An Operators Approach to Terminal Automation

Similar documents
Operations Systems of Container Terminals: A Compendious Overview

HAMBURGER HAFEN UND LOGISTIK AG ANALYSTS CONFERENCE

ISL ViTO. Virtual Terminal Optimisation Tool

Intermodal Handling TOP PERFORMANCE WITH SMART SOLUTIONS

HAMBURGER HAFEN UND LOGISTIK AG

The Role of Virtual Terminals in Optimising Terminal Processes. Holger Schuett ISL Applications GmbH

AUTOMATIC TRANSHIPMENT SYSTEMS FOR CONTAINER TRANSPORT IN TERMINALS

AGV / Lift AGV. Automated Container Transport Proven Technology from Gottwald

HAMBURGER HAFEN UND LOGISTIK AG

Port of Hamburg PIANC- AGA. Stefanie Kullmann

Maritime Container Transport

PRESS KIT OFFICIAL OPENING HUB TERMINAL POZNAN 27. September Hamburger Hafen und Logistik AG

HAMBURGER HAFEN UND LOGISTIK AG

Energy & Data Transmission Systems for Container Handling Equipment

ECT, shaping your gateway to Europe Opening Euromax Terminal and Delta Barge Feeder Terminal

How To Make Money From Shipping

Inland intermodal terminals and freight logistics hubs

1-Stop s Vehicle Booking System drives improvements for Ports of Auckland

Marine Terminal Management Training Program

Chapter 2 Container-Terminal Logistics

Port Productivity Summit, Session 4. John Reinhart CEO and Executive Director Virginia Port Authority

A SOLUTION FOR THE NEW YORK HARBOR TODAY. A LEADER FOR THE SHIPPING WORLD TOMORROW.

Multi-Modal Logistics Hub (MMLH) in Yanbu

Why infrastructure is so important

CargoBeamer. Sustainable and ecological combined rail/road transport for all semi trailers. Overview May, 2015 CargoBeamer AG. Foto: CargoBeamer 2014

Re: Presentation to be made at Port Botany and Sydney Freight Terminal Site Tour

Automating container terminals Safer, greener and more productive

TANZANIA HARBOURS AUTHORITY PO Box 9184 DAR-ES-SALAAM TANZANIA

Total Terminal Maintenance. Kalmar

The Virtual Terminal: Visualizing Automated Container Terminals

Driven by IT: Innovations in Port Operations

hhla intermodal hhla container

HAMBURGER HAFEN UND LOGISTIK AG COMPANY PRESENTATION

The Automation Market for N.A. Container Terminals 1

Abu Dhabi Ports Operating Company Abu Dhabi Terminals PJSC

Impact of Larger Vessel Size on Port Infrastructure Costs

CONTAINER TERMINAL PRODUCTIVITY:

Beating congestion by building capacity: An overview of new container terminal developments in Northern Europe

However, paper based systems were ill-suited to the requirements of container terminals, as Dally noted:

DSP Data and System Planning

OPTIMAL DESIGN OF CONTAINER TERMINAL LAYOUT. Debjit Roy Indian Institute of Management Ahmedabad Gujarat, India

Abu Dhabi Ports Operating Company Abu Dhabi Terminals PJSC

Container Terminal Operation and Cargo Handling

Railway network. [and you drive??] PhD CE Jarosław Zwolski. 1. Railway network in Poland and in Europe. 2. Safety and traffic control

Container design and types

PORTS OF. sh i p to no r way

Market Overview of Global & Regional Port Market

FRE FRE IFT IFT S.A.

Crane and Harbor Services Keeping your business moving

Warehouse planning and logistic consulting

AAPA & nawe Marine Terminal Management Training Program. Information Technology and Terminal Operations

Automated Container Handling in Port Terminals

-1- GATEWAY TERMINALS INDIA PRIVATE LIMITED Scale Of Rates GTI or Terminal means GATEWAY TERMINAL INDIA PVT. LTD.

Automated Testing of a Fully Automated Greenfield Terminal: A Case Study

From Data Migration to Optimization: The Full Project Lifecycle of MCT

Heavy Unit Load Handling Systems. Extensive Technology and Application Knowledge

BACKGROUND INFORMATION DOCUMENT

NAVIS (SPARCS N4) a SIMPLIFIED USER GUIDE

Relieving Congestion at Intermodal Marine Container Terminals: Review of Tactical/Operational Strategies

SOLAS - VGM. March, 2016

Tracking Truck Flows for Drayage Efficiency Analysis

Implementation of Gate and Crane OCR Systems for Container Terminal Automation and Security

Optimization of Container Terminal Operations

The Danish Maritime Cluster

IT SYSTEMS FOR ADVANCED OPTIMIZATION

30 years German-French Cooperation in Transport Research (DEUFRAKO)

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA

Container productivity at New Zealand ports

Making Rail the Smart Solution. Commercial Capacity Community. capability statement

Observations on warehouse requirements

TOGETHER! Let s sea more

CargoBeamer: land cargo transport 2.0

CUXPORT AUTOMOBILE LOGISTICS

STEVEDORING TARIFF The Port of Helsingborg

Table 5 Core Port and Transport Logistic Measures: Definitions, priorities, and sources of data

The Complete KASTO Program: Economic Sawing and Storing of Metal.

