Division 8 Doors & Windows

Similar documents
SECTION 6. Glass Storefront Doors:

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

BASIC FIRE DOOR REQUIREMENTS TECHNICAL DATA SHEET NO. 401

DIVISION HARDWARE FORMAT 1. Technical specifications content and numbering system shall be based on 2004 CSI MasterFormat.

DIVISION HARDWARE FORMAT 1. Technical specifications content and numbering system shall be based on 2004 CSI MasterFormat.

Automatic Door Selection Guide

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

CONCEALED BEARING HINGES. StANLEy ARCHItECtuRAL HARDwARE

HMMA 810 HOLLOW METAL DOORS HOLLOW METAL MANUAL -87 NAAMM STANDARD FOURTH EDITION METAL DOORS & FRAMES NAAMM 2 NAAMM 2 METAL DOORS & FRAMES

Stainless Steel Continuous Hinges

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN Phone (260) Sales Fax (260)

MEANS OF EXIT / ESCAPE / EGRESS SELF INSPECTION CHECKLIST

City of San Diego, CWP Guidelines

2.02. Specifications. General. Products. Execution. Offset Pivots P-694 Top and Bottom Pivots

CLEAR-DIVISIONS CENTERFOLD

n Three 4 x 4 butt hinges per door - prevents wracking and assures smooth positive operation n Heavy duty 16 gauge steel frame

Fire-rated Aluminum Doors

Minimum gauges for doorframes shall be 16 gauge for interior frames and 14 gauge for exterior frames. Exterior frames shall be galvanized.

Wood Sound Retardant Door Hardware Information Bulletin

Basic Fire Door Requirements

Fire-Rated Doors and Hardware. A Guide to Field Inspection

WINDOW PANNING AND TRIMS

Architectural Casework Description of Work

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Frost and Cooper Renovations

190/350/500 Standard Entrances

HMMA 830 HARDWARE SELECTION FOR HOLLOW METAL DOORS AND FRAMES HOLLOW METAL MANUAL -02 NAAMM STANDARD METAL DOORS & FRAMES NAAMM 01 NAAMM 01

DE Frame with C Series Sidelight

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

PERFORMANCE TEST REPORT. Rendered to: GLASSCRAFT DOOR COMPANY

CLEAR-DIVISIONS VARIOFOLD

Fabrication Illustration Part No. Description Door Frame. P092 Mortised Butt Hinge P092D P092F (includes P2092 $ 48 $ 21 frame/door reinforcing)

DIVISION 8, METAL SOUND CONTROL DOOR ASSEMBLIES PART 1 GENERAL 1.1 RELATED DOCUMENTS

Decorative Lever Designs

Eggers meticulously-crafted door frames are rivaled only by their beauty, quality and lasting performance. Turning nature s beauty into works of art

An ASSA ABLOY Group brand. 4800LN Series. Interconnected Locks

C. Codes and References: Comply with the version year adopted by the Authority Having Jurisdiction.

Flexivent Windows (1952 to 1979)

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

Technical Data Honeycomb Door Leaf

Basement Window Installation Guide Hopper and Sliding

PART 1 GENERAL 1.1 SECTION INCLUDES

quality door and window systems for metal buildings

Cluster Box Units. (CBU s) 3300 Series CBU Door Sizes. Fully Integrated Parcel Lockers CLUSTER BOX UNITS FRONT LOADING. continued on pages 7-11

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

Auxiliary hardware & general information. Exit devices

Casement/Awning Window Parts Reference Catalog

Classroom Door Security & Locking Hardware

CLEAR-DIVISIONS APERTO

FRAME PROFILE MASONRY METAL DOOR FRAME FLUSH MASONRY KD MITER CORNER JOINT. #8 Screw (MS002485) Required on all fire rated KD frames. Bend Tabs.

PERFORMANCE TEST REPORT. Rendered to: GLASSCRAFT DOOR COMPANY

BUILDING PERMIT SPECIFICATIONS

HARDWARE LOCATIONS FOR HOLLOW METAL DOORS AND FRAMES

March 14, Installation of Bay, Bow and Garden Windows

Providing the widest selection of quality vinyl and aluminum window & door products.

