Patio Covers and Enclosures

Similar documents
WINDOW AND DOOR REPLACEMENT REQUIREMENTS

STANDARD OPEN PATIO COVER

BUILDING PERMIT SPECIFICATIONS

2. What building projects are exempted? (permit not required)

TYPICAL PATIO COVERS 111

The replacement or modification of existing windows shall comply with the following requirements:

Single Family Residential Basement Finish

Preparation for 2015 Residential Code Changes Discussion with Local Builders and Designers

MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

How To Build A Basement House

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

Sample Drawing Package for One and Two Family Dwelling Applications

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Building Code Clarifications - 7. Fire Resistance

RESIDENTIAL WINDOW REPLACEMENT

BUILDING SAFETY UNIT

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

The City of Basehor, Kansas

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

COMMONLY USED RESIDENTIAL BUILDING CODES

CITY OF FAIRFAX CODE ADMINISTRATION / FAX

REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

Residential Decks. Planning and Development Services Department

Solar Panel Installations

A Guide to Detached Residential Garages and Residential Workshops (based on 2006 BCBC)

Vestibule Case Study. Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, , ]

Number of Sides Required to Have a Handrail

Maximum Floor Area and Maximum Development Area

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

SECTION 19 RESIDENTIAL CONSTRUCTION IN FLOODZONES

WHEN IS A PERMIT REQUIRED?

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

Current as of 11/10/08 1 of 1

Site Development Information Worksheet for single family residential development

County of Riverside Building and Safety Department

dpd 316 Seattle Permits Tip Subject-to-Field-Inspection (STFI) Permits Projects that Qualify as STFI

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

Solar Water Heating and Photovoltaic Electrical Systems Installed on One or Two Family Dwellings

COMMONLY USED RESIDENTIAL BUILDING CODES

A Guide for the Homeowner/Builder

Appendix B Florida Building Code Building Section Public Shelter Design Criteria

City of Morro Bay Building Division 955 Shasta Ave., Morro Bay, CA ,

How To Plan Out An Array Of Solar Panels

Concord Building Department Frequently Asked Questions

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS

Exterior Elevated Elements Inspection Guidelines

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

Certification: Building Plans Examiner. Exam ID: B3

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

PERMITS REQUIRED & PERMIT EXEMPTIONS

City of Riverside Building & Safety Division Phone: (951)

Detached accessory structures that contain no conditioned floor area are exempt.

Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured.

Guideline for Fire Safety Elements of Solar Photovoltaic Systems July 17, 2008 Rev: 1/1/10

Bureau Veritas Contact Information

Building Permits: When are they required?

Los Angeles Fire Department Requirement No. 96 SOLAR PHOTOVOLTAIC SYSTEM

GUIDELINES FOR WIRING SINGLE FAMILY DWELLING UNITS


The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

RESIDENTIAL WOOD DECKS

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

Attached/Detached Patio Cover/Carport

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

Charter Township of Shelby Harry Reese Building Director

Botetourt County, Virginia. Frequently Asked Questions

Building Department John Fiedler Construction Official Ext SAMPLE GUIDE FOR 1&2 FAMILY DWELLING BASEMENTS Rev

Mobile Home Pre-Inspection Checklist

How To Make A House Safe

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

C I T Y O F P E A R S A L L

building_inspection_faqs

Development Services Department Building Permit & Inspection Services Shed and Garage Construction Guide for Detached and Semi-Detached Dwellings

How to secure your property after a disaster

SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION

Questions and Answers for Heating and A/C Contractors

Report for. Dick and Jane Homeowner Lovers Lane, Houston, Texas 77000

Saint Cloud Business Center

PERMIT APPLICATION REQUIREMENTS FOR RESIDENTIAL ROOF MOUNTED PHOTOVOLTAIC SYSTEMS

INCORPORATION BY REFERENCE OF INTERNATIONAL. (1) The Department of Labor and Industry adopts and incorporates by

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

Solar Water Heating and Solar Electric Generators Installed on One or Two Family Dwellings

SOLAR PV SYSTEMS PERMITTING PROCESS

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

Part I: Overview and Procedure

General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.

Mark Cramer Inspection Services, Inc.

