By Thomas H. Durkin, P.E., Member ASHRAE, and James B. (Burt) Rishel, P.E., Fellow/Life Member ASHRAE

Similar documents
HEAT RECOVERY FROM CHILLED WATER SYSTEMS. Applications for Heat Reclaim Chillers

Heat Recovery In Retail Refrigeration

How Ground/Water Source Heat Pumps Work

HVAC Systems: Overview

COMMERCIAL HVAC CHILLER EQUIPMENT. Air-Cooled Chillers

Sustainable Energy and Resource Saving Concepts for HVAC/Process/Water/Wastewater. Thomas H. (Tom) Durkin, PE Dr. Glenn Krueger, EdD Bob Jacobi

Example Retrocommissioning Measure: Opening Throttled Discharge Valves

ICE THERMAL STORAGE IN AIR CONDITIONING APPLICATION FUNDAMENTALS

The next generation of geothermal systems for school buildings

Glossary of Heating, Ventilation and Air Conditioning Terms

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

Thermal Coupling Of Cooling and Heating Systems

CHILLER PLANT CONTROL MULTIPLE CHILLER CONTROLS

Life Cycle Costing Analysis of Water-cooled Chillers. Chillventa Nuremburg, Germany

Creating Efficient HVAC Systems

AIR CONDITIONING TECHNOLOGY

COMMERCIAL HVAC EQUIPMENT. Condensers and Cooling Towers

Rittal White Paper 508: Economized Data Center Cooling Defining Methods & Implementation Practices By: Daniel Kennedy

HIGH PERFORMANCE CHILLED WATER SYSTEMS. EarthWise HVAC. EarthWise HVAC High Performance CHW Plants

GLOBACON 05 HVAC Systems for Cogen

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

ENERGY SAVING STUDY IN A HOTEL HVAC SYSTEM

Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect

DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER

Mechanical Systems Proposal revised

Principals of Condensing Boiler System Design

Nordic Heat Pump Product Guide

Development of Air-to-Water Heat Pump for Home Air conditioning/hot Water Supply Combination System with Chilled/Hot Water in European Markets

Commissioning - Construction Documents (Page 1 of 6)

Sea Water Heat Pump Project

CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers

Secondary Loop Chilled Water In Super High-Rise

Wet Bulb Temperature and Its Impact on Building Performance

Water Fired Chiller/Chiller-Heater. WFC-S Series: 10, 20 and 30 RT Cooling

HEATING, VENTILATION & AIR CONDITIONING

Analysis of data centre cooling energy efficiency

HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY

Heating & Cooling Efficiency

imagine SOLAR AIR CONDITIONING MADE EASY

SustainE(Sustainable Energy)

Preliminary Final Proposal

Why and How we Use Capacity Control

Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures

EnergyPro Building Energy Analysis. Assisted Living Building

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.

Boiler System Efficiency

State of the Art Energy Efficient Data Centre Air Conditioning

Overview. Introduction Cooling Tower Basics Principles of Operation Types of Cooling Towers Common Applications Design Considerations

By Steven C. Severini, P.E., Member ASHRAE

Evaporative Cooling for Residential and Light-Commercial

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP

Pharmaceutical central utility plants

HVAC Efficiency Definitions

MAINTENANCE INSTRUCTIONS. Thermia Robust heat pump

Building Re-Tuning Training Guide: AHU Heating and Cooling Control

ALONE. small scale solar cooling device Project No TREN FP7EN Project No TREN/FP7EN/ ALONE. small scale solar cooling device

SECTION 5 COMMERCIAL REFRIGERATION UNIT 22 CONDENSERS

Building Energy Systems. - HVAC: Heating, Distribution -

Yijun Gao, Wei Wu, Zongwei Han, Xianting Li *

Environmental and Safety Impacts of HFC Emission Reduction Options for Air Conditioning and Heat Pump Systems

HEAT RECOVERY OPTIONS FOR DRYERS AND OXIDIZERS

Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency. Randy Mead, C.E.M, CMVP

