1 Technical Document Seismic Technical Guide Hanger Wire Attachment Code Requirements 1 The International Building Code (IBC) defines the requirement for hanger wire and their supports and attachment methods. However, there are exceptions and the application of hanger wires in a seismic design category can meet code requirements in different ways. USG recommends that the design team, consulting engineers and code officials work together to analyze these factors and determine the appropriate construction and application of hanger wire attachment. Because codes continue to evolve, check with local officials prior to designing and installing a suspension system. Guidelines 12-gauge, galvanized, soft-annealed steel wire Manufactured in accordance with ASTM A641 Meets or Exceeds Federal Specification QQ-W-461H Note: 12-gauge hanger wire produced by USG meets these requirements. Performance Data 12-Gauge Wire Wire Tie Failure / Pullout Load Typical 3 wrap tie lbs. Tight 3 wrap tie 358 lbs. Yields 424 lbs. Ultimate load +550 lbs. Tensile Strength (Ksi) 80 max. 1 Per ASTM C636 Note: Tight wrap typically consists of three complete wraps within 1 in. Some jurisdictions may require four complete wraps for bracing wires. These requirements may vary by jurisdiction. Splice Options Hanger wire splices are typical when the ceiling drop is greater than the length of the wire available and are allowed in seismic ceiling construction. The industry standard is to loop and tie the wire ends with three tight turns, or use a square knot. The square knot is the stronger of the two options at 550 lbs. versus 350 lbs. for the loop and tie option. 12-Gauge Wire Splice Wire Tie Failure Loop and Tie 350 lbs. Square Knot 550 lbs. Note: Accessories by others for securing hanger wire splices should be evaluated for pullout and strength. 1 See last page for Seismic Code Reference Standards
2 Application Hanger Wire Splices Step 1 Loop and Tie Application Connect the hanger wire ends together through two loops. Step 2 Wrap the hanger wire ends securely around itself with three complete turns within 1 in. Step 1 Square Knot Application Create an approximate 5 in. bend in the end of each hanger wire Step 2 With the short ends opposed, bring the right-hand end over the left-hand and loop the short end under and around the left-hand end, as shown. Step 3 Step 4 Loop the left-hand short end back up and around the right-hand loop, with the left-hand end over the right-hand end and bring the left-hand end under the loop of the right-hand end, as shown. Draw the knot tight. Step 5 Wrap the hanger wire ends securely around itself with three complete turns within 1 in. 2 Hanger Wire Attachment Note: In the symmetry of the knot, the wire piece on the left emerges parallel from below the other loop, while the wire piece on the right emerges parallel from above the other loop. This appearance confirms you have tied the square knot correctly.
3 Application Attachment to Tee Insert the hanger wire ends through a wire hole in the tee and wrap the wire end securely around itself with three complete turns within 3 in. Ensure the remaining wire end is secured so that it does not interfere with the placement of ceiling panels. USG Donn main tees are produced with round hanger wire holes in the tee web at regular intervals. There are also rectangular (convenience) holes located in the tee bulb at regular intervals. The typical location for the hanger and bracing (splay) wires is in the round holes, but the rectangular (convenience) holes may also be used when needed. We have load tested the rectangular (convenience) holes located in the tee bulb with on a 45 angle. The failure load is in excess of 400 lbs. This far exceeds the 250 lb. minimum prescribed by the code for the connections of the bracing (splay) wires. Note: USG has qualified the use of the rectangular (convenience) holes located in the tee bulb through comparison testing by seismic shake-table analysis. In these tests the rectangular (convenience) holes located in the tee bulb were used for all hanger wire attachments to the tee. Round Hanger Wire Hole Attachment Round Hanger Wire Hole Attachment hanger wire Rectangular Rectangular (Convenience) (Convenience) Hole Hole Attachment hanger wire round hanger wire hole rectangular convenience hole Alternative Hanger Wire Spacing ASTM C635 addresses the load carrying capability of main tees, categorizing them as Light, Intermediate or Heavy Duty. This is also known as deflection criteria. The associated load ratings are: Light Duty Intermediate Duty Heavy Duty 5 lbs./lf (7.4 kg/m) 12 lbs./lf (17.9 kg/m) 16 lbs./lf (23.8 kg/m) Hanger wires are typically spaced 4 ft. o.c. along the main tee. Reducing the hanger wire spacing on Intermediate Duty main tees from 4 ft. o.c. to 3 ft. o.c. can achieve Heavy Duty load carrying capacity values. structure 3 ft. o.c. 3 ft. o.c. 3 ft. o.c. 3 ft. o.c. 3 ft. o.c. 3 ft. o.c. suspended ceiling main tee Notes: Reducing the hanger wire spacing on Intermediate Duty main tees can achieve Heavy Duty load carrying capacity values but does not change the duty classification of the main tee. The performance of Donn suspension systems is based on the specific combination of superior components, and the design and installation methods shown. Components from other manufacturers were not evaluated, and their use or any mixed use is not recommended. Many jurisdictions accept the installation of Intermediate Duty main tees with additional supports to achieve Heavy Duty load carrying capacity values, however, some jurisdictions will not accept this application. Check with a local official prior to designing and installing a suspended ceiling system. Hanger Wire Attachment 3
