1 Automated Testing of a Fully Automated Greenfield Terminal: A Case Study March 2015 Stéphane Zampelli 1
2 Agenda How is Automated Testing useful? Automated Testing Overview at RWG Waterside Automated Tests Landside Automated Tests Emulation Performance Lessons learned - Impact of Automated Testing 2
3 How to secure your production deployment? Upgrade of your eco-system Still functional? No regression? Exclude old bugs Discover new bugs Behaviour has not changed Integration problems Performance stable? containers per hour New features really delivered? as soon as possible! 3
4 Automated Testing Vision Install & Config 12 hours running time Overnight Unattended No human intervention Go/NoGo Decision Automated QA benefits: Agile to change Refocus operational staff Increase confidence Repeatable and complete testing Iteratively increase coverage 4
5 How does Test Automation help our Customers? Agile to change install a patch or make a configuration change. Then automatically test changes overnight or over the weekend Refocus operational staff on running and improving the business reducing repetitive manual testing and the need to co-ordinate a big test effort over days/weeks Increase confidence with operations and management by catching issues upfront and avoiding disruptions Repeatable and structured approach to testing avoiding the question did we miss anything this time? Iteratively increase coverage add test cases that are rarely seen but have high impact. Then test the high impact flows every time 5
6 How does Test Automation help our Customers? Agile to change Refocus operational staff Increase confidence Repeatable and complete testing Iteratively increase coverage 6
7 Manual testing is costly 400+ test cases in the test case database Selected out of teams of manual testers teams of 2/3 persons Around 12 test cases per day per team Around 17 days to execute the test cases 7
8 Rotterdam Gateway, DP World 8
9 Rotterdam Gateway, DP World Started on site 2014 April Greenfield project ASC, L-AGV, Racks Automated quay cranes Automated Gates Pre-announcement Automated terminal means less people available Need a way to quickly test releases Especially true when people are moving to operations 9
10 Team Involved in Automated Testing Sidney Nederlof, Head of IT Ashish Panda Navis Consultant Guillaume Miara Navis Consultant Joeri Siebel RWG IT Engineer Stéphane Zampelli Navis Consultant Kathy Xie Navis Consultant 10
11 My Involvment Senior Consultant, Optimization Services Prime Route Expert Decking AGV/ASC Schedulers Performance emultation Business Process improvement Improvement of Testing Cycle Build an approach with RWG 11
12 Automated Testing Process at RWG Install & Config Filtering Test Cases New Release Emulation A.T. Deploy Manual Testing New features UI Failed Test Cases Go/NoGo 12
13 Reduce Cycle Time at RWG No Testing: 3 days 3 No Tests Install & Config Automated Testing Cycle Time: 7 days 3 1 Install & Config 3 Manual Testing Go/NoGo 400 test cases Manual Testing Cycle Time: 24 days 3 21 Install & Config Manual Testing Go/NoGo 13
14 Automated Testing Types at RWG Automated Testing Waterside Functionality Landside Performance Emulation Discharge Load Interstack 62 test cases Appointments Truck Rail Barge Manual Using Community Portal Execution 8 hours run Measure nbr of containers per hour fixed scenario 300 test cases 14
15 Waterside Components 15
16 Workflow example Load Move 40ft via direct interchange 16
17 Each Script is an Independent Test Case Expected Behavior Configuration & Steps Manual Testing Videos (landside) Each script is independent Reset virtual terminal Create Data Configure Execute: activate Work Queue Include script in a batch system With a timeout Each script resets the virtual terminal no blockers 21,BetaEmulationWTeams,L5InterStack40ftConventionalRackToConventionalDI 22,BetaEmulationWTeams,L5InterStack40ftConventionalRackToConventionalRack 23,BetaEmulationWTeams,L5InterStack40ftConventionalRackToCantileverDI 24,BetaEmulationWTeams,L5InterStack40ftConventionalDIToConventionalDI 25,BetaEmulationWTeams,L5InterStack40ftConventionalDIToConventionalRack 26,BetaEmulationWTeams,L5InterStack40ftConventionalDIToCantileverDI 27,BetaEmulationWTeams,L5InterStack40ftCantileverDIToConventionalDI 28,BetaEmulationWTeams,L5InterStack40ftCantileverDIToConventionalRack Unattended and overnight Configure Reset Virtual Terminal Activate WQ Check Result Virtual terminal executes the move FAILED or PASSED 17