Laundry Hot Water Systems

Building Performance With District Cooling

newsletter engineers energy-saving strategies for Water-Source Heat Pump Systems volume 36 2 providing insights for today s hvac system designer

Field test of a novel combined solar thermal and heat pump system with an ice store

Daikin Altherma hybrid heat pump. The natural combination

The Different Types of Air Conditioning Equipment for IT Environments

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

Vicot Solar Air Conditioning. V i c o t A i r C o n d i t i o n i n g C o., l t d Tel: Fax:

Energy Efficiency in Industrial HVAC Systems

HVAC Simplified Approach Option

See any red flags? Let s take a look at the problems that occurred on the job and how to avoid making the same mistakes.

CGC s Hybrid System Loop Control

POLK STATE COLLEGE CHILLER PLANT EVALUATION WINTER HAVEN, FLORIDA APRIL 2, C arastro & A ssociates, C&A# 5747

Design of a Heat Pump Assisted Solar Thermal System

Lesson 36 Selection Of Air Conditioning Systems

How To Improve Energy Efficiency Through Raising Inlet Temperatures

Optimization of Water - Cooled Chiller Cooling Tower Combinations

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries

Tips to Reduce Chilled Water Plant Costs

Second Place: Industrial Facilities or Processes, New

HEAT PUMP FREQUENTLY ASKED QUESTIONS HEAT PUMP OUTDOOR UNIT ICED-UP DURING COLD WEATHER:

How much do you know about HVAC? Try testing yourself with the following questions and then take a look at the answers on the following page.

NEW JERSEY CENTER OF EXCELLENCE

3/29/2012 INTRODUCTION HVAC BASICS

HVAC Technologies for Building Energy Efficiency Improvements 2013 National Symposium on Market Transformation. Richard Lord Carrier Fellow

Selection Tips For Air-Conditioning Cooling Systems

*At the AHRI Standard flow rate of 3 gpm/ton, using today s efficient chillers, the ΔT is 9.3 F rather than the 10 F often assumed.

ASHRAE Boston Chapter Meeting Designing AC Refrigeration Systems Lessons Learned February 11, 2014

HIGH-EFFICIENCY CO 2 HEAT PUMP WATER HEATER SYSTEMS FOR RESIDENTIAL AND NON-RESIDENTIAL BUILDINGS

RESEARCH HIGHLIGHT. The Impact of Heat Pump Water Heaters on Whole-House Energy Consumption

ADVANCES IN SUPERMARKET REFRIGERATION SYSTEMS

Solar Thermal TECHNOLOGY. Eric Buchanan Renewable Energy Scientist West Central Research and Outreach Center Wcroc.cfans.umn.edu

HEATING OF DOMESTIC OUTDOOR SWIMMING POOLS

Florida Power & Light Company. Business Heating Ventilation & Air Conditioning ( HVAC ) Program Standards. Effective: November 9, 2015

Applying Pressure Independent Control Valves in H.V.A.C. Systems. A Presentation to: Orange Empire ASHRAE Santa Ana Nov. 17, 2009

HVACPowDen.xls An Easy-to-Use Tool for Recognizing Energy Efficient Buildings and HVAC Systems

Geothermal Heat Pump Systems

Heating, Ventilation & Air Conditioning Equipment

Transcription:

By Thomas H. Durkin, P.E., Member ASHRAE, and James B. (Burt) Rishel, P.E., Fellow/Life Member ASHRAE T he advent of the small scroll or screw chiller, capable of producing condenser water as high as 140 F (60 C), created an opportunity for recovering heat from a dedicated heat recovery chiller s condenser water circuit for heating or domestic water systems while providing beneficial cooling for the chilled water system. These systems are called dedicated heat recovery because 100% of the heat generated by the dedicated heat recovery chiller (DHRC) can be used for hot water heating applications. Also, the DHRC can be piped and controlled to produce the desired evaporator or condenser temperature. Transfer of the recovered heat in this article is limited to clean water applications, such as preheating, heating, reheating, domestic, pool water heating, or snow melting. The following article was published in ASHRAE Journal, October 2003. Copyright 2003 American Society of ing, Refrigerating and Air- Conditioning Engineers, Inc. It is presented for educational purposes only. This article may not be copied and/or distributed electronically or in paper form without permission of ASHRAE.