DIVISION 8 DOORS AND WINDOWS

SECTION FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL

Lift-off hinge. Rising hinge. Standard hinge. Heavy duty hinge. Parliament hinge. Spring hinge. Double action spring hinge. Concealed mortise hinge...

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

NFRC THERMAL PERFORMANCE TEST REPORT. Rendered to: CR LAURENCE CO., INC. SERIES/MODEL: 7500 Concealed Vent TYPE: Projecting (Awning)

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL

280+ Mortise Mounted Series Shear Locks Special Application Solution

Simplex 1000 Series. All Simplex Controls are less I.C. core Series packed with both ASA and T strike.

9300BC SERIES Light Commercial Door Closer

Securing your school. Door hardware solutions for primary education

Sliding Barn Door Hardware Installation Instructions BALDUR and ODEN

REQUEST FOR QUOTE. Material $ Labor/Installation $ tax $ Total $ Material $ Labor/Installation $ tax $ Total $

Installation Instructions and Ordering Information

Sun Windows General Information Sun New Construction Window Installation Instructions

Variety of Control Options Control is possible via wall switches, remote control systems or integration into building management systems.

Reachout Lock Replacement for Andersen 2-Panel and 4-Panel 400 Series Frenchwood Gliding, 200 Series Narroline, and Perma-Shield Gliding Patio Doors

FIRE/LIFE SAFETY CLOSERS/HOLDERS SERIES

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION SECURITY SYSTEMS

SECTION SERIES 1500 VINYL PATIO DOORS

Packaged Terminal Air Conditioner Wall Sleeve Installation

GUIDELINES FOR REHABILITATION OF TRADITIONAL COMMERCIAL BUILDINGS DESIGN GUIDELINES

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

MIAMI-DADE COUNTY PERFORMANCE TEST REPORT. Report No.: B Rendered to: AMERICAN PRODUCTS, INC Tampa, Florida

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

A Complete Solution CREATING WALLS THAT DEFINE SPACE

Class A Office Buildings Commercial Facilities College and University Campuses K-12 Buildings Healthcare Facilities Government & Military Structures

Sliding Door Hardware Installation Instructions

Garden Windows Builders Vinyl

Degree Key System. Technical Manual

TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE

Electrified Products TABLE OF CONTENTS. Power Transfers...12 Pressure Sense Bars...12 Proximity Cards & Keys... 4

17,280 square feet Overview:

Door Hardware Lock Specifications

Confort 26. Sliding Systems. Sapa Building System

INSTALLATION OF A BAY WINDOW

Installing Window and Door Mouldings

Understanding Access Control

Display hidden notes to specifier. (Don't know how? Click Here) A. Advanced Upcoiling Security Grilles, power operated.

Standard Door Specification

Doc 10. UTM Standards: Card Access Security System

A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA

STANDARD MATERIAL SPECIFICATIONS FOR OUR PREFAB BALI HOUSES

Window Installation Instructions

Transcription:

Division 8 Doors & Windows 08050 Basic Door and Window Materials and Methods 1. Has a minimum door leaf size of 3-0 x 7-0 been specified for both interior and exterior doors? 2. Has the door height been standardized at 7-0 (rather than 6-8 )? 3. If fume hoods or other large equipment are included in the project, or may be required in the future, have doors been sized to allow for moving the items in and out? Have both exterior and interior doors been addressed for this requirement? 4. Has at least one main entry door accessible from adjacent sidewalks by wheelchair (the accessible path) and does it display the proper handicapped signage? Have all other entry doors been provided with proper signage per ADA/ANSI standards to direct handicapped persons? All doors must comply with ADA/Florida Building Code requirements for size, opening/closing force, time delay on closer-equipped doors, etc. 5. Do all exterior doors comply with Florida Building Code (wind loading, etc.) and all other applicable codes? 6. Do all doors used as means of egress (including those in corridors) that require vision panels have approved vision panels installed to meet NFPA 80 and other applicable code requirements? 7. Do all operable items on exterior doors have an integral finish --not applied, painted, baked on, etc.? 8. Are all doors requiring fire ratings clearly identified on the schedule and have frames and hardware been coordinated to match the required rating? 9. Are all doorways numbered? Door numbers shall relate to the adjacent room numbers. 10. Has the following been specified (coordinate with Division 9 Finishes): For solidcore wood doors and hollow metal doors 2 8 to 4 0 wide (200 lb. max.), rough framing shall be 20-ga. steel studs and runners. For heavy doors up to 4 0 wide (300 lb. max.), two 20-ga. studs shall be used. For doors over 4 0 wide, double doors and extra-heavy doors (over 300 lb.), framing shall be specially designed by the A/E to meet load conditions. Rough framing for all doors in fire-rated partitions shall be 20-ga. studs and runners. June 2010 Division 8 Doors & Windows 1 of 8

