Maintenance Guide CELCRETE

Similar documents
The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri

The HardieZone System: HZ10 Care and Maintenance Guide

Leaky Homes Financial Assistance Package (FAP) Repair plan example

FLASHMAN WINDOW AND DOOR FLASHING SYSTEM. Product. Scope. Appraisal No. 573 [2013]

Water Damage & Repair

Common Problems with Walls

Residential Inspection Guidelines

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

Tested to BS 6375: Part 1: 1989 and achieved a weathertightness classification of 2000 Pa (Special)

EXTERNAL WATERPROOFING MEMBRANES BEST PRACTICE GUIDELINES

Issue of the Guidelines on Prevention of Water Seepage in New Buildings

Sto Specification No. RC100 Guideline Specifications for Cleaning Wall Surfaces

RECOATING AND RENEWING SPF ROOFING SYSTEMS

Vision Home Inspection

March 14, Installation of Bay, Bow and Garden Windows

COMPREHENSIVE PROPERTY INSPECTIONS

Bituminous Sheet Flat Roofs: Their repair and maintenance

October 5, 2015 Dear Client,

SPPI: Specialist Inspections NZS4306 Compliant Residential Property Inspection Specialist

Maintenance & Inspection Guide

Commercial Roof Inspection Form

Sealant. 30" Model No D: 17-7/8" TO 18-3/8" (454 to 466mm) W: 29-3/4" TO 30-1/4" (756 to 768mm) Under Countertop Installation

September 3, Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

Building Owners Guide to a Duro-Last System!

Sun Windows General Information Sun New Construction Window Installation Instructions

bout your HOUSE before you start Renovating Your Basement Moisture Problems

CLAIM NO: 626. UNDER The Weathertight Homes Resolution Services Act IN THE MATTER of an adjudication

bout your house before you start Renovating Your Basement Moisture Problems

Comment Form on Proposed Gut Rehabilitation Alternatives

What you need to know about concrete block basement construction.

Tundra Series Windows January 2016

Presentation Agenda. Introduction. Types of Flooding Identifying Flood Risks Property Improvements Additional Resources.

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

Reference: BRM A0 July 18 th, Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls

FLASHCLAD VERTICAL WEATHERBOARD CAVITY SYSTEM. Product. Scope. Appraisal No. 829 [2013] Appraisal No. 829 (2013) Amended 05 February 2016

THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER

Installation Instructions

ROOF INSPECTION & MAINTENANCE

SELF-INSPECTION CHECKLIST Maintain Your Roof and Identify Potential Issues With Bloom s Comprehensive Self-Inspection Guide

0331 Brick and block construction

Manual lifting and handling

THERMOTEK SELF ADHESIVE MEMBRANE +G2 OVER WOOD SYSTEM DESCRIPTION SELF ADHESIVE OVER WOOD (8YR) BS-SA/CS

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1

METHOD STATEMENT 006 TORCH APPLIED MEMBRANE TO BASEMENT WALLS

Solving Persistent Moisture Problems and Moisture Damage

OWNER S MANUAL FOR THE PATIO SAUNA

PETERSONS WATERFRONT CONDOMINIUMS

CARLISLE OWNER S MANUAL

about your house Before You Start Renovating Your Basement Moisture Problems Figure 1 Moisture problems to solve

When dealing with a potential moisture problem, time is of the essence. Taking a proactive approach will save you money and headaches down the road.

How to report a repair

Common Callbacks. Designers love intersecting roof. ~ CoastalContractor

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

NATIONAL INSTITUTE OF BIOLOGICALS

Joseph Laquatra Cornell University

Preventing Ice Dams on Roofs

INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS. Multi-Layer Technology provides increased strength.

Dehumidifier Users manual. For Models: DH45S DH65S

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

How-To-build guide timber windows

Memorandum. July 16, To: Plan Commission City of Madison

METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2

How To Control Water Penetration In A Window

Window Installation Instructions

Part 3 Ancillary technologies. Chapter 3.2. Mechanical ventilation with heat recovery

Stucco Repair and Maintenance No. 1.01

CI SfB. (4-) Nn2. Onduline. Mini Profile. Onduline Garden Roof Range. Onduline Building Products Ltd

GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS PHILLIP STREET, SYDNEY

Home inspectors are not mold inspectors, however they do inspect for defects that

EPDM System Repair and Cleaning

Assessing Curtain Walls

Active and Passive Sash Replacement

The WANZ Guide to Window Installation

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

School Construction Authority Architecture & Engineering

Commercial Roof Management

StuccoSpec Moisture Testing Inspection

A. Work on this project shall consist of, but is not limited to, the following:

BELL ASSOCIATES ARCHITECTURE PLANNING

J. Historic Buildings Pre- and Post-Disaster Mitigation

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

BASEMENT FLOODING PART II: Reducing Flooding Risks on Your Property HISTORIC CHICAGO BUNGALOW ASSOCIATION

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING

Building Condition Assessment Report

Williamson and Associates, Inc. Report of Building Exterior Condition Evaluation, dated January 2 nd, (68 pages)

