UNIVERSITY OF MISSOURI ST. LOUIS Master Plan Update l Executive Summary

Similar documents
GEORGIA COLLEGE & STATE UNIVERSITY

Guiding Principles. McCauley Area Focused Urban Design Plan. 1 Connect: Chinatown and Little Italy with downtown and surrounding areas

Express Scripts Incorporated at the University of Missouri-St. Louis

DIVISION STREET CORRIDOR STRATEGY Arlington, Texas May 17, 2012

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE

01/31/13 ACHIEVING THE VISION FOR RESTON. Reston Master Plan Special Study Task Force

Project Design Optometry and Nursing Building Project Phase One Optometry Clinic UMSL

Downtown Tampa Transportation Vision

TABLE OF CONTENTS. Executive Summary 1-3. Introduction 4-6. Illustrative Site Plan 7. East-West Streets 8. Cooper Street Market Street 11-14

Schenk-Atwood Neighborhood Business District Master Plan

Topic 2 11/28/2012 Blocks & Street Network

PREDEVELOPMENT PLAN REVIEW OF ART CENTER COLLEGE OF DESIGN MASTER PLAN

Downtown Core Sub-district

Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two.

ELEMENT 4 - FUTURE LAND USE ELEMENT


Citizen Advisory Group Meeting #1 December 8, :00 p.m.

APPLICABILITY OF LEED FOR COLLEGES AND UNIVERSITIES

Lincoln Downtown Master Plan Update

S. BLOCK 68 REDEVELOPMENT PROJECT AREA

FIRST STREET NORTH CREATING PLACES FOR PEOPLE

DOWNTOWN AND NEIGHBORHOODS

Executive Director s Recommendation Commission Meeting: March 5, 2015

GEORGIA HIGHLANDS COLLEGE MASTER PLAN OCTOBER 2008

Land Use and Zoning. Land Use Within the Port Madison Indian Reservation

St. Clair College Planning Area Introduction

SOUTH ELM DEVELOPMENT GREENSBORO, NC. June 28, 2012

28.0 Development Permit Area #2 (Neighbourhood District)

Presentation to Board of Trustees Finance and Infrastructure Committee May 21, 2014

UNIVERSITY OF LOUISVILLE 1993 LONG RANGE DEVELOPMENT PLAN

TOPIC: The Universities at Shady Grove: Facilities Master Plan Update. DATE OF COMMITTEE MEETING: October 17, 2013 (presentation and information)

COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY. Staff: Claudette Grant

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015

Lane Community College

EDWARDSTOWN SOLDIERS MEMORIAL RECREATION GROUND BACKGROUND REPORT

Impact Analysis: The Atlanta Braves new Stadium Project. March A Cushman & Wakefield Research Publication

STAFF REPORT. December 20, North District Community Council. Director of Community Planning - North

Welcome to our exhibition

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place.

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT APRIL 9, 2015

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: 1 DISCUSSION ITEM

Planning Commission Staff Report

05 AREA/SITE SPECIFIC GUIDELINES

The Lancaster Medical District Master Plan. The Lancaster Campus District 1

The Snelling Community Park and Playground Renovation Project

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

6. Social & Community Facilities

Campus Development Plan

2010 Salida Community Priorities Survey Summary Results

Near West Side Comprehensive Plan Executive Summary (Revised) April 2004 City of Milwaukee DCD

# U N I V E R S I T Y A V E N U E S P E C I F I C P L A N Page 1-1 # 1.0 INTRODUCTION. 1.1 University Avenue, Historical Context

Schematic Plan Submittal, 21 November, 2011 Roesling Nakamura Terada Architects

Opal Service District Plan

Railyard Alternatives and I-280 Boulevard Feasibility Study. Planning Commission February 6, 2014

V I S I O N REV. 1

"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T

Town of Beaufort, NC US Highway 70 Commercial Project

Restoration. a brief look at

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

Corridor Goals and Objectives

Columbus State Community College Master Plan. A Flexible Framework.

Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview. Why Subdivision and Land Development Regulations?

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014

Arkansas River Corridor Vision & Master Plan

Design Concepts & Principles: Character Areas

Shaping Whanganui. Have your say, korero mai

New Waterloo. Transforming the Elizabeth House site

STATE UNIVERSITY OF NEW YORK COLLEGE OF CERAMICS AT ALFRED UNIVERSITY 2015 CAMPUS STATEMENT

Infrastructure Requirements and Costs Update for Strategic Locations

PLANNING FOR NEW DEVELOPMENT AT THE COTTONWOOD MALL SITE

21.04 LAND USE. Managing amenity through land use strategies

TOWN BOARD OF THE TOWN OF NORTH SALEM WESTCHESTER COUNTY, NEW YORK LOCAL LAW # OF THE YEAR 2012

CITY OF FLORENCE NEIGHBORHOOD REVITALIZATION STRATEGY SECOND PUBLIC MEETING

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES

Planning of the Pre-Concept Architectural Design For the McGill University Health Centre, Montreal

CITY COUNCIL PACKET MEMORANDUM

STRATEGIC PLAN

Envision Venice Strategic Plan for Fiscal Year Ending. September 30, Preserving and Enhancing the Venice Quality of Life.

Town of Snowmass Village. PO Box Or Delivered To: 1 P a g e

City of Arnold, Missouri

INFRASTRUCTURE POLICIES

Request for Proposal. Retail Consulting Services Date issued: Monday November 24, 2014 Close date: Wednesday December 10, 2014 at 12:00 pm MST

Capital Projects Town Hall Meeting

3.1 Historical Considerations

Motorcycle & Pedestrian Master Plans in Indianapolis, Indiana

EBDI Development Initiative Overview. 12 May 2014

University of Missouri-St. Louis North Station

INTRODUCTION TO ZONING DISTRICT REGULATIONS

Sharswood/Blumberg Choice Neighborhoods HOUSING TASK FORCE WORK SESSION #3

Brookdale Site. CB6 Update April 1, 2015

Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009

AMENDED OUTLINE DEVELOPMENT PLAN, VILLAGE DOCKLANDS PRECINCT, 2-46 BATMANS HILL DRIVE, DOCKLANDS

The following is submitted together with the plans, and application for staff approval.

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

THE DEVELOPMENT OF THE CITY IN CO EXISTENCE WITH THE CYPRUS UNIVERSITY OF TECHNOLOGY

Create a greener community by championing strategies for reducing waste while encouraging the sustainable development and use of renewable energy.

Improving Access in Florida International University Biscayne Bay Campus Executive Summary

Transcription:

UNIVERSITY OF MISSOURI ST. LOUIS Master Plan Update l Executive Summary APRIL 2006

Contents OVERVIEw... 1 PlaNNINg PROCESS.... 2 ISSUES... 3 CaMPUS MaSTER PlaN...6 Open Space Structure...8 Campus Districts... 11 Vehicular Circulation and Parking...14 Pedestrian Circulation...16 Program....16 Community Collaboration...19

Executive Summary OVERVIEw The Blanche Touhill Performing Arts Center was completed in 2002. The University of Missouri St. Louis campus master plan was presented to the University s Board of Curators in 2002. The master plan established an overall vision for the campus, and a framework to support the University s long-term plans for growth in enrollment and academic programs. The key elements addressed in the plan included: Long-term land requirements, including recommended land acquisitions Land use, including uses for newly acquired properties Organization of academic program Campus circulation and parking The open space and landscape framework Physical and programmatic linkages with adjacent communities and businesses Since the presentation of the plan, several projects and recommendations have been implemented or approved, including completion of the Blanche Touhill Performing Arts Center, acquisition of additional land to consolidate the South Campus, development of a new South Campus Residence Hall, and a strategic partnership with the adjacent Normandy community. Most recently, the University has initiated the development of the new Business, Technology and Research Park on University-owned land fronting I-70. However, since the plan was completed in 2002, a number of new issues with a potential impact on the campus have come up that require consideration. These include issues relating to land use, program, circulation and parking, development and redevelopment, and infrastructure. The purpose of this master plan update is to examine these issues and opportunities within the context of the overall vision and strategic direction established in the 2002 plan, and to define appropriate design solutions, planning strategies and recommendations to be incorporated into the plan. The master plan update will take the form of a plan addendum, which will consist of a land-use strategy for sites considered in the update, recommendations concerning the siting and development of new facilities currently being considered, revised systems plans for circulation, parking and campus infrastructure, recommendations for adjacent areas in Normandy and Bel-Nor with an impact on the campus, and other items. This executive summary report contains a summary of the update recommendations, in both graphic and narrative form. 1

