Installation Instructions for the Max/Lab Wall Rail System

Similar documents
Alpha System ADAPTABLE KEWAUNEE LABORATORY FURNITURE. encouraging new discovery

INSTALLATION INSTRUCTIONS

DE Frame with C Series Sidelight

Integral Kit Instructions

Installation Instructions For Slider Casement Air Conditioners

Ceiling Mounted Folding Attic Ladders Installation Instructions

Speed-Mat Rectangle Cutter

Dell E Series Monitor VESA Mounting Bracket Installation Instructions

DIY CABINET REFACING INSTALLATION GUIDE

Guidelines for Earthquake Bracing of Residential Water Heaters

WARNING! DO NOT ATTEMPT TO INSTALL THIS KIT IN A POWERED CONVEYOR.

Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair

Dell P Series Monitor VESA Mounting Bracket Installation Instructions

2. The Laboratory Fume Hood Specification Catalog Select the style and size hoods appropriate for your layout and laboratory use.

Horizontal Mini Blinds Installation Guide

Installation Instructions

Installation Instructions

FIX TURE CARRI ERS. 140(a) MPB-2011-USA

Hollow or Cinder Block Wall Mount Job Aid

FTC DIY Mountain Build Guide

Assembly GUIDE. display wine cellar kits. Required. Suggested. Questions? or visit wineracksamerica.com

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

Chapter 10 - Scaffolding Systems

Banner Clip Installation

Base Cabinet with Self-storing Folding Doors and Floor

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

Stair Railing. Installation Guide

Installation Instructions

PART 1 GENERAL 1.1 SECTION INCLUDES

ATS Overhead Table Shelf System INSTRUCTION MANUAL

majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

Clad Direct Glaze Window Installation Instructions

How To Install Your Frameless Shower Enclosure

screens U N D E R S TA N D I N G S C R E E N S PA N E L WA L L A D D - O N S C R E E N B A S I C S...9 3

DIRECTIONS FOR ASSEMBLING BASE & WALL CABINETS

Ladder Shelf Plans Final dimensions: 25 L x 21 W x 72 H

Basic Spring Motor Roller Shades

Stair Parts Installation. Tricks

The minimum reinforcement for the stem wall is the placement of:

Installation. Basic Rack Power Distribution Unit for Blade Servers

Canvas Office Landscape Wall Strip Installation and Disassembly for Recycling Instructions

Vinyl Greenhouse Window Page 2 of 6 New Contruction Installation Instructions

HOW TO INSTALL A BEAUTIFUL NEW KITCHEN

Wisconsin Building Products Evaluation

Retail Reception kiosk

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

HermanMiller Aeron Posturefit Installation AE905A AE905B AE905C

BUILD A TABLETOP LOOM

Panel Track Installation Guide

Many Styles and Custom Options

TREX SELECT RAILING. Installation Instructions BUY TREX PARTS G * I ** H *

149mm. Walk-Thru Assembly Gate. MODEL NO: 1161, 1167 Owner s Manual.

Lathe Milling Attachment

All-Season Sunroom Sliding Glass Door Installation Instructions

Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug.

CRASH RAIL INSTALLATION HEIGHT

Assembly Instructions Model 1544 Heart-Of-The-Kitchen Island

Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide

Brick Veneer Construction

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

Information Technology Solutions

PS6500 Storage Arrays Rack Mount Instructions

INSTALL INSTRUCTIONS KK-C-HVAC-1 HVAC UNIT CHEVROLET/GMC VANS FOR

FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

SPIRAL STAIR KIT INSTALLATION MANUAL

Installation Manual. Toilet Partitions, Dressing Compartments & Shower Stalls

Cooktop Low-Profile Ventilation Hoods

NATURAL RAILING INSTALLATION INSTRUCTIONS

Installation Instructions

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

GeekDesk Max Instructions for Assembly & Use

Guidelines for Earthquake Bracing Residential Water Heaters

19" Data Racks. Adjustable feet To compensate for uneven floors and assure great stability all feet can be up to 20 mm adjusted.

Can you design a frameless shower enclosure that doesn't leak?

Packaged Terminal Air Conditioner Wall Sleeve Installation

Hybrid Display System

glass & Glazing Products

INSTRUCTION MANUAL AND PARTS LIST MODEL 14-10

Picnic Table Plans. Made out of a single sheet of plywood, it s also portable! By Kevin Ayer. This children's picnic table would

Wren Kitchens Installation Tips Carefully check your kitchen delivery Measuring out and marking up Fitting the base cabinets...

