HOISTS AND CRANES CRANE REQUIREMENTS

Similar documents
Glossary of Common Crane Ter ms:

TOP RUNNING SINGLE GIRDER BRIDGE CRANE

LOAD TEST PROCEDURE. Bridge, Gantry and Jib Cranes & Monorail Systems B001-R05/07

INSTRUCTIONS AND PARTS LIST SINGLE GIRDER UNDERHUNG CRANE BRIDGE KITS 1/2 THRU 10 TON HAND GEARED AND MOTOR DRIVEN

HPC500 Series Top Running and Underhung End Trucks

SECTION BRIDGE CRANES

EMH, Inc. Specifications for

Cleveland Tramrail Bridge Components

SELECTING THE RIGHT OVERHEAD CRANE

Ceiling-Mounted Workstation Steel Bridge Crane

Engineered Material Handling. Overhead Bridge Cranes and Gantry Cranes

OSHA STANDARD ON TESTING

Installation and Maintenance Manual for SPANCO Freestanding Modular Bridge Cranes & Monorails

How To Make A Fall Arrest Anchor System

TABLE OF CONTENTS. COLUMBUS McKINNON CORPORATION is a leading worldwide designer and manufacturer of material handling products,

Safety Manual For Overhead Crane Operators

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope

Memberships. W.F. Welding & Overhead Cranes Ltd. Since W.F. Welding & Overhead Cranes Ton Overhead Cranes. Jib Cranes.

Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)

Most Asked Action Alerts

INTER PLANT STANDARD STEEL INDUSTRY

CRANE & HOIST PROGRAM

CHAPTER 7 OVERHEAD AND GANTRY CRANES

The mechanics finish work on time today...

Operator Training Questionnaire

Properly Install, Inspect, and Load Test Overhead Patient/Resident Track Lifts

Specification. Safelift Overhead Travelling Cranes

Cable/Conduit Conversion

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Overhead Cranes NORTH AMERICAN INDUSTRIES, INC.

CHESTER HOIST LISBON, OHIO, U.S.A PHONE (330) FAX (330)

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

STANDARD PRACTICE INSTRUCTION

Overhead cranes. crane systems. Moving on up.

KALMAR RTG - FOR HIGHER PRODUCTIVITY

N E R / E R T H R E E P H A S E ELECTRIC C H A I N H O I S T S

Crane Runway Girder. Dr. Ibrahim Fahdah Damascus University.

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F250/F-350 Single Wheel 2WD Ford F350 Dually 2WD IMPORTANT NOTES

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5

Operating Instructions

ELECTRICAL - WIRING DESIGN AND PROTECTION SELF INSPECTION CHECKLIST

CEILING-MOUNTED. Determined by ceiling structure. Freestanding: 6 reinforced concrete floor Ceiling-Mounted: Adequate support structure

Common Electrical Hazards in the Workplace Including Arc Flash. Presented by Ken Cohen, PhD, PE & CIH (Ret.)

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F250 Single Wheel 4WD Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113)

Wallace Tri-Adjustable Gantries Round Tube Assembly Instructions

METER REQUIREMENTS GENERAL REQUIREMENTS SECTION D

Contractors Guide Central Inverter System Installation

Electrical/Electronics Technology Diploma

QUESTIONS and ANSWERS RFB , Metal Clad Switchgear and Power Control Room

Bypass transfer switch mechanisms

Electrical Service Guidelines

The following components are common to most cubicles; this example is an ABB HK cubicle.

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

Top Commercial / Residential Electrical Requirements *

Massachusetts FACE Occupational Fatality Report

CMAA Crane Classification - A brief overview. Class A (Standby or Infrequent Service): Class B (Light Service): lass C (Moderate Service):

Service Manual Supplement

IRRIGATION PUMPING Table of Contents - Section 900

Circuit Breakers. Next Generation of Protection Capabilities

Low Voltage Disconnect Switches. NFPA79 and UL508A Industrial Machinery Operating Handle Requirements White Paper

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

Eaton Automatic Transfer Switches

ELECTRIC METERING COMMERCIAL & INDUSTRIAL

Table of Contents. What to Expect with. Preparation. Tools Needed. Wiring. Hanging the Fan. Blades. Motor Housing.

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

THE RIGHT LIFT FOR EVERY STATION

8146/5 Series Breaker Panelboards

Electrical. This section applies to the design and installation of building power distribution systems.

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

Underground Commercial Electric Service

AirBlock Data Center Doors

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

ENGINEERING REPORT. XYZ Corporation 100 Anyplace Drive Chicago, Illinois 60613

Understanding Emergency Power Off (EPO)

Understanding HUD s UPCS Protocol for Inspecting Electrical Devices Revised Oct. 2010

AirBlock Data Center Doors

Lighting Controls ! WARNING RISK OF ELECTRIC SHOCK. Installation Instructions DESCRIPTION

TABLE OF CONTENTS PART 5 - CRANES, HOISTING AND LIFTING

Operating Instructions

Electrical Grounding. Appendix C

Owner's Manual. Automatic Transfer Switch. This manual should remain with the unit.

