SAFETY AND HEALTH STANDARDS CRANES, HOISTS and LIFTING EQUIPMENT Effective Date: 05/10/11 Standard:16.4 Document Number: KUCSH0052 Rev:04

Similar documents
MATERIAL HANDLING PROGRAM (Section 10)

SAFETY AND HEALTH PPG INDUSTRIES, INC. -- LAKE CHARLES UNIT NAME RIGGING AND LIFTING SAFETY FOR PPG LAKE CHARLES

Safety Manual For Overhead Crane Operators

Boom and fly capacities for this machine are listed by the following sections:

TLILIC3003A Licence to operate a bridge and gantry crane

SAFE HANDLING OF PRECAST CONCRETE PRODUCTS

RESPONSIBILITIES IN MOBILE CRANE OPERATIONS CONSTRUCTION SAFETY ASSOCIATION OF ONTARIO

Mobile (Truck) Cranes

STANDARD PRACTICE INSTRUCTION

LOAD TEST PROCEDURE. Bridge, Gantry and Jib Cranes & Monorail Systems B001-R05/07

POTENTIAL HEALTH & SAFETY HAZARDS

Cranes and Lifting Equipment

EQUIPMENT SAFETY EARTHMOVING MATERIAL HANDLING NAVFAC MIDLANT

Owner s Manual Gantry Cranes

RT100 ROUGH TERRAIN CRANE DATASHEET - IMPERIAL. Features:

METHOD STATEMENT CRANE HIRE PROVIDING A CONTRACT LIFT SERVICE IN COMPLIANCE WITH BS7121 PARTS 1 & 3 AND LOLER REGULATIONS

Guidebook for Lifting Supervisors

Fall Protection Guidelines

Appendix 6145-T1 Forklift Use Practices

RT 780. RT USt Lifting Capacity Rough Terrain Cranes Datasheet Imperial. Features

Chicago Crane Operators Examination Study Guide

Technical Advisory for Safe Operation of Lifting Equipment. Programme-Based Engagement

Overhead Power Line Safety for Contractors

Aerial/Scissor Lift Program. Environmental Health & Safety Office

Owner s Manual & Safety Instructions

TÜV Middle East W.L.L. Welcome

FALL PROTECTION PROGRAM

Operator Training Questionnaire

FALL PROTECTION WORK PLAN

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

Tower crane. Code of Practice Workplace Health and Safety Queensland Department of Justice and Attorney-General

SAFE USE OF LIFTING EQUIPMENT

Tabela de Carga: Grove RT 522B - Comercial

June 22, Steve Johnson Operation Manager Best Roofing, Inc N. 288th St. Sioux City, IA Booker Elementary Safety Survey Omaha, NE

EMPLOYEE FALL PROTECTION

SITE SPECIFIC FALL PROTECTION PLAN

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

Operation of Fork Lift Trucks Procedure

How To Ensure Safety Of Lifting Equipment

OSHA Scaffold Standard for Construction. 29 CFR 1926 Subpart L

Contents. 1. Foreword Common accidents in lifting operations Legislative requirements and code of practice of lifting operations 2

Apprenticeship Curriculum Standard

CONSTRUCTION SAFETY SERIES: Crane Safety

Guidance on Lifting Operations in Construction When Using Excavators

2. Crane standing on firm, horizontal ground.

ELEVATED WORK POLICY

GUIDE TO TOWER CRANES 1

Walking and Working Surface Checklist:

Ladder Program and Training Materials

Memberships. W.F. Welding & Overhead Cranes Ltd. Since W.F. Welding & Overhead Cranes Ton Overhead Cranes. Jib Cranes.

INTERNATIONAL LABOUR ORGANISATION. REGISTER OF LIFTING APPLIANCES and ITEMS OF LOOSE GEAR

Supersedes: 10/15/09 (Rev. 5) Preparer: Owner: Approver: Team Member, Occupational Safety/Industrial Hygiene CoE

Working at Heights and Fall Protection

HAZARD IDENTIFICATION AND RISK ASSESSMENT PROCEDURES FOR DEEP SOUTH CRANE & RIGGING

LOCKOUT/TAGOUT PROGRAM. Table of Contents

CONTRACTOR CRANE AWARENESS WEB BASED TRAINING STUDENT GUIDE NCC-CCA-01

Trenching and Excavation Safety

SAFETY STAND DOWN Focus Four Hazards

Record of Performance Inspection and Test Crawler, Locomotive, Truck, and Wheel Cranes

`Fall Protection Guidelines in Construction

Powered Industrial Truck Safety Program

Names and Contact Numbers of Competent Rescuers Assigned to Job (Please print)

Fall protection systems and practices Duty to have fall protection Protection at or above 6' level.

