HYDRO DECK HYDRO DECK OVERVIEW

Similar documents
Competency Framework for Marine Engineer Class 6. Competency Framework for Marine Engineer Class 6

Floating. Diesel power stations

Part 0 - Classification and Surveys Classification and Surveys I

ATL 10.2 R/V ATLANTIS MAINTENANCE OF CRITICAL SYSTEMS

PROJECT CARGO RISK MANAGEMENT

ST. VINCENT AND THE GRENADINES

M/V TAMARITA/FERMITA/ ROSITA/FAVORITA

Technical Bulletin. Oil Record Book entries: Machinery space operations (Part 1) Including January 2011 amendments to Technical Bulletin 24

GOLIATH DPIII OFFSHORE SUPPORT VESSEL. Vessel Specification - December 2011

GAS FLAWLESS - FORM C

Fourth Generation Modular Construction

Heat Recovery Dehumidification (HRD) system. Designed for municipal swimming pools

Former Station 12 and SpecTec. SFI Group System. Product Description

VESSEL S TECHNICAL SPECIFICATION

Roadmap for Remote Controlled Ships

OFFSHORE WIND Peter Robert

AMOS SFI. Group System. Product Description

Our recent customers Siemens / Statoil and Bard Offshore have experienced this. References on request.

UNDERWATER ENGINEERING SERVICES. Visit Us Online At Part of the ATR Group

The Engine Department

Building an LNG driven vessel. LNG developments at Meyer Werft Viking Grace 18_09_2013

Kobelco Extended Warranty Program.

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

Ambient Temperature Operation and Matching MAN B&W Two-stroke Engines

Engine Room Console 6

LNG BUNKERING LNG AS A SHIP S FUEL GREEN SHIP TECHNOLOGY, OSLO 23-MAR Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager

LP News UK P&I CLUB. Introduction JANUARY 2009

VESSEL SAFETY INSPECTION

Flex separation systems, S-separators

AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS

The Dalian Developer A new approach to oil spill response

Regulation of 15 September 1992 No. 693 concerning the Form and Keeping of Log Books for Ships and Mobile Offshore Units

About us. Remontowa reliability, quality & experience At Your Service. Worldwide

Multipurpose Offshore Construction Vessel

Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures

Flood Rescue Emergency Services First Responders Coast Guard Police

SPAR s Estimating Cost Models

Spare Parts Program. Parts, Consumables & Accessories superproductsllc.com

IMO WORK PROGRAMME OF THE COMMITTEE AND SUBSIDIARY BODIES

INDUSTRIAL DIRECT DRIVEN PISTON COMPRESSORS CL - CH - CK

LEISTRITZ PUMPEN GMBH. Leistritz Screw Pumps & Systems. Cargo and Liquid Handling

Taiwan s land area is about 36,000 square kilometers. 2/3 of the lands are mountains and slope lands with cultivated land rate only 22%.

MV EVITA. VS 485 PSV MK II - Platform Supply Vessel. Ugland Supplier AS OFFICE ADDRESS:

MERIAURA LTD >YOUR EXPERT IN MARINE TRANSPORTATION

ANNEX 3. RESOLUTION MSC.339(91) (adopted on 30 November 2012) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE)

GUIDELINES FOR THE DRAINAGE OF FIRE-FIGHTING WATER FROM CLOSED VEHICLE AND RO-RO SPACES AND SPECIAL CATEGORY SPACES OF PASSENGER AND CARGO SHIPS

Exhaust Scrubbers. What you need to know. Move Forward with Confidence

Logistic solutions for the installation of offshore wind farms

Fee tariff for services of Port of Gdansk Authority SA

LNG Storage and Fuel Gas Systems. LNG: Fuel for Shipping, London 15-Feb Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager

Emergency Response Plan. at sea also valid in case of Flooding, where applicable

Engine Room Pressure Measurements onboard MT Suula

Course available 24/7 for up to six months from the date of purchase or until completion

Pump Controller Type ABS PC 441 Monitoring and/or Control of Pumps and Pumping Stations

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.

