Transbay Transit Center San Francisco, CA CMGC Contract No CMGC-000 Project No BID PACKAGE TG19.1 ADDENDUM 03

Similar documents
KIEWIT CM/GC Enabling/Utilities

TRANSBAY JOINT POWERS AUTHORITY

PART E SPECIFICATIONS

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.:

ADDENDUM NO. 8. PROJECT: NEW FIRE STATION #27 COSA, San Antonio, TX

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS

Preformed Metal Roofing and Siding

The unit costs are based on the trend line of the 3 low bids for the average quantity.

PART 1 GENERAL 1.1 SECTION INCLUDES

From the Office of: MAHLUM ARCHITECTS 71 Columbia Street Floor 4 Seattle, WA 98104

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

Sun Windows General Information Sun New Construction Window Installation Instructions

Clad Direct Glaze Window Installation Instructions

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

SECTION STORM DRAINAGE SYSTEM

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

Lee, Here are the questions from bidders received between August 17, 2015 and August 24, 2015 followed by our responses.

MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

609 West Rock Road, Radford,VA / (fax) RECOMMENDED ATTACHMENTS & CONNECTION DETAILS

WILDCAT CANYON ROAD SPECIFICATION NO SLIDE REPAIR BIDDER'S PROPOSAL (continued)

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

Chapter 36 - STRAW BALE CONSTRUCTION SECTION PURPOSE. SECTION SCOPE. SECTION DEFINITIONS.

SECTION STANDING SEAM METAL ROOF

ADDENDUM NO. 2 TO PROJECT NO

CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

Irvinton Village Apartments 2901 Fulton Houston, Texas Houston Housing Authority J. Allen Management Managing Agent

NOTE: Unless otherwise specified, unit prices for the demolition of structures shall be for wet demolitions.

Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

ADDENDUM #2 FORMAL BID

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO.

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

Stormwater/Wetland Pond Construction Inspection Checklist

Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI

Mark Cramer Inspection Services, Inc.

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

Superform Products Ltd.

A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

COMPANY ESTIMATOR BID DAY PHONE NO.

CPA Steel Stud Framing Page 1 of 11

GUIDELINE SPECIFICATIONS

NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION BUREAU OF BRIDGE DESIGN BRIDGE DETAILS - REVISION HISTORY

CONCRETE REPAIR GUIDELINES. Concrete repairs can be broken down into four basic types, plus special repairs and planing.

Design and Construction of Cantilevered Reinforced Concrete Structures

SECTION EXISTING HAZARDOUS MATERIALS CONDITIONS

PERFORMANCE TEST REPORT. Rendered to: BAMCO INC. PRODUCT TYPE: ACM Wall Panel Systems

City of San Diego, CWP Guidelines

ELECTRIC PERISTALTIC MORTAR POINTING PUMP

The Butler MR-24 Standing Seam Roof Difference. A comparison between metal roof systems

Mechanical arms, belts and sheets

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall

ADDENDUM 5 TO IFB 5212-BC UNLV UCC DORMITORY COMPLEX HUGHES AND FAIMAN HALLS HVAC AND ROOFING REPLACEMENT. University of Nevada, Las Vegas

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.

March 14, Installation of Bay, Bow and Garden Windows

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

IKG Bar Grating: Anchoring

REPLACE ROOFING DENVER CENTRAL LIBRARY PHASE I CITY & COUNTY OF DENVER DENVER, COLORADO

Chapter. Restoration of Damaged Structures

7. Installation. installation CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME

Frost and Cooper Renovations

Introduction...COMB-2 Design Considerations and Examples...COMB-3

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

September 1, 2003 CONCRETE MANUAL CONCRETE PAVEMENT REHABILITATION

FRAME PROFILE MASONRY METAL DOOR FRAME FLUSH MASONRY KD MITER CORNER JOINT. #8 Screw (MS002485) Required on all fire rated KD frames. Bend Tabs.

INSTALLATION INSTRUCTIONS for Vinyl Windows without Nailing Fin (JII011) ImPOrTANT INFOrmATION & GlOssAry. rough OPeNINGs

NATIONAL INSTITUTE OF BIOLOGICALS

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

RICHARD B. HUDGENS ARCHITECT, INC.AIA

The minimum reinforcement for the stem wall is the placement of:

Cooktop Low-Profile Ventilation Hoods

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

Project: PSFA PROJECT NO: P Parkview Early Literacy Center Expansion and Modernization - Roswell Independent School District and NM PSFA

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

C. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters.