18 Demo Script example - Load Start XPS client, deactivate WQs, revert WIs, resetn4() resetteams() purgein() configure() n4yardsync() execute() 18
19 Demo Script example resetn4() resetteams() purgein() configure() n4yardsync() execute() Reset Virtual Terminal 19
20 Demo Script example resetn4() resetteams() purgein() configure() n4yardsync() execute() Purge N4 WAs, reset CHEs 20
21 Demo Script example resetn4() resetteams() purgein() configure() n4yardsync() execute() Vessel visit, cntr in yard, shift, projection, 21
22 Demo Script example resetn4() resetteams() purgein() configure() n4yardsync() execute() Yard sync between ECS and N4 22
23 Demo Script example resetn4() resetteams() purgein() configure() n4yardsync() execute() Activate WQs, log and monitor The equipment simulator and N4 will execute the move. 23
24 Demo Video 24
25 Pass = feature works, Fail = unknown Pass means the feature was confirmed by the script Fail means something went wrong Does not mean the feature is not covered Workflow is actually functional Technical/configuration problem Workflow is really broken All the failed test cases have to be re-tested manually We currently achieve 95% filtering, the rest has to be re-tested manually 25
26 False failure can come from configuration 45ft discharge Decision has been made by op management to change the site of 45ft Information did not flow back to AT team Most 45ft discharge cases are failed (forced target position) Scripts have to be updated accordingly 26
27 Some numbers from RWG Automated Testing Waterside Functionality Landside Performance Emulation 62 TC + 5 min per TC 10 TC/h 120 TC/night 300 TC + All can be run in one night using two computers Some takes 1 minute, some more than 15 minutes 8 hours run 4 cranes, 1000 moves unattended flexible scenario 27
28 Landside Components 28
29 Technologies Unified Functional Testing AKA: Quick Test Pro, Astra Quick Test Mercury Interactive, HP Functional Test Tool Record/Playback suitable for subject matter experts Supports Java,.NET, Web, SAP, Oracle, SOAP. VB Script and Microsoft Object Model 29
30 Test Case Truck Appointment for a container already discharged in the yard Check that N4 generates am error Do not use PCS website (manual) 30
31 Test Case - Video 31
32 Test Case Using PortBase Truck Appointment for a container already discharged in the yard Check that N4 generates am error Do not use PCS website (manual) 32
33 Test Case Using PortBase - Video 33
34 Test Cases and Results 34
35 Emulation: Testing Performance Key difference: less coverage, focus on performance 8 hours of run, count Nbr of box movements Nbr of human interventions Gives a level of confidence about the performance 35
36 Emulation: Demo TODO 36
37 Emulation: Typical Result Doing single discharges only (mainly 40 s) 10 AGVs per cranes high congestion lots of parking Cruising at 45+ MPH one intervention at 18.01PM on QC105 AGV blocking QCs 37
38 Lessons Learned Expected Behaviour not always known Usually part of the testing itself Software providers should support AT Virtual Terminal Reset Should be part of O&A Software providers may refuse» Becomes black magic, reverse engineering Interfaces stability Moving to a new major version Redo part of your scripts Operational Knownledge and Coding Skills 38
39 Lessons Learned Not Covered UI Behaviour Non Functional Requirements What do you test exactly? Your terminal or the equipment emulator? Equipment is still part of the big picture Time is now spent on scripts instead of testing Especially at the beginning 39
40 Impact of Automated Testing quick (overnight) and unmanned (unattended) larger coverage regression review (including perf) of your config & install But: Does not replace manual testing Does not replace Live Equipment Testing Requires the involvment of vendors Coding/IT skills required 40
41 Get In Touch With Navis People Testing Services at Guru Bar 41
42 Automated Testing of a Fully Automated Greenfield Terminal: A Case Study March 2015 Stéphane Zampelli 42
