NATIONAL FIRE ALARM AND SIGNALING CODE



Similar documents
DELAWARE STATE FIRE MARSHAL FIRE ALARM SYSTEM CERTIFICATE OF INSTALLATION

INSTRUCTIONS FOR BUILDINGS WITH FIRE PROTECTION EQUIPMENT

Module 4, Lesson 12 Fire Alarm Systems

FIRE ALARM SYSTEM RECORD OF COMPLETION

FIRE ALARM AND EMERGENCY COMMUNICATION SYSTEM RECORD OF COMPLETION

FIRE ALARM SYSTEM RECORD OF COMPLETION

Fire Alarm System Plans Submittal Guidelines For New and Existing Systems

HERNANDO COUNTY FIRE ALARM GUIDELINES

Agenda. Agenda (continued) Fundamentals of Fire Alarm Systems

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS

FVSU REPAIR & UPGRADE FIBER OPTIC SECTION FIRE ALARM SYSTEM CONNECTIVITY

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

CITY OF PHILADELPHIA DEPARTMENT OF LICENSES AND INSPECTIONS ANNUAL CERTIFICATION FOR FIRE ALARM SYSTEMS

CHANGES IN NFPA 72 NATIONAL FIRE ALARM CODE

Attachment 9. Trouble signals. Interfaced equipment. Primary (main) power supply

Fire Alarm System Monitoring - CAN/ULC-S561-03

The Evolution of Requirements for Supervising Station Alarm Systems

Original Document 10/16/07 Revised 01/30/09 2 nd Revision rd Revision- 12/18/14

FIRE ALARM SYSTEMS PERMIT APPLICATION, PLAN SUBMITTAL, DESIGN, INSTALLATION AND INSPECTION REQUIREMENTS Effective Date: January, 2011

Life Safety Code Enabling References

Module 5. Fire and Emergency Alarm System Part I- Basics

EXHIBIT A SCOPE OF WORK

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721

OBOA 2009 Huntsville, ON Overview of ULC Standards Affecting Building Occupancy Alan Cavers Area Manager Fire & Security Systems Group

1.0 General. Inspection, Testing, and Maintenance 1 of 8

FIRE SPRINKLER SYSTEM SUPERVISORY SERVICE User s Guide (DamarNet RAR Service)

NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems

SECTION FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines

INSPECTION AND TESTING OF FIRE ALARM SYSTEMS

Approval Standard for Central Station Service for Fire Alarms and Protective Equipment Supervision

2007 ICC FINAL ACTION AGENDA

SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS

CHAPTER 8. Village of Caledonia Alarm Systems Ordinance ( /01/13)

Commercial Fire Alarm Standards July 1, 2010 Edition Page 1 of 14

DTW Works Master Specification Version 2006

NFPA 72. Exception No. 1: Where ambient conditions prohibit installation of automatic smoke detection, automatic heat detection shall be permitted.

TESTING, INSPECTION, AND MAINTENANCE FREQUENCIES FOR FIRE DETECTION AND ALARM SYSTEMS

PLAN REVIEW GUIDE FOR FIRE ALARM

City of Bettendorf Fire Alarm System Requirements

SECTION FIRE ALARM AND DETECTION SYSTEMS

INSPECTION, TESTING AND MAINTENANCE OF FIRE PROTECTION SYSTEMS AND EQUIPMENT

FIRE ALARM SYSTEM PLAN SUBMITTAL CHECKLIST

SECTION FIRE ALARM AND DETECTION SYSTEM

University Design Standard. Fire Alarm Systems

NMSU FIRE DEPARTMENT Commercial Kitchen Fire Suppression Worksheet

FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

rpsa FIRE PROTECTION ENGINEERS

Michael Catalano 24 Nassau Avenue, Islip NY Phone (631) Chief Fire Marshal Fax (631)

CAN/ULC-S Installation and Services for Fire Signal Receiving Centres and Systems- Ottawa 2013

Fire Alarm Systems Certification

ENVIRONMENTAL HEALTH & SAFETY 6 East Dr., Amherst MA

BASIC FIRE ALARM TRAINING

Alarm Systems Chapter 2.5

B. NICET: National Institute for Certification in Engineering Technologies.

Mobile Fire Rescue Department Bureau of Fire Prevention

FIRE DETECTION AND ALARM

SECTION ZONED (DC LOOP) FIREALARM SYSTEM

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

Fire Alarm Log Book. Any activity regarding this system must be documented in writing.

