SMART SOLAR PUMP CONTROLLER MPPT FOR AC PUMPS. Installation and Troubleshooting Manual

Similar documents
DCS Input/Output Relay Card Series

INTRODUCTION WARNING S!!! VOC SHOULD BE BETWEEN MUST NOT EXCEED 96 VOC USE DC CIRCUIT BREAKER/ISOLATOR BETWEEN SOLAR PANELS & CONTROLLER

32VFD Variable Frequency Drives for Centrifugal Chillers

Operational Overview and Controls Guide. Two or Three Pump IronHeart Lite with Variable Frequency Drives

Inverter / Charger Installation General Operations and AC and DC Connections

LG Air Conditioning Multi F(DX) Fault Codes Sheet. Multi Split Units

A1000 Cheat Sheet (Open Loop Vector)

User Manual. Hybrid 1KW-5KW INVERTER / CHARGER. Version: 1.1

Configure Inverter output for two utility settings, (1)120V/60Hz, (2)220V/50Hz

NASS Solar DC Pool Pumps

YSmart Technology Co.,Ltd

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5

BT300 HVAC Drives Conventional Bypass (C-Bypass) Options

Solar Home System. User Manual. AEH-SHS01-10W2L Solar Home System 2 Lamps

Product Description Full Voltage Starting Electric Fire Pump Controllers FTA1000

Operational Overview and Controls Guide

User Manual for CH-PFC76810

GPD 506/P5 Start-up Procedure and Checklist

Troubleshooting Guide, Freedom and Fleet Power Inverter/Chargers

Installation Instructions for Solar Pumps USER MANUAL FOR SPS, SPC, SPSC SPQB, SPGJ SERIES SOLAR PUMPS AND PUMP CONTROLLERS

LG Air Conditioning - Universal Split Fault Codes Sheet. Universal Split Systems

12 Volt 30 Amp Digital Solar Charge Controller

Installation, Operation and Maintenance Manual

Install the DeviceNet Module using the following procedure:

SYSTEM 45. C R H Electronics Design

Solar Controller / Battery Charger User s Manual

BATTERY BOX INSTALLATION WARNING WARNING CAUTION ATTENTION AVERTISSEMENT ADVERTENCIA PRECAUCIÓN SOLBBOX12V CARTON INVENTORY COMPLETED OVERVIEW

CM705B - Universal Expander Module CM707B - Plug On Zone Expander Security Systems

LS1024B / LS2024B/ LS3024B. Solar Charge Controller USER MANUAL

Manual. Solar Fountain Mobile Phone Charger

PSDC PSDC 12V/8A/8x1A Power supply for up to 8 analog cameras PTC/TOPIC.

R22. K Control. Indoor Unit. Nomenclature. Compatibility PL H 3 G K H B. Unit style Heat Pump Horse Power

User Manual. ATX12V / EPS12V Power Supply TG-I460R (460W+460W) TG-I550R (550W+550W) Switching Power Supply User Manual

MidNite Solar E-Panels Explained

INSTALLATION & SERVICE MANUAL. Display Panel

Phone: Fax: Web: info@clrwtr.com

* DISCLAIMER: Contents. How to Use This Guide: COMMERCIAL INSTALL GUIDE 2

PSC-A5 Solar Charge Controller Manual

Advanced Wind/Solar Hybrid Controller. Model: WWS10A-48 Version 1.0

Tracer-1206RN / 1210RN / 1215RN. Maximum Power Point Tracking Solar Charge Controller INSTRUCTION MANUAL

Battery Power Inverters

MICROSENS. Central 48 V DC Power Supplies for PoE-Components. Description. Features

AC-115 Compact Networked Single Door Controller. Installation and User Manual

Digital and Analog I/O

CENTERLINE Motor Control Centers Bulletin 2100 Smoke Detector Unit

SECTION VARIABLE FREQUENCY DRIVES

Single-phase ( V) voltage monitoring: Undervoltage Overvoltage Window mode (overvoltage + undervoltage) Voltage fault memory selectable

PSR The compact range Description

Product Description Primary Resistance Starting Electric Fire Pump Controllers FTA1500

INSTALLATION INSTRUCTIONS

ABB central inverters PVS to 1000 kw

SYSTEM 4C. C R H Electronics Design

PRODUCTIVITY THROUGH INNOVATION 600 CONTROL DIRECT DRIVE TECHNICAL/OPERATION MANUAL

SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE

ELITE-L Series. ELITE - Low Voltage / Dry contact Remote Control System

Points Position Indicator (PPI1) for Points Motors with Common Ground

User Manual DONGGUAN SHENGYANG INDUSTRIAL CO., LTD. SY WMVC Smart Grid Tie Microinverter. Dongguan Shengyang Industrial Co., Ltd.