4 Application Anchorage The International Building Code (IBC), through references to ASCE/SEI 7 Minimum Design Loads for Buildings and Other Structures, American Society of Civil Engineers/Structural Engineering Institute (ASCE/SEI), defines the requirements for component anchorage. The requirements are as follows: Component attachments shall be bolted, welded, or otherwise positively fastened without consideration of frictional resistance produced by the effects of gravity. A continuous load path of sufficient strength and stiffness between the component and the supporting structure shall be provided. Local elements of the structure including connections shall be designed and constructed for the component forces where they control the design of the elements or their connections. Anchors in Concrete or Masonry Anchors in concrete shall be designed in accordance with Appendix D of ACI 318. Anchors in masonry shall be designed in accordance with ACI 530. Anchors shall be designed to be governed by the tensile or shear strength of a ductile steel element. Exception: Anchors shall be permitted to be designed so that the attachment that the anchor is connecting to the structure undergoes ductile yielding at a load level corresponding to anchor forces not greater than their design strength, or the minimum design strength of the anchors shall be at least 2.5 times the factored forces transmitted by the component. Post-installed Anchors Post-installed anchors in concrete shall be pre-qualified for seismic applications in accordance with ACI in Concrete and Masonry or other approved qualification procedures. Post-installed anchors in masonry shall be pre-qualified for seismic applications in accordance with approved qualification procedures. Multiple Attachments Determination of force distribution of multiple attachments at one location shall take into account the stiffness and ductility of the component, component supports, attachments, and structure and the ability to redistribute loads to other attachments in the group. Designs of anchorage in concrete in accordance with Appendix D of ACI 318 shall be considered to satisfy this requirement. 4 Hanger Wire Attachment
5 Application Anchorage Power Actuated Fasteners Exception: Power actuated fasteners in concrete or steel shall not be used for sustained tension loads exceeding 100 lb (445 N) or for brace applications in Seismic Design Categories D, E, or F unless approved for seismic loading. Power actuated fasteners in steel are permitted in Seismic Design Category D, E or F if the gravity tension load on any fastener does not exceed 250 lbs (1123 N) unless approved for seismic loading. Power actuated fasteners in masonry are not permitted unless approved for seismic loading. Power actuated fasteners in concrete used for support of acoustical tile or lay-in panel suspended ceiling applications and distributed systems where the service load on any individual fastener does not exceed 90 lb (400 N). Power actuated fasteners in steel where the service load on any individual fastener does not exceed 250 lb (1,112 N). Power Actuated Fasteners for Acoustical Tile or Lay-In Panel Suspended Ceiling Applications Seismic Design Category D, E or F Concrete Steel Allowed for sustained tension loads exceeding 90 lb (400 N) Allowed where gravity tension load on any fastener does not exceed 250 lbs (1123 N) Note: The load for suspension system hanger wires will not exceed 64 lbs. based on hanger wires spaced 4 ft. o.c. along heavy duty main tees designed to carry 16 lbs/l.f. Also ASCE7-10 contains an exception allowing power actuated fasteners for support of acoustical tile or lay-in panel suspended ceiling applications. ASCE7-02 and ASCE7-05 does not contain this exception. Please check with the authority having jurisdiction as interpretation and enforcement of this may vary. Friction Clips Friction clips in Seismic Design Categories D, E or F shall not be used for supporting sustained loads in addition to resisting seismic forces. C-type beam and large flange clamps are permitted for hangers provided they are equipped with restraining straps equivalent to those specified in NFPA 13 Section Lock nuts or equivalent shall be provided to prevent loosening of threaded connections. Hanger Wire Attachment 5
6 Construction Construction Attachment to Structure Attachment to Structure Wood Wood Joist of Rafter Wood Wood Joist or Rafter Splay Wood Splay / Bracing Wood Joist or Rafter 3" max. wood joist 1 /4" diameter closed eye screw with full thread embedment (1 1 /4" min.) 3" x 1 /4" diameter closed eye screw with 1" min. penetration into wood 12 ga. hanger wire Wood Joist or Rafter (3) 1 1 /2" x 9 ga. staples or (3) stronghold "J" nails at each wire loop Wood Joist (3) 1 1 /2" x 9 ga. staples or (3) stronghold "J" nails at each wire loop 1" min. wood joist 1" min. wood joist Wood Truss Wood Truss web member Wood Truss web member bottom chord bottom chord saddle tie saddle tie 6 Hanger Wire Attachment Note: Hanger or bracing wire anchors to the structure should be installed in such a manner that the direction of the anchor aligns as closely as possible with the direction of the wire.
