Your Company Name. Your Company Address Your City, State, Zip Your Phone Number Your Email Address. Project Information



Similar documents
YOUR COMPANY NAME HERE

2ND CHANCE WATER RESTORATION

Your Company Name. Your Company Address Your City, State, Zip Your Phone Number Your Address. Project Information

Estimated Cost of Repair

Invoice. Subtotal. Balance Due. Sample Corporation c/o Property Manager Anywhere Avenue, North York, ON. Total.

7.0 REHABILITATION /RESTORATION / MAINTENANCE PLAN

IMPROVEMENT COST ESTIMATE powered by HomeFixers

Fire, Wind, Water. Small claims are fairly easy to estimate and can be done on the back

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

Estimator: Miami Estimates Business: (305) Date Entered: 04/30/2008

47 Levencourt Way London SW8 1HR. Tenant: Eric Stevenson Prepared for: Elizabeth Collins

CONDITION OF QUALITY ITEMS

Katharine Teats House HABS No. CA Seventh Avenue San Diego San Diego County /J/Vf# <? California /WtO

PELICAN BUILDERS, INC. Plan A

PROPOSAL. Prepared for: Craig Mottram & Family, 118 Rangoon Rd. Prepared by: Carlos Andrade, Owner & Operator. Brandon Andrade, Project Coordinator

Spring Valley Trails Quick Move In & Inventory Towns Colours have been selected for some of these unit. See Agent for details.

8629 S. Kimbark, Chicago, IL PROJECT SPECIFIC SCOPE:

CITY OF SHAKER HEIGHTS HOUSING INSPECTION DEPARTMENT 3450 LEE ROAD SHAKER HEIGHTS, OHIO (216) POINT OF SALE CERTIFICATE OF INSPECTION

ND ND ND ND NA ND ND ND ND NA. ND No Access Dog in room >D 25% ND ND ND ND ND ND ND ND ND NA NA NA

The Roosevelt Triangle

DIVISION 1 THIRD FLOOR COUNTY ATTORNEY. Remediation Plan Remove approximately 6 SF of mold impacted drywall Remove all carpeting in hatched.

SAMPLE QUOTE FROM: JOE THE BUILDER

5000 Series House Plans & Pricing

Texas Deparmtment of Housing and Community Affairs Community Development Block Grant (CDBG)

Historic Preservation Certification Application Part Main Street West South Haven, Vermont NPS Project No

The Verona 4 BEDROOMS I 3 ½ BATHS I 3,220 SF I PLAN 4628

QUOTATION FOR EXAMPLE BATHROOM RENOVATION

Photo 1: This photograph shows drywall, joint compound, cove base mastic, carpet adhesive, and ceiling tile in store front No. 1.

#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check

Damage and Dilapidations Report

Back Porch. Insulation Option # 2 Includes Option #1 plus, Insulate Walls Separating Both Master Suites and Leisure Room

Page 1 of 5. Exterior Finish. 1.) 8 textured lap siding. Roofing. 1.) 30-year dimensional shingles over a layer of 30# felt. Color is Weathered Wood.

The UPLANDS at ORO VALLEY Sterling Features

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

Proudly Presenting Twinflower Crescent

Cut Construction Costs: 20 Proven Techniques

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

CITY OF UMATILLA AGENDA ITEM STAFF REPORT

Borges Construction Company A limited liability Corporation Page1 of 1

Building Condition Assessment Report

Vari Inspection Services

Home Warranty Inspection Report

Georgia Home Inspection Services

Estimating Database Checklist

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

PROPERTY INSPECTION REPORT

Inspection Report. Dream Home Inspections Second Ave. Frisco CO (970)

CHRIS CURLES and ASSOCIATES INSPECTION SERVICES

The Keys to Finding BUYERS. Marketing and Listing Strategies to Sell Your Home Quickly. MikeFerrie.com (850)

SUMMARY REPORT THE BOTTOM LINE. Electrical. Report Number: Inspection Date: Saturday, February XX, XXXX

Dispute Resolution Services

PROFESSIONAL ENGINEERING INSPECTIONS, INC.

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

The Carriage Homes at Woodland Pond Phase III & IV

Substantial Improvement/Damage (FEMA 50% Rule) Frequently Asked Questions and Information

@hba_sudbury. Buying A New Home. Presented in Partnership with. Greater Sudbury Public Library PHONE SDHBA:

We are pleased to submit the summary of charges and proposed costs as a result of the damges created by the flood.