PlaNNINg PROCESS The process for preparing the master plan update involved three phases structured around four on-campus work sessions. The three phases included: Phase 1: Issues Identification and Analysis Phase 2: Preparation and Review of Planning Strategies and Design Studies Phase 3: Documentation of Master Plan Update The work sessions were held at the beginning of the project, and at the end of each phase of work. They involved brief presentations followed by roundtable discussions of issues, ideas, and concerns. Participants in these meetings included: University of Missouri System staff University of Missouri St. Louis Master Plan Committee, including senior administrators and Deans of identified academic departments, where programmatic issues are being considered Civic leaders and residents with an interest in the campus In May, 2005, Sasaki presented the findings of Phase 2 of the update to the University s Master Plan Committee. The concepts presented at the Committee meeting were intended to serve as the basis for the final plan update. Alternative options for the South Campus were explored during Phase 2 of the planning process. Subsequent to the May Committee meeting, the University entered into negotiations with a potential tenant of the University s planned Business, Technology and Research Park, relating to the development of the Park. Given the potential impact of this development on other areas of the campus, Sasaki was asked to postpone completion of the master plan update until the plans for the Park were finalized. In January 2006, with development of the Park underway, Sasaki was asked to complete the master plan update, and a presentation of the draft plan was made to the Master Plan Committee in March 2006. This executive summary report contains the recommendations and concepts presented to and adopted by the Master Plan Committee at the March meeting.

ISSUES The following were the principal issues that were considered in the master plan update and that are reflected in the plan recommendations: Athletics The principal issues concerning the University s athletics program are as follows: There is a need to replace the existing baseball field next to the Mark Twain Center as a result of the re-location of Geiger Road (now University Place Drive). Approximately two-thirds of the existing baseball field area is needed to accommodate the new road alignment. The new road will re-establish traffic flow between University Boulevard (new Florissant Road) and North Hanley. There is a need for two to four intramural sports fields. In addition to the need to relocate the baseball field, the remaining site can not accommodate future athletic programs growth. Ideally, athletics facilities should be consolidated at a single location. Up to 20 usable acres are required. Growth of the University s athletic programs would require additional land. Recreation (Wellness Center) The University has developed plans for a new Wellness Center to replace the recreation facilities currently housed in the Mark Twain Center. The program for the proposed Wellness Center consists of +/- 90,000 gross square feet of space, including administration, wellness, gyms, indoor track, activity space and support space. A location for the facility needs to be established, and costs and phasing also need to be considered. The existing soccer field. Student Housing The University s Action Plan establishes a goal of 2,500 beds of student housing, or 14 percent of the University s planned 18,000 headcount enrollment. This amounts to 1,330 additional beds beyond the current supply. Over the long-term, an additional 148 beds will need to be replaced when the Mansion Hills apartment complex is redeveloped. The development requirements for student housing are as follows: 350 gsf/bed.65 parking spaces per bed Support amenities, including expanded campus dining and student recreation space University Meadows student housing.