STEALTH I DC MANUAL TECH SUPPORT WEB BLACK UNIT IS 24/36 ONLY

IPX AUTOMATIC IP NETWORK LOSS BACKUP A/B SWITCH INSTRUCTION BOOK IB

OUTPUT CABLE CONNECTIONS:

G-100/200 Operation & Installation


Application Note: String sizing Conext CL Series

POINTS POSITION INDICATOR PPI4

SOLAR POWER - THE NEW WAY TO RV!

INSTRUCTION MANUAL EPSOLAR. Tracer-2210RN / 2215RN. Maximum Power Point Tracking Solar Charge Controller

12 Volt 30 Amp Digital Solar Charge Controller Installation & Operation Manual

Bulletin 150 Smart Motor Controllers SMC-3 Smart Motor Controller

Specifying a Variable Frequency Drive s

GST301. (Single Protection Zone) Operation Manual

13 Watt PORTABLE SOLAR POWER KIT

OPL BASIC. Dosing System for Professional Laundry machines. Contents

User Manual HomeGrid 3000 Solar Generator

PS4-24 OWNERS MANUAL 24 VAC 90 WATT WALL MOUNTED CCTV POWER SUPPLY

RC Camera Control. User Guide v /20/2012

ANTENERGY. Powered By BOSCH Cells Portable Solar Panel Kit. User Manual and Product Specifications

IMPORTANT SAFETY INSTRUCTIONS WARNING READ AND SAVE THESE OPERATING AND SAFETY INSTRUCTIONS BEFORE USING THIS HEATER.

INSTALLATION/PROGRAMMING INSTRUCTIONS 928 ENTRYCHECK

ST Series POWER SUPPLIES USER INSTRUCTIONS

User s Manual Before using the inverter, you need to read and save the safety instructions.

BlueSolar Pro Remote Panel For BlueSolar PWM-Pro charge controllers 12/24V 5, 10, 20, 30A Article number SCC

Fan Coil EC Motor Control

FA-300 Series. LCD Fire Alarm Control Panel. User Guide. LT-954 Rev. 0.1 February FA-300 SERIES Fire Alarm Control Panel

Neuton Solar Power Diverter Quick Installation Guide

2.06. Version. Kinglong New Energy Technology Co.Ltd. Sunteams 1500 Sunteams Sunteams 4000 Sunteams 5000

500r+ Installation and User Guide

Troubleshooting and Diagnostics

WATER LEAK DETECTION SYSTEM WLDS-10 INSTALLATION & COMMISSIONING

MEMOBUS/Modbus Communications

LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems

Permissible ambient temperature Operation Storage, transport

LESTRONIC DV AUTOMATIC 12 OR 24 VOLT DUAL OUTPUT DUAL MODE BATTERY CHARGER MODEL TYPE 12/24EL40-10ET

Installation and Operation Back-UPS 1250, 1300, 1500

PS1800 Centrifugal Pumping Systems

Model 201 Wiegand Touchpad Reader Installation Guide

MIDNITE SOLAR AND SOLAR WASHINGTON

New energy leads low carbon life.

OCSM Series. High Resolution Digital Crane Scale. User Guide

Chapter 2 System Basics

70-Series CAN Power Management System

Transcription:

SMART SOLAR PUMP CTROLLER MPPT FOR AC PUMPS Installation and Troubleshooting Manual PRINCIPLE OF OPERATI:- This Solar Pump controller can be used on any AC 3 phase pump, whether Monoblock or Submersible P ump of given HP as per rating. The solar pump controller is housed in powder coated, rugged MS enclosure of 1.6mm sheet. It is designed with MPPT technology to maximize water delivery at various solar energy levels. The pump controller can take solar power input and give three phase ac output to the ac pump such that when full solar power is available the motor will run at full rated speed and when it is cloudy or in the morning/evening (i.e when solar power is limited) it will run at lower speed proportional to the availability of solar energy. It has arrangement to also accept three phase ac input from grid so that you can run the pump at full speed with solar preference mode whenever solar energy is not available sufficiently. SPECIFICATI :- Input : ARRAY OF PV Vmp : MPPT point of PV Panels Voc : Maximum open circuit voltage of PV Panels Number of PV Panels in series of suitable wattage such that Vmp should be within range of 510-600V DC and Voc Does not exceed 750V. Pin (power from PV Panel) = HP X 0.75 X 1.35 in KW Number of PV panels per string (N)= 750/Voc (nearest lower integer) Wattage of each PV panel = Pin /N or higher Output : three phase output to pump Protections : Input surge, panel reverse polarity, short circuit, over load, over voltage, facility for dry run protection. Operating temperature : 0-50 deg C Soft Start : Power given to the pump is slowly increased to control the inrush current of the motor. Automatic start & stop : It starts automatically when sufficient solar power is available to pump the water and stops automatically when solar power is not sufficient to pump the water. There is a builtin 20-30 minutes timer. KB ELECTRICS - www.kbelectronics.co.in - kbelectronics@gmail.com - 022 64526057 Page 1