INSTALLATION INSTRUCTIONS for Vinyl Patio Doors with Integral Nailing Fin (JII006)

ROOF FLASHING SPRINGLOK FLASHING SYSTEM FEATURES & BENEFITS PRODUCT DESCRIPTION

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Prequalification Supplement for First Tier Subcontractors under CM at Risk Wake Technical Community College Early Site North Campus Project

SikaProof A Technology

TEST REPORT. Report No.: A Rendered to: BAMCO INC. Middlesex, New Jersey. PRODUCT TYPE: Wall Cladding System SERIES/MODEL: Dry Concept

Town of Maiden. Request for Proposals For Sign Replacement Project

BLADDER SURGE CONTROL SYSTEM

Patio Covers / Carports

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding

Unit Price Averages Reports

TARIFF CODE and updates standard

SECTION STANDING SEAM METAL ROOFING

Built to Last. Built for Beauty. Good. Solid. Logix. TM

SECTION PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK

ADDENDUM NO. 2. DATE: September 14, 2015 INVITATION FOR BID: IFB J Fire Station #22 Roof Replacement Project DATED: August 25, 2015

Transcription:

Transbay Transit Center San Francisco, CA CMGC Contract No. 08-04-CMGC-000 Project No. 30100 BID PACKAGE TG19.1 DATE: 10/15/2010 TO: FROM: BID DATE: All Potential Bidders Webcor/Obayashi Joint Venture October 20, 2010 at 2:00 PM COMMUNICATION WITH WEBCOR/OBAYASHI JOINT VENTURE At no time during the bid process (defined as the time between issuance of the IFB until award of Subcontract to Trade Subcontractor) shall Trade Subcontractors contact any person(s) or staff of the TJPA, TJPA Program Management/Program Controls (PMPC) team, Webcor/Obayashi Joint Venture, CM Oversight (CMO), or other TJPA Consultants regarding the IFB. The only contact is for submission of questions using the contact directions below. Submit questions using the s on Bid Documents (QBD) form through Webcor/Obayashi Joint Venture. Refer to the Project Bidding Manual for the QBD form. E-mail Webcor/Obayashi Joint Venture at TransbayBidding_TG19.1@webcor-obayashi.com. Fax Webcor/Obayashi Joint Venture at (510) 476-3005. Reference the Project Bidding Manual, Section III.B.1 regarding document availability and how to obtain the documents. 10/15/2010 Page 1 of 2

Trade Package TG19.1 301 Mission Interim Screen Wall TRANSBAY TRANSIT CENTER PROJECT San Francisco, CA MODIFIED DOCUMENTS PER The items listed below make up the TG19.1 (301 Mission Interim Screen Wall) Bid Package Addendum 03. This Addendum shall supersede all previously issued Bidding Documents wherein it contradicts or modifies the same. All other conditions and requirements remain unchanged. The changes, additions or deletions as set forth herein shall apply to the above bid and shall be made part thereof as though originally shown and/or specified. Documents associated with TG19.1 Addendum 03 revisions a. TG19.1 s and Answers # 1 b. TG19.1 s and Answers #2 END OF 10/15/2010 Page 2 of 2

No. 0001 0002 0003 0004 Submission Date 10.11.2010 There are currently (E) light fixtures in the (5) planter boxes. Are we required to stub up electrical conduits for the future installation of light fixtures in the planter boxes? 10.11.2010 Please provide "Architect Approved" stone support system, anchors, and accessories for the stone walls. 10.11.2010 Please provide manufacturer & specs for the stone panels. 10.11.2010 Please provide the locations where the (N) in ground lights will be reconnected to. Electrician needs to know where the (N) in-ground lights will receive power. TG19.1-301 Mission Screen Wall - Issued for Bid Response Contractor shall locate, cut, and cap all existing electrical lines feeding existing lights within existing planter boxes. Prior to removal of the planters, the contractor shall verify the location of existing electrical lines within the limits of work. Cutting and capping of existing electrical lines shall occur at the face (north) of the new interim screen wall and shall facilitate the future use and connection to reinstalled planter boxes (and lights) by others at a future date. See Note 3 on Drawing C-2000. Contractor shall propose stone support systems, anchors and accessories that comply with requirements of the Contract Documents; Architect to approve. New stone panels shall match existing stone panels. All available information on existing stone panels has been provided on the drawings. Contractor shall submit manufacturer and specs of new stone panels to Architect for approval. Contractor shall disconnect existing underground electrical lines servicing existing inground lights and reconnect existing electrical lines to new in-ground lights. New in-ground lights shall be inset into asphalt pavers/topping slab. New in-ground lights shall be located at new wall slots (4 total) and shall be placed between the face (north) of the new wall and the new concrete curb. See Note 10 on Drawing C-2000. 0005 10.11.2010 Please provide specifications for the (E) in-ground lights. Require specs in order to match manufacture, size, and model type. Existing electrical power source servicing existing in-ground lights shall be located in field; locating and shut-off of existing power source will be coordinated with TJPA Representative. Type, model, size, and manufacturer of existing in-ground lights to be determined in field by the contractor. Contractor shall submit manufacturer and specs of new in-ground lights to the TJPA Representative for approval. October 13, 2010 TG19.1 301 Mission Screen Wall - Bidder Q&A Response Set No. 1 Page 1 of 1