Transcription:

An Operators Approach to Terminal Automation SESSION VI: Elements of Container Terminal Planning and Design Dr. -Ing. Felix Kasiske, Partner, Head of Terminal Development & Design Long Beach, CA, 18 th October 2011 HPC Hamburg Port Consulting GmbH 1

An Operators Approach to Terminal Automation Agenda Introduction Approach to Terminal Planning & Design Upgrading of Terminal Facilities Foresights of the Future Terminal Automation HPC Hamburg Port Consulting GmbH 2

Introduction HPC Hamburg Port Consulting GmbH Founded in 1976 as subsidiary of the HHLA Hamburger Hafen und Logistik AG Around 100 experts (incl. subsidiaries, w/o HPC Ukraine), annual turnover in 2010 approx. 13 million Reputation as one of the world's leading consultants in the port sector Since 1976 port and transport related projects in more than 100 countries, private and public sector Approx. 1100 projects world-wide with extensive experience in container terminal planning Subsidiaries for port training & management (HPTI) and transport solutions (Uniconsult), HPC Ukraina as terminal operator in Odessa (Ukraine) HPC Hamburg Port Consulting GmbH 3

Introduction HHLA Container Terminals in Hamburg CTT Container Terminal Tollerort Unikai Empty Container Storage (LZU) CTB Container Terminal Burchardkai CTA Container Terminal Altenwerder March 2007 Hamburger Hafen und Logistik AG HPC Hamburg Port Consulting GmbH 4

Automated Container Terminals Introduction HPC Services Container Terminal Automation Planning Preparation Assessment Full Service Provider Improvement Design & Planning Realization Commissioning & Operations Conceptual planning - System selection - System calibration Concept validation - Static assessments - Dynamic simulations Equipment definition - Specification - Tender Support - Construction supervision IT + TOS selection - Business Process Definition (BPM) - Specification - Tender support Integration / Commissioning - IT + equipment integration support - Commissioning support - Operations Optimization 1 2 3 4 5 HPC Hamburg Port Consulting GmbH 5

Introduction Terminal Automation Planning Development Drivers & Goals External Drivers Meeting Point Operator Internal Goals Environmental concerns & fleet development Labour availability & reliability Economy & market development Increasing traffic vs. limited area sizes Equipment evolution & technology Terminal Automation Customer Satisfaction Improve safety and labour conditions Lowering life cycle costs Reduce equipment damage Increase the level of service Increase stacking density HPC Hamburg Port Consulting GmbH 6

An Operators Approach to Terminal Automation Agenda Introduction Approach to Terminal Planning & Design Upgrading of Terminal Facilities Foresights of the Future Terminal Automation HPC Hamburg Port Consulting GmbH 7

Approach to Terminal Planning & Design General Approach Automation as Philosophy Automation Technology to reach the Peak Efficiency Level at Required Flexibility To automate - inputs/outputs to the process are perfectly understood - inputs/outputs are stable and homogeneous - inputs/outputs are in mass production - the quality, productivity & utility to be increased (with a high level of service and specific capacity) - the material handling to be decreased - labour cost significantly high - labour safety to be increased Not to automate - inputs/outputs to the process aren t understood - inputs/outputs are volatile - inputs/outputs have changing characteristics - the performance is adaptable with the given equipment - processes may have to involve human interference (physically or in decision making) - Labour cost are very low even at high reliability Direct investment cost is only one block of total cost in automation, majority is related to set-up, integration and optimization! HPC Hamburg Port Consulting GmbH 8

Approach to Terminal Planning & Design General Approach Efficient Automation Level Equipment cost Training cost M&R cost Cost of operations breakdown Opportunity cost for reduced flexibility Cost Benefits Productivity gains Quality improvement Process stabilisation and reliability Electrification and emission reduction Safety improvement Image gains Ability Ability to integration Complexity management Usability Safety and regulatory frameworks Level of automation is a trade-off to be thoroughly evaluated! HPC Hamburg Port Consulting GmbH 9

