Joints in Concrete Structures

Similar documents
Chapter 2 Basis of design and materials

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,

Chapter. Restoration of Damaged Structures

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

Technical Notes 3B - Brick Masonry Section Properties May 1993

LAYING BLOCK AND BRICK

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

DESIGN OF SLABS. Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia

State of Connecticut Department of Public Health RADON PROGRAM

How to build a Pizza Oven in 4 days

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI

Minor Cracks in Horizontal Surfaces

Guide for SOLID CONCRETE BLOCK SEALS

September 1, 2003 CONCRETE MANUAL CONCRETE PAVEMENT REHABILITATION

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

Chapter. Earthquake Damage: Types, Process, Categories

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS

Lighthouse Engineering, L.L.C.

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Detailing of Reinforcment in Concrete Structures

PmB Expansion Joints World leaders in expansion joint technology

Structural Failures Cost Lives and Time

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

The minimum reinforcement for the stem wall is the placement of:

Construction Specification for Concrete Curb and Concrete Curb and Gutter

Issue of the Guidelines on Prevention of Water Seepage in New Buildings

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Precast Concrete Parking Structures

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR

Waterproofing construction Joints

HOUSE BUILDING DIGEST

Chapter 3 Pre-Installation, Foundations and Piers

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

If stepping is required, step at 180mm as seen in this picture.

Metropolitan Builders Association Masonry & Concrete Standard

Module 7 (Lecture 24 to 28) RETAINING WALLS

EAST LYME HIGH SCHOOL

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps

Site Inspection Report

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements

Fifteen years experience of design, production and assembling of prestressed Bridge decks in Timber

16. Beam-and-Slab Design

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING

Tunnels & Arches OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM

SLAB DESIGN. Introduction ACI318 Code provides two design procedures for slab systems:

Design and Construction of Cantilevered Reinforced Concrete Structures

Embedded Parts Introduction - Anchors

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

Always. Reliable. Tight. Wall sleeves Versatile solutions for building entries. cablepipebuildingentry+

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

DIY GUIDE 10 EASY STEPS FOR TREATMENT OF RISING DAMP

How To Build A Luxury Apartment Complex In London

Understanding BS EN 771-3: Aggregate concrete masonry units

Wastewater Capital Projects Management Standard Construction Specification

K2 STONE NATURAL VENEER

Formwork Direct International Ltd Phone No +44 (0151) Fax no +44 (0151)

FIRESTOPPING & SMOKE SEALS

Waterproofing Problems: A Simple Explanation, A Simple Solution

Installation instructions of the MIDI-Heki roof light with operating bar, with crank or electrical version

SEISMIC RETROFITTING TECHNIQUE USING CARBON FIBERS FOR REINFORCED CONCRETE BUILDINGS

The following sketches show the plans of the two cases of one-way slabs. The spanning direction in each case is shown by the double headed arrow.

Monocouche Best Practice Guide. New-Build Housing Managing movement to avoid cracking

APPENDIX B. I. Background Information

METHOD STATEMENT FOR INSTALLATION OF CABLE TRAY/TRUNKING/LADDER

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors

WATERPROOFING OF WET ROOMS

RMS Guide for design of concrete pavements in areas of settlement. Version 1.0. Roads and Maritime Services

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig some of the trusses that are used in steel bridges

COMMONLY USED RESIDENTIAL BUILDING CODES

Construction. 3-part thixotropic epoxy patching mortar. Product Description. Tests

BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP"

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

CHAPTER 2 QUANTITY TAKE-OFF

Interior Walls below and above ground OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM

Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

3 Masonry and Manufactured Stone (Interior and Exterior)

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap

How to Install Hardwood Flooring Over a Sub Floor

PANELIZED HOME INSTALLATION GUIDELINE

CONCRETE REPAIR GUIDELINES. Concrete repairs can be broken down into four basic types, plus special repairs and planing.

CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls

Passive Fire Protection

Emergency repair of Bridge B421

SECTION 1 GENERAL REQUIREMENTS

Transcription:

Joints in Concrete Structures Joints are usually part and parcel of structures made up of concrete, steel, masonry etc. Concrete structures usually call for a varieties of joints. The most commonly experienced among them are a) Construction joint b) Expansion joint c) Contraction joint and d) Isolation joint. Of these, expansion joint and isolation joint are sometimes found to be regarded as the same type. That could be because an expansion joint is also seen as an isolation joint as it too isolates one part of the structure from another. Similarly, an isolation joint is sometimes seen as an expansion joint as well because it too can accomodate heat-induced expansion of concrete members. But, actually both are distinct joints. An expansion joint is meant to take care of the stresses developed purely due to the heat-induced expansion of concrete members while an isolation joint is provided to tackle the stresses likely to result from differential settlement of adjacent members or structures. a) Construction joint : This type is the most commonly experienced joint in most concreting work in spite of the fact that this type of joint is actually not a must in concrete structures unlike the other three types. A construction joint is provided when concrete pouring needs to be stopped due to some reason and then is continued again later. This is done to retain the monolithic nature of the structure which otherwise would be broken due to the break in the continuity. In other words, the joint could have been avoided if the entire concreting were completed without any stopping in between so that no part of the structure needs to be continued (by concreting) at a later date. Practically that is often not possible, especially for larger structures. Interruptions can happen due to varieties of reasons such as sudden breakdown of machinery, stopping of work at the end of the day, sudden heavy rain, installation of formwork for next lift (for wall, column etc.) and so on. Sometimes provisions for future extention of a building or a structure are required to be kept. Construction joints are often required at the ends of beams, slabs, tie beams etc, in such cases, for the purpose of future extention.

Since, construction joints are practical requirements for most concrete structures they should preferably be planned beforehand, wherever possible, and shown in the construction drawings. That would help in planning the concrete pour-plan accordingly and also in preparing the joints properly. Construction joints resulting from unforeseen events like rain, machinery breakdown etc, however, can arise at any moment and one should just stay prepared for such cases. A construction joint can be avoided if it can be coincided with an expansion joint as monolithic nature of structure is always broken at expansion joints. Where contraction joints are required to be provided, it is always better to plan construction joints to coincide with contraction joints so as to minimise the number of joints in a structure. Concrete s capacity to take bending stresses is negligible. In reinforced concrete the steel bars take the stresses due to bending moment (BM) while the concrete has to endure primarily the shear stresses. Hence, planes of minimum shear force (SF) in structures are the ideal locations for providing construction joints. One need not worry about BM stresses as there always are enough reinforcement to take care of it and concrete does not have to bear stresses due to BM. So, in case of a beam or a slab the middle third span is the zone for providing construction joints where shear stresses are the minimum. For a column, a construction joint may be provided 3 to 4 inches below the lowermost soffit of the adjoining beams. The plane of a construction joint should be perpendicular to the steel reinforcement of the concrete member. The formwork for construction joints should have shear key blocks. Shear keys provide better interlocking and thus more efficient transfer of SF between the old and new concrete. Forms should also have well located perforations to allow the reinforcement or dowel bars to pass through. Dowel bars are usually provided when a slab, pavement etc would be subjected to heavy loads or vehicular traffic. They may as well have to be provided when concreting has to be stopped at high SF zone due to sudden unforeseen reasons as mentioned above. Shear keys are not necessary where dowel bars are provided. Before continuing concreting the formwork and shear key blocks are stripped. If concreting is continued within a day or two of stopping the work, the construction joint is thoroughly water cleaned and then a layer of rich mortar is applied onto it before proceeding with the concreting.

For an older joint it s surface is roughened first and then water cleaned well to get rid of all dirts, loose materials etc. Thereafter, a layer of rich mortar is applied and concreting is resumed. Discussion on the other three types ie, expansion joint, isolation joint and contraction joint is continued in Part II & III. Expansion joint : Concrete structural members such as slabs, pavement, walls etc expand in hot environment. For members of smaller dimensions this expansion may be negligible. For members exceeding certain lengths, widths the expansion may be more than sufficient to induce flexural stresses and thus induce cracks in the structure unless they are given the opportunity to expand freely. These cracks, besides weakening the structure, can lead to corrosion of steel reinforcement due to ingress of moisture through them which can pose even bigger problems. That is where the expansion joints come into the picture. An expansion joint is provided in order to allow a concrete member to expand freely in hot environment and thus relieve the unwanted stresses so that no damage is caused to the it or the structure as a whole. These joints are common features in masonry and metallic structures. Expansion joints are essential elements of long bridges, railway tracks, long walls, piping networks etc. These joints are provided in such a way that the overall structure is not weakened due to their presence. In liquid retaining concrete structures expansion joints are equipped with water stops. Diverse materials are used for preparing these joints. Typical expansion joints in concrete structures can be about half inch to 20mm wide. The joints are prepared by placing forms of required thickness through full depth of the concrete members. A quite common as well as economic formwork material is fibre impregnated bitumenous boards. Other compressible joint fill materials used in expansion joints are cork, polystyrene, rubber etc. Sometimes, wooden forms are used which are removed after the concrete sets. Thereafter, the concrete members on both sides of the joint are given sufficient time to go through expansion or contraction for some days. Then the compressible joint fill materials, as mentioned above, of adequate thickness are inserted in the gaps through full depth of the concrete members such that the top of the filler boards remain about 20mm below the top of the concrete member. This 20mm or so deep voids are later sealed with elastomeric compounds like polyurethane (PU) or polysulphide etc. These are applied to seal the joints completely from ingress of water, dust, dirt etc and also to render better appearance. These

