ASBESTOS SURVEY REPORT MICHIGAN STATE UNIVERSITY CYCLOTRON BUILDING EAST LANSING, MICHIGAN. January 2, Prepared By:

Similar documents
ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823

ASBESTOS BUILDING INSPECTION REPORT. for the. City of East Lansing Waste Water Treatment Plant East Lansing, Michigan

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for

Asbestos Building Inspection Report Oak Forest Gun Club 4001 W Fieldcrest Drive Markham, Illinois Project No.:

Asbestos-Containing Material Re-Inspection Report

OGS LIMITED ASBESTOS & LEAD SURVEY REPORT

AHERA 3-Year Asbestos Re-Inspection

LIMITED ASBESTOS INSPECTION POLICE DEPARTMENT - ROOFING 434 SOUTH 1 ST STREET MONTROSE, COLORADO

Asbestos Inspection Project Procedure

1200 N. COLORADO WINSLOW, ARIZONA

Asbestos Survey. for. Commercial Building TCA Building T-187, Pasco Airport Pasco, Washington. May 1, Project #A2014/0406.

Loss Control TIPS Technical Information Paper Series

EXHIBIT A SCOPE OF SERVICES

ASBESTOS and LEAD-BASED PAINT INVESTIGATION TOWN OF ST. PAUL WILLIS BUILDING ST. PAUL, VIRGINIA

If the address on this form is different than the address of the building, submit a written explanation.

PRE-DEMOLITION ASBESTOS SURVEY

Asbestos Management Plan EC 45 Page 1

ASBESTOS MANAGEMENT INTRODUCTION

ASBESTOS BUILDING INSPECTION

June 27, Project GSA Rhonda Rance U.S. General Services Administration 450 Golden Gate Avenue, Floor 4 San Francisco, California 94102

Asbestos Management POLICY

ASBESTOS NESHAP DEMOLITION SURVEY

2. 40 CFR Part 763; The Asbestos Hazard Emergency Response Act (AHERA), EPA Worker Protection Rule, February 25, 1987.

Characteristics/Applications

1804 W. Colorado Avenue Colorado Springs CO Fax AlpineConsultInc.com

Click to edit Master title style Maricopa County Asbestos NESHAP Overview. Valerie Brodeur Asbestos NESHAP Inspector

ASBESTOS INSPECTION REPORT 2 Delaware Street, 38 and 39 North Henry Court South Burlington, VT AIP 84

ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015

HART ENVIRONMENTAL RESOURCES

ASBESTOS SURVEY AND ASSESSMENT REPORT

6% Chrysotile NA White floor tile 2 nd Floor 10,000 sq ft Cat 1 2% Chrysotile Poor

TAMPA ELECTRIC COMPANY ENERGY SUPPLY ASBESTOS AWARENESS PROGRAM

Restoration Specific Asbestos and Lead Based Paint Survey Report Logan Ave Colorado Springs, CO 80909

Asbestos 2 hr. Awareness

Washington University Asbestos Operations and Maintenance Plan

NDSU TABLE OF CONTENTS

The Richard Stockton University ASBESTOS MANAGEMENT PLAN

NARRATIVE REPORT. The Asbestos Bulk Sample Results Table includes asbestos sampling data.

ASBESTOS INSPECTION REPORT 31 DUMONT AVENUE SOUTH BURLINGTON, VT AIP 78. December 16, 2011 Revised January 31, 2012

Asbestos in Soil Who Knew? A Consulting Perspective 1 st Annual Southeast Brownfields Association

May 23, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

Asbestos Survey Form (See Instructions)

BRIEFING TO THE UN STAFF

DEMOLITION INSPECTION REPORT ASBESTOS CONTAINING MATERIALS

Asbestos Procedures. Asbestos Products

Regulatory Requirements for Asbestos Inspections Prior to Renovation Projects

Asbestos NESHAP ISSUES AND QUESTIONS

How To Perform A Limited Asbestos Survey

UNVERSITY HIGH SCHOOL U W. Gregory St. Normal, IL School Asbestos Management Plan. Supplemental.

ASBESTOS AWARENESS PLAN

Title 11, Hawaii Administrative Rules (HAR), Department of Health (DOH), Chapter 501, Asbestos Requirements.