PT-6000 Power Tower INSTALLATION MANUAL SPECIFICATIONS

ERIKKILA INDUSTRIAL CRANES

AXLE SHAFTS - FRONT Toyota Celica DESCRIPTION REMOVAL, DISASSEMBLY, REASSEMBLY & INSTALLATION DRIVE AXLES Toyota FWD Axle Shafts

Owner s Manual Gantry Cranes

APPENDIX A UNIVERSITY OF MICHIGAN TRAINING PACKAGE FOR OVERHEAD OR GANTRY CRANES

Installation Manual. Rental Services. Air Handling Units CHS-SVN01A-EN. July 2008

Fire Alarm Systems Certification

Power Management Module 2. Installation

SAFETY STANDARD FOR LIFTING DEVICES AND EQUIPMENT

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION

Step 1: Application Instructions

Transcription:

Page 1 of 8 PURPOSE Provides a summary of selected requirements from various standards, specifications, and codes. SCOPE This summary is limited to selected requirements stemming from significant documents dealing with cranes. It is not a comprehensive or all-inclusive summary of crane requirements. Included in this summary is Harrington Series 3 and HPC cranes as follows: CTM CMTM CTG CMTG CTP CMUM CUM CMUG CUG HPC200A CUP HPC300 REFERENCES A. NFPA 70, National Electrical Code, 1999 Edition. B. ASME B30.2, Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Hoist), 1990 Edition including through addenda b. C. ASME B30.11, Monorails and Underhung Cranes, 1993 Edition including through addenda c. D. ASME B30.16, Overhead Hoists (Underhung), 1993 Edition including through addenda d. E. ASME B30.17, Overhead and Gantry Cranes (Top Running Bridge, Single Girder, Underhung Hoist), 1992 Edition including through addenda d. F. CMAA 70, Specifications for Top Running Bridge & Gantry Type Multiple Girder Electric Overhead Traveling Cranes, 1994 Edition. G. CMAA 74, Specifications for Top Running & Under Running Single Girder Electric Overhead Traveling Cranes Utilizing Under Running Trolley Hoist, 1994 Edition. H. OSHA Section 1910.179 of Title 29, Occupational Safety and Health Regulations Overhead and Gantry Cranes, July 1, 1996 Edition.

Page 2 of 8 APPLICABILITY The codes, regulations, standards, and specifications listed above apply to Harrington product according to the following table. CRANE REFERENCE CTM CTP CTG CUM CUG CUP CMTM CMTG CMUM CMUG HPC200 HPC300 A. NEC 1 1 1 1 1 1 N 1 B. ASME B30.2 N N N N N N 2 2 N N C. ASME B30.11 N N N N N 2 2 3 3 D. ASME B30.16 4 4 4 4 4 4 4 4 4 4 4 4 E. ASME B30.17 N N N N N N N 3 3 F. CMAA 70 N N N N N N 5 5 N N G. CMAA 74 N N 5 5 H. OSHA1910.179 Applies N Does not apply 1 Applies if motorized hoist or trolley is used on the crane 2 Harrington s UH Max-E-Lift is covered partially by B30.2 and partially by B30.11 3 B30.11 applies if configured as UH; B30.17 applies if configured as TR 4 Applies if a hoist and/or trolley (either manual or powered) is used on the crane 5 Harrington s UH Max-E-Lift is covered partially by CMAA 70 and partially by CMAA 74

Page 3 of 8 RAIL SWEEPS A rail sweep, according to its definition in ASME B30.2, is a device attached to the crane and located in front of the crane s leading wheels to remove obstructions. The table below indicates which of the referenced documents have a requirement for rail sweeps. RAIL SWEEP REQUIREMENT? REFERENCE TROLLEY END TRUCK REMARKS A. NEC NO NO none B. ASME B30.2 YES YES see section 2-1.9 C. ASME B30.11 NO SEE REMARKS section 11-1.3.3 invokes CMAA 74 D. ASME B30.16 NO N/A none E. ASME B30.17 NO YES see section 17-1.9 F. CMAA 70 NO SEE REMARKS section 3.6.3 contains related requirement G. CMAA 74 NO SEE REMARKS section 3.6.3 contains related requirement H. OSHA1910.179 NO YES see paragraph (e)(4) Harrington s Underhung crane end trucks (Series 3 and HPC) have components specifically for meeting the rail sweep requirement. Harrington s Top Running Series 3 crane end trucks have a design that inherently satisfies the rail sweeps requirement without having components specifically designed as rail sweeps. The guide roller bracket and the guide rollers combine to satisfy the intent of the requirement. Harrington s Top Running HPC crane end trucks have rail sweeps specifically designed for this requirement. And they meet the intent of the requirement with the exception of the CMAA specifications, which have the added requirement that the rail sweeps to protrude below the rail.