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

Pennsylvania Uniform Construction Code Homeowner s Guide

HOMEOWNER S PERMIT GUIDE

RRIO Checklist. Use of checklist: Definitions: Limitations

Residential Accessory Buildings

Transcription:

CITY OF NEWARK, CALIFORNIA Covers and Enclosures BUILDING INSPECTION DIVISION 37101 Newark Boulevard, Newark, CA 94560-3796 510-578-4261 Fax 510-578-4307 e-mail: building.inspection@newark.org Revised: July 16, 2010 GENERAL covers and enclosed patios require building permits. This document addresses questions commonly raised by homeowners and contractors. The following information only addresses patio and patio enclosures, which are attached to a single-family dwelling. For information on stand-alone accessory structures, please refer to Building Inspection Form No. B-56 titled Residential Accessory Structures. LOCATION In general patios must be set back at least five feet (5') from side property lines and fifteen feet (15') from rear property lines. However, setback standards differ throughout the City. Please call the City Planning Division at (510) 578-4330 for information specific to your property. PROHIBITED USES (enclosed patios) Enclosed patios can be used only for recreational, outdoor living purposes and not as carports, garages, storage rooms, living or family rooms, or other habitable rooms. Enclosed patios cannot be heated. ENCLOSED PATIOS Appendix Chapter I of the California Building Code has been adopted by the City. It allows for the enclosure of normally open patios provided the following standards are met. s installed in a U shaped configuration can not be enclosed. The open side of the patio must remain open with no glazing or screening. The highest portion of any enclosed patio can not exceed 12 feet above adjacent grade. Enclosure walls can be of any configuration, provided the open or glazed area of the longer wall and one additional wall is equal to at least 65 percent of the area below a minimum of 6 feet 8 inches of each wall, measured from the floor. Areas counted as open are the net free areas of openings and include openings with screens or glazing. Support mullions between windows can not be included as open area. The portions of the enclosure considered open can be left completely open or covered with insect screening, 1/8 inch minimum thick translucent or transparent plastic, or tempered glass. Window coverings can be permanently installed or they can be removable. Covered patios in which emergency egress or rescue openings from sleeping rooms open into a patio shall not be enclosed. An enclosed patio may be installed over exterior openings in a dwelling which provide natural light and ventilation for the dwelling provided all the following standards are met; \\Nwkfile\vol1\Shared\PUBWRKS\BLDGINSP\Bldg Insp Masters\B-74-_Enclosures_2007_CBC.doc Page 1 of 4

o Openings between the dwelling room and the patio enclosure shall be thermally isolated. Doors shall be weather stripped and windows shall be dual glazed. o The new clear opening (doors and operable portions of windows) between the dwelling room and the patio enclosure shall be not less than 8 percent of the dwelling room floor area, but not less than 20 square feet. o The openable (doors and/or operable portions of windows) area of the patio enclosure walls shall be no less than 5 percent of the combined floor area of the dwelling room and patio enclosure. o The patio enclosure shall have at least one 36 inch wide by 80 inch high door opening to the exterior of the enclosure. Thresholds for patio enclosures must meet height requirements. 7-3/4 Max 3/4 sliding 1/2 others Threshold Walking surface at interior landing must be dead level Exterior landing can have a maximum 2% slope DRAWINGS Wood Framed Wood framed patio covers can be built using standards shown in Building Inspection Form No. B-41 titled Wood Covers. You may also design your own. For complicated patio cover designs, assistance from a licensed architect or engineer may be required. Provide three copies of these drawings. You will also need to provide a site plan, drawn to scale showing the property lines, existing structures, proposed patio cover or enclosure with dimensions, and dimensions between the patio cover or enclosure and property lines and any other detached accessory structure. The City provides a form for the site plan. DRAWINGS Factory Built Modular There are a number of companies that manufacture and install metal patio covers and enclosures. These manufacturers provide standard drawings, which have been pre-approved by the International Conference of Building Officials (ICBO). Provide three copies of these drawings. You will also need to provide a site plan drawn to scale showing the property lines, existing structures, proposed patio cover or enclosure with dimensions, and dimensions between the patio cover or enclosure and property lines and any other detached accessory structure. The City provides a form for the site plan. DRAWINGS Light Duty Sheet Metal There are a number of retail stores that sell lightweight metal patio covers designed for the do-ityourself person. The manufacturers of these units provide standard drawings, which have been pre-approved by the International Conference of Building Officials (ICBO). Provide three copies of these drawings. You will also need to provide a site plan drawn to scale showing the property lines, existing structures, proposed patio cover or enclosure with dimensions, and dimensions between the patio cover or enclosure and property lines and any other detached accessory structure. The City provides a form for the site plan. \\Nwkfile\vol1\Shared\PUBWRKS\BLDGINSP\Bldg Insp Masters\B-74-_Enclosures_2007_CBC.doc Page 2 of 6