Glossary of Common Crane Ter ms:

Elkhorn Construction, Inc. Safety Manual Title: Fall Protection Policy Effective Date:

What should you check for when inspecting a crane before maintenance?

Slings, Rigging and Lifting Equipment

Click here for Lessons Learned that may apply to the requirements in this LIR. Section Title Page In this

FATAL CRANE INCIDENT 22 nd nd October 2007

HOW HYDRAULIC TRUCK CRANES WORK

Fixed and Portable Ladders- A Guide to OSHA Rules

ALL TERRAIN HYDRAULIC CRANE

APPENDIX A UNIVERSITY OF MICHIGAN TRAINING PACKAGE FOR OVERHEAD OR GANTRY CRANES

A Guide to the Factories and Industrial Undertakings (Lifting Appliances and Lifting Gear) Regulations

CONSTRUCTION SAFETY. NOTE: Barriers, guards, and warning signs are required to ensure safety against existing hazards.

Fall Protection Program

Application for Approved (Overseas/Local) Third Party Inspection Agency for Lifting Equipment

EXCAVATOR SAFETY TRAINING

PROGRAM OUTLINE. Tower Crane Operator Program Outline

CRANE & HOIST PROGRAM

Table of Contents WARNING SYMBOLS AND DEFINITIONS

7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS

Nuclear Safe Work Practice 4.2. Operation of Light / Heavy Equipment

Ensure that the operator is properly trained and certified to operate the equipment in the material handling application at hand

Drew University Ladder Safety Program Policy and Inspection Procedure Draft 0412

OSHA Crane Operator Regulations and Recordkeeping

SECTION WINDOW WASHING SYSTEMS

Model Safety Program

Safety and Analysis in Material Handling of Construction Industry

CHAPTER 13 LOAD HOOKS

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR THE CONTROL OF HAZARDOUS ENERGY (LOCKOUT / TAGOUT) SECTION: 2400

Kidd Mine Barricade Standards

GEORGIA INSTITUTE OF TECHNOLOGY ENVIRONMENTAL HEALTH AND SAFETY LADDER SAFETY PROCEDURE

Scaffold Safety L O S S C O N T R O L A L E R T

WARNING! Failure to follow these inspection procedures can cause personal injury and property damage.

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.

Sample Fall Rescue Plan for Bridge Work

The following symbol denotes a generally compliant condition: The following symbol denotes a generally noncompliant condition:

Working Copy WP 05-WH1401. Revision 4. 6-Ton Electric Forklifts 74-H-010B. Technical Procedure EFFECTIVE DATE: 01/04/06. John Guy APPROVED FOR USE

Transcription:

SAFETY AND HEALTH STANDARDS CRANES, HOISTS and LIFTING EQUIPMENT Effective Date: 05/10/11 Standard:16.4 Document Number: KUCSH0052 Rev:04 16.4.1 INTRODUCTION 16.4.1.1 The purpose of this standard is to provide requirements for the operation, inspection, and maintenance of cranes, hoists and lifting equipment. This standard applies to all cranes including vehiclemounted cranes, equipment used as cranes, hoists, and lifting equipment. 16.4.2 REQUIREMENTS 16.4.2.1 A register of cranes, hoists, and lifting equipment must be established. 16.4.2.2 There must be documented procedures that require: o All rigging connections to be checked and correct prior to commencing a lift. o Checks that the load being lifted is within the rated capacity of the crane and lifting attachments, and is also within the limits set out in the lift plan. o Checks of all safety devices or overload limiters to ensure they are not overridden or disabled. 16.4.2.3 Each facility must develop a register of critical lifts and a documented plan for each critical lift to address the associated hazards. Critical lifts include all multiple crane lifts; lifts over power lines, process piping or vessels containing hazardous materials (steam, fuel, chemicals), or operating facilities which may endanger personnel; Personnel hoisting; non-routine lifts of 20 tons or more; or a lift of more than 85% of the crane's total load capacity. Crane operators and rigging crews involved in critical lifts must have input into the lifting plan and be consulted prior to finalization of the plan. A "Planned Critical Lift Permit" (Exhibit 16.4.1) must be completed and approved by a facility Superintendent. The lift plan must include: o Lift data: equipment weight, rigging weight, total weight, height of lift, radius of lift and equipment surface area, and center of gravity. o Equipment data: manufacturer, model, size, boom length, jib length, load block, and material size. o Rigging data: sling diameter, length, sling configuration, capacity, hook type, shackle size and capacity. Page 1 of 10