7 Construction Attachment to Structure Wood Bottom of Wood Joist Bottom of Wood Joist Typical Saddle Tie saddle tie required for all widths greater than 1 /2" Splay Note: saddle tie has double loop at support Bottom of Wood Joist Not Applicable typical saddle tie with double loop at support 1 /4" diameter drilled hole 2" min. hanger wire Wood I-Joist Wood I-Joist Wood I-Joist wood I-joist wood I-joist add 2 1 /2" x 20 ga. stud* w/ (1) #10 x 1" wood screw to each of 3 joists. place stud flat and within 6" of splay wire. add 2 1 /2" x 20 ga. stud* w/ (1) #10 x 1" wood screw to each of 3 joists. place stud flat and within 6" of splay wire. Wood I-Joist Bottom Flange Wood I-Joist Bottom Flange * alternate: 2 x 4 flat with 1-10d or 1-#10 x 3" screw to each of 3 truss bottom flanges Wood I-Joist Bottom Flange Note: Do not insert screw eyes parallel to laminations * alternate: 2 x 4 flat with 1-10d or 1-#10 x 3" screw to each of 3 truss bottom flanges 1 /4" diameter closed eye screw with 1 1 /4" min. penetration at bottom flange 1 /4" diameter closed eye screw with 1 1 /4" min. penetration align with brace wire 1" min. Note: Hanger or bracing wire anchors to the structure should be installed in such a manner that the direction of the anchor aligns as closely as possible with the direction of the wire. Hanger Wire Attachment 7
8 Construction Attachment to Structure Concrete Clip Attachment Concrete Clip Attachment 5 /16" drill-in expansion anchor minimum or approved fastener Concrete Splay / Bracing Splay Clip Attachment 5 /16" drill-in expansion anchor minimum or approved fastener 12 ga. metal angle steel strap 1" wide x 2" long x 12 ga. min. 45 max. 3 turns 3 turns Clip Attachment Clip Attachment 5 /16" drill-in expansion anchor minimum or approved shot pins 5 /16" drill-in expansion anchor minimum or approved shot pins 12 ga. metal angle steel strap 1" wide x 2" long x 12 ga. min. 45 max. 3 turns 3 turns Cast In Place Concrete Cast In Place Concrete wire pigtail w/ 2" dia. loop & 4" tail Cast In Place Concrete wire pigtail w/ 2" dia. loop & 4" tail 45 max. Cast In Place Concrete wire pigtail w/ 2" dia. loop & 4" tail 45 max. 8 Hanger Wire Attachment Note: Hanger or bracing wire anchors to the structure should be installed in such a manner that the direction of the anchor aligns as closely as possible with the direction of the wire.
9 Construction Attachment to Structure Steel Steel Splay / Bracing Steel Splay Open-Web Steel Joist Open-Web Steel Joist Open-Web Steel Joist top chord web member (wrap and tie around tops of web members) bottom chord 12 ga. hanger wire typical saddle tie Open-Web Steel Joist top chord Attach hanger wire to bottom chord only when designed to carry the vertical load of the suspended ceiling system. (wrap and tie around tops of web members) Steel Roof Deck Steel Roof Deck Steel Roof Deck #3 x 12" rebar 2 #8 x 1/2" self tapping screws 20 ga. min. deck hanger wire tie to #3 rebar with three wraps around rebar and one wrap around wire Steel Deck With Insulation Fill 20 ga. min. deck steel strap 3" wide x 4" long x 12 ga. minimum Steel Deck With Insulation Fill #3 rebar x length required to cover min. of 4 high corrugations non- fill Not Applicable steel deck Steel Beam Steel Beam Steel Beam structural steel structural steel 12 ga. metal angle 12 ga. metal angle 12 ga. splayed seismic bracing wire Note: Hanger or bracing wire anchors to the structure should be installed in such a manner that the direction of the anchor aligns as closely as possible with the direction of the wire. Hanger Wire Attachment 9
10 Construction Attachment to Structure Steel Steel Deck With Concrete Fill Steel Deck With Concrete Fill fill Splay shot-in or expansion anchor with eye bolt steel deck Steel Deck With Concrete Fill Steel Deck With Concrete Fill fill fill embedded in concrete steel deck 5 /16" (min.) drill-in expansion anchor. steel strap 12 ga. x 1" wide min. steel deck Steel Deck With Concrete Fill fill shot-in anchor 3 /4" min. metal angle 12 ga. x 3 /4" wide min. steel deck Note: Hanger or bracing wire anchors to the structure should be installed in such a manner that the direction of the anchor aligns as closely as possible with the direction of the wire. 10 Hanger Wire Attachment
11 Testing and Inspection Post-installed anchors shall be tested when deemed necessary by the authority having jurisdiction. Testing shall be performed by an accepted testing facility, unless approval of an alternative is obtained in advance from the engineer of record (EOR) for the project. If any anchor fails testing, test all anchors of the same type, not previously tested until twenty (20) consecutive anchors pass, then resume the initial test frequency. The anchors tested shall be only those anchors installed by the same trade. The authority having jurisdiction shall define acceptance/failure criteria. The test values and all appropriate criteria shall be shown on the contract documents. The test load may be applied by any method that will effectively measure the tension in the anchor, such as direct pull with a hydraulic jack, calibrated spring loaded devices, or a calibrated torque wrench except that displacement-controlled anchors such as drop-ins shall not be tested using a torque wrench. When field testing of component anchorage is required by the authority having jurisdiction, the following criteria shall apply unless otherwise specified: Anchor Type Test Value Percent Tested Support () 200 lbs. in tension 10% Bracing (Splay) 440 lbs. in tension 50% Note: Drilled-in or shot-in anchors typically require special approval prior to use in pre-stressed concrete. Note: Shot-in anchors in concrete are not permitted for bracing wires. Hanger Wire Attachment 11