University of Pittsburgh Safety Manual. EH&S Guideline Number: ASBESTOS

Chicago Public Schools 6 Month Asbestos Surveillance Fall

ASBESTOS INSPECTION REPORT

Managing Asbestos* *Defined by Asbestos NESHAP 40 CFR 61, subp. M

Asbestos Containing Material MANAGEMENT PLAN

ASBESTOS MANAGEMENT PROGRAM

ASBESTOS MANAGEMENT PLAN. Tufts University Medford, Massachusetts

North Carolina State University. Asbestos Management Plan

ASBESTOS MANAGEMENT PROGRAM

Asbestos Frequently Asked Questions

Don Hau, Project Development, 100 Shops Building, th Avenue SE, Minneapolis, MN 55414

Asbestos in the Home and Workplace June 2012

Miami University s Asbestos Operations & Maintenance Program Administered by

The Vermont Department of Health When is Asbestos a Public Health Threat? Town Health Officers (THO) Training

How to Manage Asbestos in School Buildings: The AHERA Designated Person's Self Study Guide. January 1996

CATALOGUE OF ASBESTOS MATERIALS. City of White Rock White Rock Library Buena Vista Avenue White Rock, BC

Asbestos Survey Former Kraft General Foods Facility 500 Dalton Avenue and 1222 Statesville Avenue Charlotte, North Carolina. H&H Job No.

Request for Proposals ASBESTOS ABATEMENT SERVICES. Coffeyville Community College 400 W. 11 th Street Coffeyville, KS 67337

LEGAL REVIEW & UPDATE

PROTECTING TRIBAL CHILDREN & COMMUNITY MEMBERS FROM ASBESTOS-IN-SCHOOL HAZARDS

2009 Housing Provider Forum. Ontario Environmental & Safety Network Ltd.

Why was asbestos used?

The Management of Asbestos at the University of Manitoba

Building Owners Responsibilities for Asbestos

ASBESTOS in state and local government

SECTION ASBESTOS ABATEMENT

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD

Wellesley College Asbestos Management Program

Regulated Building Materials in Property Management. July 30, 2013

Asbestos Related Data For the Healthcare Facility

WORK PROCEDURES FOR ASBESTOS RELATED ACTIVITIES

Approved by: UBC ACT Committee

2013 AHERA 3 Year Re-Inspection Report For. Northeast Elementary School 82 Scofieldtown Road Stamford, CT. Performed by

Safeway 691 Berkeley Shattuck Place Date: May 3, 2007 MDA. Store Data: Interior Construction Materials: Exterior Construction Materials:

SECTION 16 ASBESTOS MANAGEMENT

ARKANSAS POLLUTION CONTROL and ECOLOGY COMMISSION REGULATION NO. 21 ARKANSAS ASBESTOS ABATEMENT REGULATION

PAGE 1 Ingraham Environmental Inc. P.O. Box South Utah Avenue Butte MT (877) info@ingrahamenvironmental.

ASBESTOS BACKGROUND INFORMATION

BOSTON COLLEGE OFFICE OF ENVIRONMENTAL HEALTH & SAFETY ASBESTOS MANAGEMENT PROGRAM

Asbestos Management Program

ASBESTOS MANAGEMENT AND OPERATING PLAN FOR MCCONNELL AIR FORCE BASE

WorkSafe BC Guidelines Regarding Demolition and Asbestos Waste Materials

PROCEDURE 31 - Asbestos Safety. Table of Contents

ASBESTOS CONTAINING MATERIALS (ACM) REFERENCE GUIDE

Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:

How To Manage Asbestos From Roofing And Siding

Asbestos Management Program (EHS Program Manager 7.5)

ASBESTOS SAMPLING REPORT. Urban Design. Louisa Ryland House Sampling to Ceiling in Room Newhall Street Birmingham B3 3PL

Transcription:

ASBESTOS SURVEY REPORT MICHIGAN STATE UNIVERSITY CYCLOTRON BUILDING EAST LANSING, MICHIGAN January 2, 2008 Prepared By: TEK Environmental & Consulting Services, Inc. 9670 Chilson Commons Circle Suite #303 Pinckney, MI 48169 TEK Project No.: CI0086/006

ASBESTOS SURVEY REPORT MICHIGAN STATE UNIVERSITY CYCLOTRON BUILDING TABLE OF CONTENTS EXECUTIVE SUMMARY...1 1.0 INTRODUCTION...1 2.0 APPLICABLE REGULATIONS...2 3.0 SAMPLING PLAN AND SAMPLE COLLECTION Procedures...4 3.1 Plan Review...4 3.2 Site Walk Through and Visual Survey...4 3.3 Sampling Plan...4 3.4 Sample Collection...5 3.5 Sample Analysis...6 4.0 SURVEY RESULTS...6 5.0 CONCLUSION...7 6.0 SURVEY LIMITATIONS...7 LIST OF EXHIBITS TABLES Table 1 Table 2 Table 3 Table 4 Table 5 Homogeneous Area List Sample Locations and Results Functional Space Suspect Materials Sheet ACM Materials Sorted by HA Damaged/Significantly Damaged ACM Materials FIGURES Figure 1 Sample Locations on Map APPENDICES Appendix A Appendix B Appendix C ACM Photographic Log of: ACM HA Materials Significantly Damaged Materials Laboratory Reports/Chain of Custody forms Inspector Accreditation