Page 4 of 8 BUMPERS A bumper, according to its definition in ASME B30.2, is a device for reducing impact when a moving crane or trolley reaches the end of its permitted travel, or when two moving cranes or trolleys come into contact. This device may be attached to the bridge, trolley, or runway stop. The table below indicates which of the referenced documents have a requirement for bumpers. BUMPER REQUIREMENT? REFERENCE TROLLEY END TRUCK REMARKS A. NEC NO NO none B. ASME B30.2 YES YES see section 2-1.8 C. ASME B30.11 NO SEE REMARKS section 11-1.3.3 invokes CMAA 74 D. ASME B30.16 NO N/A none E. ASME B30.17 YES YES see section 17-1.8 F. CMAA 70 NO YES see section 4.14 G. CMAA 74 NO SEE REMARKS section 4.8 contains related requirement H. OSHA1910.179 YES YES see paragraphs (e)(2) and (e)(3) All of Harrington s end trucks except the HPC200A, and all of Harrington s powered trolleys have bumpers that satisfy the intent of these requirements. The HPC200A end trucks have provisions for bumpers to be installed, and this is the responsibility of the customer.

Page 5 of 8 DROP STOPS Also known as a drop lug, lug, or safety lug. CMAA 70 defines a safety lug as a mechanical device fixed securely to the end truck or trolley yoke which will limit the fall of the crane or carrier in case of wheel or axle failure. The table below indicates which of the referenced documents have a requirement for drop stops. DROP STOP REQUIREMENT? REFERENCE TROLLEY END TRUCK REMARKS A. NEC NO NO none B. ASME B30.2 YES YES see section 2-1.11 C. ASME B30.11 NO YES see section 11-1.7.3 D. ASME B30.16 NO N/A none E. ASME B30.17 NO YES see section 17-1.11 F. CMAA 70 NO YES see section 3.6.3 G. CMAA 74 NO YES see section 3.6.3 H. OSHA1910.179 NO NO none All of Harrington s end trucks, and all of Harrington s powered trolleys have drop stops that satisfy these requirements.

Page 6 of 8 END TRUCK WHEEL BASE Of all the documents listed above under References, only CMAA 70 and CMAA 74 contain a requirement relating to end truck wheel base. CMAA 70 states The wheel base of the end truck shall be 1/7 of the span or greater. CMAA 74 states The wheel base of the end truck shall be 1/8 of the span or greater. This requirement is based on lateral loads associated with alignment of the end truck on the runway and with crane skewing or crabbing. [Distributing the load on the runway is a factor, but is not a basis for this requirement because the runway designer designs the runway to accommodate wheel loading and wheel base.] Harrington meets the intent of this requirement by using a design that counteracts all lateral loading resulting from crane operations without relying on flanged wheels and a long wheel base. Harrington s end trucks employ a unique guide roller design that maintains lateral alignment of the end truck on the runway. The guide rollers handle all lateral loads associated with the operation of the crane. The end truck s wheels are flange-less and play no role in lateral loads. So for Harrington s design the wheel base is not relevant to meeting the CMAA requirement. Harrington satisfies the requirement using the end truck s roller base in lieu of its wheel base.

Page 7 of 8 ELECTRICAL DISCONNECT & PENDANT ON/OFF The documents listed in the Reference section generally agree on the requirements for a Disconnect and a Pendant On/Off. For this requirement, which is electrical in nature, the NEC is the most definitive. Powered Crane: The crane must have a Disconnect that provides a way to interrupt the electrical power feed to the crane. It must be positioned in the wires from the runway power supply and must have a feature that allows it to be locked open. If the physical location of the Disconnect does not make it readily accessible to the operator, then a main line contactor (opens power to all motors of the crane) operated by a switch in the pendant (Pendant On/Off) is required. When the Pendant On/Off is required, it is in addition to the Disconnect. Monorail Hoist of Hand-Propelled Crane Bridge: The Disconnect and Pendant On/Off are not necessary as long as the unit is controlled from the ground or floor level, the unit is within view of the power supply disconnecting means (such as the circuit breaker that provides the electric power for the hoist), and no fixed work platform has been provided for servicing the unit. The table below indicates the sections or paragraphs of the referenced documents that contain this requirement. DISCONNECT & PENDANT ON/OFF REQUIREMENT REFERENCE SECTION/PARAGRAPH A. NEC section 610-32 B. ASME B30.2 section 2-1.13 C. ASME B30.11 section 11-1.9 D. ASME B30.16 section 16-1.2.2 E. ASME B30.17 section 17-1.13 F. CMAA 70 section 5.6 G. CMAA 74 section 5.6 H. OSHA1910.179 paragraph (g)(5) Harrington s powered cranes incorporate a Disconnect that can be locked open, and a Pendant On/Off that controls a main line contactor. These features may or may not be necessary for manual cranes, so they are an option for Harrington s manual cranes.

Page 8 of 8 ELECTRICAL - CONDUIT The National Electrical Code (Reference A) is the only one of the references that contains a requirement that crane wires be enclosed in conduit. All of the others invoke the National Electrical Code (NEC), which means that they too have the requirement. But, the NEC is the document in which the requirement originates. Paragraph 610-11 of the NEC sets forth the requirement that conductors shall be enclosed in raceways. This requirement does not apply if the conductors are in special types of cable. All of Harrington s crane designs incorporate wires that are enclosed in conduit in compliance with the NEC requirement. END