08110 - Steel Doors and Frames 1. Do hollow metal frames have mitered or coped and welded corners? Knock down frames are not preferred. 2. Have exterior HM frames been specified to be at least 14 gauge hot-dipped galvanized? 3. Have interior HM frames been specified to be at least 16 gauge galvanized? 4. Are all exterior HM doors Extra Heavy Duty, seamless? Glazing if used must be non-reflective. Has weatherstripping been specified on all exterior doors? 5. Are all interior HM doors Heavy Duty, seamless? 6. Exterior louvered HM doors are not allowed. Has this been coordinated with the engineers? 08210 - Wood Doors 1. Do all wood doors meet the ANSI/WDMA I.S.1A Standard for Architectural Wood Doors? 2. Are all wood doors solid core? Hollow core doors are not approved. 3. Has the A/E specified that doors shall contain no added urea-formaldehyde resins? 4. Are all wood doors 1-¾" solid core? 5. Do all doors meet the requirements of NFPA 80 and 101 where applicable, and are they able to use standard locksets? 6. Where cutouts for closers are required, has the head rail been specified to be not less than 6 inches? 7. If hardwood edges are desired have they been clearly specified with the thickness given? 8. Do all doors used as means of egress (to include corridors) and all fire rated doors that require vision panels have approved vision panels installed to meet NFPA 80 and other applicable code requirements? June 2010 Division 8 Doors & Windows 2 of 8

9. Is wood door quality clearly specified as well as approved manufacturer's names? At least 3 manufacturers must be specified. 08400 Entrances and Storefronts 1. Has it been specified that all entrances, storefronts, and windows shall be clear anodized aluminum finish? 2. Has a medium stile entrance door been specified? Narrow stile is not allowed (interior doors also). 3. Do all entrances comply with Florida Building Code (wind loading, etc.) and all other applicable codes? Narrow stile doors are not allowed in any condition. 08500 - Metal Windows 1. Has consideration been given to the provision of operable windows as a means of ventilation in the event that air conditioning equipment is not in operation? Are operable windows provided with positive locking devices? 2. Have all classroom windows, unless otherwise advised by FAU Facilities Planning Project Manager, been equipped with audiovisual blinds or acceptable window coverings? Has this been coordinated with Division 12 Furnishings? 3. Have guardrails at all full height glass panels been specified in accordance with applicable codes? 4. Are all exterior windows specified to comply with Florida Building Code requirements? (Wind loading, etc.) 08700 - Finish Hardware 1. Is the hardware schedule included in the specification? (This is to avoid change orders and delay in taking bids. A completely itemized schedule is preferred, i.e., not a group listing (see attached fall hardware spec). A cash allowance for finish hardware shall not be used unless otherwise authorized. Locksets 2. Has the lockset manufacturer for all FAU work (except Housing and Residential Life Department) been specified to be Sargent Manufacturing Co. only with no substitutes allowed? 3. Has the lockset manufacturer for all FAU Housing & Residential Life Department work been specified to be Best Access Systems only with no substitutes allowed? June 2010 Division 8 Doors & Windows 3 of 8