The ability to recover heat from a chiller s condenser has been improved due to the development of small tonnage compressors that can operate at high discharge pressures and be controlled from either the condenser or evaporator water temperatures. Some installations prove that more condenser heat is needed than originally planned. Modular units that can be expanded are a solution to such applications. The heat recovery chiller introduces an efficient answer to simultaneous heating and cooling loads. Three ways to accomplish this are: 1. Run boilers and chillers, 2. Run boilers and operate air-side economizers, and 3. Run a heat recovery chiller. Using a particular project s energy rates, operating boilers and chillers cost $0.87 per 100 MBH (29.31 kw); boiler and economizers cost $0.59 per 100 MBH (29.31 kw), while the heat recovery chiller required only $0.38 per 100 MBH (29.31 kw). This demonstrated that operating the DHRC required only 43.7% of that for running boilers and the chiller, and 64.4% for running boilers and air-side economizer simultaneously for that installation. (Note: To develop the greatest efficiency, air-side economizer operation must be coordinated with the operation of the DHRC. This is very simple. Whenever the chilled water temperature is at 55 F (12.7 C) or lower, the air-side economizers are locked out and minimum outside air is provided. Whenever the chilled water supply temperature is above 55 F (12.7 C), the air-side economizers are allowed to operate normally.) Uses of Recovered Recovered heat can be used in domestic water systems, airhandling unit preheat or heating coils, or VAV reheat coils. The ability to adjust condenser water temperatures to fit any of these heat recovery applications requires a chiller separate from the main chillers in the chiller plant for greatest potential efficiency. The combination a DHRC, operating at elevated condenser water temperatures, and main, high-efficiency chillers, operating at the most efficient condenser water temperature allowed by ambient conditions, allows beneficial loading of the DHRC to serve heating loads, while the remainder of the cooling load is served by the more efficient main chillers. This combination results in a substantial improvement in the coefficient of performance (COP) for the entire chiller installation, compared to operating the main chillers at an elevated condenser water temperature with only a portion being used for beneficial heating. When Can Recovery be Used? Recovered heat can be used when hot water and chilled water are employed simultaneously (i.e., chilled water used in the winter and hot water used in the summer). The same is true for facilities with sufficient internal loads that are served by water-side economizers. Also, installations that use a sizeable amount of domestic water throughout the year may be candidates for condenser water heat reclamation. Hospitals dormitories, computer centers, and hotels are opportunities for economical heat recovery due to their needs for hot water for reheat and domestic use, coupled with air-side economizer operation, or in some cases, winter operation of chillers.. This is a requirement of ANSI/ASHRAE/IESNA Standard 90.1-2001, Energy Standard for Buildings Except Low-Rise Residential Buildings, for large facilities that operate continuously with large water heating and cooling loads. Other applications include: 1. Existing air-cooled chillers. The installation of the DHRC provides a marked improvement in the overall chiller energy consumption whenever a corresponding requirement exists for hot water in the building (especially during winter operation). Further, when properly sized, the DHRC can eliminate the need to run the larger air-cooled chiller during the winter months, thus eliminating the associated operational problems of running air-cooled systems under low loads and low and low ambient temperature conditions (a typical application would be pool dehumidification systems). 2. Installations using condensing type boilers for heating with relatively low hot water temperatures such as 130 F (54 C) supply water and 100 F (37.8 C) return water. These applications increase the transfer of the heat from the condenser to the hot water. Non-condensing boilers must run with at least 140 F (60 C) water temperature and at 80% to 85% efficiency compared to condensing boiler efficiencies above 90%. 3. Installations with water-side economizing. Much of the same equipment can be used for condenser heat recovery. Dedicated Recovery Sizing As indicated earlier, the economical application of the DHRC is dependent on a simultaneous need for hot water (at 130 F [54 C] or less) and chilled water. Therefore, size the system to provide for the maximum hours of simultaneous operation to achieve fastest payback. Most customers who have applied these systems have expressed the desire to shut down their primary chilled water system during winter operation. If this is the case, size the DHRC for the maximum winter chilled water load. In theory, for applications in northern climates, the wintertime heating load will far exceed the winter cooling load. If this is the case, the DHRC will operate throughout the winter season to provide the facility s chilled water requirements and simultaneously provide hot water to supplement and unload the facility s main boiler system. Similarly, some customers want to shut down their hot water systems in the summertime. This is especially the case when a large hot water boiler system is operated to provide a relatively small summer reheat requirement that could otherwise be satis- About the Authors Thomas H. Durkin, P.E., is director of engineering for Veazey, Parrott, Durkin, and Shoulders, Indianapolis. James B. (Burt) Rishel, P.E., is a consultant with Pumping Solutions in Cincinnati. October 2003 ASHRAE Journal 19

