POSI-JOIST STANDARD DETAILS VERSION 2, 25/11/02.

Similar documents
Good Craftsmanship Guide. Carpentry and Joinery- Carcassing

Contents. APA Construction Details. Full fill cavity walls Partial fill cavity walls Solid externally insulated walls 26-37

Rockwool Flexi Insulation Application Guide

ENVIRONMENTAL INFORMATION APR 1200 products are made from glass mineral wool, one of the most environmentally friendly insulants available.

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in

FireWall. High performance fireresistant. FireWall.

C05. S03. P02 P08 FireWall. Including C05. S01. P02 Specialist partitions introduction

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details

IRISH BUILDING CONTROL INSTITUTE HOTEL COURT HOTEL BALLYCONNELL CO CAVAN. 26 th MARCH 2009 TIMBER FRAME CONSTRUCTION

Section A Roof Truss

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

Multi-layer Insulation Blanket for Roofs

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

Timber Frame Construction

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

Section Timber Frame Walls. Single layer between studs. Single layer between studs with service void. Between studs with insulated lining

Module 3.7. Thermal bridging

Standard Technical Details

Section 4.3. Separating Floors. Timber frame floor with I-Beams. Upgrading existing timber floor with new ceiling. Timber frame floor with

The Pocket Guide To Insulation August 2013

NRG 75 CRF NRG GREENBOARD WALL SYSTEM

Timber Decks. Technical Note. March 2007

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1

Superform Products Ltd.

Partitioning & Ceiling Product Information

8/18/14. Introduction to. Framing. Terminology and Concepts

H-Stud Area Separation Wall System

MUNICODE SERVICES LTD.

CARPENTRY - HOUSING. This is the sloping length of a right-angled triangle.

Fire Barrier Systems. For inhibiting the spread of fire and smoke in concealed spaces

PB301 July Lightweight Building Solutions. Bushfire Protection.

Residential Deck Safety, Construction, and Repair

Post and Beam Construction

Report Number BTC 17755F

FORM DESIGN. easy to work with, and generally available.

Energy Company Obligation (ECO): Technical Monitoring Questions

PASSIVE FIRE PROTECTION SYSTEMS Application & Technical Manual: Ceilings & Floors

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

The better way to build TM. Installation Manual. EXTERIOR WALL SIPs

December J-Ply Roofing, Flooring and Decking

June Posi-STRUT TRUSS SYSTEMS Manual. Posi-STRUT is available only through GANG-NAIL Fabricators throughout New Zealand

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

PERGOLAS AND CARPORTS

The WANZ Guide to Window Installation

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

How To Repair A Boat Landing Deck With A Boat Bed

INSTALLATION. General. Important Note. Design. Transport

Light Steel Modular Construction

GYPROCK PARTY WALL INTERTENANCY WALL SYSTEMS FOR CLASS 1 BUILDINGS

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

Building Construction. Lightweight construction. Conventional Construction

Handling, Erection and Bracing of Wood Trusses

CHAPTER 6 CONSTRUCTION TYPES

LIGHT FLOOR AND WALL FRAMING

POST AND FRAME STRUCTURES (Pole Barns)

The WANZ Guide to Window Installation

PRESTRESSED CONCRETE FLOORING BEAMS

Ecojoist. Practical benefits of Ecojoist.

Mark Cramer Inspection Services, Inc.

TECHNICAL RECOMMENDATION

These instructions will show you how to install an internal door into a non-loadbearing partition wall. The instructions are split into three parts.

PANELIZED HOME INSTALLATION GUIDELINE

Best Practice in Best Pra ctice in teel constr uction - onstr industrial B uildings esidential Buildings 01 Introduction 02 Key Design Factors

Typical Deck Details

A Technical Guide for Floor & Roof Framing Construction

How To Build A Gambrel Roof And A Gable End Roof

HORIZONTAL INSTALLATION

Design No. P736 September 26, Restrained Assembly Ratings 1, 1-1/2 or 2 Hr. (See Items 3, 7 and 8A)

Typical Finished Basement Details

Residential Decks. Planning and Development Services Department

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Rev Code of Practice. SIP Technology.