4. Have mortise locksets been specified and are they Sargent 8200 series with L lever handles, LN roses, and removable cores? Have classroom locksets been specified to be Sargent 8225 or 8256 series? 5. Have the removable cores been specified to be Sargent 6-pin old style 51 prefix with FAU restricted keyway for Boca Raton and Northern Campuses projects? 6. Have the removable cores been specified to be Sargent 5-pin new style 63 prefix with FAU restricted keyway for Broward Campuses projects? 7. Does the specification state that the hardware supplier must be authorized by Sargent and approved in writing by FAU? Butts 8. Have 5-knuckle, button tip, full mortise, template type stainless steel ball bearing butts with non-rising loose pins been specified? Exit Devices 9. Has Sargent 8800 series FLL or ETL in finish compatible with door been specified? At exterior pairs of aluminum doors, have Kawneer Panic Guard, or comparable, entrances been specified? 10. Have exit devices been specified to be Sargent 8800 series rim-type? 11. Have all electrically controlled exit devices been specified to have steel dogging screws and to be 2-wire? 12. Do all building entrance/exit doors contain exit devices with concealed vertical rod? Surface vertical rods for exit devices are not acceptable due to handicapped interference. Closers 13. Are closers specified to be surface applied Sargent 351 series or LCN 4040 series (both interior and exterior doors)? Is the cover finish powder coat aluminum enamel? 14. Are closers at interior doors specified to be mounted on the room side of doors so as not to be visible from corridors, lobbies, and other public spaces? 15. Has it been specified that all closers shall comply with Florida Building Code and ADA requirements for closing strength, speed, (and delayed action if required) and June 2010 Division 8 Doors & Windows 4 of 8

A/E has verified that closers specified will meet this requirement? Stops 16. Are wall-mounted convex rubber bumpers with concealed fasteners specified? At drywall partitions, has solid blocking been specified within the stud space? Floor stops are to be used only where wall bumpers cannot be used. Kickplates 17. Are 8 inch high stainless steel kickplates specified on doors subject to severe use? Office doors generally do not require kickplates. Provisions for Noise Control 18. Has weatherstripping been called for at heads, jambs, and sills at machine room and other doors where excessive noise is anticipated? Has the A/E determined if surface applied automatic door bottoms are be required? (Specific drawing sheet #/specification page # ) Hardware for Metal Entrance Doors 19. Is all hardware for metal entrance doors furnished under this Division 8 Doors & Windows (unless otherwise noted)? Has it been specified that the hardware supplier furnish to the door manufacturer templates or the actual hardware? Thresholds 20. Do all thresholds meet Florida Building Code and ADA requirements? Are thresholds at trash, receiving, recycling rooms, etc., that will require regular movement of wheeled carts as low as possible (if required at all) and shaped to allow easy movement of carts? Finish (unless otherwise noted) 21. Have interior finishes been specified to be brushed stainless steel (US32D) or brushed chrome (US26D)? Have exterior finishes been specified to be brushed stainless steel (US32D)? Have accessories been specified to have compatible finishes? Standards and Approved Equals 22. For each item except locksets and closers, has one manufacturer been specified and scheduled as the standard and, whenever possible, two other manufacturers whose products are PROVEN EQUAL? 23. Has a complete list of items proposed as the standards, together with manufacturers' names and with the names of manufacturers whose products are equals, been included in the hardware schedule? This schedule must be approved June 2010 Division 8 Doors & Windows 5 of 8

by the Owner at 50% Construction Documents. Keys and Keying 24. Is each lock cylinder compatible with specified hardware and with existing university hardware and keying systems? 25. Has the A/E specified that the Contractor shall schedule a keying meeting six (6) months prior to Substantial Completion? Attendees will be the Contractor, FAU Facilities Planning Project Manager, user group representative(s), hardware subcontractor, and Sargent representative (s). 26. Is each lock cylinder operated by one of the following keying system: a. One (1) new Master Key established for this project (if applicable). b. Existing Grand Master Key. c. Existing Great Grand Master Key. 27. Has it been specified that key bows shall be stamped on one side "PROPERTY OF STATE OF FLORIDA - DO NOT DUPLICATE" and on the other side with keyset symbol? (Specific drawing sheet #/specification page # ) 28. Has the final keying been reviewed with the university prior to issuance to the Contractor? 29. Have the keys been provided as follows (verify for each project): a. No Grand Master Keys. b. Ten (10) Master Keys. c. Ten (10) keys for each Submaster established. d. Four (4) Change Keys per lock. e. Provide Change Key blanks at a quantity of two (2) times the total quantity of cores provided for the project. ("S" bow, stamped). f. Twelve (12) Construction Master Keys "CMK". 30. Has it been specified that each project shall be a Construction Master Key project? All locks shall be shipped to the jobsite operated only by the Construction Master Key. Permanent keys, together with the Key Bitting Record, shall be sent via registered mail direct from the factory to: FAU Facilities Planning Dept., Project Manager (name), Florida Atlantic University, 777 Glades Road, Building CO-69, Room 107, Boca Raton, Florida, 33431. Automatic Door Opener 31. Has an electric-powered automatic door opener been scheduled for each major exterior entry to the building? Only one door leaf needs to be provided with the automatic opener when the entry consists of multiple doors. Standard operator is Nabco Gyro Tech GT-500 system. Activators are Linear transmitters-receivers. Transmitters are battery powered. Pushplates are 6 ¼ diameter brushed stainless June 2010 Division 8 Doors & Windows 6 of 8