SAFETY AND HEALTH STANDARDS CRANES, HOISTS and LIFTING EQUIPMENT Effective Date: 05/10/11 Standard:16.4 Document Number: KUCSH0052 Rev:04 o Lift computation: boom length, radius of lift, equipment capacity, size of outrigger footplates, and wind speed. o Proximity to power lines and process areas: mobile cranes working in proximity to energized power lines must operate under a Close Proximity Permit (Exhibit 16.4.2), which must define exclusion zones and spotter duties. o Local hazards and their controls: including the route for the crane, ground stability, proximity of people or equipment, and agreed communication method. 16.4.2.4 Lifts not subject to a critical lift plan must be subject to a risk assessment. 16.4.2.5 There must be a documented and approved method for communication between the crane operator and those assisting with the lift. o Hand signals must be those prescribed by the applicable ANSI standard for the type of crane in use. An illustration of the hand signals shall be posted at the jobsite / work area. o When hand signals are used in directing the crane operator only one employee will be designated to give the signals. Any signal not understood by the operator will be taken to mean STOP. A STOP signal shall be obeyed no matter who gives the signal. 16.4.2.6 Load ratings must be clearly marked on each crane or hoist. o Labeling for capacities, safe lifting area, and other pertinent data must be kept clearly legible. o Any crane or hoist suspected of having been overloaded shall be removed from service and locked and tagged out until either repaired or re-certified by qualified personnel. o A procedure must be in place to prevent the use of lifting or rigging equipment in lifting operations if such equipment has been used for towing. 16.4.2.7 Where practicable or where the weight of a lift is uncertain, cranes should be fitted with a load cell (LMI - load moment indicator) with the weight of the load displayed in the visual range of the operator. Load-limiting devices shall be kept in good working order. 16.4.2.8 Cranes should be equipped with an anti two-block device or limit switch that includes audible and visual alarms. Page 2 of 10

SAFETY AND HEALTH STANDARDS CRANES, HOISTS and LIFTING EQUIPMENT Effective Date: 05/10/11 Standard:16.4 Document Number: KUCSH0052 Rev:04 16.4.2.9 All lifting hooks (except for grab and chain shortening hooks) will be fitted with the correct manufacturer safety latch to prevent the load from accidentally detaching, unless otherwise specified in a risk assessment. Blocks, hooks, balls, or crane loads must not be used for lifting or transporting personnel. 16.4.2.10 Loads must not swing over people or occupied buildings and no person may be under a suspended load or in a position where they could be struck by a falling load. Where there is a risk of a load falling and striking a person, barricading or similar controls to prevent access must be in place. The operator must not leave the crane controls while a load is suspended. 16.4.2.11 Overhead travelling cranes must be fitted with effective audible warning signals. 16.4.2.12 Tag lines must be attached to loads that require steadying or guidance while suspended. The load must be well secured and properly balanced in the sling or lifting device. Tag lines must be used when the possibility exists for the load being lifted to shift or swing into adjacent structures or when a swinging load may endanger people or property. 16.4.2.13 Mobile cranes must have a rating capacity chart fixed in a position visible to the crane operator or available in the crane cabin. Mobile cranes must meet mobile-equipment safety standards including horns, back-up alarms, seat belts, etc. o Operator control stations for vehicle-mounted cranes must be located in an area protected from swinging loads and from the crane jib. o Slew pins must be secured in place in mobile cranes while travelling. o Slewing to test the integrity of outriggers on mobile cranes must be conducted prior to commencing lifts. 16.4.2.14 Mobile cranes are prohibited from operating within 10 feet of energized power lines (greater distances are required for voltages above 50kV). Signs must be installed in all mobile cranes to inform the operator of this requirement. o A "Close Proximity Permit" (Exhibit 16.4.2) must be completed before conducting work that places a mobile crane within 15 feet of a powerline; within any fenced substation; within any work Page 3 of 10