fied by the relatively low hot water temperature (130 F to 140 F [54 C to 60 C]) of the DHRC. In this situation, the DHRC s heating capacity should be matched to the facility s maximum summer reheat load. For such applications, the DHRC will operate throughout the summer to provide the facility s heating and domestic water requirements and simultaneously provide chilled water to supplement, and unload, the main chiller system. For installations that eliminate boiler operation in the summer and chiller operation in the winter, the payback for the installation of a DHRC system can be less than one year, depending on the local cost of electricity and natural gas. When sizing this system, compare the maximum winter chilled water load and the maximum summer hot water load. Select the DHRC to serve the larger of these two loads. Instrumentation and Balance The basic instrumentation for the heat recovery chiller is shown in Figure 1. This includes the temperatures in and out of the evaporator and condenser, flows in both of them, and the kw input to the chiller. The heat balance or COP for the heat recovery chiller can be computed by determining the cooling effect plus the heat recovered divided by the kw input in Btu/h. This assumes no heat is rejected to a cooling tower or closed circuit cooler. The COP for the chiller is: Cooling Effect + Recovered COP = kw input 3,412 500[ F1 ( T2 T1 ) + F2 ( T4 T3 )] = kw input 3,412 (1) Figure 1: Basic chiller instrumentation. where is the flow, in gpm, in the chiller evaporator is the temperature of the water entering the evaporator is the temperature of the water leaving the evaporator is the flow, in gpm, in the chiller condenser is the temperature of the water entering the condenser is the temperature of the water leaving the condenser is the kilowatt input to the chiller This equation does not include energy saved by not delivering the heat to the cooling tower or closed cooler fan. In addition to fan energy savings, the heat recovery chiller may reduce other operating costs for cooling towers, such as water treatment and makeup water. The COP for a heat recovery chiller varies with the temperature of the water leaving the condenser. For example, when applying the heat to a hot water heating system or for reheat coils, the leaving temperature may be as high as 130 F. In this case, Equation 1 provides the chiller COP with the following conditions. = 100 gpm (6 L/s); = 44 F (7 C); = 56 F (13 C) = 81 gpm (5 L/s); = 110 F (43 C); = 130 F (54 C) = 61.5 kw (Data was taken from an actual 50-ton [175 kw] chiller.) [ ( 56 44) + 81130 ( 110)] 500 100 COP = = 6.7 61.5 3,412 When transferring condenser heat to domestic water systems, the leaving temperature from the chiller condenser can be much lower, resulting in a lower energy consumption and much higher COP: (2) To Water er and System Tank Returning From ing System To Boilers, ing System and Reheat Recovery Pumps, P 1 Circulating Pumps, P 2 Domestic Water Supply Recovery Figure 2: Domestic water heating. Figure 3: Space hot water heating. 20 ASHRAE Journal ashrae.org October 2003

