300 Front Street West. Public Art Plan. Prepared for Tridel Corporation. Brad Golden + Co Public Art Consulting. Revised 03 May 2010

Similar documents

Toronto and East York Community Council. Director, Community Planning, Toronto and East York District STE 14 OZ and STE 14 RH

CITY OF BRAMPTON STREET CORRIDOR MASTER PLAN

WELCOME WELCOME TO THE PUBLIC EXHIBITION FOR THE ILONA ROSE HOUSE REDEVELOPMENT. ILONA ROSE HOUSE

68 & 70 Charles Street East & 628, 634, 636 & 638 Church Street- Zoning Amendment Application - Preliminary Report

8. EXTERIOR SITE LIGHTING

Guiding Principles. McCauley Area Focused Urban Design Plan. 1 Connect: Chinatown and Little Italy with downtown and surrounding areas

Media Production MA. School of Graduate Studies w w w.r yerson.ca/graduate

DIVISION STREET CORRIDOR STRATEGY Arlington, Texas May 17, 2012

Downtown Core Sub-district

GARFIELD BOULEVARD. concept planning 54TH PL CALUMET AVE ELLSWORTH DR CTA STATION STUDY AREA GAS STATION GARFIELD BLVD PRAIRIE AVE

STAFF REPORT. December 20, North District Community Council. Director of Community Planning - North

50 Bloor Street West Zoning Amendment Application - Preliminary Report

3655 Kingston Rd - Official Plan and Zoning By-law Amendment Applications - Preliminary Report

Welcome. Purpose of the exhibition

05 AREA/SITE SPECIFIC GUIDELINES

28.0 Development Permit Area #2 (Neighbourhood District)

315 First Ave NE Minneapolis, MN 55413

Welcome to our exhibition

SUNRISE FILM FESTIVAL

EXECUTIVE SUMMARY. Figure 1: Downtown Vancouver District Map and Woodward's Site Location (City of Vancouver, 2014; 2015b) Woodward s

Near West Side Comprehensive Plan Executive Summary (Revised) April 2004 City of Milwaukee DCD

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

PLAZA DESIGN GUIDELINES. Adopted by City Council November 17, 1992

FIRST STREET NORTH CREATING PLACES FOR PEOPLE

We have consulted with internal and external. King Square Estate Newsletter. Regeneration Proposals

Parklet FAQs. Each parklet has a sign on it clearly indicating that it is a public space.

B. Improve the appearance and character of areas surrounding new development.

Sergison Bates architects. 90 Masterplan for landscape and urban housing, Newham, London


{MANCHESTER} A NEW NEIGHBOURHOOD FOR ENTERPRISE, CULTURE AND LIVING

Project: Setting the Stage: Planning the Hennepin Avenue Cultural Corridor on Downtown Minneapolis' Oldest Street

Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota. Land Use Goals:

Liska+Associates. Communication Design. Design for Real Estate

CITY COUNCIL PACKET MEMORANDUM

Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

New Waterloo. Transforming the Elizabeth House site

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

Parkway Forest Context Plan

Downtown Tall Buildings Project - Consultant's Study, Public Consultation and Implementation

icity submits planning application in major milestone for delivery of London 2012 legacy

City Planning Heritage Preservation

Introduction to the town of Vinge. Vibrant town. Ever-present nature 1

B. Chief Corporate Officer and Director of Real Estate Services each has signing authority on behalf of the City for:

OFFICIAL PLAN REVIEW ENVIRONMENTAL STAKEHOLDERS FEEDBACK REPORT

PROPOSAL Stalker Hall Sunwork and Garden A large outdoor sculpture and garden space

Everton Library THE JEWEL ON THE HILL

CityCenterDC. A New Focal Point for Downtown Washington, D.C. Feature Mixed-Use DEVELOPMENT SUMMER 2013

Lincoln Downtown Master Plan Update

Mondrian Project Team Champion (Head of Learning)

Topic 2 11/28/2012 Blocks & Street Network

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

BENTONVILLE BLUEPRINT Executive Summary

Amendment C195 to the Boroondara Planning Scheme - Maling Road Built Form Guidelines - Summary of Submissions and Request for Panel

ARTICLE VIII SECTION 8.1 O-I OFFICE INSTITUTIONAL DISTRICT

Development Variance Permit Application Package

Neighborhood Planning Guide To Zoning

OVERVIEW PROJECT SUMMARY

Date: 15 September Cathedrals FOREWORD COUNCILLOR MARK WILLIAMS, CABINET MEMBER FOR REGENERATION AND NEW HOMES

2175 Keele Street - Official Plan and Zoning By-law Amendment and Draft Plan of Subdivision Applications - Preliminary Report