Approach to Terminal Planning & Design General Approach Aspects to be considered Planning an automated terminal requires several aspects to be considered: Waterside Export Import Transhipment Interchange Zone Perpendicular Parallel Geography and topography of the selected area Space availability (general footprint & depth of area) Land and water transport links with the hinterland Type and size of vessels per visit Terminal annual throughput goal per year Projected productivity and utilization level Service level Investment costs Yard Layout ( or ) Peak factors (waterside, yard, landside) Storage Yard Landside Entry Gate Gate Exit Interchange Zone Interchange Zone DB HPC Hamburg Port Consulting GmbH 10

Approach to Terminal Planning & Design Design & Handling Equipment Aspects to be considered Hinterland accessibility? Planning Layout (// or )? Equipmentt hand shake? How many RMGs per stack? To be discussed on the next slides desired horiz. transport? How many QCs? How many containers to be handled in one call? HPC Hamburg Port Consulting GmbH 11

Cumulative costs Approach to Terminal Planning & Design Scope of Automation Terminal Automation Process Cost Factors Cost behavior resulting from increased complexity Sum of individual component implementation cost Scope of Automation Complexity is THE automation cost driver Bing Bang solution require very professional management! HPC Hamburg Port Consulting GmbH 12

Approach to Terminal Planning & Design Off-the-Shelf Solution? Off-the-Shelf vs. Taylor Made Reduced complexity Faster implementation Reduced investment Responsibility/liability can be passed over to suppliers Integration MAY BE less costly and faster If done right, terminal remains adaptable to market changes Due to higher involvement of operator, resources for continuous optimization are available inhouse Options remain with terminal operator to create a competitive advantage Every Terminal is a unique Terminal and requires a specific Solution! HPC Hamburg Port Consulting GmbH 13

Factors to be considered for selection Water side Approach to Terminal Planning & Design Waterside Quay Cranes Consideration Single Quay cranes Tandem Size & frequency of vessels No. of QC (mvs/h) QC performance (mvs/h) Height of the QC Length of the Berth Spreader type Utilization factor Investment costs TEU factor Peak factor Triple # Boxes per Vessel Twin 20 etc Single Trolley Double Trolley QC Utilization Factor: 78% Peak 64% Avarage QC system decision difficult to change in automated environments! HPC Hamburg Port Consulting GmbH 14

Storage Yard Factors to be considered for selection Waterside Transport Water side Approach to Terminal Planning & Design Storage Yard-1 Layout & Handling Equipment Consideration Quay cranes Straddle Carrier AGV Lift AGV Cassette AGV Yard Layout Parallel Perpendicular Size (L, W, H) RTG RMG Layout fit to footprint Primary yard area (50-75 %) (Container Freight Station (15-30%) for stuffing & stripping etc. ) Empty container (M&R, 10-20%) Entrance facilities customs & buildings, parking (5-15%) Footprint determines RMG System AND Layout! HPC Hamburg Port Consulting GmbH 15

Storage Yard Factors to be considered for selection Waterside Transport Water side Storage Yard-2 Layout & Handling Equipment Consideration Quay cranes Straddle Carrier AGV Lift AGV Cassette AGV Yard Layout Parallel Perpendicular Size (L, W, H) RTG RMG Approach to Terminal Planning & Design Waterside input/output Landside input/output Annual yard capacity Nr. of blocks Block lengt, width & height Nr. of ground slots Nr. of total slots Yard Layout ( or ) Equipment performance Equipment compatibility Productivity factor Utilization factor TEU factor Dwell time Peak factor Twin-RMG D-RMG Perpendicular Twin-RMG C-RMG Parallel Example Transshipment Share determines RMG System AND Layout! HPC Hamburg Port Consulting GmbH 16

Nr. of mvs. Storage Yard Factors to be considered for selection Waterside Transport Water side Approach to Terminal Planning & Design Waterside Horizontal Transport Consideration Quay cranes Straddle Carrier AGV Lift AGV Cassette AGV Yard Layout Parallel Perpendicular Size (L, W, H) Equipment compatibility Equipment performance Utilization factor TEU factor Peak factor RTG RMG Lift AGV Source: Gottwald Cassette AGV Source: TTS Terminal Tractor Source: Cagotec Source: Cargotec Waterside Horizontal Transport is not an isolated Decision! days HPC Hamburg Port Consulting GmbH 17