ASBESTOS SURVEY REPORT MICHIGAN STATE UNIVERSITY CYCLOTRON BUILDING EXECUTIVE SUMMARY TEK Environmental & Consulting Services, Inc. (TEK) was retained by Mr. Zach Hansmann, Environmental Technologist, Office of Safety an Health of Michigan State University to perform an Asbestos Survey at the Cyclotron Building, located in East Lansing, Michigan. The purpose of the inspection was to identify asbestos containing materials in the facility. Mr. Adam Cobb, a licensed State of Michigan asbestos building inspector, conducted inspection and sample collection procedures. Materials identified during this inspection included: 4 and 6 cove base and mastic 9 x 9 and 12 x 12 floor tiles and mastic, plaster, mag. and fiberglass pipe insulation and associated fittings, 2 x 2, 2 x 4 and 12 x 12 ceiling tiles, HVAC fabric, HVAC duct calk, vinyl stair tread, transite lab hoods, sink undercoating, spray-on fire proofing and fire doors. The following materials tested positive for asbestos content: 9 x 9 Light green floor tile w/ gray specs and mastic 12 x 12 Cream floor tile w/ brown streaks and mastic (mastic only) 9 x 9 Gray vinyl squares w/ cream streaks White sink undercoating 12 x 12 Beige floor tile w/ marble pattern and mastic (mastic only) Mud fittings on fiberglass insulation Canvas wrap on fiberglass duct insulation Mag. Pipe insulation Mud fittings on mag. pipe insulation 9 x 9 Cream floor tile w/ green streaks Former exterior, window calking (atrium/ hall) Black sink undercoating The following materials were assumed to contain asbestos: Transite lab hood Tagged fire door and frame Roofing materials Exterior window and doorframe caulk (building) Window calk (greenhouses)

Locations of ACM materials and quantities in each unit are located in Tables 3 and 4. Included in this report are tables listing the suspect materials found during the survey, as well as asbestos survey data, floor diagrams, photographic logs of homogeneous materials, inspector licensing documentation, laboratory reports, and the chain of custody forms.

1.0 INTRODUCTION TEK Environmental & Consulting Services, Inc. (TEK) was retained by Mr. Zach Hansmann, Environmental Technologist, Office of Safety an Health of Michigan State University to perform an Asbestos Survey of the Cyclotron Building, located in Lansing, Michigan. Tables and Figures summarize the survey information separately for the building. Table 1- Homogeneous Materials List identifies homogeneous materials found in the building and identifies if these materials tested positive or negative for asbestos. Table 2-Sample Locations and Results provides information on where inspectors collected sample and the analytical results. Table 3 Functional Space Suspect Materials Sheet identifies material descriptions and applicable quantities and/or damages sorted by functional space. Table 4-ACM Materials Sorted by HA idenitifies material descriptions and applicable quantities and/or damages however it is sorted by homogeneous material. Table 5-Damaged or Significantly Damaged ACM Materials provides information regarding damaged materials identified during the asbestos survey. Elements of the asbestos building inspection were based on practices specified in Michigan Public Act 440 of 1988, U.S. Environmental Protection Agency (EPA) and Occupational Safety and Health Administration (OSHA) standards and included the identification of homogeneous areas within the subject facilities, bulk sample collection of suspect materials, and laboratory analysis. Field activities were performed by Accredited Asbestos Building Inspectors as recognized by the State of Michigan Department of Labor and Economic Growth (DLEG) who have met the requirements of Section 206 of the Toxic Substances Control Act and the Asbestos School Hazard Abatement Reauthorization Act (ASHARA). The Model Accreditation Plan (MAP) under ASHARA extends training and accreditation requirements to those individuals performing asbestos inspections in public, commercial and industrial buildings.