43 Still to do Waterside components - convert to ppt Landside components convert to ppt Waterside demo Emulation demo «Get in touch with Navis People» «Team involved in automated Testing» Discuss relevance of Emulation example with G.Miara Buy photo 43
Safe Harbor Statement
Presented with Next-Generation Testing with Oracle Application Testing Suite Mikael Fries Product Management Director - Oracle Mark Tobias Facebook Safe Harbor Statement The following is intended to outline
101-301 Guide to Mobile Testing
101-301 Guide to Mobile Testing Perfecto Mobile & Toronto Association of System and Software Eran Kinsbruner & Joe Larizza 2014 What To Do? Great News Your first Mobile Project has arrived! You have been
ASSURING SOFTWARE QUALITY USING VISUAL STUDIO 2010
ASSURING SOFTWARE QUALITY USING VISUAL STUDIO 2010 QA2010 3 Days INTRODUCTION This three-day, instructor-led course provides students with the knowledge and skills to prevent, detect, manage and avoid
Testing Lifecycle: Don t be a fool, use a proper tool.
Testing Lifecycle: Don t be a fool, use a proper tool. Zdenek Grössl and Lucie Riedlova Abstract. Show historical evolution of testing and evolution of testers. Description how Testing evolved from random
The Importance of Continuous Integration for Quality Assurance Teams
The Importance of Continuous Integration for Quality Assurance Teams Without proper implementation, a continuous integration system will go from a competitive advantage for a software quality assurance
Service Definition Document Microsoft Dynamics CRM Training
Service Definition Document Microsoft Dynamics CRM Training Date: 1 April 2014 Issued by: Matt Broomhall Head of Sales and Marketing Y: Name Tisski Limited: +44 (0) 203 418 0411 E: [email protected]
Automation and Virtualization, the pillars of Continuous Testing
HP Software: Apps meet Ops 2015 Automation and Virtualization, the pillars of Continuous Testing Jerry Saelemakers/ April 2 nd, 2015 Today s business initiatives demand a balance between velocity and quality
Bringing Value to the Organization with Performance Testing
Bringing Value to the Organization with Performance Testing Michael Lawler NueVista Group 1 Today s Agenda Explore the benefits of a properly performed performance test Understand the basic elements of
Software Implementation Technology report
Software Implementation Technology report Team: No Best 1 - Program Manager 2 - Developer 3- Tester 2007-8 Peking University Software Implementation Technology report 1 Problem & Plan 2 Design & Implementation
Integrating Siebel CRM 8 with Oracle Applications
Integrating Siebel CRM 8 with Oracle Applications Agenda Corporate Overview Siebel 8.0 New Features Siebel Integration Approaches Integration with Oracle Applications Option 1 Option 2 Pros and Cons Evaluation
Release Automation for Siebel
June 30 th 2015 Release Automation for Siebel Stefan Kures Agenda + Common Challenges + Automic s solution + Positive Outcomes + Customer Example 3 Property of Automic Software. All rights reserved Siebel
Laila TECHNICAL SKILLS
PROFESSIONAL SUMMARY Diversified experience in the field of Information Technology in the financial domain. In depth knowledge of RUP, Agile, waterfall Software Development Life Cycle (SDLC) processes.
ALM/Quality Center. Software
HP ALM/Quality Center Software Datasheet Page 1 of 8 HP Application Lifecycle Management software In today s rapidly changing business world, business agility depends on IT agility. And predictable, high
HP Service Virtualization (HP SV) Remove delay-causing roadblocks in development and testing
HP ALM Masters 2014 HP Service Virtualization (HP SV) Remove delay-causing roadblocks in development and testing Jose Talavera ADM Technical Consultant A tipping point for application delivery Surging
Manual Tester s Guide to Automated Testing Contents
Manual Tester s Guide to Automated Testing Contents Introduction...3 Knowing the Differences...3 Common Misconceptions About Automated Testing...4 How to Transition to a Blended Manual/Automated Approach...7
Testhouse Training Portfolio
Testhouse Training Portfolio TABLE OF CONTENTS Table of Contents... 1 HP LoadRunner 4 Days... 2 ALM Quality Center 11-2 Days... 7 HP QTP Training Course 2 Days... 10 QTP/ALM Intensive Training Course 4
Quality Testing. Assured.