BEFORE THE MARYLAND INSURANCE ADMINISTRA1~ION

Converting an existing house in Dallas for two people with MCS

HEDDERMAN ENGINEERING, INC. Office , Fax

Damage Charge Lists. FLOORING Replace Repair Carpet per square foot (Mohwak heat carpet tile)

REQUEST FOR PROPOSALS. Unit Make Ready Services for Public Housing for HOUSING AUTHORITY OF THE CITY OF MCKINNEY, TEXAS

31 Linden Lane Kirby Muxloe Leicestershire LE9 2EG

Sample Rehabilitation Proposal: Narrative

Specification Of Repairs

Title: Attic Keyword: Structure Description: roof framing rafters and decking File Name: P

SUMMARY OF WORK FOR GENERAL CONTRACTOR

NEW HOME LIMITED WARRANTY. Healy Homes LLC KINGSTON PIKE SUITE 250 KNOXVILLE TN office fax

SITE OVERALL CONDITION COMMENTS

STERLING SPRINGS. Irrigation System Front & 2 Sides Yard 9 Ceiling First Floor

Winter Growth Water Damage Restoration Showcase

Stanley Martin Custom Homes

Open House and Home Tour Checklist

Substantial Improvement/ Damage Review

Stanley Neighborhood Series

Loft Apartments - Approximately 780 square feet Full size in-unit washer and dryer - Fully equipped kitchens - Controlled access entry

GUIDELINES FOR WIRING SINGLE FAMILY DWELLING UNITS

Commission Districts Affected Facilities and Transportation Services Department

QUIKHOUSE. Quik Satisfaction.

Insulation R-Value Comparisons

How To Prevent Water Damage To A Home

COMMONWEALTH OF MASSACHUSETTS DISTRICT COURTS DEPARTMENT CHELSEA DIVISION C.A. NO.

NAHB PRODUCT DEFINITION

Mold In Your Home and at Work

GENERAL WIRING RULES FOR HOUSES

(02) Peel Street TAMWORTH STANDARD INCLUSIONS (Residential)

Summit Series Single Section and Double Section Homes

2015 Maintenance Tenant Charge Schedule

SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS

Every Home Offers Special Features

PRE-PURCHASE INSPECTION REPORT

HEDDERMAN ENGINEERING, INC Carrie Cove Ct., Spring, TX , fax

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

Requirements for All Developments. Requirements for New Construction

WITH A GOOD FAITH EFFORT BY BOTH TENANTS AND LANDLORDS, WE CAN KEEP MOLD OUTSIDE, WHERE IT BELONGS.

INSPECTION CONNECTION, INC.

The Peaks Features List

S t e p h e n A l e x a n d e r

SOUTHWIND: PHASE IV UPGRADE TOWNHOMES

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10

Transcription:

Inc. Living Room : Repair water damage Remove Underlayment 236 Sf Remove Drywall From Walls (up 2') 31 SF Supply & Install Underlayment 236.25 SF Supply & Install 1/2" Drywall 105 SF Prime Wall(S) 105 SF Paint Ceiling 64 SF Supply & Install Baseboard 62 LF Prime Wall Moldings 62 LF Paint Wall(S) 496 SF Paint Wall Moldings 62 LF Supply & Install Padding (Good) 26.25 SY Supply & Install Carpeting (Good) 26.25 SY $2,108.97 Other Room : Stairway water damage repairs Remove Carpet & Pad From Steps 6 EA Remove Drywall From Walls (up 2') 32 SF Supply & Install 1/2" Drywall 32 SF Prime Wall(S) 32 SF Paint Ceiling 32 SF Paint Wall(S) 32 SF Install Carpet & Pad To Steps 11 SY $380.34 Page 1 of 7

Inc. Kitchen : Water damage repair R & R Major Appliances 2 EA Remove Underlayment 175.5 Sf Remove Trim 48 LF Remove Drywall From Walls (up 2') 23 SF Supply & Install Underlayment 175.5 SF Supply & Install 1/2" Drywall 55 SF Prime Wall(S) 55 SF Supply & Install Baseboard 53 LF Paint Wall(S) 318 SF Supply & Install Sheetgoods (Good) 19.5 SY $1,703.43 Kitchen : Laundry Area -- water damage repair R & R Major Appliances 2 EA Remove Underlayment 21 Sf Supply & Install Underlayment 21 SF Supply & Install Baseboard 9.5 LF Paint Wall(S) 76 SF Paint Wall Moldings 9.5 LF Supply & Install Sheetgoods (Good) 2.33 SY $278.68 Other Room : Pantry Closet -- water damage repair Page 2 of 7