Landside Transport Storage Yard Factors to be considered for selection Waterside Transport Water side Approach to Terminal Planning & Design Landside Horizontal Transport Consideration Quay cranes Straddle Carrier AGV Lift AGV Cassette AGV Number of external trucks (gate input/output) closed or open trucking community Railway accessibility Buffer-Zone railway layout Peak factor Yard Layout Parallel Perpendicular Size (L, W, H) RTG RMG RMG Reach Stacker AGV Lift AGV Cassette AGV Gate Rail Interaction with Hinterland Transportation Characteristics determines Decision! HPC Hamburg Port Consulting GmbH 18

Landside Transport Storage Yard Factors to be considered for selection Waterside Transport Water side Landside Gate Horizontal Transport Consideration Quay cranes Straddle Carrier AGV Lift AGV Cassette AGV Yard Layout Parallel Perpendicular Size (L, W, H) RTG RMG RMG Reach Stacker AGV Lift AGV Cassette AGV Gate Rail Approach to Terminal Planning & Design Identification Automation possible OCR Auto-Checking Automated check and Remote check Cameras Auto-Handling Rail safety regulations require human supervision and control Auto-Planning Appointment systems w. sufficient participation HPC Hamburg Port Consulting GmbH 19

Landside Transport Storage Yard Simulation/ Emulation & Evaluation Waterside Transport Water side Approach to Terminal Planning & Design Selection & Decision Making Complexity of taking a Decision Quay cranes Objectives Straddle Carrier AGV Lift AGV Cassette AGV Key Performance Indicators & Analysis Operational & Engineering Aspects Yard Layout Parallel Perpendicular Size (L, W, H) Financial Indicators & Cost Estimation RTG RMG RMG Reach Stacker AGV Lift AGV Cassette AGV Gate Rail Regulations, Environment, Safety & Labour Decision HPC Hamburg Port Consulting GmbH 20

Emulate Approach to Terminal Planning & Design Development of the Terminal Layout Simulation & Emulation Data Input & Planning Design Consultants Designers Feedback Simulate Feedback Decision Makers Feedback Decisions Consultants & Operators Analyse & Evaluate Terminal Automation requires a Team of experienced Professionals HPC Hamburg Port Consulting GmbH 21

An Operators Approach to Terminal Automation Agenda Introduction Approach to Terminal Planning & Design Upgrading of Terminal Facilities Foresights of the Future Terminal Automation HPC Hamburg Port Consulting GmbH 22

Initial Situation for Automation Path Upgrading of Terminal Facilities Greenfield Project Political framework conditions and set timelines Interferences with general infrastructure project challenges Upgrading of external infrastructure Commercial performance expectations Key focus: Commencement date and stakeholder expectations Conversion Project Scope of automation and resulting process changes Adequate sequencing of conversion steps Proper phasing of conversion of capacities Acceptance within existing labour organisation Key focus: Least disruption of existing processes and smooth transition Preconditions determine Degree of Freedom in Design and Project Management Objectives HPC Hamburg Port Consulting GmbH 23

Upgrading of Terminal Facilities CTB s Terminal Development New Railhead Completed, Extended Storage under SC, RMG Construction Commenced (2007-2008) Phase 1 Berth No. 2 Consolidated & First 8 RMG Blocks Completed (2009-2010) Phase 2 Including Implementation of High Density Full Container Storage under RMG (Final Terminal Layout, 5.2 Mio TEU) Phase 3 Open-heart operation with mixed operations models HPC Hamburg Port Consulting GmbH 24

15,3 m approx. 10 m Upgrading of Terminal Facilities CTB s Terminal Development Past CTB New Terminal Design 18 m Gauge Straddle Carrier Storage and Traffic Area Future Quayside Transfer Area RMG Block 35 m Gauge Quay Extension Straddle Carrier Traffic Area RMG Storage Area HPC Hamburg Port Consulting GmbH 25

A Guide to Terminal Automation Planning & Design Agenda Introduction Approach to Terminal Planning & Design Upgrading of Terminal Facilities Foresights of the Future Terminal Automation HPC Hamburg Port Consulting GmbH 26

Future Terminal Automation Design & Innovations Foresights New Innovative Developments Technologies could be like ZPMC development or like Caspar, Phillips & Associates or FastNet Concept by APM Terminals No Limits for new innovative ideas or HPC Hamburg Port Consulting GmbH HPC Hamburg Port Consulting GmbH 27

HPC HAMBURG PORT CONSULTING GMBH CONTACT ADDRESS HPC Hamburg Port Consulting GmbH Dr.-Ing. Felix Kasiske Container-Terminal Altenwerder Am Ballinkai 1 D-21129 Hamburg Germany Phone: +49 40 74008 132 Fax: +49 40 74008 133 f.kasiske@hpc-hamburg.de HPC Hamburg Port Consulting GmbH 28