Design & Constr. Complexities of Yerba Buena Island Transition Structures for SFOBB - East Spans

Similar documents
San Francisco Oakland Bay Bridge East Span Seismic Safety Project

Performance-based Evaluation of the Seismic Response of Bridges with Foundations Designed to Uplift

Incorporating Innovative Materials for Seismic Resilient Bridge Columns

Safe & Sound Bridge Terminology

SEISMIC DESIGN. Various building codes consider the following categories for the analysis and design for earthquake loading:

SEISMIC RETROFIT DESIGN CRITERIA

ASSESSMENT AND PROPOSED STRUCTURAL REPAIR STRATEGIES FOR BRIDGE PIERS IN TAIWAN DAMAGED BY THE JI-JI EARTHQUAKE ABSTRACT

4B The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

Bridging Your Innovations to Realities

INFLUENCE OF ENERGY DISSIPATING SYSTEMS ON THE SEISMIC RESPONSE OF CABLE SUPPORTED BRIDGES

US 51 Ohio River Bridge Engineering and Environmental Study

NUMERICAL ANALYSIS OF A HORIZONTALLY CURVED BRIDGE MODEL

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC October 27, 2015 Session 26

Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE

SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP

DESIGN SPECIFICATIONS FOR HIGHWAY BRIDGES PART V SEISMIC DESIGN

2015 ODOT Bridge Design Conference May 12, DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.

fib Bulletin 39, Seismic bridge design and retrofit structural solutions: Colour figures

SEISMIC DESIGN OF HIGHWAY BRIDGES

REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE

EVALUATION OF SEISMIC RESPONSE - FACULTY OF LAND RECLAMATION AND ENVIRONMENTAL ENGINEERING -BUCHAREST

San Francisco Oakland Bay Bridge SELF-ANCHORED SUSPENSION (SAS) SPAN

SMIP05 Seminar Proceedings VISUALIZATION OF NONLINEAR SEISMIC BEHAVIOR OF THE INTERSTATE 5/14 NORTH CONNECTOR BRIDGE. Robert K.

SEISMIC RETROFITTING STRATEGIES FOR BRIDGES IN MODERATE EARTHQUAKE REGIONS

(1) Minami Nagamachi and Naka Nagamachi viaducts between Shiraishi Zao and Sendai Stations on the Tohoku Shinkansen line

Investigation of the November 2, 2013 collapse of concrete beams at Fort Lauderdale-Hollywood Airport runway project

Virginia Approach Spans

Chapter 7 Substructure Design General Substructure Considerations Foundation Design Process

CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS

Chapter 3 Pre-Installation, Foundations and Piers

Seismic Retrofit of Bridges - A Short Course

METHOD OF STATEMENT FOR STATIC LOADING TEST

Seismic performance evaluation of an existing school building in Turkey

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples

EXPERIMENTAL INVESTIGATION INTO THE SEISMIC PERFORMANCE OF HALF- SCALE FULLY PRECAST BRIDGE BENT INCORPORATING EMULATIVE SOLUTION

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

Long-term serviceability of the structure Minimal maintenance requirements Economical construction Improved aesthetics and safety considerations

PRELIMINARY SEISMIC CONSIDERATIONS FOR PULASKI SKYWAY REHABILITATION PROJECT. Xiaohua H. Cheng 1

Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI

Detailing of Reinforcment in Concrete Structures

VERIFICATION OF THE METHOD FOR IMPROVING ACCURACY OF SIMPLIFIED SEISMIC RESPONSE ANALYSIS OF STEEL RIGID FRAME VIADUCTS

Residential Deck Safety, Construction, and Repair

REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA

Quality Control and Quality Assurance Guide

Optimum proportions for the design of suspension bridge

STRUCTURAL FORENSIC INVESTIGATION REPORT

Rehabilitation of a 1985 Steel Moment- Frame Building

SECTION 7 Engineered Buildings Field Investigation

Bridge Seismic Design, Retrofitting and Loss Assessment

EFFECTS ON NUMBER OF CABLES FOR MODAL ANALYSIS OF CABLE-STAYED BRIDGES

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

WASHINGTON STATE s BRIDGE SEISMIC RETROFIT PROGRAM

NUMERICAL INVESTIGATION OF SEISMIC ISOLATION FOR SINGLE- TOWER CABLE STAYED BRIDGES

Seismic Retrofit of Reinforced Concrete Beam- Column T-Joints in Bridge Piers with FRP Composite Jackets