FOUNDATIONS covers and enclosures can be installed directly on new or existing concrete slabs provided the concrete is at least 3-1/2 inches thick, is in sound condition, and does not support posts with loads higher than 750 pounds. Depending on the weight of the patio cover, 50 to 60 square feet of patio roof equals 750 pounds. ELECTRICAL Any electrical lights, switches, or outlets shall be installed per the California Electrical Code. Wiring shall be installed in metal or plastic electrical conduit (not plastic sprinkler pipe) or run within the structure. All electrical plugs shall be ground fault interrupted (GFI) protected. For enclosed patios, any new electrical wiring shall be fed by a new circuit. Extending an existing circuit is prohibited, unless it can be demonstrated that the area served by the extended circuit will be less than 640 square feet for 20 amp circuits or 480 square feet for 15 amp circuits (existing floor area plus new enclosed patio area). INSPECTION Open Side Wood Frame The number of inspections required depends upon the complexity of the construction. Open framed structures with metal roofs and located on an existing concrete patio slab only require a single inspection conducted when the construction is completed. If foundations are installed then an additional inspection is needed. If the roof is a hot-mopped or torched-downed type of material over a wood deck then an additional inspection is needed of the plywood deck before the roof covering is installed. The inspector will verify: Compliance with the approved plans Proper type and quantity of fasteners Layout in relation to property lines Proper roof panels Electrical wiring and GFI breakers, if any Minimum open area INSPECTIONS Factory Built Modular Factory built metal patio enclosures generally require two inspections. First Inspection Will occur after the wall base track and the track attached to the existing structure, which will support the roof, are installed but before any wall or roof panels are installed. The inspector will verify: Compliance with the approved plans Proper tracks at both sill and wall Proper type and quantity of fasteners Layout in relation to property lines Potential issues with existing or proposed landings Second inspection Will occur after the patio enclosure is finished. The inspector will verify: Proper wall and roof panels \\Nwkfile\vol1\Shared\PUBWRKS\BLDGINSP\Bldg Insp Masters\B-74-_Enclosures_2007_CBC.doc Page 3 of 6

Proper type, quantity, and spacing of fasteners Location and size of landings Weather proofing at existing wall and new roof intersection Electrical wiring and GFI breakers (random panels should be left off so inspector can see wiring, which may be inside wall panels) New circuits, if needed Minimum open area Glazing or screen type INSPECTIONS - Open Sided Light Duty Sheet Metal Most light duty sheet metal patio covers require only one inspection. This inspection will occur after the patio cover is finished. The inspector will verify: Compliance with the approved plans Proper type and quantity of fasteners Layout in relation to property lines Proper roof panels Electrical wiring and GFI breakers, if any Minimum open area COST OF PERMITS The cost of a permit is based upon the number of inspections needed plus plan review costs and application fees. PLAN REVIEW All patio covers and enclosures require a plan review which normally can be accomplished over-thecounter while the applicant waits, provided both Building and Planning staff are available. In order for contractors of enclosed patios (sun rooms) to obtain an over-the-counter plan review they need to do the following: Provide three (3) sets of plans of the standardized drawing. Provide a site plan, drawn to scale showing the property lines, existing structures, proposed patio cover or enclosure with dimensions, and dimensions between the patio cover or enclosure and property lines and any other detached accessory structure. The City provides a form for the site plan. Provide a dimensioned floor plan drawn to scale showing the enclosure walls, in addition to window and door locations for both the patio and adjacent main dwelling. Circle the applicable details from the standard plans utilized for the subject project. Please use a heavy dark pen rather than yellow highlighter. Yellow highlighter will not microfilm. Provide calculations demonstrating compliance with the 65 percent open requirement (please note that mullions between window panels cannot be counted as open area.) \\Nwkfile\vol1\Shared\PUBWRKS\BLDGINSP\Bldg Insp Masters\B-74-_Enclosures_2007_CBC.doc Page 4 of 6

12' max. 12' max. Only open area below 6'-8" is counted as required open and/or glazed area L = Longer Wall S = Shorter Wall Open and/or glazed areas L = Longer Wall S = Shorter Wall Open Two Sides Open and/or glazed areas L = Longer Wall S = Shorter Wall Open Partially Open Two Sides Open No glazing or screening allowed Open Three Sides Open and/or glazed areas Open wall Open One Side No glazing or screening is allowed on the open side of patios with only one exposed side \\Nwkfile\vol1\Shared\PUBWRKS\BLDGINSP\Bldg Insp Masters\B-74-_Enclosures_2007_CBC.doc Page 5 of 6

Do not count area above 6'- 8" 6" 11'- 0" 4'- 6" 1'- 0" 4'- 6" 6" 1'- 4" Minimum Height = 7'- 0" 6'- 8" 5'- 4" Glazed and/or open area Do not count posts or mullions between windows or open areas Opaque wall surface Sample Calculation For Determining Compliance With Minimum Glazed and/or Open Area Minimum glazed and/or open area below 6'- 8" is 65% of the gross wall area below 6'- 8" Gross wall area below 6'- 8" = 11'- 0" x 6'- 8" = 73.4 sf Required glazing and/or open area below 6'- 8" = 73.4 sf x 65% = 47.7 sf Glazed and/or open area provided below 6'- 8" = 4'- 6" x 5'- 4" = 24 sf x 2 windows = 48 sf 48.0 sf is greater than 47.7 sf - Therefore, configuration complies with minimum standards \\Nwkfile\vol1\Shared\PUBWRKS\BLDGINSP\Bldg Insp Masters\B-74-_Enclosures_2007_CBC.doc Page 6 of 6