Returning From ing System V 2 To Boilers, ing System and Reheat Recovery Recovery Loads Recovery To Reheat Coils To s V 1 Chilled Water Return P 3 Cooling Tower V 1 Figure 4: Reheat coils. Figure 5: Cooling tower connections. [ ( 56 44) + 71.5( 90 70) ] 500 100 COP = = 11.5 33.5 3,412 It is evident from these values of COP that very significant energy savings can be made, particularly when the central chillers are air cooled with typical COPs of less than 3.0. From Equation 2: Recovered/Hr = 500 81 20 = 810 MBH (4) Similarly, from Equation 3: Recovered/Hr = 500 71.5 20 = 715 MBH Recognizing these equations, the following are piping diagrams for methods of heat recovery. A number of piping accessories such as shut-off valves are not shown for clarity. Domestic Water ing Figure 2 describes the piping and equipment arrangement for transferring heat to the domestic water including the heat recovery pumps (P 1 ). This requires a circulating loop due to the variable flow in the domestic water system. This loop consists of a double-wall heat exchanger, circulating pumps (P 2 ), blending tank, and interconnecting piping. The water is circulated through the heat exchanger to the tank and back to the heat exchanger. Maximum recovery of heat is achieved by having an active heat exchanger. Supply water to domestic water systems can vary from 45 F to 60 F (7 C to 16 C). Most makeup water flows to the pump from the bottom of the tank. Typical condenser leaving water temperatures are 90 F to 100 F (32 C to 38 C). This can be varied to suit the installation and to achieve maximum chiller performance. (3) Hot Water ing Hot water for space heating has been traditionally at temperatures such as 180 F (82 C) supply and 160 F (71 C) return. With the diminishing amount of direct radiation such as finned tube and the increased use of radiant heaters and fan/ coil types of terminal units, there is no need for such high temperatures. Along with this comes the development of the condensing boiler that can operate with temperatures down to 80 F (27 C). The old standard of 80% boiler efficiency has changed to efficiencies higher than 90%. If these lower operating temperatures are available, the heat recovery chiller can be used for space heating. The circuit is shown in Figure 3. The heat recovery chiller is located on the return water-side of the boiler. Supply Water For Reheat Although reheat coils are normally supplied by the hot water heating system, opportunities may exist for providing heating from a heat recovery chiller. This eliminates the need to run boilers in the summertime. Because there is no reason to heat 55 F (13 C) air with 180 F (82 C) water, a heat recovery chiller can be useful in providing warm water to the reheat coils at 110 F (43 C) in the summer and 130 F (54 C) in the winter. Figure 4 describes the reheat chiller as the prime source of heat for the reheat coil with a heat exchanger for heat from higher temperature boilers when no heat is available from the reheat chillers. Obviously, if the boilers are operating at lower temperatures, the heat exchanger is not needed. One possible application is to use recovered heat from these chillers in natatoriums where reheat is required for satisfactory operation. Excess If the heat recovery chiller generates excess heat when it is delivering the required cooling capacity, a heat exchanger must be provided to deliver this heat to the cooling tower. A careful evaluation of the available heat from the condenser October 2003 ASHRAE Journal 21