Quality Testing. Assured. Applications can make or break your business Quality an imperative for success Reliability in quality assurance and control, challenges in adapting to changing benchmarks in delivery
How To Test For Performance
: Roles, Activities, and QA Inclusion Michael Lawler NueVista Group 1 Today s Agenda Outline the components of a performance test and considerations Discuss various roles, tasks, and activities Review
From Data Migration to Optimization: The Full Project Lifecycle of MCT
From Data Migration to Optimization: The Full Project Lifecycle of MCT Marco Fehmer, DSP General Manager Session 204 - March 30 4:25 pm Telegraph Hill CONNECT. COLLABORATE. INNOVATE. Nice to meet you Marco
Application Test Management and Quality Assurance
SAP Brief Extensions SAP Quality Center by HP Objectives Application Test Management and Quality Assurance Deliver new software with confidence Deliver new software with confidence Testing is critical
<Insert Picture Here> When to Automate Your Testing (and When Not To)
When to Automate Your Testing (and When Not To) Joe Fernandes (Oracle) Alex Di Fonzo (Synchronoss Technologies) Three Myths of Automated Testing 1. Automated testing always results
Codeless Test Automation for Web Apps
Codeless Test Automation for Web Apps Webinar by TestingWhiz December 11, 2012 1PM EST Agenda Functional Test Automation for Agile Teams Developing and Implementing Codeless Automation Frameworks Achieving
The George Washington University
PMLC Project Management Life Cycle The George Washington University eexpense System Implementation Project Test Plan & Procedures Prepared By: Jeff Pearson Version: 1 Date: August 13, 2012 Project Owners:
What s new in the HP Functional Testing 11.5 suite Ronit Soen, product marketing John Jeremiah, product marketing
What s new in the HP Functional Testing 11.5 suite Ronit Soen, product marketing John Jeremiah, product marketing Today s agenda A new world order for applications impact on QA HP s response announcement
End-To-End Invoice Processing Automation at Land O Lakes. Session #705. Natalie Hawley, Applications Developer
End-To-End Invoice Processing Automation at Land O Lakes Session #705 Natalie Hawley, Applications Developer Agenda 1) Opportunities for Improvement 2) Automation Options 3) Oracle s End-to-End Solution
ALM120 Application Lifecycle Management 11.5 Essentials
ALM120 Application Lifecycle Management 11.5 Essentials Instructor-Led Workshop OVERVIEW This course provides the tools you need to implement and use Quality Center 11.50. Students learn how to manage
Federal Secure Cloud Testing as a Service - TaaS Center of Excellence (CoE) Robert L. Linton
Session 5: Federal Secure Cloud Testing as a Service - TaaS Center of Excellence (CoE) Robert L. Linton Agenda HP ALM Solution Review HP Cloud Potential Cloud Portal HP ALM Solutions in a virtual environment
Automation using Selenium
Table of Contents 1. A view on Automation Testing... 3 2. Automation Testing Tools... 3 2.1 Licensed Tools... 3 2.1.1 Market Growth & Productivity... 4 2.1.2 Current Scenario... 4 2.2 Open Source Tools...
