SECTION FIRE PROTECTIVE FIXED SMOKE DRAFT CURTAINS

Similar documents
FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION METAL WALL PANELS

ROXUL Board Insulation Section Master Guide Specification (CAVITYROCK ) Page 1 April 2016

The Pennsylvania State University Physical Security Office. Intrusion Alarm. Performance Specification

LANSING COMMUNITY COLLEGE TLC BUILDING SERVER ROOM UPGRADES SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.

INSTRUCTIONS FOR COORDINATION SECTION SOLID SURFACE FABRICATIONS

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

SECTION SERIES 1500 VINYL PATIO DOORS

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721

ADDENDUM #1(BID PACKAGE # 3)

A ROAD MAP FOR YOUR CODE, SMOKE BARRIER & SMOKE PARTITION REQUIREMENTS

SPECIFICATIONS FOR NW CONTROL CENTER, HURRICANE HARDENING - SARASOTA ISSUE FOR CONSTRUCTION

SECTION GUARDA SECURITY WINDOW SCREENS

SCENIC VIEW SV 10 SECTION SOLAR CONTROL FILMS

Pyroguard Wired Glass

SECTION CABLE TRAYS. A. Continuous, rigid, welded steel or stainless steel wire mesh cable management system.

C. Codes and References: Comply with the version year adopted by the Authority Having Jurisdiction.

FIRESTOPPING & SMOKE SEALS

SECTION STANDING SEAM METAL ROOFING

Section 100 Contractor Quality Control Program

LAKE COUNTY ANIMAL SERVICES EXPANSION SECTION 15459

Project Name: Nortrax Section Project No: SURGE PROTECTION DEVICES Page 1

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

FIRE-RESISTANCE RATINGS WITH STEEL JOISTS

3-Part Specification Railing Cable Systems

SECTION PREFORMED METAL STANDING SEAM ROOFING

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

SECTION FireGard ROLLING FIRE DOORS / SMOKESHIELD FIRE DOORS

SUBSTITUTION PROCEDURES

PART 1 GENERAL 1.1 SECTION INCLUDES

SECTION COLD-FORMED METAL DECK FRAMING Elevations Steel Deck Framing by Trex

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

Roxul Board Insulation Section Master Guide Specification (CAVITYROCK DD) Page 1 October 2013

09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec Master Spec Page 1

SECTION PRE-ENGINEERED BUILDING BLANKET INSULATION

SECTION WINDOW WASHING SYSTEMS

SECTION METAL ROOF & WALL PANELS

BASIC FIRE DOOR REQUIREMENTS TECHNICAL DATA SHEET NO. 401

HOUSTON COMMUNITY COLLEGE HCC ALIEF CAMPUS MAIN BUILDING, FIRST, SECOND & FOURTH FLOORS RENOVATION ISSUE DATE:

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

ENGINEERING SPECIFICATION FIBERGRATE MOLDED GRATING. January 24,

SECTION EXPANSION CONTROL

Tremco Fire Protection Systems Group Technical Bulletin

Thomas and Betts Corporation Product Guide Specification

EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS

SECTION ZONED (DC LOOP) FIREALARM SYSTEM

SECTION STANDING SEAM METAL ROOF

SECTION ACCESS CONTROL SYSTEM. CONDITIONS OF THE CONTRACT AND DIVISION 1, as applicable, apply to this Section.

SURGE PROTECTIVE DEVICES (SPDs) LOW VOLTAGE AC INTEGRATED SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION SYSTEMS SECTION 16671A SECTION 16671A

Invitation to Bid FIRE ALARM & DETECTION SYSTEM

238T Standing Seam Metal Roof System (SSMRS)

Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

TruexCullins Architecture Fairfield Center School Bid Documents Kitchen and Bathroom Renovation March 1, 2015

SECTION ELECTRO-MECHANICAL HARDWARE

DIVISION 27 COMMUNICATIONS. A. System design shall be completed by a Registered Communications Distribution Designer (RCDD).

Scottsdale, Arizona. Presentation by: Hermes Norero, P.E. President and CEO

SECTION ACOUSTICAL WALL TREATMENT. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

REPORT NUMBER: MID-001 ORIGINAL ISSUE DATE: JUNE 27, 2012

The replacement or modification of existing windows shall comply with the following requirements:

FIREFINDER XLS ADDRESSABLE FIRE ALARM SYSTEM SECTION 13851

Construction Management Standards of Practice

Lightning Protection Services Prevent loss from lightning damage with UL s Inspection Certificate

DESIGN CLARIFICATION (DC)

SOLICITATION STATEMENT OF WORK CONSTRUTING OVERHEAD ROOF COVER ON THE TENT AT DTFS. US. Embassy, Sawan Street, Himyar Zone

NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES Fire Alarm Systems

SECTION PLAYGROUND SURFACING TILES

Pre-Cut Sauna Specifications

DIVISION 8, METAL SOUND CONTROL DOOR ASSEMBLIES PART 1 GENERAL 1.1 RELATED DOCUMENTS

Fiberglas, Exterior Wall Thermal Insulation

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive

Kiln Room. Design and Product Specifications

AUSTIN INDEPENDENT SCHOOL DISTRICT INTERNAL AUDIT DEPARTMENT CONSTRUCTION AUDIT PROGRAM

Classroom Door Security & Locking Hardware

Sample Company SECTION GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES

FIRING RANGE PHASE 1 DESIGN

FVSU REPAIR & UPGRADE FIBER OPTIC SECTION FIRE ALARM SYSTEM CONNECTIVITY

MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015

Career Path Project Engineer to Project Manager 1

SECTION FIRE ALARM AND DETECTION SYSTEM

LITHIUM BATTERY CR123A SPECIFICATION

Code of Standard Practice for Timber Frame Structures

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

City Of Portsmouth, New Hampshire REQUEST FOR QUALIFICATIONS # For. Construction Management Services for the

SECTION Photovoltaic (PV) Glass

High Strain Dynamic Load Testing of Drilled Shafts

SECTION ( ) FIRE DETECTION AND ALARM SYSTEM

SECTION HEAT PUMPS

Gridstone Gypsum Ceiling Panels

ENTRANCE MATS & GRIDS

H.V.A.C. Design Plumbing Design

ACL 395 Resistivity Meter

Selecting Energy Efficient New Windows in California

1.02 DESCRIPTION A. This Section specifies furnishing and installing Cast in Place Detectable/Tactile Warning Surface tiles where indicated.

