEDIMENTATION

District Cooling Best Practices Piping Systems

CENTRIFUGAL PUMP OVERVIEW Presented by Matt Prosoli Of Pumps Plus Inc.

Backwater Rise and Drag Characteristics of Bridge Piers under Subcritical

CHAPTER 2 HYDRAULICS OF SEWERS

GUIDELINES FOR THE DRAINAGE OF FIRE-FIGHTING WATER FROM CLOSED VEHICLE AND RO-RO SPACES AND SPECIAL CATEGORY SPACES OF PASSENGER AND CARGO SHIPS

FAQ and Device/Usage Chart. What Is a Cross-Connection? What Is Backflow Prevention? What Is Backflow?

Pumps: Convert mechanical energy (often developed from electrical source) into hydraulic energy (position, pressure and kinetic energy).

VAG Non-Return Valves

Module 3 : Sewer Material. Lecture 3 : Sewer Material

Force Main Condition Assessment: New Technologies & Case Studies

SECTION 3 SANITARY SEWER DESIGN

ENGINEERING REPORT FOR PAIES WATER SUPPLY SYSTEM KlTTl MUNICIPALITY, SECTION I, POHNPEI FEDERATED STATES OF MICRONESIA

CHAPTER 26 PLUMBING CODE

(a) Purpose. The purpose is to safeguard potable water supplies by preventing backflow into public water systems.

Plumbing for retail food businesses

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

SPRINKLER SYSTEM PLANS AND CALCULATIONS CHECK LIST

Experiment (13): Flow channel

CLEANING, INSPECTION, AND TESTING OF SEWERS

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

Exercise (4): Open Channel Flow - Gradually Varied Flow

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES

WATER MEASUREMENT USING TWO INCH (50 mm) DRAIN TESTS

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

oil liquid water water liquid Answer, Key Homework 2 David McIntyre 1

Explosion of a gasoline vapour cloud formed in a hydrocarbon loaded effluents storage tank 10 December 1999 Arquata Scrivia Italy

Water Management in Helsinki. Water supply. Mikael Sillfors

HS-901(A) BASIC STEAM HEATING SYSTEMS

Steam System Best Practices Condensate System Piping

WHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS

TYPE "A" AND TYPE "B" CONSTANT DOWNSTREAM LEVEL CONTROL GATES TYPE "A" FOR OPEN CHANNEL FLOWS F.P.O. TYPE "B" FOR ORIFICE APPLICATIONS WATERMAN

MATHEMATICS FOR WATER OPERATORS

SECTION DUCTILE IRON PIPE AND FITTINGS

4.3 Cisterns and Rain Barrels

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2

Town House Center Highway North Huntingdon, PA 15642

Design & Construction Standards, Revised January

I. Introduction. 10 minutes

Fabricated Drainage Products

Meeting the Challenge of Pipeline Emergency Repair

Emergency Spillways (Sediment basins)

What to Expect From the Examination. How to Study the Plumbing Codes

The Flow Regulator. Flow regulation

Minor losses include head losses through/past hydrants, couplers, valves,

Wastewater Collection Practice Test #3 Page 1 of 15

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

Section 4 Page 2. Flow in Pipes

Pro-Lift Steel Pile Foundation Repair

HEAVY DUTY STORAGE GAS

SECTION STORM DRAINAGE TABLE OF CONTENTS

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH (440)

TOPIC: KNOWLEDGE: K1.01 [3.3/3.5] Which one of the following contains indications of cavitation in an operating centrifugal pump?

Transcription:

COLLECTION AND DISTRIBUTION OF WATER Addis Ababa University Addis Ababa Institute of Technology Department of Civil Engineering

Collection and Distribution of Water Deals with the transport of water from the source through the treatment plant to the consumers. It requires intake structures, transmission lines, distribution pipe networks and other essential accessories.

Intake structures

Key requirements of intake Reliability Of adequate size to provide the required quantity of water. Located to obtain the best quality water. Protected from objects that may damage equipment. Easy to inspect and maintain. Designed to minimize damage to aquatic life. Located to minimize navigational hazards.