Applicable licensing and accreditation information is included in Attachment C. The goal of this asbestos survey is to provide an identification of Asbestos Containing Materials (ACM) in the subject structures. The information contained in this report can serve as a database for asbestos activities including abatement and Operation and Maintenance (O&M) program development. 2.0 APPLICABLE REGULATIONS The following list highlights the primary federal regulations governing the asbestos inspection and abatement industry. EPA 40 CFR 763-Asbestos- This regulation requires local education agencies to conduct inspections, sample suspect asbestos containing building materials (ACBM), assess the condition of the ACBM, develop and implement response action recommendations and develop a plan for managing the materials. OSHA 29 CFR 1926.1101 Construction Industry Standard for Asbestos - Covers asbestos exposure in work involving: (A) demolition or salvage of structures where asbestos is present (B) removal or encapsulation of materials containing asbestos (C) construction, alteration, repair, maintenance, or renovation of structures, substrates, or portions thereof that contain asbestos (D) disposal, storage, transportation, containment of and housekeeping activities associated with asbestos or products containing asbestos. OSHA 29 CFR 1910.134 General Industry Standard for Respiratory Protection Purpose proper use, fitting instructions, maintenance, care and limitations of respirators. Requires development of standard operating procedures and a written respirator program. OSHA 29 CFR 1910.20 Access to Employee Exposure and Medical Records - Record keeping and employee access to records including exposure monitoring information, medical surveillance and training records. OSHA 29 CFR 1910.1200 Hazard Communication Standard - Requires employers to provide information to their employees about hazardous chemicals/materials to which they are exposed. This information is transmitted by means of a hazard communication program, labels and other forms of warning, material safety data sheets and training.

EPA ASHARA Model Accreditation Plan (MAP) - Expands TSCA Section 206 specifically the training and accreditation requirements to persons performing asbestos work in public and commercial buildings. Applicable to anyone who inspects for ACM designs or conducts a response action with respect to friable ACM. Department of Transportation (DOT) 49 CFR 171-178 - Includes requirements for classification of materials, packaging, hazard communication (package marking, labeling, placarding, and shipping documentation), transportation, handling and incident reporting. Asbestos is classified as follows: Proper Shipping Name: Environmentally Hazardous Substance (Asbestos) Special Provisions: None Hazard Class or Division: 9 I.D. Numbers: NA 2212 Packing Group: III Label: Class 9 EPA 40 CFR Part 61 National Emission Standards for Hazardous Air Pollutants - Rules concerning the application, removal, and disposal of ACM. Also covers notification requirements to a regional NESHAP Coordinator which specifies quantities, project dates, description of planned removal methods, procedures to be used to comply with the requirements of the regulation, and disposal site information. Asbestos materials can be categorized into one of the following three common material types: (1) surfacing material, (2) thermal system insulation, and (3) miscellaneous material. According to the U.S. Environmental Protection Agency (EPA), asbestos materials are classified as friable, Category I nonfriable or Category II nonfriable in 40 CFR Part 61, National Emissions Standards for Hazardous Air Pollutants (NESHAPS). The NESHAPS classifications are defined as follows: Friable asbestos material - any material containing greater than one percent (>1%) asbestos that when dry can be crumbled, pulverized, or reduced to powder by hand pressure. Category I nonfriable ACM - means asbestos-containing packing, gaskets, resilient floor covering, and asphalt roofing products containing greater than one percent (>1%) asbestos. Category II non-friable ACM - means any non-friable material, excluding Category I non-friable ACM, containing greater than one percent (>1%) asbestos.

3.0 SAMPLING PLAN AND SAMPLE COLLECTION PROCEDURES The objective of the asbestos survey investigation was to identify suspect visible and accessible asbestos-containing building materials (ACM) grouped by homogeneous materials and functional spaces. Mr. Adam Cobb, (Appendix C- Inspector Accreditation), conducted the onsite investigation on October 23, 2007 through October 31, 2007. The following subsections describe the sampling plan and data collection phases of the survey. 3.1 Plan Review One of the first steps in conducting an asbestos survey is to review building plans or specifications of the subject property to determine the construction type and materials used. However, specifications could be located at the time of inspection for the subject buildings. 3.2 Site Walk Through and Visual Survey A site walk-through and visual survey was conducted to identify various suspect building materials. The inspection included the observation of wall and ceiling materials, flooring systems, various structural building components, utility/mechanical components and thermal system insulation. 3.3 Sampling Plan Homogeneous areas of material appear uniform in texture and color, and appear identical in every other respect. Materials were categorized into one of the following three material types commonly known to contain asbestos: (1) surfacing material, (2) thermal system insulation, and (3) miscellaneous material. Each type contains many different and distinct variations. For classification purposes, each distinct material was assigned a unique identification number. Suspect homogeneous materials were also quantified within each building. Information regarding homogenous materials is located in Table 1-Homogeneous Materials List. According to the U.S. Environmental Protection Agency (EPA), asbestos materials are classified as friable, Category I nonfriable or Category II nonfriable in 40 CFR Part 61, National Emissions