C O N V E Y O R C O M P O N E N T S C H A I N S B E L T S B E A R I N G S

K17.11 DOOR BOLTS K17 DOORS

Installing Shutters using Fasteners

Universal Gauge Measuring System USERS MANUAL

Aluminium systems profile selection

Vector Frame Monitor Kiosk 02

To Purchase This Item, Visit BMI Gaming

PRO PANELS the artist s choice in display designed by artists, for artists. voice: fax:

19 DYNAmax Free Standing Server C A B I N E T s

Saferand easierinstallation

EZ-48-3AB Weather Station Mounting Tripod and Mast

CONFER ABOVE GROUND CURVE STEP / ABOVE GROUND CURVE STEP SYSTEM ASSEMBLY AND INSTALLATION MANUAL

PITCHED ROOF STRUCTURES

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

Slide the new steering column shaft through the steering column from the driver compartment.

Pulleys and Belt. Install the Major Accessory and Pulley. Install the Motor Pulley NOTE. Align the Motor Pulley and the Tool Pulley NOTE

installation guide ACTIV-1

Transcription:

Hamilton Laboratory Workstations PL-737- PL-737-1 0 April 07 Part No. 60016 USA 1

with No. 2 & 3 tips. Single Slotted Optional Insert Panel (Fabric or steel facing) Double Slotted Optional Rail Covers (Two per set) Single Slotted Bottom Rail to Top Illustration 1 Above-Counter System The most important aspect this system is that walls must be plumb, smooth and that proper grounding be used for rail support. Note: 1. The wall this system attaches to must be securely anchored at the floor and ceiling. 2. If walls are not plumb and smooth, shims will be required for proper system alignment. If not securely anchored the system is unsafe and can not support specified weights. 3. Mounting hardware is not provided for this system because the variety materials used for wall construction. 4. System requires No. 10 screws for attaching to the wall. One No. 10 screw required every 12" on our top and bottom horizontal rails. If screws are not securely anchored into the blocking add an additional screw in the same area. No. 10 Panhead screws are required for attaching the horizontal rails. No. 10 Flathead screws are required for attaching the vertical rails to the wall, and these screws will be 1" longer than the No. 10 Panhead screws. Illustrations 1, 2, 3, & 4 are examples typical assemblies with various options. Illustration 5 is wall blocking details. 47.937" to Bottom PL-737-1 PL-737-0 April 07 Part No. 60016 USA 2 Thermo Fisher Scientific 1316 18th Hamilton Street, Laboratory Two Rivers, Workstations WI 54241

Single Slotted Optional Insert Panel (Fabric or steel facing includes Mid-Rail and one Cover Rail) Mid Rail (Required only when insert panels are used) 37.312" to Bottom Mid Rail Optional Rail Covers (Two per set) Double Slotted Single Slotted to Top Top Horizontal Rails Bottom Rail Optional Rail Covers Illustration 2 Full-Height System to Bottom Bottom Rail Island Panel Island Panel Support to Top to Bottom Bottom Rail Illustration 3 Full-Height System with Island Panel Thermo Hamilton Fisher Laboratory Scientific Workstations 1316 18th Street, PL-737- PL-737-1 0 ril 07 Part No. 60016 USA 3

Vertical Support Rails Island Core Support Panel Middle to Top Opening for Plumbing Island Core 37.312" to Bottom Middle Top Horizontal Rail Bottom Horizontal Rail 2" X 6" 2" X 6" 2" X 6" 2" X 6" 34.45" 80.094" 48.2" 1.06" Illustration 5 Wall Blocking Detail 0.44" Illustration 4 Full-Height System with Island Core to Bottom 2.817" Cross Section Wall PL-737-1 PL-737-0 April 07 Part No. 60016 USA 4 Thermo Fisher Scientific Hamilton Laboratory Workstations 1316 18th Street,