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

EXECUTIVE SUMMARY CHAPTER 6

Owner Controlled Insurance Program (OCIP) Overview

6 RETROFITTING POST & PIER HOUSES

FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1

1.054/1.541 Mechanics and Design of Concrete Structures (3-0-9) Outline 1 Introduction / Design Criteria for Reinforced Concrete Structures

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE

Analysis of the Interstate 10 Twin Bridge s Collapse During Hurricane Katrina

A COMPUTER ANALYSIS OF THE VINCENT THOMAS SUSPENSION BRIDGE

bi directional loading). Prototype ten story

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

DESIGN OF BLAST RESISTANT BUILDINGS IN AN LNG PROCESSING PLANT

Miss S. S. Nibhorkar 1 1 M. E (Structure) Scholar,

Remote Monitoring of Soil Pressures on Bridge Footings

Spon Press PRESTRESSED CONCRETE DESIGN EUROCODES. University of Glasgow. Department of Civil Engineering. Prabhakara Bhatt LONDON AND NEW YORK

1,045 m length of the Deh Cho Bridge

[TECHNICAL REPORT I:]

Chapter 12 LOADS AND LOAD FACTORS NDOT STRUCTURES MANUAL

SEISMIC RETROFITTING OF STRUCTURES

ABSTRACT 1. INTRODUCTION 2. DESCRIPTION OF THE SEGMENTAL BEAM

Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009.

3.1 Historical Considerations

Seismic Risk Prioritization of RC Public Buildings

The unit costs are based on the trend line of the 3 low bids for the average quantity.

Seismic Design of Cast-in-Place Concrete Special Structural Walls and Coupling Beams

IH-635 MANAGED LANES PROJECT, SEG. 3.2

The Rehabilitation Alternative Huey P. Long Bridge Case Study. Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc.

Reinforced Concrete Design

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

How To Write An Analysis System For Bridge Test

Seismic Isolation Retrofitting of Japanese Wooden Buildings

AASHTOWare Bridge Design and Rating Training. STL8 Single Span Steel 3D Example (BrDR 6.6)

AN IMPROVED SEISMIC DESIGN APPROACH FOR TWO-COLUMN REINFORCED CONCRETE BENTS OVER FLEXIBLE FOUNDATIONS WITH PREDEFINED DAMAGE LEVELS

Statics of Structural Supports

ANALYSIS FOR BEHAVIOR AND ULTIMATE STRENGTH OF CONCRETE CORBELS WITH HYBRID REINFORCEMENT

Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile

Structural Analysis of the Sutong Bridge

Performance of Existing Reinforced Concrete Columns under Bidirectional Shear & Axial Loading

RECOMMENDATIONS FOR THE DESIGN AND CONSTRUCTION OF BASE ISOLATED STRUCTURES

Elevated Roads for Sri Lanka

FOOTING DESIGN EXAMPLE

Chapter. Earthquake Damage: Types, Process, Categories

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM

Transcription:

Design & Constr. Complexities of Yerba Buena Island Transition Structures for SFOBB - East Spans Authored by: Robert Dameron; Gernot Komar; Al Ely; Tony Sánchez; Jal Birdy; Brian Maroney Presented by: Robert Dameron Western Bridge Engineers Seminar Sept. 10, 2015

SFOBB East Span Segments YBI Transition SAS Skyway Structures Oakland TD 500 m 620 m 2100 m 660 Total length: 3.9 km = Expansion joint Existing Bridge

Yerba Buena Island Transition Structure: Geometry Challenges Deck Heights: 3m to 51m Westbound Transition 460 meters; 2 Frames Frame 1: Conventional Reinforced Concrete Spans are 21.6m to 36.7m Frame 2: Post-tensioned Concrete Spans are 59.2m to 84.8m EB and WB transition from Parallel to Double-Deck Structures Outrigger Bents

YBITS Plan & Elev.

