The Dutch Railway System Logistics & Railway Infrastructure Forum NL Indonesia April 30 th 2015 1
Welkom Eigenaar: ProRail 27 november 2014
Welkom Eigenaar: ProRail 27 november 2014
Exchange of knowledge optimising usage of the network
Welkom Eigenaar: ProRail 27 november 2014
Welkom Eigenaar: ProRail 27 november 2014
Welkom Eigenaar: ProRail 27 november 2014
Areas for cooperation Governance of the railway sector: division of roles Optimising usage of the (mixed) network Freight Stations and public transport nodes Public Private Partnership High Speed Line South
Welkom Eigenaar: ProRail 27 november 2014
Welkom Eigenaar: ProRail 27 november 2014
Mixed use of network by public passenger trains and freight trains ProRail is the non discriminatory and transparant capacity and traffic control manager 50% of freight trains on Betuweroute, rest of the Dutch network 8% of trains are freight trains, rest is passenger trains Dutch law garantuees minimum frequency level for market segments ProRail coordinates time table design with all railway undertakings and allocates capacity. Capacity allocation in close cooperation with German and Belgian IM s ProRail s market proposition is presented in yearly network statement ProRail is seeking its role in cooperation with private rail terminals ProRail and RU s contract performance regime in access agreement ProRail and RU s both responsible for optimizing system performance under continuous supervision of Dutch Competition Authority ACM RU s pay infra charge for using the ProRail network (line haul and yards) 11
Rail Freight Corridors Europe 12
Betuweroute: dedicated freight railway line to Europe Connection between Europe s biggest port and the European market 173 km dedicated freight railway from Port of Rotterdam to German border and further. Switzerland and Italy included A15 track: bundled with the A15 highway and Rhine Harbour line Port of Rotterdam Shunting yards and connections to port industries and terminals Europe s number 4 port, Amsterdam, is connected at Geldermalsen First and last O/D in 3 European Rail Freight Corridors Rotterdam Amsterdam Zevenaar Duisburg Noordzee Europoort Maasvlakte Scope: van Rotterdam zee tot Zevenaar A15 tracé Geldermalsen Havenspoorlijn Giessen Tiel Emplacementen / raccordementen, bedrijfsaansluitingen Kijfhoek Gorinchem Waal Pannerdensch Kanaal Zevenaar Valburg Duitsland 13
Importance Betuweroute for Netherlands Contributes to the ports of Rotterdam and Amsterdam improve competitive position Dutch seaports, industry and green ports better hinterland connection facilitate growth of freight and passenger traffic on Dutch Railway network higher air quality Harbour Line: >80.000 trains per year A15-track : >25.000 cargo trains per year Development A15-track: Start 2009: 160 trains a week 2014: 530 trains a week 14
Stations (1)
Stations (2)
Public transport nodes
What is HSL-Zuid? Amsterdam Schiphol Rotterdam Breda Antwerp London Paris Brussels
IP contract characteristics Scope: design and build new systems operate and maintain all new infra Term: 5 + 25 years Size: over 1 billion Euro Type: DBFM Interfaces: civils works, existing rail infra, train operations HSL-Zuid - 19
Private finance Infraprovider Civil works Government Transport Companies Payment during constr. phase Transfer Payment during operations
The Netherlands: PPP Model provides a clear role for the Infraprovider Concessionaire Private Public TOCs Train Operating Companies International (Thalys, DB, Virgin etc.) Train Operators, Ticketing Domestic (NS) Government Operation Finance Design Construct Maintain Infrastructure manager Timetabling Traffic Control Capacity Power Control allocation Infraprovider Concessionaire Systems, Trackwork, Signalling,Telecommunication, Power Supply, Noise Barriers. Financing, Design, Construction, Maintenance Regulator Audit Approval Regulator State Insurances Design Construct Civil Works Six sections, one shield driven tunnel State provides finance
Financing Overview The Package m maturity Subordinated Debt Bridge 119 06 Syndicated Loan*) 605 28 European Investment Bank Guarantee*) 460 28 Working Capital Facility (as of 06) 15 28 Total Financing Available 1199 *) Syndicated with 27 banks Shareholder s equity max 10% of 1.2 bln = 120 m Securities Parent company guarantees Share pledges, Performance Bonds, Advanced Payment Bonds Hedged interest rates Subdebt and SYL
SPARE SHEETS
Welkom Eigenaar: ProRail 27 november 2014
Welkom Eigenaar: ProRail 27 november 2014