DSP Data and System Planning
DSP Data and System Planning PROCESS AUTOMATION PROJECT: DRIVERS OF THE CHANGE AND RISK MANAGEMENT TO MAKE THEM SUCCESSFUL Marco Fehmer, DSP General Manager Rotterdam 10 th June 2015 10:30 12:00 Nice to
Automating Master Data Management Workflows for Oracle
1 Automating Master Data Management Workflows for Oracle Jessica Marion, Account Executive, Winshuttle LLC Chad Miller, Product Manager, Winshuttle LLC 10am Pacific Standard Time, March 14 th, 2012 2 Poll
ICAgile Learning Roadmap Agile Testing Track
International Consortium for Agile ICAgile Learning Roadmap Agile Testing Track Learning Objectives Licensing Information The work in this document was facilitated by the International Consortium for Agile
Business white paper. Best practices for implementing automated functional testing solutions
Business white paper Best practices for implementing automated functional testing solutions Table of contents Contents 3 Introduction 3 Functional testing versus unit testing 4 The pros and cons of manual
Siebel Installation Guide for UNIX. Siebel Innovation Pack 2013 Version 8.1/8.2, Rev. A April 2014
Siebel Installation Guide for UNIX Siebel Innovation Pack 2013 Version 8.1/8.2, Rev. A April 2014 Copyright 2005, 2014 Oracle and/or its affiliates. All rights reserved. This software and related documentation
Functional Validation of SAP Implementation
Functional Validation of SAP Implementation Efficiently produce and maintain a SAP test repository thru modeling of business processes and business rules Geoffrey Potoczny/Smartesting Professional Services
HP ALM. Software Version: 12.50. Tutorial
HP ALM Software Version: 12.50 Tutorial Document Release Date: December 2015 Software Release Date: December 2015 Legal Notices Warranty The only warranties for HP products and services are set forth in
Continuous Integration and Bamboo. Ryan Cutter CSCI 5828 2012 Spring Semester
Continuous Integration and Bamboo Ryan Cutter CSCI 5828 2012 Spring Semester Agenda What is CI and how can it help me? Fundamentals of CI Fundamentals of Bamboo Configuration / Price Quick example Features
Copyrighted www.eh1infotech.com +919780265007, 0172-5098107 Address :- EH1-Infotech, SCF 69, Top Floor, Phase 3B-2, Sector 60, Mohali (Chandigarh),
Content of 6 Months Software Testing Training at EH1-Infotech Module 1: Introduction to Software Testing Basics of S/W testing Module 2: SQA Basics Testing introduction and terminology Verification and
Lessons Learned in Test Automation
Lessons Learned in Test Automation Peter Chau, David Cranstone SQDG - January 19th 2010 Information Technology Introduction Our experiences with functional test automation High level presentation, not
Table of contents. Enterprise Resource Planning (ERP) functional testing best practices: Ten steps to ERP systems reliability
Enterprise Resource Planning (ERP) functional testing best practices: Ten steps to ERP systems reliability Table of contents Introduction.......................................................2 Step 1:
Continuous Integration (CI) for Mobile Applications
Continuous Integration (CI) for Mobile Applications Author: Guy Arieli, CTO, Experitest Table of Contents: What Continuous Integration Adds to the Mobile Development Process 2 What is Continuous Integration?
Continuous Delivery / Continuous Deployment How to automate your Deliveries. Bernhard Keprt 24.02.2014
Continuous Delivery / Continuous Deployment How to automate your Deliveries Bernhard Keprt 24.02.2014 Bernhard Keprt Software Developer Teamleader Software Development Job at willhaben.at! Likes Agile
WEMS IT User Group. Mark Brodziak: Solutions Architect John McLean: Project Manager Gary Wade: IT Consultant. 20 March 2015
WEMS IT User Group Mark Brodziak: Solutions Architect John McLean: Project Manager Gary Wade: IT Consultant 20 March 2015 AGENDA WEMS 3.12 an overview SHA-1 / Internet Explorer 8 Web service retirement
Collaborating for Quality in Agile Application Development From Beginning to End
Collaborating for Quality in Agile Application Development From Beginning to End + 1 Agenda Application Development Challenges Meeting the Challenge in the Enterprise End-to-End HP/CollabNet Solution Agile
Improving your Drupal Development workflow with Continuous Integration
Improving your Drupal Development workflow with Continuous Integration Peter Drake Sahana Murthy DREAM IT. DRUPAL IT. 1 Meet Us!!!! Peter Drake Cloud Software Engineer @Acquia Drupal Developer & sometimes
www.hcltech.com Business Assurance & Testing QEx Automation Platform
www.hcltech.com Business Assurance & Testing QEx Automation Platform MARKET NEED Increasing application complexities and shorter release cycles have made it imperative to test new features whilst performing
Unified Communications-as-a-Service (UCaaS) for Video Conferencing
Unified Communications-as-a-Service (UCaaS) for Video Conferencing The proliferation of technology at a consumer level has been empowering. Laptops, tablets and smart phones now come equipped with extensive
Microsoft Modern ALM. Gilad Levy Baruch Frei
Microsoft Modern ALM Gilad Levy Baruch Frei Every app Every developer Any platform Achieve more Team agility The Open Cloud Open, broad, and flexible cloud across the stack Web App Gallery Dozens of.net
Getting started with API testing
Technical white paper Getting started with API testing Test all layers of your composite applications, not just the GUI Table of contents Executive summary... 3 Introduction... 3 Who should read this document?...