REGULATIONS FOR CELLULAR ANTENNA TOWERS AND CELLULAR TELECOMMUNICATIONS SERVICES

PLANNING FOR NEW DEVELOPMENT AT THE COTTONWOOD MALL SITE

Tall Building Design Guidelines Status Update

The Zig Zag Building Victoria Street, London, SW1

Cobourg Tourism Asset Feasibility Study

23 Glen Watford Drive - Zoning Amendment Application - Preliminary Report

Ohio Department of Transportation. Lytle Tunnel Rehabilitation Phase 2 Public Information Meeting

General Manager, Parks, Recreation and Culture General Manager, Finance and Technology

COMMUNITY REDEVELOPMENT AGENCY FAÇADE IMPROVEMENT PROGRAM GUIDELINES

St Vincent s University Hospital New Clinical Block Dublin, Ireland. 500 Bed Acute University Teaching Hospital Main Clinical Block

21.04 LAND USE. Managing amenity through land use strategies

Opal Service District Plan

Downtown Community Planning Council Meeting offebruary 18, 2015

Shaping Whanganui. Have your say, korero mai

Best Practice For Selecting Bus Stop Locations

A CONDO- COLLABORATION OF ART, FASHION, DESIGN AND GOOD TASTE IN TORONTO S SOHO SOUTH NEIGHBOURHOOD AT RICHMOND AND PETER.

DESIGN Chapel Hill 2020 Newsletter September 2013

Director, Community Planning, Toronto and East York District STE 27 OZ & STE 27 RH

1 Amendment C195 to the Boroondara Planning Scheme - Maling Road Built Form Controls - Adoption

P u b l i c. Development Proposal And Rezoning

East Lake Park {xäñ Çz uâ Äw t à z{àxü véååâç àç

ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1. Inner Business Zone. Outer Business Zone PALMERSTON NORTH CITY COUNCIL

2015 SPONSOR OPPORTUNITIES

About PXSTL About the Sam Fox School of Design & Visual Arts

a) Budget. The City of Fort Collins requests $100,000 to design and plan the Rocky Mountain

WELCOME TO OUR EXHIBITION

We look forward to working with you during this exciting weekend of art, education and cultural entertainment.

SCHOOL OF ARCHITECTURE & COMMUNITY DESIGN COLLEGE OF THE ARTS UNIVERSITY OF SOUTH FLORIDA

Theme 1: Activities. Background

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016

Schenk-Atwood Neighborhood Business District Master Plan

Build a Bench for Kowloon East

Create a greener community by championing strategies for reducing waste while encouraging the sustainable development and use of renewable energy.

Landscape Architecture

City of Quesnel Business Façade improvement Program Guidelines for 2016 year

Rapid Transit Backgrounder

WE OFFER THE FOLLOWING COURSES... Art and Design Photography Graphics Textiles

Millennium Dundas Street. Ayerswood Development Corp.

Supplementary Report - Mimico-by-the-Lake Secondary Plan

The main objective of this proposal is to enhance the quality of life in Kársnes. It embraces the positive features of the peninsula s tip and weaves

Transcription:

300 Front Street West Public Art Plan Prepared for Tridel Corporation by Brad Golden + Co Public Art Consulting Revised 03 May 2010

PROJECT OVERVIEW The 300 Front Street West Condominium development is located in Toronto s downtown media and entertainment district. The project site is located on the northwest corner of Front and John Streets at the foot of the CN tower and across the street from the Rogers Centre (formerly known as the SkyDome), in the midst of the city s burgeoning International Film Festival district 300 Front Street West, designed by Rudy Wallman Architect, is comprised of a 49 storey residential condominium tower, a 13 storey front loaded bar building with grade-related retail- which acts as a visual buffer to a hydro transformer complex directly north of it, as well as an inviting publically accessible open space located directly at the corner of Front and John Streets. The development is consistent with the urban design policy framework which supports intensification and infill within urban centers on locations that are well served by public transit. The at grade experience for pedestrians is enhanced through creating a comfortable base condition of the tower, improved streetscape along Front and John Streets, as well as the creation of a large urban garden which plays against the park on the opposite side of Front Street and contributes to the amount of quality open space available in the area. PUBLIC ART OVERVIEW Tridel and the public art consultant have endeavoured to meet the City s urban design objectives to support the public realm of streets and open spaces, and to maximize public accessibility and visibility of the artwork through consideration of site conditions, built form opportunities and context. To this end, we have made available, for public art vision, the most publicly accessible and visible site, the park that is a component of the development. Front Street Park Located at the southeast corner of the site, Claude Cormier Landscape Architects, have designed a picturesquely layered crisscross of paths, luxuriant vegetation, and a sprinkling of street trees evoke the atmosphere of a park on the scale of a garden and as a counterpoint to the formal grid of city streets. Accessible to condominium owners and neighbourhood residents alike, the park serves as a link between private and public zones in the metropolis. To give the building a signature presence, the paving pattern of the site has inscribed the address 300 directly into the design. The roadways and sidewalks of the site make up the digits, clearly visible from the high vantage points in the nearby surroundings. Like the logo on a Fendi purse, the site-integrated icon is woven through with an intricate network of paving.