South Campus and Gateway Site With the acquisition of the child care center site on the South Campus, the University has successfully consolidated its landholdings south of Natural Bridge Road. Planning for the South Campus needs to address: Program accommodation and adjacencies. Consolidation of vehicular circulation and parking systems. Integration with the North Campus. Overall aesthetics. Marillac Hall currently houses the Optometry Program on the South Campus. Science Renovation and Expansion The principal issues considered in the master plan update were: There is a need to renovate the teaching and research labs in Benton and Stadler Halls. Swing space is required to house science programs as renovations occur. Over the long-term, new space will be required to accommodate planned growth of the biology and chemistry programs. Parking on the South Campus requires consolidation. Fine Arts Relocation There is a long-term goal to consolidate fine arts programs near the Blanche Touhill Performing Arts Center. Issues to be addressed include: Confirmation of space needs for the music program as part of the General Services Building renovation. The need for rehearsal and work shop space for the theatre program. The long-term relocation of Fine Arts programs from the existing Fine Arts building on Florissant Road. Circulation and Parking There were several circulation and parking issues that required consideration in the update: It was determined that the original siting of the proposed West Drive Garage North in the master plan was not the most cost effective solution for replacing the old parking structure (Garage N) that was demolished and removed. The overall South Campus circulation system requires consolidation and clarification. Metro requires approximately 130 additional parking spaces at the South Campus MetroLink station. It was determined that proposed access to the Beffa property identified in the master plan was not the most cost effective solution. The safety of pedestrians crossing Natural Bridge Road continues to be of concern. Neither bridge or tunnel options would be feasible because of grade conditions on both sides of the Road, and the presence of underground utilities. Improved pedestrian connections are required to the Metro stations on both the North and South Campuses. Routes for both the Trailnet and Greenway Trails recreational pathway systems need to be accommodated. 4

Site Plan for the Express Scripts development. Accommodation of Business, Technology and Research Park The current development of the new Business, Technology and Research Park requires reconsideration of several elements of the plan for this area of the campus: The relocation of Geiger Road (now University Place Drive) requires the relocation of the baseball field at the Mark Twain Center. Areas for potential expansion of the Park need to be identified. Appropriate land uses on University-owned land adjacent to the Park need to be defined. Collaboration with Surrounding Communities The University is exploring ongoing opportunities for collaboration with adjacent communities. Areas of exploration include: Relationships of the campus within broader regional plans. The need for commercial development surrounding the campus. Strategic relationships for economic development and shared economic benefits. Growth of the campus and the Business, Technology and Research Park.

CaMPUS MaSTER PlaN The master plan is structured around a framework of four principal elements: Open Space Network Campus Districts Vehicular Circulation Pedestrian Circulation The master plan concepts, goals and related initiatives for each of these elements are described on the following pages. The illustrative master plan is shown in Figure 1. The Master Plan reinforces the valley as the central unifying element of the campus. 6

Figure 1 Illustrative Master Plan

Open Space Network The master plan organizes the campus around the central valley that extends through the North Campus and connects to the South Campus. The valley serves as both a defining feature of the campus, and the connecting fabric that links all areas of the campus. Other elements of the open space network include the South Campus Athletics District (see Districts below), quadrangles, streetscapes, and connections to adjacent open space areas. The open space network is illustrated in Figure 2. The valley connects with open space areas adjacent to the campus. A goal of the plan is to remove surface parking from the valley. Master Plan Goals Reinforce open space connections between the North and South Campuses Replace surface parking with structured parking, green space and plant trees Frame the valley edges with buildings Extend the character of the valley into adjacent areas by creating an open space focus for each campus district Strengthen open space connections beyond the campus Master Plan Initiatives Consolidation of the athletics fields within the South Campus Accommodation of the Trailnet and Greenway Trails recreational pathway networks Introduction of streetscape improvements along Natural Bridge Road to link the North and South Campuses Natural Bridge Road Streetscape Improvements 8

Figure 2 Open Space Network 9

Figure 3 Campus Districts 10

Campus Districts The North and South Campuses consist of several districts that are defined by existing and planned future land-uses. Additional University-related districts are located in areas adjacent to the campus. The campus districts (Figure 3) are: North Campus Academic Core Fine Arts and Communication District Beffa Special Use District North Campus Residential and Recreation District University Place Drive Incubator and Retail District South Campus South Campus Residential District South Campus Athletics District Health Profession Schools Adjacent Districts Business, Technology and Research Park Natural Bridge Road/Hanley Commercial District West Residential District Normandy Center Master Plan Goals Reinforce the function of each district with future land uses. Connect each district to other areas of the campus with open space and the pedestrian and vehicular circulation systems. 11