steel with engraved handicap symbol. Microswitch and transmitter fit within a standard 4 square junction box. Verify transmitter frequency is 310MHz. 08720 - Schedules 1. Does the hardware schedule relate to the FAU-approved room numbering system (see Division 10 Specialties, Section 10400 Identifying Devices)? 2. Has the keying system been reviewed with the users and FAU Facilities Planning Project Manager? 08730 Card Access Control System 1. Has a complete, operable, tested and certified Card Access Control System (C.A.C.S.) been specified? 2. Is the specified system Software House-C. Cure 800 System? 3. Has the C.A.C.S. been designed and specified to connect to and interface with the Campus Central Control System through the campus data system? 4. Has the Campus Central Control System been analyzed to verify capacity for the proposed new access control system? If the Central Control System requires an upgrade of hardware or software to function properly campus-wide after the addition of the proposed new access control system, has the upgrade been designed and specified as a part of this project? 5. Has it been specified and scheduled that an adequate number of exterior entry doors are controlled by card readers and connected to the C.A.C.S.? A/E shall confirm locations with FAU Project Coordinator. 6. Has it been specified and scheduled that all exterior doors are connected to the C.A.C.S. and monitored for open-close conditions? 7. Has it been specified that all exterior doors not normally locked all of the time (such as stairways, secondary emergency exits, etc.) are connected to the C.A.C.S. and are equipped with electric locks so the FAU Police can remotely lock-down and unlock buildings through the C.A.C.S? (Specific drawing sheet #/specification page # ) 8. Have all wiring/cabling, operating devices, door contactors, relays, controls panels, boxes, grounds, and testing been specified to be performed by a systemmanufacturers' factory-trained and certified installer? 9. Have all C.A.C.S. devices been shown on the construction documents and has the A/E coordinated all electrical requirements with the electrical drawings and June 2010 Division 8 Doors & Windows 7 of 8

specifications, including raceways in door frames and j-boxes? 10. Has a campus data port been provided at the C.A.C.S. Building panel location? 11. Has a 4 x 4 x ¾ plywood backboard been specified to mount the C.A.C.S. equipment? 12. Has a dedicated 110v/20A circuit been provided at the C.A.C.S. building panel location? 13. Has the C.A.C.S. building panel and all hardware on the C.A.C.S. system been tied into the building s emergency power supply, and if the building does not have an emergency generator has a UPS been specified that will provide a minimum of 24 hours of backup power? 08800 - Glazing 1. Has each glass type been noted clearly and concisely on the drawings with a Type Number? Lengthy descriptions do not go on the drawings, but are to be in the specifications. 2. Has each glass type been precisely defined in the specifications? 3. Where glass is used in in toilet, bathroom, etc., windows, is it obscure? 4. Is all window glass replaceable from inside the building wherever feasible? 5. Does all glass meet the requirements of the Florida Building Code, Life Safety Code, and all other applicable codes? (Wind loading, safety glazing, etc.) (Specific drawing sheet #/specification page #- ) 6. Has it been specified that windows should be glazed in the closed position and left closed for several weeks? (This applies particularly to awning or projected types.) 7. Has it been specified that all exterior glass on the FAU Boca Raton campus shall be Atlantica spectrally selective tinted glass by PPG (green tint - formerly Solargreen), or approved equal? Standards for ¼ (6mm) monolithic glass are: 67% visible light transmittance, 0.52 solar heat gain coefficient, 0.61 shading coefficient. End of Division 8 Doors & Windows. June 2010 Division 8 Doors & Windows 8 of 8