Solar Energy Meter: Provided to read PV (INPUT) voltage, current, instantaneous power and generated power in units. CNECTIS :- PV +VE PV -VE E R Y B UT1 UT2 UT3 SOLAR INPUT EARTH GRID INPUT MOTOR OUTPUT 3-Phase 415V AC PV +VE : Connect positive wire from PV array as input to panel PV -VE : Connect negative wire from PV array as input to panel E : EARTH ( please ensure the proper earthing connection- it is must) UT1,UT2,UT3 : MOTOR wires to be connected here R,Y,B : 415V AC three phase ac input coming from grid (ac line) INDICATIS DOOR : 4) VFD Green 5) CTROLLER Green 6) AC Red 7) Dry Run - Red INSTALLATI : 1) Ensure PV array combination is as per requirement i.e. Voc should not exceed 750V DC & MPPT point should be within range of 510-600V DC 2) Ensure the correctness of motor ratings & Panel ratings. 3) Make input connection from PV to control panel through solar fuse & EARTH connection. 4) If there is a DOL starter, please remove. Please note that Solar System will not operate when starter is present. 5) If AC mains supply is present, check current drawn by pump directly without using controller. This should match with the current on nameplate of pump. Please email this data to us at kbelectronics@gmail.com 6) Before connecting motor, check the MPPT voltage of existing PV panel configuration. KB ELECTRICS - www.kbelectronics.co.in - kbelectronics@gmail.com - 022 64526057 Page 2

Procedure as follows:- a) Back side of energy meter, 3 burg pin (SW5) provided, remove jumper from left side and put it to right side then switch on the control panel switch. You can see MPPT voltage on energy meter ( 560V -default set ). b) to change the MPPT set voltage vary the potentiometer which is provided on MPPT controller and set the desired value. Example : suppose if your PV panel rating - P=250W ; Voc=36V ; Vmp=29V And if you have connected 20nos. of PV panels in series then total Vmp = 29V x 20nos= 580V ; so you need to set Vmp point from default value to 580V by above steps. c) After Vmp setting donot forget to put jumper on original position i.e. left side (SW5) and switch off the control panel switch. 7) Connect output to motor 8) Toggle switch(controller bypass switch) provided inside the panel should be on NORMAL position 9) Check the input connection is made as per polarity i.e. +ve & -ve coming from PV array & output connection given to motor. 10) Now switch the unit from front of panel door on position of VFD. Motor will start if sufficient power is available. In case, motor starts but water does not flow, then interchange one wire of motor output (UT2/UT3) to change direction of Motor. 11) For Grid input { AC supply - if you wish to run motor without solar power OR with solar power & grid power( Preferential Mode) } Switch the VFD by switch from panel door and connect 3 phase 415v ac grid supply R,Y, B wires through MCB provided inside the panel. A) PV Solar Mode : If you want to run motor on solar only then keep AC MCB in position. B) PV Solar + AC mode preferential logic : If you want to run motor at full speed at any time (morning/evening/night). In this mode keep AC MCB always Because of sharing of solar & grid power, motor will always run at full speed. Preference always goes to solar power and balance required power will be taken from grid. Example : suppose if motor power is 3hp 2250W & Solar available power is 1000W then balance 1250W will automatically be taken from grid source(ac line). Load power = solar power + grid power(ac line) Switch input MCB for 3 phase grid supply, Switch the switch from panel door. The motor will start at full speed. 4,5 and 9 will glow will glow on outer panel. Whenever you do not want to use grid (AC) supply please switch grid(ac) MCB. KB ELECTRICS - www.kbelectronics.co.in - kbelectronics@gmail.com - 022 64526057 Page 3