elastomeric sealants are quite capable of accommodating the expansion or contraction of the concrete structures. On the other hand, some prefer to install the compressible fill materials as sacrificial forms, ie they are not withdrawn upon completion of casting of the members. Elastomeric sealants are applied after some days as mentioned above to seal the joints. Reinforcing steel bars are always discontinued at expansion joints to enable free expansion of the concrete members. However, sometimes dowel bars have to be provided in order to prevent differential settlement of the members on both side of the joint. This is especially true for concrete members subjected to heavy load or high traffic. When dowels are provided they are usually kept fixed inside concrete at one end while the other ends (on the other side of the joint) have to be kept free by some means, eg by installing hollow tube inserts inside the concrete. The other ends remain inside the hollow tubes so that they can move freely when the concrete members expand or contract. The forms or the compressible joint fills should have perforations accordingly to let the dowel bars pass through them. Construction drawings usually clearly show the details of dowel bars wherever they are required. A little suggestion from this author in this regard. There are coatings available that can completely prevent bond between a bar and the sorrounding concrete. Such coatings can be applied to dowel bars and two small compressible caps can be fitted at both ends of these bars after installing them. Even one cap of adequate thickness at one end should serve the purpose. These compressible caps should be able to facilitate movements of the bars inside the concrete even as the coating prevents bonds. This would eliminate the cumbersome process of installing hollow tubes etc besides proving to be more economical. In fact, this looks so simple that such a practice could already be existing unless there are some shortcomings in the suggestion. Construction joints and expansion joints (aka movement joints) were discussed in Part-I & II respectively. Isolation joints and contraction joints are discussed in this post. Isolation joint : In concrete structures isolation joints are provided in order to relieve the stresses developed due to differential movement of the adjacent members or structures, thus preventing cracks (or damage) in the members or the structure as a whole. Isolation joints around machine foundations also perform the function of cutting off the vibrations generated by the machines, thus safeguarding the adjoing slabs or other structural elements from possible damage.

Isolation joints may be required at the junctions of horizontal members (slabs etc) and vertical members (columns, walls etc) when there are possibilities of significant differential movements. These joints may very well be required when a slab or a roof of a newly built structure has to meet an existing structure, or, a new block has to be extended from an old building in relatively softer soil or in a filled area. In both the cases there is every likelihood that the newly built slab or the newly extended block would settle more as compared to their old counterparts. Unless isolated, these differential movements can develope sufficient stresses causing cracks and damage to the structural members. The same issue might develope at the junction of large columns and slabs. While the slab would tend to move horizontally the column would always move vertically due to expansion or load related settlement causing differential movement. So, if the same is expected to be significant, an isolation joint along the periphery of the column can prove quite worthy. Isolation joints are seen in bridges as well. Isolation joints are usually about half an inch to 20mm wide. Like expansion joints these too are filled with compressible joint fillers such as fibre impregnated bituminous boards, cork, polystyrene, rubber etc. Either the joint fill boards are installed about 20mm short of top of the concrete surface or after installing the compressible boards through full depth of the joint the top 20mm (or so) portion is cut off. This void is later filled with elastomeric sealing materials like Polyurethane (PU) or Polysulphide (PS) sealants for better appearance as well to render the joints water and dirt proof. For best results, joint fillers and elastomeric sealants are to be installed only after the concrete members are cast and full loads are transferred through them. Contraction Joint : When concrete sets and dries it tends to shrink. This shrinkage or contraction can cause hair cracks on the surface of the concrete. Besides affecting the appearance of the finished surface these cracks could lead to other problems in the course of time. This is not an issue for concrete members with small surface area such as beams, columns etc. That s because the quantum of shrinkage is negligible. But cracks due to drying shrinkage can be a major issue for concrete structures with large surface area such as concrete roads, other large concrete pavement or floors etc. By forming contraction joints on the surface this issue is sorted out. Contraction Joints are also known as control joints. These joints are created in the concrete surface by inserting thin strips in fresh concrete, by saw cutting using either dry-cut or wet-cut saws, by grooving using grooving tools etc.

An important aspect is the depth of these joints as unless the depth of joint is adequate they won t serve the purpose well. According to a popular thumb rule the depth of a contraction joint should be at least one fourth of the depth of a concrete slab. Similarly, thumb rules are also there regarding spacing of control joints. Unlike an isolation joint or an expansion joint, a contraction joint is quite thin as the purpose of it is just to guide the cracks to a predetermined weak plane which is the joint itself. As already mentioned these joints should be preplanned to coincide construction joints so as to minimise the number of joints in a structure. Source: http://civilconstructionresourcez.wordpress.com/2012/05/01/joints-in-concrete-structurespart-i/