527 CMR: BOARD OF FIRE PREVENTION REGULATIONS

FIRE ALARM SYSTEMS PERMIT APPLICATION, PLAN SUBMITTAL, DESIGN, INSTALLATION AND INSPECTION REQUIREMENTS Effective Date: January 2014

Finance and Administration Department 907 Billy Mitchell Blvd. P: (210) Fire Alarm Permit Application

Telluride Fire Protection District Fire Alarm Systems Policy Version 03/2007

COMMISSIONING OF FIRE ALARM SYSTEMS

Understanding Fire Alarm Requirements & Inspections. Presented By Bill Conroy Technical Sales For Briscoe Protective Systems Inc

Chapter 67 ALARM SYSTEMS

POSITION STATEMENT THE ENGINEER AND THE ENGINEERING TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS. July 28, 2008

FIRE ALARM PLAN REVIEW. Office of the State Fire Marshal Massachusetts Department of Fire Services December 2009

Invitation to Bid FIRE ALARM & DETECTION SYSTEM

General Safety & Health Standards Published by the Division of Building Safety In Cooperation with the Idaho Industrial Commission

The Mission Critical Fire Protection Experts

FIRE ALARM APPLICATION

Bold items are particular to the City of Euless

Fire Alarm System Monitoring, a Primer for the Property Owner David Duggan, 2005

Request For Board Action

INSTRUCTION MANUAL PC255O

FIRE ALARM /FIRE PROTECTION OUTAGE/IMPAIRMENT RESPONSE GUIDELINE

ORDINANCE REGARDING ALARMS IN THE TOWN OF PLAINVILLE

PLAN SUBMITTAL REQUIREMENTS FOR SPRAY BOOTHS AND SPRAYING ROOMS EXTINGUISHING SYSTEMS

Program No Section Heading

How To Make A Private Security System Safe For A Home

PRIVATE ALARM CONTRACTOR LICENSURE EXAMINATION INFORMATION

The Pennsylvania State University Physical Security Office. Intrusion Alarm. Performance Specification

CHAPTER 4. Regulation of Private Alarm Systems

ENGINEERING SPECIFICATION. Engineering Specification SAPPHIRE 42 Bar

NEW YORK CITY FIRE DEPARTMENT. Notice of Promulgation of. Amendments to 3 RCNY 17-01, entitled "Central Station Monitoring of Fire Alarm Systems;

CHAPTER. Fire Alarm Systems APPROVAL AND ACCEPTANCE. Shop Drawings

Chapter 4. Regulation of Alarm Systems

INSTRUCTION MANUAL LCD-6OO SECURITY STATION

ENGINEERING SPECIFICATIONS

BS5839 Part 1:2002 Overview

Fire Alarm and Detection Systems And Central Station Monitoring Plan Submittal Guidelines

SECTION DETECTION AND ALARM

INSPECTION AND TESTING FORM

SMOKE DETECTOR INSTALLATION PROGRAM The Burlington Ordinance Perspective

LCD5500Z / PKP-LCD v3.x Installation Instructions

Transcription:

GAP.11.1.1.0 A Publication of Global Asset Protection Services LLC NATIONAL FIRE ALARM AND SIGNALING CODE INTRODUCTION National Fire Protection Association (NFPA) documents describe a level of fire protection agreed on by persons representing a variety of interests. The guidance in these documents does not reflect unique conditions or special considerations, such as system performance under adverse conditions. Nor does NFPA guidance reflect the increased system reliability that Global Asset Protection Services (GAPS) recommends for high valued properties. This GAPS Guideline takes a position on the provisions of NFPA 72 that GAPS believes require clarification or changes. To understand the position, this GAPS Guideline must be read with a copy of NFPA 72. The provisions of the NFPA document are not repeated. POSITION General Achieving an acceptable level of surveillance at a GAPS surveyed facility may include more than having a fire alarm system that meets the recommendations of this GAPS Guideline. GAP.11.0.1 indicates when additional surveillance is recommended at GAPS surveyed locations. Apply the inspection, testing and maintenance requirements of the Code to all fire alarm systems, regardless of the date installed. In the United States, GAPS recommends equipment listed for alarm service by the nationally recognized laboratories in GAP.18.3.1. When applying the Code to an installation outside the United States, use equipment listed by a nationally recognized testing laboratory for the particular country. Contact the GAPS local field servicing office for information on recognized laboratories. When a supervising station fire alarm system uses circuits leased from a communications utility, such as the telephone company, it might also use utility-owned terminal equipment at the protected premises such as an optical fiber multiplex interface that must itself have standby power. In most cases, the standby power will not meet the duration recommended in this section. When this is so, either upgrade the standby power supply of the utility-owned terminal equipment to meet this duration, or provide an alternate communications pathway. Locate overrides for fire safety functions inside locked enclosures with keys available only to trained and authorized personnel. Arrange the override to initiate an audible and visible trouble signal upon activation. Include instructions for using the override in impairment handling programs. Assign the responsibility for testing and maintenance of fire alarm system. This applies for multi-tenants and leased buildings. Protection of Fire Alarm Control Unit If the control unit is located in an area protected by automatic sprinklers where water flow is monitored by the fire alarm system, GAPS considers this protection adequate for the control unit in lieu of smoke 100 Constitution Plaza, Hartford, Connecticut 06103 Copyright 2015, Global Asset Protection Services LLC Global Asset Protection Services LLC and its affiliated organizations provide loss prevention surveys and other risk management, business continuity and facility asset management services. Unless otherwise stated in writing, our personnel, publications, services, and surveys do not address life safety or third party liability issues. The provision of any service is not meant to imply that every possible hazard has been identified at a facility or that no other hazards exist. Global Asset Protection Services LLC and its affiliated organizations do not assume, and shall have no liability for the control, correction, continuation or modification of any existing conditions or operations. We specifically disclaim any warranty or representation that compliance with any advice or recommendation in any document or other communication will make a facility or operation safe or healthful, or put it in compliance with any law, rule or regulation. If there are any questions concerning any recommendations, or if you have alternative solutions, please contact us.

detectors or heat detectors. If the system is UL Certificated, a smoke detector mounted above the control unit is required. Approval And Acceptance In addition to the Record of Completion required, submit the following information to the local GAPS Local Plan Review Office for review and comment prior to the start of an installation. GAPS does not approve systems, but reviews the plans and specifications to confirm compliance with applicable codes and comment on deficiencies and concerns. Resolve any deficiencies and concerns prior to the start of installation: An exact copy of the contract covering the installation, acceptance testing, periodic testing, periodic preventive maintenance and emergency maintenance of the fire alarm system. Product descriptive literature stating the manufacturer s name and model number for each fire alarm system component, and verifying that each component is listed for the specific. A list of all functions monitored by the fire alarm system. A list of all equipment locations, including the termination points of all circuits connecting the protected premises fire alarm system to a supervising station. A general wiring diagram showing the interconnection of all fire alarm system components. Standby battery calculations or details of the standby power supply. Wire type and size of interconnection wiring and wiring methods to be used. A list of points and point addresses. A written sequence of events describing all functions of the system. A written plan for the acceptance test. Where specifically requested by GAPS, internal schematic wiring diagrams of individual fire alarm system components. Shop drawings and notification appliance circuit voltage drop calculations. Third Party Verification of Fire Alarm Systems In meeting the requirements of NFPA 72, GAPS recommends that a UL Central Station Fire Alarm Certificate be issued for all new installations of fire alarm systems that include connection to a central station, whether such an installation is a completely new installation or a complete retrofit of a system including new head on gear to an existing installation. If an accurately and thoroughly completed FMRC Placard is in place, GAPS will consider the Placard as evidence that at the time the installation was made it complied with the then current edition of whatever NFPA signaling standard was applicable. However, if such a system is modified, then the UL Central Station Fire Alarm Certification should be issued for the modification to the system. As an extension to the requirements of NFPA 72, GAPS recommends that the appropriate UL Fire Alarm Certificate for Local, Auxiliary, Remote Station, Proprietary or Emergency Voice/Alarm Communications System be issued for each such installation. In addition to confirming that an alarm installation meets all the provisions of NFPA 72, experience has shown that UL certification results in more prompt repair and restoration of alarm systems when problems are discovered during testing. Impairments The GAPS RSVP* Impairment Handling Program should be followed when the alarm system is impaired. Qualifications of Service Personnel Fire alarm systems should be serviced by personnel employed by an organization that has been UL listed for the servicing of fire alarm systems, either under UL designation UUFX or UUJS. 2 A Publication of Global Asset Protection Services LLC