Location for intake structures Avoid wastewater discharge points and pollution hazard Enable withdrawal of water from a range of levels Magnitude and direction of stream or current velocities should not affect the function and stability of the intake structure. Reliable access roads and power sources should be available should be near to treatment plant Major environmental impacts should be avoided

Surface water Intakes Floating intakes Submerged intakes Tower intakes Shore intakes Pier intakes

Reservoir Intake

Multi-level intake

Tower Intake

Submerged Lake Intake

Intake Structures

Unprotected river intake

Pumped river intake

River Intakes

River Intake components Major components Screen inlet Intake pipe Intake sump Suction pipe Pumps Gate and foot valves access

Design Criteria for intakes Design capacity = Q max-day Intake velocity should be 8 cm/s vertical positions intake ports should be such that good quality water is withdrawn. Locate the top intake port at a distance not less than 2 m from the normal water level and the bottom port at least 1 m above the bottom.

Intake design Volume of sump detention time. A detention time of at least 20min is recommended. At least two sumps - to avoid interruption of service. Height (with a freeboard about 0.5m) Location of the bottom of the sump should be > 1.5m below the lowest stream level or > 1m below stream bed.

Example 1: River Intake design Given the following information proportion a suitable river intake. Daily demand 5000 m 3 Pump capacity: 50 l/s (working 8 hr/day) River bank HWL 1209.1 m LWL 1202.5 m 1200.1 m

Example 1 Solution Capacity of each pump daily = 8x3600x50/1000=1440 m 3 Number of pumps = 5000/1440 = 3.47 4 Hourly flow of each pump = 5000/(4x8)=156.24 m 3 /h Take detention time, T d = 20 min capacity = T d x Q = (20/60)x 156.24 = 52.08 m 3

Example 1 Solution 1209.1-1202.5=6.6 m Effective height of sump = 6.6 + 1.5 = 8.1 Free board = 0.5 Total sump height = 8.6 m If we use circular sump diameter = 2.86 m 1.5 m

Pipelines and appurtenances The selection of pipe materials is based on carrying capacity strength ease of transportation and handling availability quality of water cost (initial and maintenance)

Pipelines and appurtenances Cast iron pipes: highly resistant to corrosion, strong but brittle, easy jointing, withstanding high internal pressure, long life very heavy and difficult to transport

Pipelines and appurtenances Steel pipe: strong, very light weight and can withstand higher pressure than cast iron pipes. cheap, easy to construct and can be easily transported cannot withstand external loads, affected by corrosion and are costly to maintain.

Pipelines and appurtenances Cement-lined cast iron pipes: cement protect against corrosion. very small coefficient of friction than unlined cast iron pipes.

Pipelines and appurtenances Plastic pipes: corrosion resistant, light weight and economical. Rigid (unplasticized) upvc is stronger and can withstand much higher pressure for a given wall thickness.

Pipelines and Appurtenances Valves: to isolate segments of a pipeline, to regulate rate of flow, to control pressure, and to allow release or entry of air from pipe system.

Pipelines and Appurtenances Factors considered in the selection of valves: include purpose and operation, capacity required, head loss and rate of flow, cost, availability, etc.

Pipelines and Appurtenances Shutoff (Isolation) valves: to stop the flow of water through a pipeline spacing from 150 to 370m a minimum of three of the four pipes connected at a junction are valved. fire hydrant, in inlet, outlet, and bypass lines Gate valves and butterfly valves

Gate and butterfly valves Gate valve Butterfly valve

Pipelines and appurtenances Check valves: semiautomatic device and permits water flow only in one direction. in the discharge pipes of centrifugal pumps prevent backflow in conjunction with altitude valves

Pipelines and appurtenances Altitude valves : to automatically control the flow into and out of an elevated storage tank or standpipe to maintain desired water level elevations. include double-acting sequence valve, single-acting type, or differential altitude valve

Pipelines and appurtenances Air-release and vacuum valves : Air-release valves installed at high points of distribution piping, in valve domes, and fittings, and in discharge lines from pump to discharge the trapped air. Vacuum valves are used to protect pipelines from collapse as they are emptied, by allowing air to enter the pipes.

Pipelines and appurtenances Location of Air-release and vacuum valves :

Pipelines and appurtenances Air-release and vacuum valves :

Pipelines and appurtenances Pressure reducing valves (PRV). :

Pipelines and appurtenances Pressure sustaining valves (PSV) :

Distribution systems Depending upon the level of the source of water and the city, topography of the area, and other local considerations, Gravitational system, Pumping without storage, and Pumping with storage.