MAX/LAB WALL RAIL SYSTEM 1-1/4" 1-1/4" 84-13/16" 4-15/16" Installing Full Height System (See Page 7 for Installing Above-Counter System) 1. With a level, check the floor at the installation area for its high point. This point will control the assembly height. 2. When starting an assembly at an inside corner wall, mark a plumb line 1-1/4" from the corner that starts from the floor to a height 85". Note: If assemblies meet at the corner and it is not plumb, control the 1-1/4" horizontal space at the 37-5/16" height to insure that the corner table can be mounted. See Illustration 8. If only one assembly is required at the corner place the top and bottom horizontal rails tight and plumb to the corner. See Illustration 7. Make this mark light enough so it can be easily removed later. If the assembly is in the middle a room, mark a plumb line as a starting point at one end the assembly. 3. Starting from the high point the floor, measure up and mark a line at the height 4-15/16", (37-5/16" if an upper facing insert panel is required) and 84-13/16". These lines must align with the vertical plumb line. See Illustration 6. 4. Continue to position and attach the upper and lower horizontal rails end-to-end until the desired length assembly is completed. If the horizontal rails are too long, cut f the excess as shown in Illustration 8. Note: The top and bottom horizontal rails are in 8-foot lengths only. If you want to use the excess, you must cut f the section as shown because the width the saw cut will destroy the modularity the system. See Illustration 8. Illustration 6 Guidelines for L-Saped Good Section 37-5/16" Illustration 7 Tight to Corner Saw Cut Discard This Section Good Section 11/64" Illustration 8 Cutting Horizontal Rails to Shorter Lengths 11/64" Thermo Hamilton Fisher Laboratory Scientific Workstations 1316 18th Street, PL-737- PL-737-1 0 April 07 Part No. 60016 USA 5

Top Horizontal Rails MUST BE FLUSH Vertical 5. If your layout requires a Max Island Panel projecting out from the system, you will need to cut the top and bottom horizontal rails at the six-inch increment (as shown in Illustration 8) and insert the panel support bracket as shown in Illustration 9, then continue on with the horizontal rails. Note: If you need to project out with a Max Island Core you do not have to cut the rails, just insert the core support panel. See Illustration 10. Island Panel Panel Support to Top Vertical Support Rails 37.312" to Bottom Middle Island Core Support Panel Illustration 9 Panel Support to Bottom Middle to Top Opening for Plumbing Island Core 37.312" to Bottom Middle Illustration 10 Core Support Panel to Bottom PL-737-1 PL-737-0 April 07 Part No. 60016 USA 6 Thermo Fisher Scientific 1316 18th Hamilton Street, Laboratory Two Rivers, Workstations WI 54241

Illustration 11 Middle Rail for Insert Panels MIDDLE MARK 6. Insert and attach the vertical rails with four No. 10 flat-head screws starting with a single member at the corner. Note: The top and bottom rails are notched on six-inch centers, to ensure proper system modularity. Measure over the desired number feet and insert a single- or double-slotted upright, or core support panel as required and continue this process until the set up is complete. 7. If insert panels are required, align the bottom the middle rail flush with the marked line and attach with No. 10 pan-head screws and then insert the top the insert panel into the top rail and let the insert slide down into the lower rail. See Illustration 11. 8. If the optional rail covers are required, insert and attach with No. 10 pan-head screws. Thermo Hamilton Fisher Laboratory Scientific Workstations 1316 18th Street, PL-737- PL-737-1 0 April 07 Part No. 60016 USA 7

Installing Above-Counter System 1. With a level, check the floor at the installation area for its high point. This point will control the assembly height. 2. When starting an assembly at an inside corner wall, mark a plumb line 1-1/4" from the corner that starts from the floor to a height 85". Note: If only one assembly is required at the corner, place the top and bottom horizontal rails tight and plumb to the corner. See Illustration 12. Make this mark light enough so it can be easily removed later. If the assembly is in the middle a room, mark a plumb line as a starting point at one end the assembly. 3. Starting from the high point the floor, measure up and mark a line at the height 47-15/16" and 84-13/16" where the assembly is to be installed. See Illustration 13. 4. Continue to position and attach the upper and lower horizontal rails end-to-end until the desired length assembly is completed. If the horizontal rails are too long, cut f the excess as shown in Illustration 8. Note: The top and bottom horizontal rails are in 8-foot lengths only. If you want to use the excess, you must cut f the section as shown because the width the saw cut will destroy the modularity the system. See Illustration 8. 5. Insert and attach the vertical rails with two No. 10 flat-head screws starting with a single member at the corner. Note: The top and bottom rails are notched on six-inch centers, to ensure proper system modularity. Measure over the desired number feet and insert a single- or double-slotted vertical rail. 6. If insert panels or rail covers are required, insert the top the insert panel into the top rail and let the insert slide down into the lower rail. Attach the rail covers with two No. 10 pan-head screws. 84-13/16" 1-1/4" 47-15/16" Illustration 12 Guidelines for L-Saped Above-Counter Illustration 13 Tight to Corner or in Middle Wall 1-1/4" PL-737-1 PL-737-2 0911 April 07 Part No. 60016 USA 8 Thermo Fisher Scientific Hamilton Laboratory Workstations 1316 18th Street,