PROJECT TEAM Developer: Tridel Corporation Project Architect: Rudy Wallman Architect Project Landscape Architect: Claude Cormier Landscape Architects Public Art Consultant: BRAD GOLDEN + Co SELECTION PROCESS We propose an invitational competition as set out below: The art consultant and the Developer have reviewed portfolios of eleven artists and artist teams and have short-listed the following 3 artists or artist teams for development of specific proposals for the project: Jennifer Marman and Daniel Borins, Toronto, ON Robert Youds, Victoria, BC Jason Bruges, London, UK The short-listed artists will be paid an honourarium, as well as reimbursed for travel expenses, to develop specific proposals in response to terms of reference prepared by the art consultant. Short-listed artists will be invited to present their proposal to the project jury. The jury will then select an artist for this project who will subsequently enter into an agreement with the Developer to create the artwork. ESTIMATED BUDGET Item Budget Total $970,000 Artwork Capital Budget 85% Administration Allowance 8.75% Contingency* 1.6% Launch and Public Relations 1.0% Maintenance Fund** 5% of artwork construction *Any surplus from the contingency at end of project installation will be distributed to the artist and/or to the public relations and maintenance fund. ** May be adjusted relative to form of winning proposal JURY COMPOSITION The jury will be composed of: **Michelle Jacques, associate curator of contemporary art, Art Gallery of Ontario *Michael Alstad, artist, Year Zero One Artist Collective Robert Ouellette, writer, critic, author of John Street Media Corridor thesis Claude Cormier, Project Landscape Architect **Rudy Wallman, Project Architect * lives in ward ** works in ward

PUBLIC RELATIONS PROGRAMME The public relations programme for the public art programme will consist of an unveiling ceremony and the production of a booklet that will be distributed to local residents and to any interested parties. Local media outlets will be contacted via. press release and media interviews with the artist will be arranged if requested. TIMELINE The following proposed timeline is dependent upon approval of the public art plan by appropriate City staff. Meet with planning staff Fall 2009 Presentation to Public Art Commission Spring 2010 Preparation of artist s proposals Summer 2010 Adjudication of submissions Fall 2010 Artwork development and construction Winter 2010 Spring 2012 Artwork installation Spring 2012 Launch and public relations Summer 2012 * Specific date to be confirmed by the developer s project manager as determined by the construction schedule ROLE OF THE ART CONSULTANT The art consultant will be an independent agent who will facilitate the public art programme with the intent of achieving the successful integration of art within the development and the surrounding urban fabric. The Art Consultant will be responsible for all aspects of managing the public art project from the initial planning stage through to the installation of the artwork and submission of final documentation to the City. Responsibilities of the consultant include development of this plan, facilitation of the artist selection process, coordination of the artwork programme with the artist, design team, client and City and facilitation of artwork installation.

300 Front Street West Public Art Plan CONTEXT Diurnal Nocturnal Public Private The artwork will communicate to a broad public audience ranging from the residents of the condominium both day and night to office workers during the day to sports fans attending an event at Rogers Centre/SkyDome to music lovers attending a performance at the Glenn Gould Theatre in the CBC building at night.

300 Front Street West Public Art Plan URBAN DESIGN GOALS Reinforce Landscape Design Engage Space of Park Utilize Existing Park Services Recognize Disparate Patrons Starting at the AGO and Grange Park to the north and terminating at the 300 Front Street West park, the artwork site - adjacent to the CBC and Roger Centre/SkyDome - sits at the south end of the media and cultural corridor that is John Street. The hydro transformer pen situated directly north of the park is a further landmark that functions to reinforce the themes of the artwork: Artifact and Illumination, Object and Effect.

Site Plan

300 Front Street West Public Art Plan ART OPPORTUNITIES The 300 Front Street West Park, designed by Claude Cormier Landscape Architects, utilizes a number of strong organizing principles which present themselves as potential art sites: Perimeter Benches Perimeter Planting Beds Intersecting Pathways Mounded Quadrants Planting Grid Artists may choose to engage these elements, or the entire space of the park, integrating the artwork with the overall park design.

Park Plan

300 Front Street West Public Art Plan ART THEMES The following themes are proposed as guidelines for the artwork such that as broad a range of artistic vision is possible. Artifact and Illumination The artwork should be sculpture and light source Object and Effect The artwork should provide interest day and night