JBOSS ENTERPRISE APPLICATION PLATFORM MIGRATION GUIDELINES
JBOSS ENTERPRISE APPLICATION PLATFORM MIGRATION GUIDELINES This document is intended to provide insight into the considerations and processes required to move an enterprise application from a JavaEE-based
Building and Deploying Enterprise M2M Applications with Axeda Platform
w h i t e p a p e r Building and Deploying Enterprise M2M Applications with Axeda Platform According to Harbor Research, there are billions of wired and wireless intelligent assets around the globe that
Project Server 2010 Migration
Project Server 2010 Migration Presented by Chad Olson, Director of Technical Services Agenda Reasons to Migrate Types of Migrations Best Practices Lessons Learned Post Migration Considerations Backwards
AUTOMATED MOBILE TESTING REQUIRES BOTH REAL DEVICES AND EMULATORS
WHITE PAPER AUTOMATED MOBILE TESTING REQUIRES BOTH REAL DEVICES AND EMULATORS SEPTEMBER 2015 Today, businesses compete in an increasingly mobile-centric marketplace. Mobile QA can no longer take a backseat
Work Experience HP ALM (Quality Center), Bugzilla
Name: xxxxxx Email ID: xxxxxx Ph: xxxxxx TECHNICAL SUMMARY: Having 9 years of experience in Information Technology in Project Life cycle and QA testing life cycle. Quality Assurance: Reviewing and converting
Engineering Documentation. Fermilab Documentation Management within Teamcenter
Engineering Documentation Fermilab Documentation Management within Teamcenter Agenda Current status of document management Fermilab Engineering Manual Our Document Management Goals How do we achieve our
Agile Power Tools. Author: Damon Poole, Chief Technology Officer
Agile Power Tools Best Practices of Agile Tool Users Author: Damon Poole, Chief Technology Officer Best Practices of Agile Tool Users You ve decided to transition to Agile development. Everybody has been
Seeking Nirvana. Jason Collins Director Solution Sales ITKO, a CA Technologies company
Seeking Nirvana Can you deliver new business services FASTER, CHEAPER, and BETTER? With LISA, we can Jason Collins Director Solution Sales ITKO, a CA Technologies company CA Technologies: Accelerate, Secure,
About me - Joel Montvelisky
About me - Joel Montvelisky PractiTest Co Founder & Prod. Architect QA Instructor & Consultant Mercury Interactive - QA Manager (retired ) TD, QC, WR, QTP, etc ITCB (IL) Advisory Board QABlog.practitest.com
The Benefits of Deployment Automation
WHITEPAPER Octopus Deploy The Benefits of Deployment Automation Reducing the risk of production deployments Contents Executive Summary... 2 Deployment and Agile software development... 3 Aim to deploy
Siebel Installation Guide for Microsoft Windows. Siebel Innovation Pack 2013 Version 8.1/8.2, Rev. A April 2014
Siebel Installation Guide for Microsoft Windows Siebel Innovation Pack 2013 Version 8.1/8.2, Rev. A April 2014 Copyright 2005, 2014 Oracle and/or its affiliates. All rights reserved. This software and
Best Practices for Adopting Visualization Into Your Software Process. Mitch Bishop Johann Mendoza
Best Practices for Adopting Visualization Into Your Software Process Mitch Bishop Johann Mendoza #1 Issue Facing CIOs Today Dramatically cutting application development cost How Do CIOs Get There? (part
Case Study: Financial Institution Deploys MBT to Test at the Speed of Agile Development
Case Study: Financial Institution Deploys MBT to Test at the Speed of Agile Development Background One of the world s largest financial companies needed to reduce its time to product release. In an industry
The Customer. Manual and Automation Testing for a leading Enterprise Information Management (EIM) Solution provider. Business Challenges
CASE STUDY a t t e n t i o n. a l w a y s. The Customer Manual and Automation for a leading Enterprise Information Management (EIM) Solution provider Our Customer is one of the global leaders in Enterprise