Standards for Hazardous Air Pollutants (NESHAPS). The NESHAPS classes are defined as follows: "Friable asbestos material" - any material containing greater than one percent (>1%) asbestos that when dry can be crumbled, pulverized, or reduced to powder by hand pressure. "Category I nonfriable ACM" - means asbestos-containing packing, gaskets, resilient floor covering, and asphalt roofing products containing greater than one percent (>1%) asbestos. "Category II non-friable ACM" - means any non-friable material, excluding Category I non-friable ACM, containing greater than one percent (>1%) asbestos. 3.4 Sample Collection Sampling procedures were performed in an Asbestos Hazard Emergency Response Act, 40 CFR Part 763 (AHERA) manner, by State of Michigan licensed asbestos inspectors. A total of 83 samples, including layers, were collected during the survey. Materials identified during this inspection included 4 and 6 cove base and mastic 9 x 9 and 12 x 12 floor tiles and mastic, plaster, mag. and fiberglass pipe insulation and associated fittings, 2 x 2, 2 x 4 and 12 x 12 ceiling tiles, HVAC fabric, HVAC duct calk, vinyl stair tread, transite lab hoods, sink undercoating, spray-on fire proofing and fire doors. Photographs of each homogenous material are located in Appendix A. Random sampling methods were conducted in a manner to minimize unnecessary building material damage and to avoid disturbance of building occupants. When feasible, samples were collected on materials that exhibited signs of damage. This survey excluded inaccessible or hidden areas that could not be viewed without destructive access such as above fixed ceilings, materials located within equipment, or inside or behind walls. There may be materials located within equipment, behind walls, or above ceilings which are not accessible and therefore, not identified or quantified during the survey. Details about sample collection locations and results of samples are located in Table 2-Sample Locations and Results.

3.5 Sample Analysis Samples of suspect ACM were submitted to Apex Research, an EPA accredited laboratory, for analysis by Polarized Light Microscopy (PLM) method EPA 600/R-93/116. A material is considered positive for asbestos is present in an amount greater than 1 percent. Laboratory analytical reports and chain-of-custody forms are included in Appendix B. 4.0 SURVEY RESULTS A material that is positive for asbestos means that asbestos was present in the material in the amount of greater than 1% by weight. The following materials tested positive for asbestos: 9 x 9 Light green floor tile w/ gray specs and mastic 12 x 12 Cream floor tile w/ brown streaks and mastic (mastic only) 9 x 9 Gray vinyl squares w/ cream streaks White sink undercoating 12 x 12 Beige floor tile w/ marble pattern and mastic (mastic only) Mud fittings on fiberglass insulation Canvas wrap on fiberglass duct insulation Mag. Pipe insulation Mud fittings on mag. pipe insulation 9 x 9 Cream floor tile w/ green streaks Former exterior, window calking (atrium/ hall) Black sink undercoating The following materials were assumed to contain asbestos: Transite lab hood Tagged fire door and frame Roofing materials Exterior window and doorframe caulk (building) Window calk (greenhouses) Locations of ACM materials and Quantities in each unit are located in Tables 3 and 4.

5.0 CONCLUSION All ACM that will be impacted by any future renovations should be removed prior to work by a State of Michigan licensed Asbestos Abatement Contractor. Furthermore, abatement activities must be conducted in compliance with all applicable regulations, standards and generally accepted environmental and safety practices. 6.0 SURVEY LIMITATIONS The following locations were not accessible at the time of the survey: 3, 4, 9, 20A, 02/ K500 & K1200 Vaults, Transfer Hall, Vault N3, N100, N101, N103, N104, N107A, N112, 100T, 102, 114A, 118, 126, 127, 129, 132T, 142A, 148, 154A, 178, 179, 215A, 221, 224T, 226 and 245. The new addition, West wing (1 st floor, 2 nd floor and lobby area) was not included in this survey. If any new homogenous materials are identified in these locations, the materials should be assumed positive for asbestos until they can be sampled and submitted to a laboratory for analysis. TEK has attempted to investigate the existing conditions within the Michigan State University Cyclotron Building using standard professional procedures. This asbestos survey is intended to identify containing materials associated with the Cyclotron Building. Regardless of the thoroughness of an asbestos survey, it is possible that some materials were inaccessible. Such areas may include mechanical equipment or wall cavities and pipe chases. Renovation or demolition may expose unidentified materials. If a newly identified suspect material is found, the material should be sampled prior to disturbance or removal. Report prepared by: Adam Cobb Michigan Accredited Building Inspector-A2954

Report reviewed by: Tyler S. Lenling Senior Project Manager Michigan Accredited Building Inspector-A13413