GreenHOME Operation Caulk. Air Sealing Procedure for DC Habitat For Humanity Duplex Houses (February 2004)

Similar documents
Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

HVAC INSTALLATION. Success with 2015 IECC Northeast & Mid-Atlantic. Checklist for Builders & Trades

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

HVAC INSTALLATION SUCCESS WITH 2012 IECC DELAWARE. for Builders & Trades. Recommended Practices for Optimized Energy Savings

Home inspectors are not mold inspectors, however they do inspect for defects that

Window Installation Instructions

How to Install GoBoard:

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

solutions & tips six Wise Energy Guide Building envelope solutions and simple tips AIR SEALING

Improve Comfort. Lower Energy Costs with GREAT STUFF Insulating Foam Sealants.

Barewood Octagon and Elongated Windows Installation Instructions

EASY$ TIP SHEETS. Energy Advice Saving Yukoners Money

GreenGuard Housewrap Installation Guide

Composite Stone Veneer

WINDOW INSTALLATION GUIDE

HomeSpec REPORT SUMMARY

Building Condition Assessment Report

Electrical Wiring Technical Bulletin

Mark Cramer Inspection Services, Inc.

Excerpts from the Canadian National Building Code (NBC)

RODENT PROOFING CHECKLIST

Best Barns USA Assembly Book

Installing Window and Door Mouldings

Foundation. Foundation

INSTALLATION OF A BAY WINDOW

State of Connecticut Department of Public Health RADON PROGRAM

ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill

Waterproofing and interior insulation for basements takes new twist in technology.

Comment Form on Proposed Gut Rehabilitation Alternatives

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

Sun Windows General Information Sun New Construction Window Installation Instructions

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

DETAILED INSTALLATION GUIDE

DIY CABINET REFACING INSTALLATION GUIDE

HfHMD uses LP SmartSide siding and trim.

PANELIZED HOME INSTALLATION GUIDELINE

ROOFS, SNOW AND ICE DAMS

Installation Guide. Bath and Wall Surrounds SERIES B

INSTALLATION INSTRUCTIONS FOR MINERAL FIBER BATTS

Inspecting to a higher standard.

How To Repair A Boat Landing Deck With A Boat Bed

Chapter 8. Duct Design and Sealing

Home Performance with ENERGY STAR. Evaluation Report

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

Guidelines for Earthquake Bracing Residential Water Heaters

March 14, Installation of Bay, Bow and Garden Windows

2014 British Columbia Building Code Changes

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Clad Direct Glaze Window Installation Instructions

Important Information for Installer & Homeowner

Chapter 2: Foundations

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN Phone (260) Sales Fax (260)

Additions and Alterations

) SIGNIFICANT CHANGES INCLUDING CODE COMMENTARY

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

Report for. Dick and Jane Homeowner Lovers Lane, Houston, Texas 77000

Retrofitting an Insulated Cold Roof

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

INSTALLATION INSTRUCTIONS FOR FIBER GLASS BATTS AND ROLLS

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

Best Basement Water Management Practices

Inspection Report of 1895 Jamesport Circle PSL, Fl Prepared for Yen Ho

Tundra Series Windows January 2016

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/20/2009)

4 Installation Requirements

DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS

Air Conditioner Duct Construction & Repair

PDmB, Inc. Definitions

bout your apartment SOLVING ODOUR TRANSFER PROBLEMS IN YOUR APARTMENT Understanding Air Movement in Your Building

Superform Products Ltd.

City of St. Charles Basement Finish or Remodel

The Closed Crawl Space: Making the Transition Climate Zones 3A & 4A

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

*Trademark of The Dow Chemical Company A business unit of The Dow Chemical Company and its subsidiaries Copyright 2003 The Dow Chemical Company.

Guidelines for Earthquake Bracing of Residential Water Heaters

FAQs. 19. Does the sub floor need to be level before I install my new direct-to-stud bathtub or shower base?

Structure Survey Findings:

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

Brick Veneer Construction

Asphalt Shingle Application Requirements

Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

Inspection Item COMMENTS

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

Preparation for 2015 Residential Code Changes Discussion with Local Builders and Designers

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

Orlando Home Inspection Services

Best Practices for Crawl Space Insulation

DE Frame with C Series Sidelight

CLOSED CRAWLSPACES. Have you ever been in your crawlspace? If not, have you ever even

ATTIC BYPASSES HOME ENERGY GUIDE

Propery Inspection Report

EcoTouch Insulation with PureFiber Technology

Irvinton Village Apartments 2901 Fulton Houston, Texas Houston Housing Authority J. Allen Management Managing Agent

Attachment #23 Health Safety Table. Client Education Inform issue and document. How to clean & maintain gutters. How to adjust sprinklers

What s Wrong with this Project? Report

Selecting Energy-Efficient Windows

Transcription:

GreenHOME Operation Caulk Air Sealing Procedure for DC Habitat For Humanity Duplex Houses (February 2004) A major component of heat transfer between the interior and exterior of a house result from infiltration of outside air. Therefore, minimizing air leaks in a house during its construction is just as important for creating an energy efficient home as is reducing radiating heat transfer with insulation and energy efficient windows. Minimizing air leakage in the outer envelope of a house during building is a process called air sealing. Care should be taken throughout the building process to create an effective air barrier separating the interior conditioned spaces from the exterior, as well as unconditioned interior spaces such as an attic or crawl space. In homes with forced air heating and cooling, sealing leaks in the ductwork is also very important because leaky ducts can be very wasteful of energy. Fortunately, air sealing and duct sealing can be done effectively with skilled labor and with minimum added costs. A little bit of attention to these details will pay off with savings for the homeowner for years to come. In addition, air sealing provide additional benefits to the homeowner, including eliminating drafts, preventing moisture penetration into walls, and reducing the chances of pest infestation. GreenHOME, a nonprofit organization operating in Washington, DC, has been working on improving the air sealing of homes built by DC Habitat for Humanity since 1999. We have developed this procedure for air sealing and improving energy efficiency of duplex houses built by DC Habitat for Humanity. While the procedure applies specifically to this home plan, the principles and general techniques could apply to all houses. General Tips Use caulk for gaps less than ¼ inch, and insulated foam for anything wider. Infiltration of light is a sure sign of an air leak. Check for outside light coming through the exterior walls before the insulation is installed. It helps to darken the room by covering windows. Also, after the drywall is installed, check the dark attic for light coming through from the top floor. Latex insulated foam is recommended because it works well around windows and doors, and being water-based, is much easier clean up than polyurethane foam. Polyurethane foam is useful for filling larger gaps. Do not use fiberglass insulation to fill in gaps around windows or other areas where air may infiltrate. Fiberglass insulation does not stop airflow and is not effective when it is compressed. Remember that each unit of the duplex house is staggered. This makes part of the party wall (i.e., the wall that separates the units) exposed to the outside. This part of the wall should be insulated and air-sealed like all other exterior walls.

A. Steps to Do Before the Insulation Is Installed Insulating Headers Headers are rectangular boards that fill the space in the framing of walls above windows and doors. Headers need to be insulated with rigid insulating foam board such as Dow Tuff or Super Tuff or Owens Corning Foamular. At a minimum, sandwich a half-inch insulated foam board between the interior and exterior headers. Better still is to build a header with a single 1½-inch outer header board and a 2-inch inner foam board. Sheathing 1. Fill gaps around cut-outs in sheathing where the electrical outlets and porch lamps are installed in front and in back of the house. Also seal all openings in metal electrical boxes where daylight is seen coming through from the inside. Use caulk and/or insulated foam. 2. Where there is a large hole cut out of the sheathing, such as the one for the outdoor faucet, install pieces of wood on the inside of the sheathing to make a tighter fit. Use a jig saw to cut a scrap piece of plywood or OSB board into two small rectangular pieces with a halfcircle cut out of one side so that the pieces fit snugly around the pipe or wires. Glue the pieces on the sheathing, fitting them around the pipe or wires. Fill any remaining gaps around the pipe or wires with caulk, and caulk the joints between the pieces and where the pieces meet the sheathing. 3. From inside, caulk around electrical wires and cables wires where they come through the sheathing, filling any space where you can see daylight coming through. 4. In the back of the house a duct of the dryer vent penetrates the side wall between the first and second floor. Use foam or caulk to seal gaps around this duct. 5. Use caulk to fill gaps between sheets of sheathing where you see daylight coming through. 6. On the first floor, inspect around the exterior walls where the sheathing meets the bottom plate of the framing. Caulk any place where the seam does not appear tight or where daylight is seen coming through. Do the same thing on the second story where the sheathing meets the top plate. 7. Caulk the seam where the sheathing meets the vertical stud at all the corners of the exterior walls.

Framing 1. Around all windows and doors, fill the gaps between the framing and sashes using latex insulated foam. Do not use caulk or polyurethane foam for this. You may use sill seal or "caulksaver" cords to fill in large spaces before finishing with insulated foam, but be careful not to cause the sash to bow out by stuffing too much material into the gap. 2. Caulk joints where the sheathing meets the studs of the window and doorframes. Make sure to caulk beneath the bottom of the windows as well as along the sides. Figure 1 Penetrations in the framing where wires and pipes enter the attic should be sealed 3. After the wiring and sprinkler system are installed, fill the holes made in the framing on the top floor where wires and pipes penetrate into the attic. Check the construction codes to determine which of these holes must be filled with red fire-rated caulk. Where permitted by code, you may use black fire resistant mortar or regular caulk to seal these holes. 4. In the wall of the upstairs bathroom, there is a large opening where a PVC pipe (sewer vent) goes through to the attic. Use a jig saw to cut a scrap piece of plywood or OSB board into two small rectangular pieces. Out of once side of each piece cut a half-circle with a diameter slightly larger than that of the pipe. Glue and screw these pieces to the wood on the bottom of the top plate, fitting them tightly around the pipe. Seal the gap between the pipe and pieces, as well as the joint between the two pieces, using red fire-rated caulk. Fill the open space above the pieces with insulated foam or a combination of foam and sill seal. 5. Run a bead of caulk along all joints around the headers above the windows and doors on exterior walls. Figure 2 Large gaps around pipes, such as around this sewer vent where it penetrates the attic, should be sealed first by cutting and fitting pieces of scrap wood snugly around the pipe, and then filling in the gap with insulating foam. 6. Run a solid bead of caulk along the entire length of the joint between bottom plate and the concrete slab on the first floor from the inside of the house, all the way around exterior walls. Trim any sill seal that sticks out before caulking. 7. On the second story, check the joint on exterior walls where the sheathing meets the top plate. Run a bead of caulk along any place where this joint is not tight.