Section EXTERIOR STONE VENEER Full Mortar

Energy Design Resources Commissioning Plan Outline Template

Transcription:

SECTION 10 52 00 FIRE PROTECTIVE FIXED SMOKE DRAFT CURTAINS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Division 5 Section "Metal Fabrications" for supplementary metal members supporting smoke curtain systems to structure. B. Products Furnished Under This Section: 1. This Section includes Fixed Smoke Draft Curtains 2. Model- U.S. Smoke & Fire SD60 Fixed Fabric Draft Curtains C. Related Requirements: 1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.02 REQUIRED TEST REPORTS & MINIMUM PERFORMANCE STANDARDS - Underwriter Laboratory Label Requirement for Fire Protective Smoke Curtains A. Required Testing Reports, Label Requirements, and Minimum Performance Standards: 1. UL 10B- Fire test of Door Assemblies Time Temperature Curve minimum 1 hour rated. 2. UL 10C- Positive pressure for fire door assemblies 3. UL 10D- UL Labeled, Listed Protective Curtains. 4. UL Follow up Service Report Required 5. ASTM E84- Test Report 6. ASTM 136 Test Report 7. NFPA 701 Test Report 8. NFPA 105

9. California Department of Forestry and Fire Protection and Office of the State Fire Marshal Listing. 10.Impact test required by Independent testing Laboratory 1.03 SUBMITTALS A. Product Data: 1. For each type of product indicated. B. Shop Drawings: 1. Show fabrication and installation details for fixed smoke curtains. Include plans, sections, details, attachments to other work, and the following: a. Operating clearances. b. Locations of equipment components. B. Samples: 1. For each type of fabric from dye lot to be used for the Work, with specified treatments applied, and showing complete pattern and texture repeat, if any. Mark top and face of fabric. Prepare Samples of not less than 36 inches (900 mm) square. C.Qualification Data: 1. For Installer. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified. D. U.S. Green Building Council (USGBC)- LEED- local and regional materials. Assembled in the United States by factory-trained employees. 1.04 CLOSEOUT SUBMITTALS A. Warranty Documentation: 1. Warranties specified in this Section. 1.05 QUALITY ASSURANCE

A. Qualifications: 1. Installers: a. A firm or individual in the United States with no less then five years on-site installation experience in the United States, experienced in installing fixed smoke curtains similar in material, design, and extent to those indicated for this Project, whose work has resulted in applications with a record of successful in-service performance. b. Conduct conference at Project site to comply with requirements in Division 01 Section "Project Management and Coordination." 1.06 FIELD CONDITIONS A. Existing Conditions: 1. Verify rough and clear openings and the dimensions of other construction by field measurements before fabrication and indicate measurements on shop drawings. 1.07 WARRANTY A. Manufacturer Warranty: 1. Warranty of one year. PART 2 - PRODUCTS 2.01 FIXED FIRE PROTECTIVE SMOKE CURTAINS

A. Manufacturers: 1. U.S. Smoke & Fire, 888-917-8777 Ext 102 www.ussmokeandfire.com, www.ussmokeandfirecurtain.com 2. Fabrilok, Smoke & Fire Prevention Systems, 434.374.8537 3. Total Door, 800.852.6660 B. Description: Provide Model U.S. Smoke & Fire SD60 Fixed Fabric Smoke Curtains as manufactured by U.S. Smoke and Fire. 1. There are no substitutions of materials specified allowed during the bidding process. If, for any reason a deviation from materials specified by the designers is desired or warranted, a cover letter and a request for deviation. Transmittal form must be submitted to construction manager (CM). If the proposed deviation is rejected by the CM or the Designers, it is this subcontractor s responsibility to obtain the original items and maintain the original construction schedule. The Designer has the right to require the originally specified material or item and his decision on the matter is final. C. Performance/Design Criteria: 1. The fabric curtain shall be manufactured from X32K woven. The woven glass fiber fabric shall have a nominal weight of no less than 540g/ square meter and shall be UL listed for at least one hour. 2. An optional weighted bottom bar shall be provided to prevent deflection.

PART 3 - EXECUTION 3.01 INSTALLERS A. Installers: 1. CYSA-U.S. Smoke & Fire 888.917.8777, 888.917.5612 2. B.T. Mancini 408.942.7900 3. Total Door 714.258.1700 3.02 EXAMINATION A. Verification of Conditions: 1. Examine areas and conditions, with Installer present, for compliance with requirements for supporting members, blocking, installation tolerances, clearances, and other conditions affecting performance of fixed smoke-curtain work. Proceed with installation only after unsatisfactory conditions have been corrected. 2. Examine inserts, clips, blocking, or other supports required to be installed by others to support curtain fabric. Proceed with installation only after unsatisfactory conditions have been corrected. 3.03 INSTALLATION A. Install fixed smoke-curtain according to manufacturer s written instructions. END OF SECTION 10 52 00