Seismic Technical Guide

Chapter. Restoration of Damaged Structures

Window Installation Instructions

PDmB, Inc. Definitions

Guidelines for Earthquake Bracing of Residential Water Heaters

Joist. Reinforcement. Draft 12/7/02

HOPLEYS OPENWEBSTEELJOISTS

Internal wall insulation in existing housing

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig some of the trusses that are used in steel bridges

CI/SfB 2- Rj7 December 2010

Featuring TJ Rim Board and TimberStrand LSL

Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span

Additions and Alterations

Uncovered Decks & Porches

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

DEFAULT HEAT LOSS COEFFICIENTS

rationel WINDOWS WITH VISION

FIRE AND SMOKE PROTECTION FEATURES

GYPSUM AREA SEPARATION FIREWALLS GA

FIRE AND SMOKE PROTECTION FEATURES

EAST LYME HIGH SCHOOL

SIMPLE SAVER SYSTEM DESIGN MANUAL

6 RETROFITTING POST & PIER HOUSES

Guide to Assessment and Repair of Flood Damaged Timber and Timber Framed Houses

Transcription:

POSIJOIST STANDARD DETAILS VERSION 2, 25/11/02.

PSD27 Service Void Posiweb over bearing by min 15mm 100mm Mineral wool insulation quilt 23kg/m2. Floor Comprising: 22mm T & G Chipboard on 19mm Plasterboard Plank on 47x75mm Resilient floor batten at 600mm centres on 18mm T & G Chipboard. All T & G edges glued. 200 approx Mineral wool cavity barrier. First PosiJoist beam set back from wall by approx 200mm PosiJoists Parallel to wall. 47x 89 Continuous Pack Plasterboard noggins SERVICE VOID Ring Beams in solid timber or LVL. Ceiling (not shown) comprising: 2 Layers 15mm Gyproc Fireline Board on 16mm resilient bars at 400mm centres. First layer fixed with 38mm Gyproc screws at 230mm centres. Second layer fixed with 60mm Gyproc screws at 230mm centres. Staggered with first layer screws. Lay Firleline board in echelon pattern with staggered joints. 2 no 30 x 200mm GMS Straps at 1200mm centres. Bead of sealent applied to floor deck prior to fixing 19mm plasterboard plank. 47x 89 Packs between joists. PosiJoists Bearing on wall. CONTENTS PSD01 PosiJoist to girder. PSD02 Bottom chord fixing (with noggins). PSD03 Bottom chord fixing (with continuous estraint). PSD04 Top chord fixing to timber frame. PSD05 Masonry hanger (with noggins). PSD06 Masonry hanger ( with continuous ledger). PSD07 Bottom chord built into masonry. PSD08 Top chord built into masonry. PSD09 Continuous joist through masonry. PSD10 Top chord fixing to steel. PSD11 Internal bearing. PSD12 Partitions parallel to floor. PSD13 Partitions above and parallel to floor. PSD14 Maximum duct sizes. PSD15 Edge closure. PSD16 Staircase opening 1. PSD17 Staircase opening 2. PSD18 Narrow opening 1. PSD19 Narrow opening 2. PSD20 Strongback 1. PSD21 Strongback 2. PSD22 Strongback bridging. PSD23 Strongback splice. PSD24 Horizontal restraint fixed to strongback. PSD25 Horizontal restraint. PSD26 Timber frame compartment wall/party wall. PSD27 Timber frame compartment wall/party wall (with service void). TYPICAL TIMBER FRAME COMPARTMENT FLOOR / PARTY WALL DETAIL WITH SERVICE VOID