Wynn s Extended Care

Marine Generating Sets 3.7 to 50 kva

maersksupplyservice.com S-TYPE ANCHOR HANDLING TUG SUPPLY VESSEL Visit our web site at: maersksupplyservice.com

(2) Various fire sections enclosed by various classes of fire divisions; (3) Arrangement of fire detectors and manual fire alarm stations;

Design methodology and numerical analysis of a cable ferry

Lay-up of Vessels MARCH This chapter has been amended since the main revision (March 2012), most recently in April See Changes on page 3.

GUIDANCE ON DETENTION AND ACTION TAKEN

DEPARTMENT OF TRANSPORTATION UNITED STATES COAST GUARD

SIMON STEVIN. 24,350kw Diesel-Electric Propulsion 19,500m 3 Capacity of Rock Storage Dynamic Positioning System DP-2

How To Prevent Over Water Activities

MARINE FIRE SAFETY POCKET CHECKLIST

FOGA ApS. Arctic Hunter Multipurpose/support vessel

SECTION 5. Action for Emergency Response

Rules for Classification and Construction Ship Technology

Guidelines RULES on on Trailer. Presented by: Richard L.Krabbendam Heavy Lift Specialist

Law Relating to the Prevention of Marine Pollution and Maritime Disaster

Construction Services. Furnishing Energy Solutions

Bergen Engines Products and Applications

Atlas Copco Generators

LOADING DOCK EQUIPMENT. A. Section Concrete Forms and Accessories: Placement of anchors into concrete.

Recognized Org: Bureau Veritas. Organization. to Detention: Ship Management:

> Capital Markets Day 2011

A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society

GENERAL OCEAN TOW RECOMMENDATIONS FOR JACKUP DRILLING UNITS International Association of Drilling Contractors (I.A.D.C.) February 13, 1991

Heavy Fuel Oil supply units. The world s best selling HFO supply unit. The right choice for any conditions

Fot. Kacper Kowalski/aeromedia.pl

Advances in Arctic Oil-Spill Mitigation, Response Measures and Clean-up Techniques

SPEEDROC D30. Surface Drill Rig for marble, granite, sandstone and limestone in the dimension stone industry.

Guidance for Reducing Port State Detentions. Pre-Port Arrival Quick Reference

Module Title: General Ship Knowledge

Company Overview. Freo has been proudly serving industry since Our Vision. Our Values. National Hotline: 1300 CRANES

Rules for Classification and Construction Ship Technology

products 22 º C Ventilation Air Conditioning Refrigeration Energy & Cost Saving Products Inside PROVIDED BY HEINEN & HOPMAN

WÄRTSILÄ DYNAMIC MAINTENANCE PLANNING (DMP) AND CONDITION BASED MAINTENANCE (CBM) Wärtsilä

Diesel Engine Driven Generators Page 1 of 6

Fuel Treatment and Conditioning Systems

PVE Piling and Drilling Rigs Powerful, Versatile and Efficient. PVE Piling and Drilling Rigs B.V. Worldwide supply of specialized foundation machines

Alfa Laval PureBallast 3.1

Phone Phone

Rotary Screw Compressors UP-Series 4 & 5.5 kw

LNG as Ship Fuel. Effects on Ship Design, Operations and Supporting Infrastructure

PUMP MAINTENANCE SCHEDULE AND CHECKLISTS

LOSS PREVENTION IAT GROUP

Supply, storage and handling of LNG as ship s fuel Björn Munko LNG 17, Houston

THE REPUBLIC OF LIBERIA LIBERIA MARITIME A

Transcription:

HYDRO DECK

HYDRO DECK Combining the very best in engineering design, mooring analysis and high-end fabrication, AG&P ALE Ventures Pty Ltd delivers an innovative solution to the offshore market to solve major logistical challenges and remove supply chain bottlenecks. The first of its kind, the Hydro Deck has been designed and built through the joint venture between AG&P, a leader in integrated industrial process outsourcing and ALE, one of the world s leading engineering and heavy lift companies. The Hydro Deck is a transition pontoon that works in conjunction with modular offloading facilities (MOF) for on-shoring modules and infrastructure. Its innovative design enables load-in operations for combined loads of up to 17,000 metric tonnes, regardless of tidal conditions or port facilities. HYDRO DECK CONTROL ROOM HYDRO DECK OVERVIEW A mobile port solution, designed to serve as a bridging platform from vessel to quayside, the Hydro Deck is utilised for global projects faced with restricted offloading delivery windows due to unpredictable high tidal variations and where local port facilities are limited by scale or capability for a project s specifications. The Hydro Deck transports and offloads fabricated modules in adverse conditions, significantly increasing the availability of delivery windows. Its unique tidal buoyancy adjustment system provides clients with a greater range of ro-ro vessels and barges, improving both availability and cost competitiveness. This feature also allows the MOF to be built at higher elevations, therefore reducing the gradient to site. The landmark innovation can be provided on lease, fully crewed with expert heavy lift operators, and, on completion of the load-in phase, it can be towed away, reducing upfront capital expenditure and environmental footprint. The Hydro Deck offers our clients continuous offloading anywhere in the world, 24/7. ON BOARD SYSTEMS: 2.1 Ballast System 2.2 Air Ballast System 2.3 Ballast Stripping System 2.4 Hydraulic Valve System 2.5 Cooling Water System 2.6 Fuel Oil System 2.7 Lubricating & Hydraulic Oil Systems 2.8 Bilge Systems 2.9 Deaeration System 2.10 Fresh Water System 2.11 Sewage System 2.12 Hydraulic Mooring system 2.13 Hydraulic Ro-Ro Ramp system 2.13 Ventilation & Air Conditioning System ELECTRICAL SYSTEMS: 3.1 Power Generation 3.2 Main Switchboard, Control & Power Distribution 3.3 Main & Emergency Lighting System 3.4 AMS Control, Alarm & Monitoring System 3.5 Impressed Current Protection System 3.6 Navigation Aids System 3.7 Communications System 3.8 CCTV System SAFETY SYSTEMS: 5.1 Fire Hydrant System 5.2 CO 2 Fire Extinguishing System 5.3 Quick-Closing Valve System, Ventilation Dampers & Emergency Stops 5.4 Fire Detection System 5.5 Fire Integrity Plan

HYDRO DECK SAFETY ADVANTAGES TIDE INDEPENDENT UNLOADING SOLUTION - The Hydro Deck provides a tide independent unloading solution. In the event there are problems during the ro-ro operations and the SPMT is partly on the ship or quay, the Hydro Deck can pump through the tide cycle allowing for a maximum safe situation for the problems to be rectified without compromising the operation. INTERNAL BALLAST SYSTEM - The internal ballast system has been designed with 100% redundancy. The deck of the Hydro Deck is clear of pumps, hoses and piping for flexible SPMT configurations and support stool locations. Internal ballast systems are far more reliable than external ballast systems because they are protected from the elements and permanently located, maintained and tested on regulated intervals inside the barge. External ballast systems need assembly, testing and disassembly time for each operation and are susceptible to failure due to the exposure to the elements. FIXED RAMP SYSTEM ON EACH END The ramp system has been designed for the maximum axle loads of the strongest SPMTs on the market to provide the safest possible ramp solution. Their hydraulic capability eliminates crane and/or forklift work, which are often the cause of an incident during a ro-ro operation. This feature also limits the exposure of the field personnel to the elements by eliminating tasks. HYDRO DECK GENERATORS 6X CATERPILLAR C18 480kW HYDRO DECK BALLAST PUMPS 12x AZCUE 2000m3/hour WATER BALLAST SYSTEM CONTROLS