SAFETY AND HEALTH STANDARDS CRANES, HOISTS and LIFTING EQUIPMENT Effective Date: 05/10/11 Standard:16.4 Document Number: KUCSH0052 Rev:04 area where exposed buses are present; or when moving loads over powerlines or substations. 16.4.3 MAINTENANCE and INSPECTION 16.4.3.1 There must be a documented process that ensures all critical components are inspected and in place prior to a crane being commissioned and put into service. 16.4.3.2 Crane operators must undertake a pre-operational safety check for each shift the crane is used and this should be kept with the crane. The detail required in the pre-operational safety check must be based on a risk assessment for the crane. The operator must report any malfunction to the supervisor immediately. A crane must not be operated with an inoperable or defective safety device. 16.4.3.3 Any crane brought to site must have a current test certificate and a pre-use safety inspection to ensure the crane is fit for purpose. As a minimum, this inspection must satisfy regulatory and manufacturer requirements for frequency of inspection and physical condition of the machine. 16.4.3.4 There must be a system for the inspection, maintenance and approval of lifting equipment, including a process that verifies the equipment is able to function to its design specifications and the integrity of: o Mechanical and electrical components. o Controls for each piece of lifting or rigging equipment. o Crane cables and all lifting attachments. o Structural components of the hoist, brakes, wheels, hooks, hookblocks and rails. o Integrity of load limiting devices, safety devices, limit switches and control systems required for individual equipment. 16.4.3.5 All welding procedures and welder qualifications used on loadsustaining members must be in accordance with AWS D14.3. Modifications or additions are prohibited without written approval from the manufacturer. 16.4.3.6 All cranes must be formally inspected on a monthly and annual basis. The inspections must be documented, and performed in accordance with manufacturer's recommendations and regulatory requirements. Inspections and repairs to cranes, cables and lifting Page 4 of 10

SAFETY AND HEALTH STANDARDS CRANES, HOISTS and LIFTING EQUIPMENT Effective Date: 05/10/11 Standard:16.4 Document Number: KUCSH0052 Rev:04 16.4.4 Training equipment must comply with the manufacturer s specifications and regulatory requirements as a minimum. All operations and maintenance inspection records, and cable tests records must be sent to the facility recordkeeping center and retained for one calendar year. 16.4.4.1 Personnel must be trained, competent and authorized if they operate cranes; set-up or rig loads; provide signals for controlling lifts; or inspect, maintain or test cranes, hoists, personnel cages, or lifting equipment. o Operators of cranes and hoists must be trained and capable of safely operating the hoisting equipment. There must be a system for establishing minimum operating time, frequency of operation and testing to ensure competency for each class of crane. Task training documentation for crane operation must be filled out as each employee is trained. Training documentation is to be sent to the facility recordkeeping center for recording and filing. REFERENCES: OSHA CFR 29 Part 1910.179-181. MSHA CFR 30 Subpart M, O, and R. ANSI/ASME B30. Equipment Manufacturers' Specifications. Rio Tinto Standard C6. Cranes and Lifting Equipment REVISION HISTORY: MOC# Description of Change Prepared By Date 15573 The standard was reviewed and updated by the C6 Standards Champion and Custodians to include lifting equipment and clarifications to the critical lift definition. Also, updated format and Document number added. KUC Safety and Health Standards Committee 04/11 Page 5 of 10