12 International Building Code (IBC) American Society of Civil Engineers (ASCE) Ceilings Interior Systems Construction Association (CISCA) or ASTM International (ASTM) 2003 IBC ASCE7-02 Installation Guidelines for Suspended Ceilings 2006 IBC ASCE IBC ASCE IBC ASCE7-10 CISCA Zones 0-2 CISCA Zones 0-2 CISCA Zones 0-2 ASTM E580 CISCA Zones 3-4 CISCA Zones 3-4 CISCA Zones 3-4 International Building Code (IBC) defines Seismic Design Categories A, B, C, D, E, and F. ASCE/SEI 7 Minimum Design Loads for Buildings and Other Structures American Society of Civil Engineers/Structural Engineer Institute (ASCE/SEI) Guidelines for Seismic Restraint for Direct-hung Suspended Ceiling Assemblies (Zones 3-4) Recommendations for Direct-hung Acoustical Tile and Lay-in Panel Ceilings (Zones 0-2) CISCA Ceilings & Interior Systems Construction Association (CISCA) ASTM Internationl E580/E580M Standard Practice for Installation of Ceiling Suspension Systems for Acoustical TIle and Lay-in Panels in Areas Subject to Earthquate Ground Motions. ASTM International (formerly American Society for Testing and Materials) Further References USG Seismic Ceiling Resource Center Seismic Technical Guides seismicceilings.com Product Information See usg.com for the most up-todate product information. Installation Must be installed in compliance with ASTM C636, ASTM E580, CISCA, and standard industry practices. Code Compliance The information presented is correct to the best of our knowledge at the date of issuance. Because codes continue to evolve, check with a local official prior to designing and installing a ceiling system. Other restrictions and exemptions may apply. This is only intended as a quick reference. Purpose This seismic technical guide (STG) is intended as a resource for design professionals, to promote more uniform criteria for plan review and jobsite inspection of projects. This STG indicates an acceptable method for achieving compliance with applicable codes and regulations, although other methods proposed by design professionals may be considered and adopted. ICC Evaluation Service, Inc., Report Compliance Suspension systems manufactured by USG Interiors, Inc., have been reviewed and are approved by listing in ICC-ES Evaluation Report Evaluation Reports are subject to reexamination, revision and possible cancellation. Please refer to usgdesignstudio.com or usg.com for current reports. L.A. Research Report Compliance Donn brand suspension systems manufactured by USG Interiors, Inc., have been reviewed and are approved by listing in the following L.A. Research Report number: Notice We shall not be liable for incidental and consequential damages, directly or indirectly sustained, nor for any loss caused by application of these goods not in accordance with current printed instructions or for other than the intended use. Our liability is expressly limited to replacement of defective goods. Any claim shall be deemed waived unless made in writing to us within thirty (30) days from date it was or reasonably should have been discovered. Safety First! Follow good safety/industrial hygiene practices during installation. Wear appropriate personal protective equipment. Read MSDS and literature before specification and installation. Manufactured by USG Interiors, LLC 550 West Adams Street Chicago, IL usg.com seismicceilings.com sustainableceilings.com usgdesignstudio.com The following are trademarks of USG Interiors, Inc. or a related company: Donn, USG, USG in stylized letters. SC2522/rev , USG Interiors, LLC Printed in U.S.A.
POST AND FRAME STRUCTURES (Pole Barns)
POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:
Standard Practice for Installation of Ceiling Suspension Systems for Acoustical Tile and Lay-in Panels in Areas Subject to Earthquake Ground Motions 1
Designation: E 580/E 580M 09a Standard Practice for Installation of Ceiling Suspension Systems for Acoustical Tile and Lay-in Panels in Areas Subject to Earthquake Ground Motions 1 This standard is issued
SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes seismic restraints and other earthquake-damage-reduction measures for electrical
Wisconsin Building Products Evaluation
Safety & Buildings Division 201 West Washington Avenue P.O. Box 2658 Madison, WI 53701-2658 Evaluation # 200813-O Wisconsin Building Products Evaluation Material Best Management Standards for Foundation
Concrete Design Manual
The Reinforced Concrete Design Manual In Accordance with ACI 318-11 SP-17(11) Vol 2 ACI SP-17(11) Volume 2 THE REINFORCED CONCRETE DESIGN MANUAL in Accordance with ACI 318-11 Anchoring to concrete Publication:
HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES
HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES 101 Retrofits Required. Pursuant to Section 553.844 553.884, Florida Statutes, strengthening of existing site-built,
CPA Steel Stud Framing Page 1 of 11
CPA Steel Stud Framing Page 1 of 11 STEEL STUD FRAMING General Requirements City of Palo Alto (CPA) Building Inspection Division 285 Hamilton Ave. Inspection Request: 650 329-2496 Building Division IVR#
HOW TO ESTIMATE THE COST OF T-BAR
HOW TO ESTIMATE THE COST OF T-BAR ACOUSTICAL CEILINGS MICHAEL HILL DATE WRITTEN: MAY OF 2007 The author is Michael Hill, Estimator with Kaiser Foundation Hospitals, National Facilities Services Cost Engineering
STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM
Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally
PART 1 GENERAL 1.1 SECTION INCLUDES
J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including
usg.com/me USG Middle East, Ltd. Dammam, Saudi Arabia E-mail: [email protected] Fax: +966 3 8121029 +966 3 8120995
USG Middle East, Ltd. Dammam, Saudi Arabia E-mail: [email protected] Fax: +966 3 8121029 +966 3 8120995 Riyadh, Saudi Arabia E-mail: [email protected] Fax: +966 1 4772734 +966 1 4772734 Jeddah, Saudi
TZ WEDGE ANCHOR FOR CRACKED AND UNCRACKED CONCRETE
SECTION 2.2 PAGE 1 / 9 l DESCRIPTION UCAN TZ torque controlled mechanical expansion wedge anchors have a Category 1 classification. They are used to resist static, wind and seismic tension and shear loads
Ceiling Mounted Folding Attic Ladders Installation Instructions
Ceiling Mounted Folding Attic Ladders Installation Instructions WARNING Before you start installing your new Louisville Ceiling Mounted Folding Attic Ladder, you must read and understand the following:
Mark Cramer Inspection Services, Inc.
Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction
Submittal Sheet. Product: Item# Description Unit Pack
Submittal Sheet Submittal Sheet #03090414-H Hex Head Drivall Screws (246) Product: Item# Description Unit Pack 08050H3 8 x 1/2-in, Hex Head, Drivall, Clear Zinc, Bulk 10,000 12150H3RG 12 x 1-1/2-in, Hex
Trusted SECTION: 04 HILTI, INC. TULSA, Conformity! ICC-ES Evaluation. not specifically. Copyright 2015
0 ICC ES Report ICC ES (800) 42 6587 (562) 699 054 www.icc es.orgg 000 Most Widely Accepted and Trusted ESR 2269 Reissued 02/205 This report is subject to renewal 02/207. DIVISION: 0 00 00 CONCRETE SECTION:
Veneer Anchors. Masonry Veneer Anchors. Description. Applications
Veneer Anchors Description Dur-O-Wal manufactures and markets a large variety of veneer anchor assemblies designed and engineered to anchor brick, tile, stone or CMU veneer to a wood stud, metal stud,
WEBSTER ELEMENTARY SCHOOL New Rochelle, New York Evaluation of Collapsed Ceiling Room 204
WEBSTER ELEMENTARY SCHOOL New Rochelle, New York Evaluation of Collapsed Ceiling Room 204 Structural Inspection Report Client: CSArch Architecture Engineering Construction Management 19 Front Street, Newburgh,
Residential Deck Safety, Construction, and Repair
Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the
Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION
SIPS SCREWS WITH MINIMUM 1" PENETRATION IN WOOD MEMBER IN SIP WALL PANEL CONNECTED TO @ 24" O.C. MAXIMUM OUTSIDE SKIN EACH SIDE OF FRAMING TYP. AS RECOMMENDED BY FOAM CORE AS EACH SIDE OF FRAMING TYP.
Submittal Information
Wedge SPECIFIED FOR ANCHORAGE INTO CONCRETE Wedge anchs feature a stainless steel expansion clip, threaded stud body, nut and washer. Anch bodies are made of plated carbon steel, hot-dipped galvanized
Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections
Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built
Design of Cold-Formed Steel Shear Walls
DESIGN GUIDE 2 Design of Cold-Formed Steel Shear Walls March 1998 The following publication was developed by R.L. Brockenbrough & Associates for the American Iron and Steel Institute (AISI), In the production
Assembly Instructions
Assembly Instructions Overhead Storage Rack 4 x 8 3 x 8 2 x 8 4 x 6 3 x 6 2 x 6 4 x 4 Two 4x8 Racks Pictured Eagle Industrial Group, Inc. 25471 Arctic Ocean Drive Lake Forest, CA 92630 877.655.3443 888.313.9228
STANDARD OPEN PATIO COVER
STANDARD OPEN PATIO COVER BUILDING & SAFETY DIVISION 201 E. LA HABRA BLVD. LA HABRA, CA 90631 62-90-9710 Call Before You Dig 1-800-227-2600 PLEASE NOTE: This information Bulletin is made available to assist
Guidelines for Earthquake Bracing of Residential Water Heaters
Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)
I BEAM TRACK INSTALLATION
PDQ 0/700 FESTOON SYSTEM INSTALLATION AND MAINTENANCE INSTRUCTIONS INTRODUCTION The PDQ Festoon System was designed to run on one of three sizes of I-beams: S x., S8 x 8. and S x.. System trolleys must
Connection Solutions
Connection Solutions DESIGN BUILD SYSTEM Connection Solutions for Cold formed Steel Construction Complies with; AS/NZS 4600:2005 AISI S100:2007 AS/NZ 1397 ASTM A653 DESIGN & BUILD SYSTEM FRAMECAD Construction
SELF-STEERING AXLE TABLE OF CONTENTS
SELF-STEERING AXLE TABLE OF CONTENTS Section 1 - Introduction Section 2 - Pre-Installation Check List Section 3 - Ride Height Adjustments Section 4 - Suspension Mount Section 5 - Axle Mount Section 6 -
Celebration Ceiling System
Page 1 of 6 Celebration Before beginning installation of the CELEBRATION, check the enclosed bill of materials to ensure that all parts are present and undamaged. Read all installation instructions and
How To Design A Post Tensioned Deck For A Building
SAMUEL ÁVILA STRUCTURAL OPTION FACULTY CONSULTANT: THOMAS BOOTHBY UNIVERSITY OF CENTRAL FLORIDA S ACADEMIC VILLAGES ORLANDO, FL THESIS PROPOSAL EXECUTIVE SUMMARY DECEMBER 12, 2005 Introduction: The University
DESIGN OF PRESTRESSED BARRIER CABLE SYSTEMS
8601 North Black Canyon Highway Suite 103 Phoenix, AZ 8501 For Professionals Engaged in Post-Tensioning Design Issue 14 December 004 DESIGN OF PRESTRESSED BARRIER CABLE SYSTEMS by James D. Rogers 1 1.0
Guidelines for Earthquake Bracing Residential Water Heaters
Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the
MEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE
MEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE This specification is intended to describe the general requirements applicable to a proper structural mezzanine design. In addition, it is to serve as
TECHNICAL NOTE. Design of Diagonal Strap Bracing Lateral Force Resisting Systems for the 2006 IBC. On Cold-Formed Steel Construction INTRODUCTION
