Air-ground data link deployment A/C manufacturer perspective

Similar documents
( T A C T ) C A ) I A

AeroMACS Briefing / Update

RTCA SC-214 / EUROCAE WG-78 Advanced Data Communication Baseline 2 Standards. Baseline 2 Tutorial. Melbourne (FL), March 2013

Aircraft Tracking & Flight Data Recovery

IMPLEMENTATION OF ADS-C & CPDLC SERVICES

SITA AIRCOM Service (VHF & Satellite)

Official Journal of the European Union L 13/3

Australian Enhanced Flight Tracking Evaluation Performance Report. August 2015


FANS-1/A Datalink Communications Environment. Version 1.0 March 7, 2008

AIRBUS INDUSTRIE. Flight Operations Support - Customer Services Directorate

Invitation to Dialogue

Aeronautical Communications Panel. Use of Internet Protocols Suite (IPS) As a Provision for. Aeronautical Internetworking

Policy Regarding Datalink Communications Recording Requirements. AGENCY: Federal Aviation Administration (FAA), Department of Transportation (DOT).

Integrated surface management Herve Drevillon (DSNA) Airport safety support tools for pilots, vehicle drivers and controllers Nicolas Leon (DSNA)

Regional Data Link Monitoring Agencies & Problem Reporting

Future Communications Study (FCS)

AERONAUTICAL INFORMATION CIRCULAR 26/15

Advanced Data Link Infrastructure Solution for Next Generation of Air Traffic Management

Initial 4D Trajectory Management Concept Evaluation

FANS Over Iridium and Voice Solutions For the Cockpit & Cabin

CND/COE/CN/CO LINK2000+ PROGRAMME. White Paper on VDL Performance Monitoring

Communication Management Unit : Single Solution of Voice and Data Routing Unit

Tuesday, March 18, :00 p.m. 5:30 p.m. MODERATED BY: Carey Miller Universal Avionics Systems Corp.

C-130 Fleet CNS/ATM Solutions

Future Air Navigation Systems Interoperability Team-Asia (FIT-ASIA)

THE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking

Guidance Material for ATS Data Link Services in North Atlantic Airspace

MARCH 2011 WISE. World In-Service Experience

MIAMI CONTROLLER-PILOT DATA LINK COMMUNICATIONS SUMMARY AND ASSESSMENT

AIRBUS CORPORATE ANSWER TO DISSEMINATE ENVIRONMENTAL MANAGEMENT SYSTEM. Environmental requirements for suppliers and management of the supply chain

PRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION

Evolution in Regional Aircraft Avionics

Portfolio update and roadmap

Automatic Dependent Surveillance Broadcast (ADS-B)

SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014

CIVIL AVIATION REQUIREMENTS SECTION 2 - AIRWORTHINESS SERIES 'I' PART VI

Aeronautical Telecommunication Network (ATN) Comprehensive ATN Manual (CAMAL)

Mobile Communication Network Architecture (MCNA) Architecture Report (A040)

ESSIP OUTLINE DESCRIPTION FOR THE IMPLEMENTATION OF THE VOICE OVER INTERNET PROTOCOL IN ATM

Block 0: Capabilities within our Grasp

Design & Manufacture Seminar SOFTWARE SECURITY & DESIGN ASSURANCE JAYSON ROWE SENIOR ENGINEER AVIONICS

ACARS INTRODUCTION. ACARS Coverage

Air Traffic Service Providers Entry Control Procedures Manual 3. Approved Provider s Operations Manual

Air Traffic Management. Steve Bradford Chief Scientist Architecture & NextGen Development April 22, 2013

Rockwell Collins ARINC MultiLink SM flight tracking service

Opening the airspace to UAS - ASTRAEA s next phase

ASTRAEA the findings so far

Meeting Room Booking System Allan MacDougall. Room Booking System at Airbus, Filton.

Cabin and Cockpit SATCOM Connectivity Inmarsat Aero Conference June 12/13, 2013

TERMS OF REFERENCE RTCA Special Committee 228 Minimum Performance Standards for Unmanned Aircraft Systems (Rev 2) REQUESTORS:

AIXM Change Management Charter

SAGEM FOQA Hardware & Software

Quality Assurance Manual for Flight Procedure Design

EUROCONTROL. Paving the way towards UAS ATM integration. Mike Lissone

MOS Part 171 Aeronautical Telecommunication and Radio Navigation Services

European ADS-B Regulation

Military SATCOM Solutions Inmarsat Aviation Conference June 2013

Workpackages. This view provides the list of the SESAR Workpackages More information can be obtained by selecting a Workpackage.

PAPER WORKING. International. Montréal, 12. (Presented by SUMMARY SARSAT. Appendix. C provides criteria. be undertaken. actions to 1. COSPAS-SAR 1.