PSD01 100mm Mineral wool insulation quilt 23kg/m2. Posiweb over bearing by min 15mm PSD26 Simpson L70 angles or similar as specified by design Mineral wool cavity barrier. Floating Floor Comprising: 18mm T & G Chipboard on 19mm Plasterboard Plank on 25mm Fibreglass Slab on 18mm T & G Chipboard. All T & G edges glued, and 19mm plank bonded to chipboard with dabs of Gyproc sealant at 300mm centres. Joints between chipboard and plasterboard to be staggered and board direction reversed. 2 no 30 x 200mm GMS Straps at 1200mm centres. Bead of sealent applied to floor deck prior to fixing 19mm plasterboard plank. 47x 89 Continuous Pack Simpson LBV or Cullen OWF/ OWT hangers. 47x 89 Packs between joists. Bottom member of posi to be notched over bottom flange of hanger POSIJOIST TO GIRDER DETAIL 200 approx First PosiJoist beam set back from wall by approx 200mm PosiJoists Parallel to wall. Plasterboard noggins Ring Beams in solid timber or LVL. Ceiling (not shown) comprising: 2 Layers 15mm Gyproc Fireline Board on 16mm resilient bars at 400mm centres. First layer fixed with 38mm Gyproc screws at 230mm centres. Second layer fixed with 60mm Gyproc screws at 230mm centres. Staggered with first layer screws. Lay Firleline board in echelon pattern with staggered joints. PosiJoists Bearing on wall. TYPICAL TIMBER FRAME COMPARTMENT FLOOR / PARTY WALL DETAIL

PSD25 PSD02 35 x 97 C16 twice nailed to brace using 3.1 x 75mm long galvanised wire nails 47x72 top chord restraint fixed between beams Strap fixed with a minimum of four fixings of which at least one is to be over the third joist. Head binder HORIZONTAL RESTRAINT STRAP DETAIL BOTTOM CHORD FIXING TO TIMBER FRAME (with restraint noggins)

PSD03 PSD24 Continuous 47x72 top chord restraint fixed over ribbon block. Twice nailed to brace using 3.1 x 75mm long galvanised wire nails Strap fixed with a minimum of four fixings of which at least one is to be over the third joist. Head binder BOTTOM CHORD FIXING TO TIMBER FRAME (with continuous restraint) HORIZONTAL RESTRAINT STRAP FIXED TO STRONGBACK

PSD23 PSD04 38x75 (min) blocks twice nailed to top and bottom members and twice nailed to brace using 3.1 x 75mm long galvanised wire nails Posiweb over bearing by min 15 mm 47x89 Packing piece 35 x D x 1200mm long splice fixed with 10 no 3.1 x 75mm galvanised wire nails each side of splice, nailed through and clenched over on far side 35 x D strongback, see table for depths. Ring beam (size to suit) Max 6mm gap WEB SIZE PS8, PS9 & PS10 PS210, PS14 & PS16 STRONGBACK DEPTH 100 150 STRONGBACK SPLICE 40x47 Continuous plasterboard noggin TOP CHORD FIXING TO TIMBER FRAME

PSD05 PSD22 47x72 top chord restraint fixed between beams Twice nailed to brace using 3.1 x 75mm long galvanised wire nails Position strongbacks tight to underside of top chord. Minimum bearing determined by design (choose correct hanger for load, bearing width and courswork level of hanger bearing flange) MASONRY HANGER DETAIL STRONGBACK BRIDGING (webs with built in verticals)

PSD21 PSD06 Continuous 47x72 ledger fixed over ribbon block. Twice nailed to brace using 3.1 x 75mm long galvanised wire nails Position strongbacks tight to underside of top chord. Minimum bearing determined by design (choose correct hanger for load, bearing width and courswork level of hanger bearing flange) INSERT STRONGBACK THROUGH JOISTS BEFORE FIXING JOISTS. IT CANNOT BE INSTALLED AFTER JOISTS HAVE BEEN FIXED. STRONGBACK DETAIL (webs with built in verticals) Fix at a maximum of 4.0 metre centres. MASONRY HANGER DETAIL (continuous ledger)