TECHNICAL NOTE On Cold-Formed Steel Construction 1201 15th Street, NW, Suite 320 W ashington, DC 20005 (202) 785-2022 $5.00 Design of Diagonal Strap Bracing Lateral Force Resisting Systems for the 2006
Hilti, Inc. 5400 South 122 nd East Avenue Tulsa, OK 74146. 1-800-879-8000 www.hilti.com
Attached are page(s) from the 2014 Hilti North American Product Tech Guide. For complete details on this product, including data development, product specifications, general suitability, installation,
Policy on Water Heater Installations Policy No. UPC 510-1-94 Effective: September 1, 1995 Revised: February 10, 1996
CITY OF SAN JOSE BUILDING DIVISION POLICY Policy on Water Heater Installations Policy No. UPC 510-1-94 Effective: September 1, 1995 Revised: February 10, 1996 All new and replacement water heaters installed
CEILING SYSTEMS. Between us, ideas become reality. Installing. Suspended Ceilings. North America Version
CEILING SYSTEMS Between us, ideas become reality Installing Suspended Ceilings North America Version 1 Installing Armstrong Suspended Ceilings An Armstrong suspended mineral fiber ceiling is functional,
Featuring TJ Rim Board and TimberStrand LSL
#TJ-8000 SPECIFIER S GUIDE TRUS JOIST RIM BOARD Featuring TJ Rim Board and TimberStrand LSL Multiple thicknesses, grades, and products to cover all your rim board needs 1¼" Thickness matches lateral load
Hilti KWIK HUS-EZ I (KH-EZ I) Internally Threaded Carbon Steel Screw Anchor
Hilti KWIK HUS-EZ I (KH-EZ I) Internally Threaded Carbon Steel Screw Anchor Supplement to Hilti North American Product Technical Guide Volume 2: Anchor Fastening Technical Guide 2011 Edition 3.3. KWIK
Chapter 6 ROOF-CEILING SYSTEMS
Chapter 6 ROOF-CEILING SYSTEMS Woodframe roof-ceiling systems are the focus of this chapter. Cold-formed steel framing for a roof-ceiling system also is permitted by the IRC but will not be discussed;
RPS - [email protected] - 858 755 4505-12478 San Bruno Cove, San Diego, CA 92130
RPS - [email protected] - 858 755 4505-2478 San Bruno Cove, San Diego, CA 9230 SWH Solar Mount Rail R-MR-SW-SR-0.5, R-MR-SW-SR-2, R-MR-SW-SR-4, R-MR-SW-SR-4B, R-MR-SW-SR-7 Part No. MR-SW-SR-0.5, MR-SW-SR-2,
PANELIZED HOME INSTALLATION GUIDELINE
PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.
6 RETROFITTING POST & PIER HOUSES
Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This
WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION
WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION WorkSafe Guidance Document Fall Protection in Residential Construction Table of Contents Executive Summary... 1 Introduction... 1
March 14, 2007. Installation of Bay, Bow and Garden Windows
March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed
Andersen Electric Window Opener for Andersen Awning and Roof Windows
W A Electric Window Opener Electric Window Opener for Awning and Roof Windows Congratulations! You have just purchased one of the many fine products. For ease of installation and continued enjoyment of
CONSTRUCTION DETAILS & LOAD DESIGN CHARTS
Office and Production 126 New Pace Rd., PO Box 279 Newcomerstown, OH 43832 1-800-446-2188, Fax: 740-498-4184 www.buildwithsips.com CONSTRUCTION DETAILS & LOAD DESIGN CHARTS Table of Contents Description
Introduction...COMB-2 Design Considerations and Examples...COMB-3
SECTION DIRECTORY General Information Introduction...COMB-2 Design Considerations and Examples...COMB-3 Combination Assembly Recommendations and Limitations Composite Configurations...COMB-4 Typical Sealant
STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES
ROOFING APPLICATION STANDARD (RAS) No. 117 STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES Scope 1.1.
The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................
Protecting Your Home from Wind Damage
Protecting Your Home from Wind Damage During severe thunderstorms or hurricanes, homes may be damaged or destroyed by high winds. Debris flying through the air can break windows and doors, allowing high
MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)
MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) 11805 SW 26 Street, Room 208 BOARD AND CODE ADMINISTRATION DIVISION Miami, Florida 33175-2474 T (786) 315-2590
Section A Roof Truss
Section A Roof Truss Truss Types Wisconsin Truss, Inc. can build a variety of truss types, pictured below are some common examples. Common Bobtail Scissor Mono Studio Dual Slope Cathedral Tray Vault Parallel
By SP Partners, LLC. www.rainbowatticstair.com INSTALLATION GUIDE. Prestige
By SP Partners, LLC www.rainbowatticstair.com INSTALLATION GUIDE Prestige IMPORTANT READ THIS FIRST Inspect stair for any damage prior to installation. Stair is NOT to be installed while home is under
Chapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS.