TROUBLE SHOOTING : Before starting trouble shooting please write down Pump Voltage and Current from pump label. Also note Pv Panel wattage, number of panels, Vmpp and Voc. Also check if Bypass switch is in Normal mode. A) Pump Controller starting but no water flow or less flow 1) While commissioning if sufficient input power is given to panel but no water comes then switch input and interchange one wire of motor output (UT2/UT3) at the output terminal and again switch. 2) Check if Solar power is sufficient for given Pump rating. 3) If Power drawn by motor is more than specified ratings then VFD may trip. Ensure correct motor ratings for the application. 4) Check MPPT settings by following Installation Step 6. 5) In case of failure of controller (i.e. when controller No. 5 is not ) then change the position of controller bypass switch (toggle switch inside panel) to BYPASS/AC LY position which is provided inside the panel. 6) If still not giving required results, please email all data to kbelectronics@gmail.com and call after 1 day on 022-64526057 B) Controller/ VFD tripping 1) Check the MPPT Voltage setting for the panels. If it does not match then please repeat Installation step 6 If VFD tripping after 1 minute, check the VFD display message. If OL or L is seen in display message, then in the VFD, press the down key till you reach.a Call 022 64526057 and let us know the value. 2) IF VFD tripping and if Dry Run 8 comes on, check the dry run contact and if not used then it should be shorted. 3) If energymeter LCD display and display No. 5 (CNTRL ) on external panel door are not glowing, then check inside panel for No. 10 ( i/p OK) and No. 13 (o/p ok). If both are off then please call us. You can run the pump temporarily by switching Controller Bypass switch to Bypass mode located above Input/output connections. 4) To Check error in VFD display, remove jumper shown on diagram or orange wire No. 6 ( Older versions). Turn on switch S1 and then check the VFD display and call. Error example: uv PV Panel undervoltage Sc Short Circuit OL/L Overload OV Overvoltage KB ELECTRICS - www.kbelectronics.co.in - kbelectronics@gmail.com - 022 64526057 Page 4

c) Controller not starting 1) Check all input / output connectors. 2) If Voltage on Energymeter LCD is showing less than 400VDC in switched off position then add required number of PV panels as it is incorrect. 3) If 5 (CNTRL ) is off, then do Troubleshooting Step B3. 4) If 5 (CNTRL ) is on, then reset controller by On/Off switch S1. IF still doesn t start then goto Troubleshooting Step B4 d) Pump not working in Hybrid (Solar + Grid AC) mode or only AC Mode. 1) First go through all steps shown in Troubleshooting B to ensure pump operates on Solar. 2) Disconnect PV input by removing PV fuse. Switch AC MCB on and check if 9 (AC on) is glowing. If not glowing then connections are not correctly done. Redo and recheck all connections. If it is glowing, please call us 3) If in only AC mode it is working but in Hybrid mode it is not working, then fix Vmpp to 540VDC following installation step 6. If still not working, then keep increasing Vmpp till in starts. Please note : All data given above is subject to change as per our continuous improvement drive and upgradations. The recommended communication channel is by email at kbelectronics@gmail.com Do not call us unless all troubleshooting steps have already been attempted. All parts are designed to be easily swappable for servicing Please do not tamper with the system beyond instructions given as this will cause warranty to be void. KB ELECTRICS - www.kbelectronics.co.in - kbelectronics@gmail.com - 022 64526057 Page 5

1 2 3 DRY RUN BYPASS FAULT TIMER POWER TIMER J4 FAULT RLY 1 7 +12V 6 MPPT CTROLLER KB-VFDRLY,REV A SOLAR ENERGY METER FRT VFD CNTRL AC DRY RUN 4 5 9 8 SWITCH S1 I/P OK 10 O/P OV 11 =MPPT ORG=/PV LO 12 MPPT V-SET O/P 13 INDICATI MEANINGS SYSTEM RUN IN NORMAL CDITI SYSTEM STATUS COLOUR LOCATI NORMAL RUNNING CTROLLER 5 +12V 6 VFD 4 POWER TIMER 3 FAULT TIMER 2 RLY 1 7 DRY RUN BYPASS 1 DRY RUN 8 AT I/P POWER (SUN RISE) & SW IN POSITI.SYSTEM WILL WAIT 30 MINUTES FOR.THIS TIME CAN BE RESET BY / SWITCH RECYCLE. FAULT DUE TO OR EXTERNAL.SYSTEM WILL WAIT 15 MINUTES FOR NEXT ATTEMPT.THIS TIME CAN BE RESET BY / SWITCH RECYCLE. SYSTEM FOR 1 MINUTE AFTER POWER & FAULT TIMER OVER & WHEN / SWITCH RECYCLE.TO CHECK THE DRY RUN CTACT STATUS. DUE TO DRY CTACT OPEN AT THE SAME TIME FAULT TIMER & SYSTEM WILL WAIT FOR 15 MINUTES FOR NEXT ATTEMPT.THIS TIME RESET BY / SWITCH RECYCLE.