Inmarsat Global Xpress Global, Mobile, Trusted. U.S. Government > Services > Global Xpress

ALAMEDA DO AEROPORTO Caixa Postal, Maputo REGULATIONS NEW FORMAT FLIGHT PLAN

LISP A Multi-Homing and Mobility Solution for ATN using IPv6

MINUTES OF THE 19 th PLENARY MEETING OF SC-214/WG-78 Standards for Air Traffic Data Communication Services

CNS / ATM R&D Activities in Korea

Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India

Space Based ADS-B. Transforming the Way you See the Sky March, COPYRIGHT 2014 AIREON LLC. ALL RIGHTS RESERVED.

ATIS/VOLMET Flex ATIS/VOLMET/DATALINK and Clearance

ISC- HPC I/O in the Datacentre. I/O in an Industrial Scientific Computing Environment. Gerd Büttner. July 2015

The SESAR programme: Making air travel safer, cheaper and more efficient

HIGHLIGHTS 2015 THE IRIS PRECURSOR PROJECT SESAR JU CAPACITY AND MEASUREMENT ANALYSIS FOR VDL MODE 2 PAGE 5 GLOBAL FLIGHT TRACKING PAGE 7 PAGE 3

Registration for service activation of Aircraft Earth Station (AES)

DRAFT. Advisory Circular. AC 121A-09(0) December 2003 HUMAN FACTORS AND CREW RESOURCE MANAGEMENT TRAINING

Prevention of loss of communication. Air China

EUROCONTROL COOPERATIVE NETWORK DESIGN

INTERNATIONAL CIVIL AVIATIN ORGANIZATION ASIA AND PACIFIC OFFICE ADS-B IMPLEMENTATION AND OPERATIONS GUIDANCE DOCUMENT

Performance management Identification of metrics

International Civil Aviation Organization The Fourth Meeting of the APANPIRG ATM Sub-Group (ATM /SG/4) Bangkok, Thailand, July 2016

ICAO New FPL Format Interpretation of different set of rules -

CPDLC A NEW DIMENSION IN AIR TRAFFIC CONTROL CPDLC OPERATIONAL TESTING AND TRIALS

ATC Networks are the application area for VoIP in ATM

ICAO FLIGHT PLAN MODIFICATIONS 2012

Opening the European Sky to UAS From military to civilian

Technology Assessment for the Future Aeronautical Communications System

COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP)

13th January 2015 John Leahy Chief Operating Officer, Customers

AGENDA. Need for PENS Business Case PENS Governance Current PENS Users

UAS Forum Sweden Att öppna Europas och Sverige luftrum för UAS. Gunnar Frisk, Saab AB 19 Maj 2015

ASIA/PACIFIC REGIONAL PERFORMANCE-BASED NAVIGATION IMPLEMENTATION PLAN

IMPLEMENTATION AND VALIDATION OF TAXI-CPDLC FUNCTIONALITY WITHIN THE EU PROJECT EMMA2

Performance-based Navigation and Data Quality

Satellite Voice Guidance Material (SVGM)

Flight Operations Support & Line Assistance. getting to grips with. datalink

Certification Authorities Software Team (CAST) Position Paper CAST-3

New Avionics Systems Airbus A330/A340

Castor Demo Simulations

Avionics requirements for civil aircraft Edition 30/10/2013

ANALYSIS OF THE CPDLC REAL TIME CHARACTERISTICS AND THE MODE S DATA LINK CAPACITY

Transcription:

NAM/CAR/SAM Air Traffic Services (ATS) Data Link Implementation Workshop, 18-21 Apr 2016 Air-ground data link deployment A/C manufacturer perspective Presented by Jerome CONDIS AIRBUS

ATS Data Link context AIRBUS Solutions Future Roadmap Air-ground interoperability

ATS Data Link context precursor of the FANS concept Initiated by industry (CDPLC & ADS-C) Use of ACARS network Operationally used in many oceanic remote and some continental areas ICAO FANS concept Defined by ICAO (CDPLC) Use ATN/OSI network Being deployed in European continental area (Link2000+ - EC Reg. 29/2009) FANS 1/A applications ATN B1 Applications ACARS Router ATN/OSI Router HF SATCOM VHF Page 3

CPDLC & ADS-C in the World Page 4

CPDLC & ADS-C in the World Page 5

CPDLC & ADS-C in the World Page 6

CPDLC & ADS-C in the World Page 7

CPDLC & ADS-C in the World Page 8

CPDLC & ADS-C in the World Page 9

CPDLC & ADS-C in the World Page 10

ATS Data Link context AIRBUS Solutions Future Roadmap Air-ground interoperability

ATS Data Link context AIRBUS FANS A+B all areas Basic Since 2014 Option Since 2015 AIRBUS FANS A or A+ AIRBUS FANS B+ Basic Since 2008 Basic Since 2000 Option Since 2006 Option Since 2011 Page 12

FANS A+B Dual Functional Architecture ATC Applications Cockpit automation A623 FANS A+ FANS B+ Displays Message display AOC D-ATIS DCL OCL AFN CPDLC ADS-C CM CPDLC FMS RMP AESS CVR Route Loading Voice Freq Loading ITP integration Datalink Recording A/C Router ACARS ATN Comm Means VDL A VDL2 SATCOM* HFDL Page 13 * SATCOM services can be provided via Inmarsat only