HYDRO DECK COMMERCIAL ADVANTAGES HYDRO DECK AIRCOMPRESSOR UNITS 3X ATLAS COPCO ZA5 4000m 3 /hour CAPABILITY - 24 hours per day, 7 days per week, which can drastically improve the overall project schedule. Most of the Heavy Lift Vessels (HLV) are tide dependent, limiting unloading to 5-6 hours per day, sometimes only certain days of the month. The Hydro Deck eliminates the risk of costly demurrage costs and allows the HLV to focus on its role going back to the fabrication yard for another load of modules. INCREASE IN COMPETITION - The Hydro Deck makes any HLV suitable for the job. Not many HLV s are capable of compensating for these tides and their value to the project without the Hydro Deck will be at premium rates. EXTRA STORAGE AREA - The Hydro Deck provides 5600m 2 of storage space on the deck of the barge to provide for the rapid unloading and release of the delivery vessel. This operation can take top priority to eliminate the risk of demurrage and provide the maximum output of the delivery vessel. DECK STRENGTH - The Hydro Deck has been designed for the delivery and staging of modules using support stools and SPMTs. With its 20t/m 2 uniform deck loading and the high strength of the bulkheads, rarely will additional load spreading be required to self unload a module more than a normal support stool positioned by a forklift. HYDRO DECK ENVIRONMENTAL ADVANTAGES The internal ballast system is a sealed solution that enables water to be transferred from tank to tank within the pontoon. This eliminates the need to ballast water in or out of the Hydro Deck when catering for load transfer. Tide compensation is achieved by utilising the air system. HYDRO DECK SERVICE TUNNEL The service tunnel is an underdeck walkway between the two pumprooms. Utilising two pumprooms and two control rooms means that the Hydro Deck has 100% redundancy as one can take over the whole operation in case of an emergency in the other.

Technical Specifications Type of vessel Build 2013 Class notation FLAG Ro-ro ramps Principal dimensions Draft minimum (empty) Ro-ro pontoon for use in extreme tidal waters Lloyd s Register, unmanned pontoon Singapore Hydraulic operated ro-ro ramps on bow and stern 140/40/12m 1.7/2.7m Draft maximum 11.1m Light weight Dead weight capacity 8500t 32000t Max deck load 20t/m 2 Ballast system Mooring system :12 x 2000m 3 /hour water pumps :3 x 4000m 3 /hour air compressors :2/60t winches :mooring cylinders HYDRO DECK AFT PUMPROOM Key 1 - Fuel Oil Day Tank 2 - Exhaust Silencer 3 - Main Generator 4 - Harbour Service Generator 5 - Air Ballast Compressor 6 - Starter Board Ballast Air Compressor (Aft) 7 - Hydraulic Oil Tank 8 - Plate Cooler 9 - Sea Water Pumps 10 - Fresh Water Tank 11 - Fuel Oil Overflow Tank 12 - Fuel Oil Bunker Tank 13 - Sea Chest 14 - Sea Strainer 15 - Sludge Tank 16 - Ballast Pump 17-400V Ballast and Starter Switchboard (Aft) 18 - Bilge Holding Tank 19 - Solenoid Box for Values 20 - Hydraulic Power Unit for Valves 21 - Sewage Tank 22 - Start Battery Cabinet 23 - Hydraulic Power Unit Mooring 24 - General 24V Supply Cabinet 25 - Control Room Switchboard 26 - Fuel Oil Transfer Pumps 27 - Hydrophore 28 - Bilge Pump 29 - Sewage Pump 30 - Fire Pump Certified to operate in Australian Territorial Waters Fabricated under DAFF Biosecurity requirements. Compliant with Australian AS 3000 and other design and use-of-materials rules. Designed and fabricated under Lloyd s Register Class certification to the highest safety and quality standards. AG&P ALE Ventures offer the Hydro Deck and its team of specialists as part of the full service solution available to clients worldwide. Contact details: Derek Thomas derek.thomas@agp.ph www.agp.ph James Dunn j.dunn@ale-heavylift.com www.ale-heavylift.com HYDRO DECK FWD PUMPROOM Key 1 - Fuel Oil Day Tank 2 - Exhaust Silencer 3 - Main Generator 4 - Air Ballast Compressor 5 - Starter Board Ballast Air Compressor (Forward) 6 - Plate Cooler 7 - Sea Water Pump 8 - Hydraulic Power Unit for Vales 9 - Solenoid Box for Valves 10 - Ballast Pump 11-400V Ballast and Starter Switchboard (Forward) 12 - Sea Strainer 13 - Sea Chest 14 - Sludge Tank 15 - Bilge Holding Tank 16 - Start Battery Cabinet 17 - Hydraulic Power Unit Mooring 18 - General 24V Supply Cabinet 19 - Control Room Switchboard 20 - Bilge Pump and Oily Bilge Pump 21 - Fire Pump 22-400V/230V Transformer 23 - Fresh Water Cooling Pumps