Seismic Design Criteria and Two Levels of Ground Motions 1. Functional Evaluation Earthquake (FEE): 92 yr return period or 80% probability of exceedance in 150- year design life 2. Safety Evaluation Earthquake (SEE): 1500 yr return period or 10% probability of exceedance in 150- year design life Expected Performance

YBITS Time History Sample: Longitudinal Ground Displacements at West Pier- Set No. A1 Six sets of ground motion time histories, three postulated from Hayward Fault and three from San Andreas (prepared by the Fugro-EMI Joint Venture) were applied in the structure design

YBITS Time History Analysis: Longitudinal Ground Displacements at West Pier- Set No. 2

FEE Event Perf. Criteria All Structure Elements to perform essentially elastically and have minimal impact between structure frames FEE design limits: Column Concrete Strain: 0.004 Primary Reinforcement Strain: 0.015 Strength Reduction Factor: 1.0

SEE Event Perf. Criteria All Structure Elements except Columns remain essentially elastic; impact between frames is expected but unseating of hinges and abutments not allowed Columns Ultimate Strain in Columns Primary Reinforcement 0.12 (confinement bars #13 - #25) 0.09 (main bars #29 - #57) Relative Displacement Demands: 80% of calculated capacity Column Shear Capacity: SDC - 1999 Superstructure, Bent Caps & Column Footings Maximum Moment induced by columns

Site Challenges Steep Inclines Steep Cross-slopes Varying Soil Conditions Along Length Connect Hinge K to SAS Main Span-West Pier

YBITS Westbound Frame 2 Ductile System with Plastic Hinging

Analysis and Design Overview: Substructure Pushover Analyses: Column Transverse & Longit. Displacement Capacities NASTRAN: Longitudinal behavior of the frame SEE Demand (26.9 ) FEE Demand (10.1 )

Response Spectrum Analysis mass distribution well discretized to nodes Releases between adjoining frames at hinges Linear Fdn. Springs to represent fdn. flexibility Both tension and compression models analyzed 1 st Period WB: 3.32 sec (long); 3.01 sec (transv.) Peak Displacement WB: 26 in (long); 28 in (trans)

YBITS Westbound Response Spectrum Analysis

YBITS Connected Westbound Structure Response Spectrum Analysis Mode Shapes

YBITS Connected Westbound Structure Response Spectrum Analysis Mode Shapes

NASTRAN Model used for Elastic and Inelastic Time History Analysis Average Peak Demands to Capacity Displacement Ductility Ratios of 1.8 Tall Piers ~1 Short Piers Max 4.2 (Transv. Direction) WB and 5.4 EB

Analysis and Design Overview: Superstructure and Hinges Modular Expansion Joints: FEE Event: Fully Functional SEE Event: Beyond normal operating range resulting in tearing or parting of flexible seals Used Between Frames 1 & 2 and ramps State Developed Joints w/ Steel Bridging Plates: SEE Event Bridging Plates Maintain Bearing Seat Width allows full movement Restrainer cables engage with full SEE gap Used at East and West Ends of YBITS (Abut 10 & 11 and Hinge K)

Construction

Hinge K Cast-in-place concrete closure pour 6.4m long Extension of YBITS supported on two pipe beams extending from SAS Bearings: Isolate longitudinal forces Gap under Pipe: Unrestrained Uplift

Hinge K Pipe Beams Hinge K Pipe Beams SEE Philosophy: Pipes may sustain plastic damage but are replaceable Fabricated Pipes stronger than Designed YBITS evaluated for 27,000 kip pipe beam reaction Hinge K checked using strut-and-tie models Main Alterations Girder Thickness Stirrup Spacing Bar Length Additional Bars

Hinge K Rebar A Partnering Approach Challenges of Hinge K Rebar Placement Time Space Density of Rebar

Hinge K Rebar A Partnering Approach Solutions Models -3D Computer Model -1:10 Scale Physical Model Weekly Meetings with Caltrans, Designers, and Contractor Review of Design Criteria Elimination of Heads on U-bars

Hinge K Rebar Placement

Hinge K Construction Elevation Control Challenges Hinge K Cantilever During Construction Falsework Supported on Decks of YBITS and SAS Tie Down System to Control Elevation Temperature and Construction Load Fluctuations

Tie-down system

Tie-down Jacks

Tie-down System

Hinge K Construction- Elevation Control Continuous Tie-Down Force Monitoring Temperature Monitoring Survey taken weekly and for major construction steps Computer Models Updated Weekly

Conclusions for Hinge K Dynamic dissimilarities of YBITS & SAS Designed-in a capacity protected failure mode at hinge Accelerated, zero-tolerance schedule for Hinge K rebar placement Hinge K Cantilever Elevation Control