AIRBUS FANS in A320/A330/A340 Cockpit DCDU: Datalink Control & Display Unit Your mailbox Cockpit interfaces identical to FANS A/A+ and FANS B/B+ MCDU: Multi-purpose Control & Display Unit Page 14 Your keyboard

Airbus FANS in A350 XWB and A380 cockpits Attention getter Shared ATC Mail Box Downlink messages composition On MFD (Multi-Functions Display) Page 15

Receiving an Uplink Message ATC MSG ATC MSG Page 16

Sending a Downlink Message Page 17

ATS Data Link context AIRBUS Solutions Future Roadmap Air-ground interoperability

Next generation ATS Data Link package : Baseline 2 Origin: Industry-initiated FANS standards Concept: precursor of the FANS CNS/ATM concept Communication network: ACARS (Aircraft Communications Addressing and Reporting System Network) AIRBUS FANS A or A+ (CDPLC & ADS-C) in many oceanic remote and some continental areas Origin: ICAO & industry CNS/ATM standards Concept: global definition to support worldwide operations Communication network ATN/OSI or ATN/IPS (Aeronautical Telecommunication Network) AIRBUS FANS A+C (CDPLC & ADS-C) Unique & convergent product supporting all technologies Origin: ICAO-initiated CNS/ATM standards Concept: loyal to the native ICAO FANS definition Communication network ATN/OSI (Aeronautical Telecommunication Network) AIRBUS FANS B+ (CDPLC) in European continental area (Link2000+ - EC Reg. 29/2009) Page 19

B2 in ICAO GANP Page 20

ATS Data Link context AIRBUS Solutions Future Roadmap Air-ground interoperability

A/C supporting worldwide operations Air-ground interoperability is key for Aircraft Manufacturers Operational interop Technical interop Current Operations Next Step PANS-ATM ICAO GOLD OPDLWG (ex-oplink) GOLD ICAO Doc 10037 Ed1 PANS ATM Amendment OPDLWG (ex-oplink) GOLD ICAO Doc 10037 Ed2 PANS ATM Amendment EUROCAE/RTCA Standards EUROCAE WG78 RTCA SC214 B2 Revision A Page 22

A/C supporting worldwide operations Operational interop Technical interop PANS-ATM ICAO GOLD EUROCAE/RTCA Standards Current Operations Next Step OPDLWG (ex-oplink) Facilitating coexistence of FANS 1/A and ATN B1 GOLD ICAO Doc 10037 Ed1 PANS ATM Amendment OPDLWG (ex-oplink) GOLD ICAO Doc 10037 Ed2 PANS ATM Amendment EUROCAE WG78 RTCA SC214 B2 Revision A Prompt global convergence with Baseline 2 ANSPs involvement and collaboration is key to secure correctness and completeness of supporting standards and guidance materials Page 23

Mitigation of risks on air-ground interoperability Compliance with applicable standards and guidance Delivery of mature certified Airbus products Thoroughly verified at test lab, during flight tests, in interoperation with many ANSPs In Service Problems monitoring, analysis, and actions when required (new product releases for defects found on Airbus airborne systems implementation) Proactive interoperability tests campaigns with ground ATC Centers At Airbus initiative in the scope of the certification of any new avionics product release At ground ATC Centers initiative to validate new ground platform versions Airbus products particularities documented in ICAO GOLD Page 24

How to organize interoperability tests with Airbus? Send an e-mail to contact person marine.glimois@airbus.com Interoperability tests can cover A623, CPDLC, and ADS-C applications A/G traffic exchanged through ARINC or SITA operational networks An Interoperability tests campaign generally implies Some teleconferences to agree on tests dates, and tests scope Exchange of tests procedures documents through e-mail Tests execution session (generally over a half day) A teleconference for debriefing on the tests results Page 25

Conclusion Involvement and collaboration in standardization (in particular GOLD) is key To ensure any particular needs are considered, documented and shared with all stakeholders To make sure implementations comply to the applicable standards and guidance materials (avoid misinterpretations) Anticipate interoperability tests campaigns with aircraft systems Setup large scale trials with multiple partner Airlines for pre-operational validation of the datalink services when possible Participate to in-service monitoring agencies Use CRA databases to report abnormal events and trigger analysis/fix Share experience with other organisations and get awareness on reported issues and resolution status FIT : FANS Interoperability Team Page 26 CRA :Central Reporting Agency

This document and all information contained herein is the sole property of AIRBUS Operations S.A.S. No intellectual property rights are granted by the delivery of this document or the disclosure of its content. This document shall not be reproduced or disclosed to a third party without the express written consent of AIRBUS Operations S.A.S. This document and its content shall not be used for any purpose other than that for which it is supplied. The statements made herein do not constitute an offer. They are based on the mentioned assumptions and are expressed in good faith. Where the supporting grounds for these statements are not shown, AIRBUS Operations S.A.S will be pleased to explain the basis thereof. AIRBUS, its logo, A300, A310, A318, A319, A320, A321, A330, A340, A350, A380, A400M are registered trademarks. THANK YOU FOR YOUR ATTENTION jerome.condis@airbus.com Page 27