PSD07 PSD20 Blockwork to continue between beams to provide restraint 38x75 (min) blocks twice nailed to top and bottom members and twice nailed to brace using 3.1 x 75mm long galvanised wire nails Position strongbacks tight to the underside of top chord. 35mm x D strongback, see table for depth (DTLR Robust Detail For Thermal Bridging should be observed) WEB SIZE PS8, PS9 & PS10 PS210, PS14 & PS16 STRONGBACK DEPTH 100 150 INSERT STRONGBACK THROUGH JOISTS BEFORE FIXING JOISTS. IT CANNOT BE INSTALLED AFTER JOISTS HAVE BEEN FIXED. BOTTOM CHORD BUILT INTO MASONRY STRONGBACK DETAIL Fix at a maximum of 4.0 metre centres.

PSD19 PSD08 Continuous 47x72 ledger fixed to wall. Simpson L70 angles or similar as specified by design Beam (depth to suit) slotted through girders Packing piece to pick up ceiling Max 6mm gap (DTLR Robust Detail For Thermal Bridging should be observed) NARROW OPENING TOP CHORD BUILT INTO MASONRY

PSD09 PSD18 Solid timber block with grain parallel to span Simpson L70 angles or similar as specified by design Simpson LBV or Cullen OWF / OWT hangers (DTLR Robust Detail For Thermal Bridging should be observed) Trimmer to be notched over bottom flange of hanger CONTINUOUS JOIST THROUGH MASONRY NARROW OPENING

PSD17 Posiweb over bearing by 15mm min Posiweb over bearing by 15mm min. PSD10 Simpson L70 angles or similar as specified by design Simpson LBV or Cullen OWF / OWT hangers 47x89 Noggins between top chords Timber plate fixed to top of steel Solid timber or LVL trimmer depth to suit Trimmer to be notched over bottom flange of hanger Max 6mm gap Timber pack fixed to beam (size to suit) STAIRCASE OPENING TOP CHORD FIXING TO STEEL

PSD11 PSD16 Simpson L70 angles or similar as specified by design Simpson LBV or Cullen OWF / OWT hangers Bottom member of posi to be notched over bottom flange of hanger INTERNAL BEARING STAIRCASE OPENING

PSD15 PSD12 35mm Prefabricated edge closure Prefaced with plywood with 20mm lap at the top edge. Wall panel skew nailed through onto noggin with a min of 2 no 3.35 dia galvanised wire nails, length to suit. Noggin nailed down onto wall panel as above. 50 min Simpson Z35N clips. Edge closure to be supplied to site 4.8m long and cut on site as required. EDGE CLOSURE DETAIL 38x89 C16 (min) noggins at max 600mm centres NONLOADBEARING PARTITIONS PARALLEL TO FLOOR BEAMS.

PSD13 PSD14 Purpose made noggins at max 600mm centers. Wall panels skew nailed through onto noggins with a min of 2 no 3.35 dia galvanised wire nails, length to suit. W POSI STRUT SIZE PS8 PS9 PS10 PS210 PS14 PS16 W CIRCLE DIA 108 105 95 134 130 115 159 150 135 210 190 155 286 250 200 324 275 220 RECTANGLE DEPTH SQUARE 50 75 100 125 150 175 200 225 250 275 300 RECTANGLE WIDTH 270 180 90 310 240 180 100 320 270 210 160 80 350 310 260 210 160 110 70 490 440 390 350 300 250 200 160 110 60 510 470 430 390 340 300 260 220 170 130 90 NONLOADBEARING PARTITIONS ABOVE AND PARALLEL TO FLOOR BEAMS. INSERT LARGE SERVICES THROUGH JOISTS BEFORE FIXING JOISTS. IT MAY NOT BE POSSIBLE AFTER JOISTS HAVE BEEN FIXED. MAXIMUM DUCT SIZES