Aspire's Approach to Test Automation
WHITE PAPER Aspire's Approach to Test Automation by Ujjawal Bagaria, Aspire Systems Automation has been seen as the long term solution for cost reduction of manual testing across the globe. A successfully
HP ALM11 & MS VS/TFS2010
Comparison Test Management Tools HP ALM11 & MS VS/TFS2010 22 mei 2012 voordracht georganiseerd door Discussiegroep Software Testing met de steun van Ingenieurshuis, Antwerpen 24/05/2012 HP ALM 11 Microsoft
Automate Your BI Administration to Save Millions with Command Manager and System Manager
Automate Your BI Administration to Save Millions with Command Manager and System Manager Presented by: Dennis Liao Sr. Sales Engineer Date: 27 th January, 2015 Session 2 This Session is Part of MicroStrategy
ISL 2010. ViTO. Virtual Terminal Optimisation Tool
ViTO Virtual Terminal Optimisation Tool 2 The main mission of CHESSCON VIRTUAL TERMINAL what you can do with CHESSCON use your Terminal Operation System (TOS) use your software interfaces but use a Virtual
Software Testing. Knowledge Base. Rajat Kumar Bal. Introduction
Software Testing Rajat Kumar Bal Introduction In India itself, Software industry growth has been phenomenal. IT field has enormously grown in the past 50 years. IT industry in India is expected to touch
Axe in the Agile World
Axe in the Agile World WHITE PAPER Executive Summary This paper explains the way in which Axe (Odin s Enterprise Test Automation Platform) allows the automated testing to take place in a range of project
SolovatSoft. Load and Performance Test Plan Sample. Title: [include project s release name] Version: Date: SolovatSoft Page 1 of 13
SolovatSoft Load and Performance Test Plan Sample Title: [include project s release name] Version: Date: SolovatSoft Page 1 of 13 Approval signatures Project Manager Development QA Product Development
Continuous Application Delivery From concept to reality. Carsten Lentz Sr. Solution strategist [email protected]
Continuous Application Delivery From concept to reality Carsten Lentz Sr. Solution strategist [email protected] Agenda - Introduction to customer case A Danish insurance company started the journey,
Supporting GIS Best practices for Incident Management and Daily Operations
Supporting GIS Best practices for Incident Management and Daily Operations Shaun Collins, Project Manager Venkat Nittala, Operations Lead Agenda Introduction & History of GIS at PG&E PG&E GIS Environment
Automate Your Deployment with Bamboo, Drush and Features DrupalCamp Scotland, 9 th 10 th May 2014
This presentation was originally given at DrupalCamp Scotland, 2014. http://camp.drupalscotland.org/ The University of Edinburgh 1 We are 2 of the developers working on the University s ongoing project
Automating Security Testing. Mark Fallon Senior Release Manager Oracle
Automating Security Testing Mark Fallon Senior Release Manager Oracle Some Ground Rules There are no silver bullets You can not test security into a product Testing however, can help discover a large percentage
Key Benefits of Microsoft Visual Studio Team System
of Microsoft Visual Studio Team System White Paper November 2007 For the latest information, please see www.microsoft.com/vstudio The information contained in this document represents the current view
AGV / Lift AGV. Automated Container Transport Proven Technology from Gottwald
AGV / Lift AGV Automated Container Transport Proven Technology from Gottwald AGV Automated Guided Vehicles Leading-Edge Technology for Performance-Aware Container Terminals Automated solutions for increasing
Automated testing and continuous integration
Technical white paper Automated testing and continuous integration Build and test your software at the same time Table of contents Introduction 2 Who should read this document? 2 Build managers 2 Developers
Mobile Testing, Agile Methodologies & You!