8. Look for spaces between studs on the framing on exterior walls that are less than 1 ½ inches wide. Since these gaps are difficult to fill with fiberglass insulation, it is best to fill them with latex or polyurethane insulated foam. If you use polyurethane foam, wait for it to dry and then cut away any excess foam polyurethane insulated foam to make it flush with the studs. B. Inspection of Insulation After wall insulation is finished, check that it is continuous and complete in its coverage. Fill gaps, even small ones, with fiberglass insulation. Check the bathroom on the second story to ensure that the exterior wall is insulated behind the tub. Keep in mind that the purpose of insulation is to deter heat transfer; don't expect it to stop airflow. Don't compress insulation since it is less effective when compressed. C. Sealing the Air Ducts 1. Inspect tape applied to duct joints by the contractor. Make sure that they used metallicbacked tape, not duct tape. Remove any duct tape or tape that is not securely fixed to the ducts, replacing it with metallic-backed tape or sealing the joint with mastic sealer. 2. Apply a continuous coat of mastic duct sealer over all joints in the ducts not sealed by the contractor. The coat should be 1/16th to 1/8th inch thick. All joints should be sealed, including circular joints of branches and straight joints at elbow and between straight pieces. 3. Check the opening of the ducts in the floor of the second story. The sheet metal from the duct should be bend over the top of subfloor. Fill any openings in the corners with mastic or caulk. D. Hanging Drywall When hanging drywall on walls, run a continuous bead of glue along the horizontal upper plate on the top of the wall and bottom plate on the bottom of the wall. This acts as a seal that prevents movement of air and moisture in and out of the inside of the wall.

E. Steps to Do After the Drywall Is Hung 1. On exterior walls, fill gaps between all electrical boxes and drywall using caulk or insulated foam. Be careful not to get any caulk or foam on the interior surface of the drywall. Alternatively, you can install foam gasket beneath plates of the outlets and switches. 2. On the ceiling of the first story, fill the gap around the vents between duct endings (boots) and drywall using caulk, insulated foam, or duct sealer. (The duct vents on the floor of the second story are sealed when the ducts are sealed; see step 3 above.) 3. From the second floor, put masking tape over any large gaps in the drywall ceiling around the light fixtures. This will keep the insulated foam from falling through. Since the tape may damage the surface of the drywall and leave a visible rough area, only tape around light fixtures where the drywall will be covered by the ceiling light, and not around the water sprinklers. 4. Then go into the attic and fill all gaps around the light fixtures from the top using caulk and insulated foam. Also apply caulk or foam over all openings in the plastic covers over the light fixtures, blocking any penetrating light that you see. Seal the gaps in the drywall associated with the water sprinkler, around the pipe that penetrates from the second story and around the sprinkler outlets. 5. While in the attic, spray foam in the holes where wires penetrate through the framing. (The bottom of these holes should already be sealed with caulk.) 6. There is a large duct for return flow to the furnace in a walled-off space above the steps. If this space is not capped on the top, it will create a large air leak between the conditioned areas of the second story and the unconditioned attic. Check in the attic to see if the top of this space is covered with drywall. If it has been left open, cut a piece of drywall to fit and nail over top of the opening. Caulk around the edges of this drywall piece. 7. Check the ceiling or the second story and clean off any caulk or foam that came through the gaps. After the caulk and foam Figure 3 This open chase for the return duct to the furnace creates a major air leak into the attic. It must be sealed with a piece of drywall or wood. has dried, remove the tape from around the light fixtures. 8. When the attic hatch is installed, weatherstrip should be put around the edges of the hatch. Cut boards of rigid insulating foam that about 1/4 inch smaller than the attic hatch in both dimensions. Glue the boards to the top of the hatch cover to obtain a thick ness of at least 4 inches.

F. Things to Do Outside the House 1. Clear silicon caulk should be applied around the windows when they are installed. (This is normally done by the Habitat crew.) 2. Before the siding is installed, check to make sure that at least one layer of house wrap (Tyvek) is wrapped around the inside corner where the two houses are joined. 3. After the siding is installed, neatly fill with electrician's putty the gaps around pipes and wires where pass through the sheathing and siding. GreenHOME, Inc. 110 Maryland Ave., NE Washington, DC 20002 Phone: (202) 544-5668 info@greenhome.org www.greenhome.org