Acceptance Testing A representative of GAPS should witness initial acceptance and any reacceptance testing. Use hot water to test restorable heat detectors. If live smoke is chosen as a test method, use a bee smoker to produce the smoke. This device, normally used by a beekeeper to anesthetize bees, can be safely carried through ordinary environments and only releases smoke when the bellows is squeezed. If a UL listed aerosol test gas is used in place of live smoke, the test gas should be approved by the manufacturer for the specific smoke detector. To prevent contamination of the smoke detector with an excessive amount of aerosol test gas, the user must strictly follow the instructions of the manufacturer of the smoke detector and the manufacturer of the aerosol test gas. Such instructions may include the use of an extension delivery tube, maintaining the distance between the aerosol test gas container or nozzle and the smoke detector, and limiting the duration of the application of the aerosol. Maintenance, Inspection And Testing Records Records of testing must include individual listing of each device tested. Simply indicting the system was tested or indicating the number of devices tested is not acceptable. Partitions When partitions require detector spacing to be reduced in accordance with engineering judgment, the designer/installer should submit to the local GAPS Local Plan Review Office a narrative clearly describing all factors that were considered in calculating the spacing. Heat Sensing Fire Detectors There are two general types of heat detectors. Spot type, which are devices that occupy a specific spot or point and line type, which are linear devices that extend over a distance, sensing temperature along their entire length. Recognize detection is not protection and detection systems should be used as required by other NFPA Codes, selected and applied with consultation of GAPS. Temperature Classification Select a detector based on temperature classification and stability in the environment of the area where detection is to be installed. For information about choosing heat-sensing fire detectors to be installed in high temperature environments, see GAP.11.3.1.1.1. High Ceilings As the fire plume rises, cooling is a factor and detector spacing must be reduced. GAPS encourages using Annex B to determine spacing of heat detectors for large open areas or for special hazard applications. The designer/installer should submit to the local GAPS Local Plan Review Office a narrative clearly describing all factors that were considered in calculating the spacing. Sprinkler Water Flow Alarm-Initiating Devices When valve tamper supervision is not provided, GAPS suggests that water flow alarms be the drop-inpressure type. See GAP.11.3.2.2. Time Limit For Indication of Water Flow Alarms NFPA 72 allows a maximum of 90 s from initiation of water flow to indication of a water flow alarm at the premises control panel. This time allowance starts when the flow of water at the alarm-initiating device equals or exceeds the flow from a sprinkler head of the smallest orifice in the system and ends when the water flow alarm signal is indicated at the protected premises fire alarm system control unit. 3 A Publication of Global Asset Protection Services LLC