Block Lofts Condominiums

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

DRYVIT SYSTEMS, INC. RESIDENTIAL MD SYSTEM AND SPRINT MD SYSTEM 30-YEAR WARRANTY AND MAINTENANCE AND CARE GUIDE

YEAR TRANSFERRABLE TANALISED 25 YEAR TERMITE RESISTANT* STRUCTURAL TIMBER AND WOOD PRODUCTS GUARANTEE

Residential Roofing Guide

NEOGARD. Preventive Maintenance Manual

Document type: Practice Note Title: External and internal membranes Document number: AC2234 Version: Purpose

EXISTING FACILITIES EVALUATION REPORT

BUILDING CONTROL GUIDANCE SHEET USE OF BREATHABLE ROOFING FELTS.

SOUND INSULATION FOR EXTERIOR WALLS AND FACADE SYSTEMS

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

Transcription:

Maintenance Guide 0800 4 CELCRETE www.celcretecladding.co.nz

The Celcrete Maintenance Guide has been designed to ensure your property is kept in first class condition Your home is one of the biggest investments you will make and the best way to protect this asset is with a little regular maintenance to keep your Celcrete clad home in first class condition. Celcrete has produced this pro-active maintenance guide so regular maintenance is met to ensure that the performance requirements of the New Zealand Building Code are continually met and failure to correctly maintain the system may void any guarantees provided with the Celcrete Panel Veneer System. Simple things such as clearing leaves from blocked gutters, keeping gardens at an appropriate distance from the cladding and cleaning windows in a timely manner, all contribute to the longevity of your home. An annual inspection must be made to ensure that all aspects of the cladding system are in a weatherproof condition. This means that the paint coating system, plaster, flashings and all sealed joints must be thoroughly checked to confirm that they are still weather tight. All cracks, damaged areas or areas showing signs of deterioration which would allow water ingress must be repaired immediately. These areas must be repaired in accordance with Celcrete s instructions and with Celcrete approved materials. Sealant, paint coatings etc. must be repaired in accordance with manufacturer s specifications. If exterior work requires you to make a penetration through the Celcrete exterior cladding you must call us for direction 0508 CELCRETE to ensure this is done correctly, a simple phone call could save you time and money in the long run.

Painting of the Celcrete Cladding System The paint coating system should be recoated by a professional approximately every 5-10 years in accordance with manufacturer s specifications and to ensure the integrity of the entire system. Please call Celcrete for re-coating options and a list of Approved Applicators. Landscaping around Celcrete Cladding System It is essential that the Celcrete Panels maintain the minimum ground clearance at all times, as set out in the Celcrete Technical Manual. Failure to comply with this could seriously affect the durability of the Celcrete Panel Veneer System. Exterior claddings fixed over timber frame require a minimum ground clearance to ensure no moisture gets to the bottom plate of the wall by capillary action. Also cavity based exterior claddings require ground clearance to allow for adequate drainage and air flow behind them. Celcrete panels cannot be used for retaining walls or in any situation where they come in contact with the ground. The New Zealand Building Code requires the following clearances from paved and unpaved surfaces: Paved Surface: 100mm from the underside of the Celcrete Cladding. Unpaved Surface: 175mm from the underside of the Celcrete Cladding. REBATED STEP-DOWN FOOTING DETAIL CAD REF 4-8 SCALE 1:10

Annual Maintenance is a requirement of the Celcrete Cladding Performance Guarantee Cleaning of the Celcrete exterior cladding Annual cleaning of the exterior cladding should be carried out to maximise the life of the coating. Water blasting: The exterior can be cleaned with a low pressure water blast (lest than 450 psi) using a fan jet at a 45 degree angle from the wall surface (not perpendicular). The fan of the water should be kept at a minimum of 20cm from the wall surface to avoid any damage to the paint coating. Cleaning: Any localised grime or ingrained dirt should be removed by cleaning with a scrubbing brush using a mixed solution of detergent and warm water. Under no circumstances should you attempt to remove heavy staining using a high pressure water blast as this will damage the paint coating. DO NOT use harsh solvent based cleaners. Please contact Celcrete Ltd on 0800 4 CELCRETE for a full list of Celcrete approved materials and for information on carrying out any repairs that may be required.

Home Maintenance Checklist Maintenance Items Frequency Clean out gutters 6 monthly Remove leaves and other obstructions Inspect exterior sealant junctions Annually Window perimeter / pipe penetrations /control joints Ground cladding clearances Annually 175mm unpaved / 100mm paved Balustrade / wall intersections Annually If cracking has occurred contact Celcrete Inspect exterior walls, roof Annually and guttering Clean exterior walls Annually Re-paint exterior walls 5-10 Years Contact Celcrete for Applicators

Celcrete Panel and Block Building Systems Celcrete Cladding Solutions (2008) Limited P.O. Box 19535, Woolston CHRISTCHURCH Telephone: 0800 4 CELCRETE For a list of Celcrete Distributors and further product information please visit our website... www.celcretecladding.co.nz