From ing System To Boilers V 2 Tank To s From s T 2 Chilled Water Recovery Loads Pumps, P 4 Parallel Recovery V 3 Series To Chilled Water Pumps To s From s Parallel Circulating Pumps, P 2 V 3 Series Domestic Water Supply Chilled Water Pumps, P 4 To Chilled Water Pumps Figure 6: cooling load. may prove that this heat exchanger is not needed. Figure 5 describes this heat exchanger and the necessary piping. When the heat recovery chiller is not required, the same heat exchanger can be used for free cooling. Pump 3 then circulates the return water through the heat exchanger. Cooling Load From Recovery Obviously, one of the important factors in the design of the heat recovery chiller is the usefulness of the cooling effect of the chiller. Figure 6 describes the connection of the cooling load of the heat recovery chiller. (Of course, this is the most important load, as there must be a cooling load for the heat recovery chiller to be a viable answer to heat recovery.) As shown in Figure 6, the chiller can be connected in series or parallel to the main chillers. This is a decision that must be made by the designer on each application. The heat recovery circulating pumps (P 4 ) are selected to meet the design chilled water flow of the chiller. They run when the chiller is in operation and are constant speed. An evaluation of the head of these pumps must be made carefully when the heat recovery chillers are piped in parallel with the main chillers. Combination Recovery Loads Actual installations often have several loads that can be serviced by the heat recovery chiller. Therefore, the piping may be a combination of the previous piping diagrams. Along with the loads to be serviced, the piping diagram would include the chilled water piping of Figure 6. For example, if the hot water heating system is of the lower temperature design, such as 130 F (54 C) supply water temperature, and it is desired to provide heat to the domestic water system, the control system for the heat recovery chiller can be set up to automatically select the load that provides the greatest benefit from the heat recovery chiller. Valve V 2 transfers the heat Figure 7: Combination system. from the hot water heating system to the domestic water system when it is more efficient to use the heat for the domestic water. The overall piping of this system is shown in Figure 7. It is a combination of Figures 2, 3, and 6. This diagram is for a system with low-temperature boilers and use of the recovered heat for space heating, and domestic water heating. The chilled water produced is used in series with the central chillers. Control of Recovery s It is obvious that the control of heat recovery chillers is different than that for ordinary chillers. The control of the condenser heat becomes the principal objective of the control system, not necessarily the production of a specific number of tons of cooling or a chilled water supply temperature. For example, several of the above piping configurations assume that no heat is being rejected to a cooling tower or other heat absorbing equipment. How can this be done? With most applications of these chillers, the desire is to produce a specific amount of heat from the condenser, and the cooling effect is secondary. To achieve this, it is necessary to control the chiller operation by the amount of heat that is derived from the chiller. This can be done by maintaining a particular temperature for the water leaving the condenser. Other applications may require the control of the water temperature entering the condenser. As has been stated, this system only makes sense when there is a simultaneous need for heating and cooling and must run as many hours as possible to deliver the promised paybacks. Further, when the dedicated heat recovery chiller is operating to satisfy the facility s hot water requirements, there must be a chilled water requirement in the building that meets or exceeds the hot water demand. If this is not the case, the heat recovery system will subcool the chilled water loop and eventually lock out on a low-temperature fault (freeze-stat). Similarly, if the dedicated heat recovery chiller is operating to satisfy 22 ASHRAE Journal October 2003

the facility s chilled water requirement, a hot water requirement in the building must meet or exceed the chilled water demand. If this is not the case, the heat recovery system will overheat the hot water system and eventually lock out on high temperature fault (high head pressure). It has been discovered that the best way to operate the dedicated heat recovery chiller is to always set the control point (hot water or chilled water) to the side of the system that has the lowest demand. In doing this, we are always ensured of operating the heat recovery system during the maximum available hours for maximum economic impact on the facility. This can be done by simply monitoring the temperatures on the side of the system (hot water or chilled water) that is not being controlled actively by the dedicated heat recovery chiller. That is, if the chiller is controlling to a leaving hot water temperature, thus producing chilled water as a by-product, then the control system must monitor the entering chilled water temperature. If this temperature drops below a predetermined setpoint, indicating a lack of chilled water load, the control point of the dedicated heat recovery chiller is changed over to the chilled water-side of the system. This ensures that the heat recovery system only produces the amount of heat that can safely be absorbed from the facility s chilled water system. This logic can be applied similarly when in the chilled water control mode. This control may be easily accomplished by the building control system or can come prepackaged within the dedicated heat recovery chiller s control system. Such chillers are being produced with automatic switchover from control of the amount of cooling to the amount of heat recovered. Installations of these chillers have proved the need to train chiller plant operators to understand the need to operate the heat recovery chillers as many hours as possible. Likewise, the owners and managers of these chillers must understand the operation of these chillers to ensure that they operate as many hours per year as possible. The application of heat recovery chillers requires detailed evaluation of each installation. Success will be determined by the care provided for this evaluation. The use of heat recovery chillers is an old procedure for energy conservation, but the development of digital control, along with special types of chillers and condensing boilers, is opening a new field of efficient chilled/hot water operations with the resultant energy conservation. Acknowledgments Figures supplied by Thomas H. Durkin, P.E., and Benny L. Kincaid. Advertisement in the print edition formerly in this space. October 2003 ASHRAE Journal 23