& Mobile Testing, Agile Methodologies & You! Before We Begin... It's Quiet in Here Q&A at End of Webinar Contact Details Available Let s Go! Today s Presenters Alan Trefzger XBOSoft William Anderson Go2Group
Informatica Data Replication: Maximize Return on Data in Real Time Chai Pydimukkala Principal Product Manager Informatica
Informatica Data Replication: Maximize Return on Data in Real Time Chai Pydimukkala Principal Product Manager Informatica Terry Simonds Technical Evangelist Informatica 2 Agenda Replication Business Drivers
A Practical Guide to implementing Agile QA process on Scrum Projects
Agile QA A Practical Guide to implementing Agile QA process on Scrum Projects Syed Rayhan Co-founder, Code71, Inc. Contact: [email protected] Blog: http://blog.syedrayhan.com Company: http://www.code71.com
Agile on huge banking mainframe legacy systems. Is it possible?
EuroSTAR 2011 Agile on huge banking mainframe legacy systems. Is it possible? Christian Bendix Kjær Hansen Test Manager November 22, 2011 What is this presentation about? Goal Inspire others working with
How To Improve Lrs Maintenance
GIS-T Conference 2015 Crossroads in the Heartland LRS Maintenance and Asset Management Systems Phil Hardy LRS Product Manager Agenda Evolution of LRS Maintenance Lessons learned implementing Roads & Highways
EMPOWERING THE DYNAMIC WORKPLACE
EMPOWERING THE DYNAMIC WORKPLACE Matrix42 has been positioned in the visionary quadrant of the Gartner Magic Quadrant as the only vendor that enables organizations to manage physical, virtual and mobile
Second CRM CRM Solution for Small Companies
Second CRM CRM Solution for Small Companies Technologize Your Business TM Introductory Presentation June 2010 Agenda Second CRM On Demand CRM Solution Introduction Second CRM Features Pricing, Implementation
a new generation software test automation framework - CIVIM
a new generation software test automation framework - CIVIM Software Testing is the last phase in software development lifecycle which has high impact on the quality of the final product delivered to the
Automated Testing Best Practices
Automated Testing Best Practices This document includes best practices to consider before implementing automated software testing. These best practices are strategic and are applicable regardless of the
MANUAL TESTING. (Complete Package) We are ready to serve Latest Testing Trends, Are you ready to learn.?? New Batches Info
MANUAL TESTING (Complete Package) WEB APP TESTING DB TESTING MOBILE APP TESTING We are ready to serve Latest Testing Trends, Are you ready to learn.?? New Batches Info START DATE : TIMINGS : DURATION :
Building and Managing a Standard Operating Environment
Building and Managing a Standard Operating Environment Dirk Herrmann Head of Strategic Consulting Central Europe, Red Hat Todd Warner Satellite Product Manager, Red Hat Milan Zázrivec Satellite Software
DevOps Practical steps towards greater business agility AND stable IT operations.
DevOps Practical steps towards greater business agility AND stable IT operations. White Paper BUSINESS AGILITY VS OPERATIONAL STABILITY In today s world, organisations, and the software teams that deliver
Fast Feedback: Jenkins + Functional and Non-Functional Mobile App Testing Without Pulling Your Hair
Fast Feedback: Jenkins + Functional and Non-Functional Mobile App Testing Without Pulling Your Hair Uzi Elion, Tecnology Director Carlo Cadet, Director, Technical Evangelists Tuning the Process for Mobile