Potential locations for additions to the science complex. Master Plan Initiatives Specific master plan initiatives within each district are as follows: Academic Core: Accommodate the renovation of science labs and the future expansion of science programs through a 25,000 gsf addition to Benton or Stadler Hall. Fine Arts and Communication District: Accommodate the consolidation of arts programs in the area to the east of the Touhill Performing Arts. The long-term program needs for Fine Arts are summarized in Table 1. Beffa Special Use District: Provide for a number of use options, including graduate housing, an event center, an alumni house, or conference facilities. Improve access to the Beffa site with a new road to the south of Garage I. Maintain existing Lucas Lane for emergency access. Table 1. Long-Term Fine Arts Program Needs Proposed KWMU Radio Station building in the Arts District. Program Element Required ASF GSB Renovation for Music Expansion 37,000 Relocate Music Building Program 16,000 Program Consolidation 28,000 Fine Arts Building Florissant Road Facility University Park Facility Lucas Hall Visual Arts Expansion 20,000 Rehearsal Space/Work Shop 16,000 Storage 20,000 Total 137,000 View of future Incubator site. Arts District Beffa Special Use District 1

North Campus Residential and Recreation District and University Place Drive Incubator and Retail District North Campus Residential and Recreation District: Re-assign the Mark Twain Center for exclusive use for campus recreation in lieu of new Wellness Center. Build new student housing around Mark Twain. University Place Drive Incubator and Retail District: Provide a destination for technology incubator and service uses to support the adjacent Business, Technology and Research Park. South Campus Residential District: Continue to accommodate housing on infill sites within the South Campus. Provide parking for residential students. South Campus Athletics District: Relocate the University s athletics program to a consolidated site on the South Campus. Begin with the relocation of the baseball field to the Normandy Hospital site. Move soccer fields, tennis courts and build a new athletics building over the long term. University Place Business, Technology and Research Park: Accommodate the longterm expansion of the Park along I-70, east and west of University Boulevard. Natural Bridge Road/Hanley Commercial District: Support the development of University-related retail and service uses. Normandy Center: Support the development of a mixed-use district with University-related retail, service and housing uses. Proposed site for the University s athletics fields and future athletics center. South Campus Athletics District 1

Cross-section of Proposed Natural Bridge Road Streetscape Improvements Vehicular Circulation and Parking The master plan establishes a continuous vehicular circulation system (Figure 4) defined by a new entrance to the campus from University Boulevard, a continuous loop road that links the North and South Campuses, and reconfigured intersections with the regional road network. It also provides for the consolidation of surface parking lots into several parking structures that are strategically placed to serve the various Campus Districts. Natural Bridge Road Today Master Plan Goals Improve connections between the North and South Campuses and consolidate Natural Bridge Road crossings at a signalized intersection. Rationalize the South Campus road network and consolidate parking. Identify sites for parking garages. Master Plan Initiatives Re-alignment of East Campus Drive to connect to the South Campus through a signalized intersection. Accommodation of the re-located Geiger Road (University Place Drive) Natural Bridge Road streetscape improvements (see Pedestrian Circulation below). Rationalization of the South Campus road network and replacement of surface lots in a parking structure west of the Metro Station. Accommodation of structured parking on existing Lot LL. Replacement of Garage N to the north of the existing garage site. Introduction of an access drive to the Beffa property to the south of MSC Garage I. 14