Austin City Code - Volume II TITLE 25 LAND DEVELOPMENT\CHAPTER 25-12 TECHNICAL CODES\ARTICLE 1: UNIFORM BUILDING CODE\25-12-3 LOCAL AMENDMENTS TO THE BUILDING CODE Chapter 36 - STRAW BALE CONSTRUCTION
HUS-H Screw Anchor. Technical data. Seismic design data. HUS-H Carbon steel screw anchor. HUS-H diameter 8, 10, 14. Seismic design data
Technical data HUS-H Carbon steel screw anchor HUS-H diameter 8, 10, 14 10 / 011 Version 011-10 1 HUS-H screw anchor seismic design data Anchor version Carbon steel screw Benefits - Quick and easy setting
4 Installation Requirements
4 Installation Requirements 9 4.1 Code Reference The authority having jurisdiction should be referenced to determine what law, ordinance or code shall apply in the use of flexible duct. Ducts conforming
BUILD A TABLETOP LOOM
BUILD A TABLETOP LOOM From 1" x 2" stock (actual 3/4" x 1"1/2) cut: 4 pieces 15" long 4 pieces 5"1/2 long Use the above to make 2 frames for the front and back of the loom. From 1" x 4" stock (actual 3/4"
ICC-ES Evaluation Report Reissued September, 2010 This report is subject to re-examination in one year.
ICC-ES Evaluation Report ESR-2270 Reissued September, 2010 This report is subject to re-examination in one year. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council
HORIZONTAL INSTALLATION
THERMO/SOLAR Žiar s.r.o. MANUAL FOR INSTALLATION PV SUPPORTING FRAMES HORIZONTAL INSTALLATION Technical alternation reserved A1410 1 12/2014 CONTENT ORD.NO. PAGE Mounting information 3 Mounting, flat roof
Building Construction. Lightweight construction. Conventional Construction
Ventilation 53 Building Construction The firefighter s ability to safely and efficiently ventilate a building through its roof will depend to some degree on the firefighter s understanding of roof construction.
PERIMETER FLASHING. Table of Contents
FM Global Property Loss Prevention Data Sheets 1-49 February 1985 Revised September 2000 Page1of25 PERIMETER FLASHING Table of Contents Page 1.0 SCOPE... 3 1.1 Changes... 3 2.0 LOSS PREVENTION RECOMMENDATIONS...
Protecting Your Home From Hurricane Wind Damage
T H E W I N D Protecting Your Home From Hurricane Wind Damage During a hurricane, homes may be damaged or destroyed by high winds and high waves. Debris can break windows and doors, allowing high winds
Chapter 10 - Scaffolding Systems
Chapter 10 - Scaffolding Systems Contents Chapter 10 - Scaffolding Systems... 10-1 Check and Oil the Pump Jacks... 10-4 Set Pump Jack Brackets... Error! Bookmark not defined. Set Pump Jack Poles... 10-5
INSTALLATION OF A BAY WINDOW
INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening
necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the
Chapter 7 PLUMBING AND ELECTRICAL 7.1 Introduction to Plumbing and Electrical Consideration of support services such as plumbing and electrical systems from the preliminary schematics phase through final
TYPICAL PATIO COVERS 111
City of Laguna Niguel Building Division 30111 Crown Valley Pkwy Laguna Niguel, CA 92677 (949) 362-4360 FAX 362-4369 www.cityoflagunaniguel.org TYPICAL PATIO COVERS 111 PLEASE NOTE: This information Bulletin
609 West Rock Road, Radford,VA 24141 540-633-5000 / (fax) 540-731-3712 RECOMMENDED ATTACHMENTS & CONNECTION DETAILS
609 West Rock Road, Radford,VA 24141 540-633-5000 / (fax) 540-731-3712 RECOMMENDED ATTACHMENTS & CONNECTION DETAILS INDEX OF DRAWINGS SECTION A: A-1 = METAL TRACK TO PANEL ATTACHMENT A-2 = WOOD PLATE TO
Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug.
P-5 The P-5 is hot forged from carbon steel. The formed head provis spherical seating that the Lifting Eye engages, while a disc-shaped foot is embedd in the concrete. Due to its being a forged part, the
Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14
Draft Table of Contents Building Code Requirements for Structural Concrete and Commentary ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318 14) Chapter 1 General 1.1 Scope of ACI 318
PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT
PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT GENERAL INFORMATION 1.1 This section applies to piping systems for chilled water, hot water, condenser water, steam, condensate return, fuel oil, refrigerant
PUMP JACK SYSTEM AND ACCESSORIES
Pump Jack Model # 2200 A low cost, easy to operate, safe, portable scaffolding built of rugged steel. It's perfect for shingling, siding, sheathing, insulating, painting, building, roofing, home repair
Structural Holding System
Structural Holding System Users Manual November 2013 by Vehicle Service Group. All rights reserved. CO8812.1 502071 Rev. - 11/21/2013 CHIEF'S LIMITED ONE-YEAR WARRANTY & LIABILITY Chief Automotive Technologies
INSTALLING SEISMIC RESTRAINTS FOR MECHANICAL EQUIPMENT
VISCMA 412/August 2014 INSTALLING SEISMIC RESTRAINTS FOR MECHANICAL EQUIPMENT August 2014 Developed originally by the Vibration Isolation and Seismic Control Manufacturers Association under a cooperative
DIVISION: 07 00 00 THERMAL AND MOISTURE PROTECTION SECTION: 07 41 13 METAL ROOF PANELS REPORT HOLDER: FIRESTONE BUILDING PRODUCTS COMPANY, LLC
0 ICC ES Report ICC ES (800) 423 687 (62) 699 043 www.icc es.org 000 Most Widely Accepted and Trusted ESR 3422 Reissued 09/201 This report is subject to renewal 09/2016. DIVISION: 07 00 00 THERMAL AND
Formwork for Concrete
UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Formwork for Concrete Horizontal Formwork Design and Formwork Design
USP SIP Connection Manual www.uspconnectors.com
SIP Connection Manual www.connectors.com Structural Insulated Panels (SIP) supplies quality products to build Stronger Safer Structures Los Angeles San Francisco Minneapolis Houston Tampa Charlotte Philadelphia
SECTION 15140 - PIPE HANGERS AND SUPPORTS
Part I - GENERAL 1.01 SECTION INCLUDES A. The work covered under this section consists of the furnishing of all necessary labor, supervision, materials, equipment, and services to completely execute the
M113 VEHICLE FAMILY RUBBER TRACK INSTALLATION INSTRUCTIONS SOUCY TRACK SYSTEM 04-M113-1ENS (SPLIT IDLER) Litho d in Canada 1 04-M113-1ENS
M113 VEHICLE FAMILY RUBBER TRACK INSTALLATION INSTRUCTIONS (SPLIT IDLER) 1 # TABLE OF CONTENTS List of parts and tools................................................3 Installation of complete kit...................................................5
Chapter. Restoration of Damaged Structures
5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.
Chapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
PITCHED ROOF STRUCTURES
PITCHED ROOF STRUCTURES for framed and frameless photovoltaic modules Needed tools and materials: cordless screwdriver 10mm and 13mm spanners 5mm Allen key bolts, screws and tools for fixing the system
Expanding a 40-Type Cabinet
Expanding a 40-Type Cabinet using the 3M Add-On Terminal 4220P 400-Pair and Jumper Trough Instructions January 2006 Table of Contents 1.0 General... 3 2.0 Cabinet Overall Descriptions... 3 3.0 Tools Required...
RZ Guardrail System Installation Manual
TM RZ Guardrail System Installation Manual RZ Guardrail System Compliance is based on OSHA standards: (Standards - 29 CFR) 1910.23 (e) and (Standards - 29 CFR) 1926.502 (b) Failure to read, understand
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
1.02 SYSTEM DESCRIPTION
1 OF 7 MODULAR MEZZANINES GUIDE SPECIFICATIONS FOR PART 1 - GENERAL 1.01 RELATED WORK A. SECTION 03 30 00: Cast in Place Concrete (and Concrete Finishing) 1. The area where mezzanine is installed shall
Post and Beam Construction
Post and Beam Construction A Presentation By the Canadian Wood Council Canadian Conseil Wood canadien Council du bois Early settlers introduced the concept of post and beam construction in North America
National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination
Structural Effective Beginning with the April 2011 The structural engineering exam is a breadth and exam examination offered in two components on successive days. The 8-hour Vertical Forces (Gravity/Other)
Best Barns USA Assembly Book
Best Barns USA Assembly Book Revised November 27, 2013 the Easton - R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
IKG Bar Grating: Anchoring
IKG Bar Grating: Anchoring All bar grating must be tightly fastened in place. Welding of the grating panels to the supporting members provides a superior, permanent installation. Although, for gratings
ISO Types 1-6: Construction Code Descriptions
ISO 1 Frame (combustible walls and/or roof) Class 1B Buildings where the exterior walls are wood or other combustible materials, including construction where the combustible materials are combined with
Steel Bridge Design E90 Project Proposal
Steel Bridge Design E90 Project Proposal 12/5/07 Abstract We propose to design and construct a steel bridge to the specifications and constraints governing the 2008 ASCE/AISC Steel Bridge Competition.
Handling, Erection and Bracing of Wood Trusses
Handling, Erection and Bracing of Wood Trusses Follow these guidelines for safe installation of Wood Trusses. These guidelines should not be considered to be the only method for erecting and bracing of
REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION
RESIDENTIAL: REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION 2 COMPLETE SETS OF PRINTS WITH ENGINEERS STAMP ON FOUNDATION PLAN INCLUDING ELECTRICAL, PLUMBING, ETC. SITE PLAN SHOWING HOUSE LOCATION
THE DOW CHEMICAL COMPANY Issued: August 1, 2008 200 LARKIN CENTER 1605 JOSEPH DRIVE MIDLAND MICHIGAN 48674 (989) 638-8655 www.dowbuildingmaterials.
ICC EVALUATION SERVICE, INC. EvaluateP InformP Protect Los Angeles Business/Regional OfficeP 5360 Workman Mill RoadP Whittier, CA 90601 (562) 699-0543 phonep (562) 695-4694 fax DIVISION: Section: 6 WOOD
Fall Protection Susan Harwood Grant Training Program 2013 Fall Arrest. OSHA Susan Harwood Training - AGC
Fall Protection Susan Harwood Grant Training Program 2013 Fall Arrest Learning Objectives Identify the components of a proper personal fall arrest system (PFAS) Understand how to calculate total fall distance
PC-Concrete Injectable Concrete Anchoring and Repair System
PC-Concrete Injectable Concrete Anchoring and Repair System DESCRIPTION: PC-Concrete is a two component (1:1 ratio), 100% solids, high modulus, structural epoxy paste. PC-Concrete is a solvent free, no