Exhibit 16.4.1 PLANNED CRITICAL LIFT PERMIT (Standard 16.4) REV 7 4/11 Permit will be posted at work site until work is complete or a new permit is issued. This permit must be reviewed every shift and reissued if a change in conditions or work scope has occurred. Expired permits shall be returned to the facility recordkeeping center for filing. This permit and supporting data must be submitted before any of the following lifts are made (check all that apply): A multiple crane lift Personnel Hoisting (See Safety and Health Standard 16.20) A non-routine lift of 20 tons or more An expected load lift is 85% or more of the crane s rated load capacity A lift over power lines, process piping or vessels containing hazardous materials, or operating facilities which may endanger personnel Is a Close Proximity Permit required? Yes No Originated By: Crane Operator: Work Description: Contractor Name: Date and Time Issued: Work Area / Location: Contractor Supervisor: AM PM TRACK completed for this task (Initials): 1. Equipment Weight 1. LIFT DATA 2. Weight of Rigging 3. Total Lift Weight 4. Height of Lift 5. Radius of Lift 2A. Main Hoist Block 2B. Slings Shackles Secondary Block or Ball Total Rigging Weight: 2A. 2B. 3A. On Sling (1 + 2B) = 3B. On Crane (1 + 2A + 2B) = Not greater than Feet Elevation sketch showing height relation to crane attached? Not greater than Feet Plot plan showing location and orientation of crane attached? 6. Equipment Surface Area Maximum subject to crosswind Sq. Ft. CRANE DATA Yes Yes No No 1. Crane Manufacturer 2. Model and Size Manufacture s load chart showing capacity at varying radiuses and boom lengths attached? Yes No 3. Attachments Page 6 of 10

Exhibit 16.4.1 4. Bumper or Auxiliary Counterweight Lbs. 5. Boom Length Not greater than Feet 6. Jib Length Not greater than Feet 7. Load Block Size Weight # Sheaves 8. Secondary Block or Ball Size Weight # Sheaves 9. Main Block Parts of Line Capacity 10. Secondary Block Parts of Line Capacity 11. Mat Size / Footplate Size 12. Notes Beneath each track or fully extended outrigger? Soil bearing pressure (PSF) calculated Allowable RIGGING DATA 1. Sling(s) Diameter Length Capacity Vendor s chart showing capacity for different angles and sling configurations, type of wire rope and loop splice attached? 2. Briefly describe and sketch sling connection at hook and equipment. Show dimensions and sling angles. Yes No 3. Shackle(s) Size Capacity per shackle Vendor s chart showing capacity attached? Yes No Page 7 of 10

Exhibit 16.4.1 4. Briefly describe and sketch shackle connections. 5. Notes LIFT COMPUTATION 1. Boom Length 2. Radius of Lift 3. Crane Capacity 4. Initial orientation of lift relative to crane 5. Swing orientation of lift relative to crane From manufacturer s chart using conditions in #1 and #2 of CRANE DATA? Front Side Rear Front Side Rear 6. Total Lift Weight Item 3B of LIFT DATA Lbs. 7. Sling Capacity Required 8. Shackle Capacity Required 9. Total Weight on Slings and Shackles Safe working load with hitch configuration based on two legs maximum Based on two legs maximum Item 3A of LIFT DATA 10. Mat Size / Footplate Size Beneath each track or fully extended outrigger Soil bearing pressure (PSF) calculated Allowable Yes No 11. Wind Speed No lifts to be made with wind speeds in excess of MPH Page 8 of 10

Exhibit 16.4.1 12. Notes 1. LOCAL HAZARDS AND THEIR CONTROLS - Crane Route Describe road conditions observed when traveling the route the crane will take for the job. 2. Ground stability Have ground control conditions been assessed 3. Proximity of people and equipment Is barricading required (reference KUC standard 16.3) 4. Agreed communication method Hand signals, radio APPROVALS Contractor Supervisor Acceptance Signature: KUC Supervisor Acceptance Signature: KUC Superintendent Acceptance Signature: WORK COMPLETION or CANCELLATION Completed or Cancelled By: Date : Time: AM PM If cancelled, provide reason: Page 9 of 10

Exhibit 16.4.2 CLOSE PROXIMITY PERMIT (Standard 16.4) Rev. 5 4/11 A Close Proximity Permit must be completed and approved before conducting work that places equipment or workers within: q 15 feet of power lines; q Any fenced substation; q Any work area where exposed busses are present. Requested By Plant Department Print Name Signature Date Work Location Contractor (If Applicable) Description of Work: TRACK completed for this task (Initials): Reference Drawing No.: Location: Work to be Performed: Brief Description of Interference and Safety Measures to be Taken: Area Barricaded Electricity De-energized Proposed Work Date and Time: Approved By: Superintendent Electrical Engineering/ Supervisor Print Name Signature Date Print Name Signature Date Safety Print Name Signature Date Equipment Operator Print Name Signature Date Page 10 of 10