This 90 s time allowance must include any mechanical or electronic time delay either built into the water flow alarm-initiating device or inserted at any other point in the system. The 90 s time allowance must also include any alarm transmission time inherent in the communications technology used. For example, if an addressable multiplex fire alarm system is installed at the protected premises, NFPA 72 would permit such a system to have a maximum scan time of 90 s when fully loaded. In addition, a maximum of 90 s from receipt of an alarm at the premises control panel is allowed to the time of receipt of the alarm at the supervising station. In summary, the Code allows a maximum of 180 s from initiation of water flow to signal receipt at the supervising station, with neither of the limits addressed exceeding 90 s. Control Valve Supervisory Signal-Initiating Devices GAPS does not recommend using plug-type valve supervisory devices as they can be reset with the valve actually not fully open, or completely shut. See GAP.11.3.4.1. Presignal Feature and Positive Alarm Sequence Because of the unnecessary delay in transmitting fire alarm signals to the supervising station, avoid using Presignal Feature and Positive Alarm Sequence. If specific circumstances warrant the application of these features, review the situation with the GAPS Principal Consultant prior to the installation. Combination Systems Avoid using combination systems, since overall system reliability is generally enhanced when different types of signaling systems, such as fire, burglary and building management, are separate and distinct. If specific circumstances warrant the application of combination systems, obtain the review and comment of the GAPS. Alarm Signal Initiation Detection Devices Alarm verification should not be used to compensate for a poor design and inappropriate detectors or improper location of detectors. The Record of Completion must show whether alarm verification is enabled and should be utilized only after agreement with the GAPS Principal Consultant. Alarm verification should not be installed/programmed in a system experiencing false alarms without considering the specific cause(s) of the false alarms. Cross Zoning GAPS recognizes AND-gate detection designs using smoke detectors or flame detectors when they activate extinguishing systems, but not when they are used for alarms only. GAPS does not recommend AND-gate designs of other types of initiating devices. Manufacturers have developed many AND-gate detection designs, each with its own trade name. Trade names for some common AND-gate designs include counting zone, cross zoning, detector matching, priority matrix, sequential verification, verification zone, and verified detection. When using AND-gate designs, space detectors in accordance with NFPA 72 sections and GAP.13.0.1. With this spacing, the area covered by the two detectors required to actuate the extinguishing system is the same as the area that would be covered by one detector in a system without AND-gate design. This decreases chances of false alarms while maintaining the same effective detector spacing. Elements Of Central Station Service This section also specifies three methods for providing the required elements under contract to a listed central station. UL lists central stations under designation UUFX, which includes categories for full service central stations, fire alarm service local companies, and monitoring companies. GAPS recommends that subscribers have one contract with a company in one of the first two categories, and that the alarm service be UL certificated by the contracting company. Note that the contracting company can subcontract services, but must still be responsible for upholding the contract with the subscriber. 4 A Publication of Global Asset Protection Services LLC

Retransmission Of Signals The central station should be able to retransmit fire alarm signals to the public fire service communications center by two telephone numbers, or by other means allowed by code. The central station should also record retransmission conversations, retain them for at least one year, and make them available for examination by GAPS representatives. Accessibility Of Records GAPS reserves the right to examine all records of signals received from a protected premises in which we have a contractual obligation to provide loss prevention services. Retransmission of Signals The proprietary supervising station should be able to retransmit fire alarm signals to the public fire service communications center by at least two telephone numbers. The supervising station should also record retransmission conversations retain and them for at least one year. When the remote supervising station is not located within the public fire service communications center, the supervising station should be able to retransmit fire alarm signals to the public fire service communications center by at least two telephone numbers or other method accepted by the Authority Having Jurisdiction. The supervising station should record retransmission conversations, should retain them for at least one year, and should make them available for examination by GAPS representatives. Single And Multiple Station Alarms And Household Fire Alarm Stations In addition to homes, this chapter applies to hotels, dormitories and apartment buildings. A smoke detector is part of a system utilizing a control panel, while a smoke alarm is a unit that includes detection and warning components all in one unit. As an extension to the requirements of NFPA 72, GAPS recommends that a UL Fire Alarm Certificate for an Emergency Voice/Alarm Communications System be issued for each installation. 5 A Publication of Global Asset Protection Services LLC