Distribution systems Gravitational system: action of gravity without any pumping most economical and reliable for cities situated at foothills Reservoir min. demand max. demand City

Distribution systems Pumping without storage: treated water is directly pumped into the distribution mains without storing High lift pumps operate at variable speeds to match variable water demand Disadvantageous (power failure) no reserve flow

Distribution systems Pumping without storage: Pump head HGL HGL min. demand max. demand City Pump Reservoir

Distribution systems Pumping with storage: treated water is pumped at a constant rate stored in elevated distribution reservoir distributed to the consumers by the action of gravity excess water during low demand period gets stored in the reservoir supplied during high demand periods. pumps work at uniform rate high efficiency quite reliable (even during power failure)

Distribution systems Pumping with storage: Peak demand Low demand Pump City Elevated Tank Reservoir

Pipeline layout options

Pipeline layout options

DISTRIBUTION RESERVOIRS

Purpose of Distribution reservoirs Equalizing supply and demand Increasing operating convenience Leveling out pumping requirements Providing water during source or pump failure Maintaining pressure levels within acceptable ranges Providing water to meet fire demands Increase detention times Blending water sources

Equalizing demand and supply

Distribution reservoirs Maintaining pressure levels within acceptable ranges

Elevated tank location

Elevated tank location

Elevated tank location

Distribution reservoir types Ground reservoirs Buried reservoirs Elevated reservoirs Stand pipes Can be made of Concrete or masonry Steel tank

Distribution reservoirs

Elevated concrete reservoir

Concrete water tower Up to 5000 m 3 Circular or rectangular

Distribution reservoirs design considerations and details Minimum capacity: Equalizing storage + Emergency reserve (about 25%) + Fire storage. Location: provide several smaller storage units Aesthetics: visual impacts Ventilation Overflow Security and safety

Reservoir capacity Size (m 3 ) Depth of water (m) Up to 3500 2.5 3.5 3500 15 000 3.5 5.0 Over 15 000 5.0 7.0 For rectangular concrete tank

Example 1 Design a service reservoir if Q daymax is 2400 m 3. Two pumps are working at constant rate of 150 m 3 /hr. Determine for how many hours pumping should be done.

Solution Step 1. Determine pumping hours Pumping hour = Q dmax /(2 x pumping capacity) = 2400/(2 x 150) = 8 hrs for each pump Step 2. determine reservoir capacity Balancing requirement Pumping is done for a total of 16 hrs = 2400 m 3 But demand for 16 hrs is 2400 x 16/24 = 1600 m 3 Excess that needs to be stored = 2400-1600 = 800 m 3

Solution 300 200 100

Solution Emergency requirement = 0.25 x 800 = 200 m 3 Ignore fire demand = 0 Total reservoir volume = 1000 m 3 Provide 2 reservoirs of each 500 m 3 Take depth of 3.0 m X-sectional area = 500/3.0 = 166.67 m 2 Taking circular tank diameter = 14.57 m

Example 2 A water supply system is proposed to be designed for a small town which has a maximum daily demand of 515 m 3 /d. Estimate storage requirement if pumping is done for 12 hrs only (from 4 to 16). Use the following demand variation data. Time (hr) 0-4 4-8 8-12 12-16 16-20 20-24 Demand as % of total daily demand 6.7 9.2 20.8 28.3 25 10

Solution Pumping hours Time (hr) 0-4 4-8 8-12 12-16 16-20 20-24 Total Demand as % of total daily demand 6.7 9.2 20.8 28.3 25 10 100 Demand m 3 34.51 47.38 107.12 145.75 128.75 51.50 515 Pumping rate m 3 0 171.67 171.67 171.67 0 0 515 Excess m 3 124.29 64.55 25.92 0 0 214.76 515 6.7 = 34.51 m 3 100 ppppppp rrrr = 515m3 4 hr = 171.67m 3 ppp 4 hrr 12hr Storage required = 214.76 + 0.25 x 214.76 = 268.45 m 3 or 270 m 3 Equalizing volume Emergency volume

Solution 175 150 Excess pumped or Equalizing volume 125 100 75 50 25 0 4 8 12 16 20 24