Figure 4 Vehicular Circulation and Parking 1

Pedestrian Circulation The master plan establishes a hierarchy of pedestrian circulation routes that clearly define pedestrian routes between different areas of the campus (Figure 5). The routes include primary pedestrian corridors serving the North and South Campuses and regional recreational trails with connections through the campus. Construction of TrailNet pathway in 2005. Master Plan Goals Enhance pedestrian routes to support a walkable campus. Improve pedestrian connections between the North and South Campuses and the safety of Natural Bridge Road crossings. Accommodate planned regional trail routes through the campus. Master Plan Initiatives Rationalization of the South Campus pedestrian circulation system as part of Athletics District development. Improvement of pedestrian connections across Natural Bridge Road through creation of a signalized intersection and implementation of streetscape improvements, including traffic calming, street tree planting and introduction of a central median. Accommodation of the Trailnet and Greenway Trails recreational pathway through the North and South Campuses with connections to the surrounding recreational trail network. Program and Program accommodation The master plan accommodates the University s building and facility needs for academic, student life, student housing, support and parking functions. The master plan program is summarized by District in Table 2. Campus housing and parking programs are summarized in Tables 3 and 4. North Campus Academic Core Fine Arts and Communication District Beffa Special Use District North Campus Residential and Recreation District University Place Drive Incubator and Retail District South Campus South Campus Residential District South Campus Athletics District Adjacent Districts Business, Technology and Research Park Natural Bridge Road/Hanley Commercial District 16

Figure 5 Pedestrian Circulation 1

Table 2. Master Plan Program District Academic Core Fine Arts and Communication District Beffa Special Use District North Campus Residential and Recreation District University Place Drive Incubator and Retail District South Campus Residential District South Campus Athletics District Business, Technology and Research Park Natural Bridge Road/Hanley Road Commercial District Program Element Benton and Stadler Hall Lab Renovation Science Lab Addition Future Health Professions Schools GSB Renovation Fine Arts Program Consolidation: - Fine Arts Building - Florissant Road Facility - University Park Facility - Lucas Hall Fine Arts Program Expansion: - Visual Arts - Theatre Rehearsal and Workshop - Shop and Storage KWMU Building Building Re-use: - Graduate Housing (40 beds) - Event Center - Faculty Resource Center - Alumni House - Conference Facility Student Housing (400 beds) Mark Twain Center Assigned to Recreation Technology Incubators Service Retail Infill Student Housing (1,090 beds) Parking Lot LL Garage (300 spaces) Athletics Facilities: - Replacement Baseball Field - Soccer Practice Field - Soccer Competition Field - Replacement Tennis Courts - Replacement Athletics Building - Garage (850 spaces) Research Park Expansion Future Campus Town : - University-related Retail and Service - Housing Table 3. Summary of New Housing District Program Element Beds Beffa Special Use District Graduate Housing 40 North Campus Residential and Recreation District South Campus Residential District Soccer Field Site 400 Infill Student Housing: - South of Meadows Apartments - East of South Campus Residence Hall - South of South Campus Residence Hall - East of Marillac Hall 650 200 100 100 Total New Housing, All Sites 1490 18

Table 4. Summary of Changes to Parking Supply District North Campus Garage N West Drive Parking Structure North North Garage North Campus Total South Campus Lot LL Lot NN Lot S Lot SS Lot T Lot U Lot V Lot W Lot Y Lot SC2 South Campus Garage Phase I South Campus Garage Phase II South Campus Total Parking Removed 515 515 33 40 74 336 57 135 189 52 56 68 1,040 Parking Provided 500 650 1,150 300 850 1,150 Community Collaboration The University is exploring opportunities to collaborate with the surrounding communities of Normandy, Bellerive Acres, Bel-Nor and Cool Valley in areas of shared interest. University staff have met with representatives of these communities to initiative discussions on issues such as planning, economic development, strategic relationships and campus and research park expansion. It is anticipated that these efforts will lead to future partnerships and an action plan for moving forward. Potential areas of opportunity include: Collaboration on planning and development of University-related retail, service and housing uses at Natural Bridge and Hanley Roads, Normandy Center, and University Boulevard Future expansion of the Business, Technology and Research Park Ongoing community access to the Optometry Clinic Community access to other University facilities 19