s are numbered in the order received. TG0019.1-301 Mission Screen Wall - Issued for Bid No. 0006 0007 0008 0009 0010 Submission Date 10.15.2010 Reference drawing sheet C-2000. Note 10 calls out Contractor to disconnect (E) underground electrical line servicing (E) inground lights and reconnect to (N) in-ground lights. There are no as-built drawings shown (E) conduit routing and depth to determine if additional demo of concrete or excavation for conduit routing is required. Please provide additional information. 10.15.2010 Reference drawing sheets S-4000 and S-5000. On wall elevation A on sht S-4000 and detail 2/S-5000 the #6 verticals are referred to as nelson studs. Are the #6 verts to be welded to the (E) embed plate? If so, what are the welding requirements? If the (E) embed is not continuous or does not exist, do the #6 verts get drilled and epoxied into the (E) concrete? 10.15.2010 Reference detail A/C-5000. Note calls out for (E) chain link gate to be removed and relocated. Drawings do not show where the gate shall be relocated or if additional fenceing is required. Please clarify. 10.15.2010 Reference details A/A-600 & B/A-6000. In details A & B, the drawings show a 1/2" joint between the aluminum composite panel and the epoxy set stone panel with no sealant. The (E) wall joint is caulked with sealant. Should this joint be sealed? 10.15.2010 Reference details A/A-6000 and D/A-6000. The drawings call for the wall on the Transbay Terminal side to receive 16GA galv. coated G90 rolled stell panels. The (E) wall looks to be plaster w/expansion joints. Are there any specific requirements for joints, etc on the (N) Response The depth and alignment of existing electrical conductor/conduit shall be determined in field by the Contractor; work shall be coordinated with the TJPA Representative. #6 verticals referred to as a nelson product are deformed bar anchors. Yes, #6 verticals are welded to the existing embed plate. The welding requirement is full penetration. If the existing embed plate is not continuous and/or does not exist, the #6 verticals shall be drilled and epoxied 6" into existing concrete with Hilti RE500 or approved equal. Remove and relocate (E) chain link gate/fence as-required. The location of the gate shall be coordinated in field with the TJPA Representative. The extent of the new temporary construction fence is shown on Drawing C-2000. No, there is no sealant between the aluminum composite panel and the epoxy set stone panels. The requirements for the joints on the terminal side are shown on Detail E/A- 6000 for the vertical joints and Detail D/A-6000 for the top and bottom horizontal joints. Intermediate horizontal joints should not be provided. Note on Detail E/A-6000 the SASM waterproofing sheet behind, and the 2" overlap of the 16 Ga steel sheet. The overlap also includes a 3" width of sealing tape between the sheets. The metal sheet joints are then secured to the plywood backer behind with stainless steel self-tapping sheet metal screws at 8" on center. The October 15, 2010 TG0019.1 301 Mission Screen Wall - Bidder Q&A Response Set No. 2 Page 1 of 2

0011 wall. Does the (N) wall get painted? 10.15.2010 Plan view on sheet sht C-2000 calls for (4) new 9" x 12" concrete curbs. Detail B-C-5000 shows the curbs in section. Do these curbs get placed on top of the (E) pavers of do they go down on top of the 4" topping slab w/pavers around the (N) curb? Are there any rebar or epoxy anchorage requirements? rolled sheet is to be galvanized for weather resistance, but is not painted. New concrete curbs are to be placed on top of existing 4" topping slab. Remove and replace existing pavers as required to facilitate construction of new concrete curb. Height of curb shall be measured from top of pavers. For vertical reinforcement, use four #3 bars (equally spaced with a minimum of 4" cover at each end); for anchorage, drill four 1" embeds per curb. For longitudinal reinforcement, use two #3 bars with minimum 3" cover. October 15, 2010 TG0019.1 301 Mission Screen Wall - Bidder Q&A Response Set No. 2 Page 2 of 2