Inc. Other Room : Pantry Closet -- water damage repair Remove Underlayment 12.02 Sf Supply & Install Underlayment 12.02 SF Supply & Install 5/8" Type-X Drywall 12.02 SF Supply & Install 1/2" Drywall 114.72 SF 24" x 80" Flush Hardboard Door BC: [$27.79 ] - (1 carpenter) 1 Ea Supply & Install Baseboard 14.34 LF Prime Closet Walls and Ceiling 1 EA Prime Wall Moldings 14.34 LF Paint Closet Walls and Ceiling 1 EA Paint Wall Moldings 14.34 LF Supply & Install Sheetgoods (Good) 1.33 SY $507.91 Bath 1 : Water damage repair Remove Trim 14 LF Remove Sheetgoods On Underlayment 30 SF Remove Underlayment 30 Sf Supply & Install Underlayment 30 SF 24" x 80" Flush Hardboard Door BC: [$27.79 ] - (1 carpenter) 1 Ea Supply & Install Baseboard 14 LF Prime Wall Moldings 14 LF Paint Wall Moldings 14 LF Supply & Install Sheetgoods (Good) 3.33 SY Page 3 of 7

Inc. Bath 1 : Water damage repair $385.50 Other Room : Hallway -- water damage repair Remove Underlayment 34.5 Sf Remove Drywall From Walls (up 2') 54 SF Supply & Install Underlayment 34.5 SF Supply & Install 1/2" Drywall 54 SF Prime Wall(S) 54 SF Supply & Install Baseboard 29 LF Prime Wall Moldings 29 LF Paint Wall(S) 54 SF Paint Wall Moldings 29 LF Supply & Install Padding (Good) 3.83 SY Supply & Install Carpeting (Good) 3.83 SY $474.58 Other Room : Closet Under Stairs -- water damage repair Remove Underlayment 27 Sf Supply & Install Underlayment 27 SF Supply & Install 1/2" Drywall 18 SF Prime Wall(S) 123 SF Supply & Install Baseboard 24 LF Prime Wall Moldings 24 LF Paint Ceiling 27 SF Page 4 of 7

Inc. Other Room : Closet Under Stairs -- water damage repair Paint Wall(S) 123 SF Paint Wall Moldings 24 LF Supply & Install Padding (Good) 3 SY Supply & Install Carpeting (Good) 3 SY $396.42 Bedroom 1 : Front Bedroom -- water damage repair Remove Underlayment 166.75 Sf Remove Drywall From Walls (up 2') 24 SF Supply & Install Underlayment 166.75 SF Supply & Install 1/2" Drywall 24 SF 30" x 80" Flush Hardboard Door BC: [$27.79 ] - (1 carpenter) 1 Ea Prime Wall(S) 24 SF Supply & Install Baseboard 52 LF Prime Wall Moldings 52 LF Paint Wall(S) 24 SF Paint Wall Moldings 52 LF Supply & Install Padding (Good) 18.53 SY Supply & Install Carpeting (Good) 18.53 SY $1,386.40 Bedroom 2 : Water damage repair -- other downstairs bedroom Page 5 of 7

Inc. Bedroom 2 : Water damage repair -- other downstairs bedroom Remove Underlayment 143 Sf Remove Drywall From Walls (up 2') 26 SF Supply & Install Underlayment 143 SF Supply & Install 1/2" Drywall 26 SF Prime Wall(S) 26 SF 30" x 80" Flush Hardboard Door BC: [$27.79 ] - (1 carpenter) 1 Ea Supply & Install Baseboard 48 LF Prime Wall Moldings 48 LF Paint Wall(S) 26 SF Paint Wall Moldings 48 LF Supply & Install Padding (Good) 15.89 SY Supply & Install Carpeting (Good) 15.89 SY $1,233.49 Total $8,855.70 Page 6 of 7

Inc. Summary $8,855.70 All materials are warranted by manufacturer. All work is warranted for one year after date of completion. Warranty does not cover damage caused by Settlement or Fill place by others on site; damage caused by machinery or other heavy vehicles; damage caused by other Trades on site, damage caused by bad weather or other natural causes. Tax TOTAL $0.00 $8,855.70 40% on Start and Balance upon Completion. Estimator Signature: Date: I/We agree to the above cost and specifications and authorize you to do the work as outlined above. Customer Signature: Date: Page 7 of 7