Mounting systems. South system with optimized ballast. Assembly instruction

Similar documents
PITCHED ROOF STRUCTURES

HORIZONTAL INSTALLATION

00MK-MA0190-EN00. Mounting System ASSEMBLY INSTRUCTIONS. Universal Light system with locking brackets, for sloped roof

ASSEMBLY INSTRUCTIONS Residential Roof solutions

PV Mounting System For Crystalline Solar Module THE POWER OF ASTRONERGY

Installation Instructions

UBBINK SOLAR IN-ROOF SYSTEM

SD. Flat roof. Rack Mounting. Installation instructions (2010/11) AU

AA Solar and Sun Power Plus

INSTRUCTION BOOK FOR. Dual Monitor Video Conferencing Cart

Installation Guide of Sunrise Solartech PV Modules. Term Contents. Purpose of this guide. General. Safety precaution for installing a solar

Solar Mounting System

MGB Chrome Bumper Conversion

Mounting Instructions for SP4 Power Modules

Service Manual Supplement

INSTRUCTION BOOK FOR. Single Monitor Video Conference Cart

INSTALLATION MANUAL. Contents JAPANESE ENGLISH GERMAN FRENCH ITALIAN SPANISH. To the installing technician: CEILING BRACKET

Installation Instructions

Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide

PREASSEMBLED ELEMENTS FOR LIFTING AND SLIDING DOORS

STEEL-RITE II or III COMMERCIAL SECTIONAL DOOR Owner s Manual Supplement Model NOTICE TO USER

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

GENERAL INSTALLATION MANUAL FOR EGING PV MODULES

RELAZZO DECKING THE TERRACE. INSTALLATION GUIDE. Construction Automotive Industry. REHAU R20680 EN

FRONT BUMPER INSTALLATION INSTRUCTIONS DODGE / MERCEDES SPRINTER

RAIL FREE SOLAR ROOF MOUNT

Front axle components, overview

S4 - Top Hung Window. Outside view. Inside view. Interior frame. Exterior frame. Glazing Panel

Figure 2 The fan and shroud also needs to be removed for access to the four a/c compressor bolts and removal of the compressor from the top.

Destiny Shower Enclosure Installation Instructions

How To Mount An Ecosa Series Solar Panel

Standard Sleep Pod Side Entry Assembly Instructions

LG G5 Chassis Brace Gen 5 Camaro THE MOST POWERFUL HEADERS ON THE PLANET Brought to you by LG Motorsports

Chapter 10 - Scaffolding Systems

Installation Instructions

SECURITY SYSTEM SMART SIREN KIT

BUILDINGA 1/10 SCALE FLATBED TRAILER

Installation Instructions Avalanche XUV Cap IMPORTANT! IMPORTANT!

TECHNICAL INFORMATION

Front brakes (FN- 3), servicing

TRS 090/105 Compressor. Repair Procedures

Traditional Sonar and DSI Sonar Installation

Installation Manual. SKU# series (Base Rails) SKU# series (Overhead Racks)

DYNA RIDER FOOTBOARD KIT

Installation Instructions HighRock 4x4 TM

Speed-Mat Rectangle Cutter

www. ATIgunstocks.com Page 1

INSTRUCTIONS THOROUGHLY BEFORE BEGINNING***************

FL ADJUSTABLE RIDER BACKREST MOUNTING HARDWARE KIT

EZ-Steer Assisted Steering System

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

Installation Instructions

INSTALL/REMOVAL INSTRUCTIONS: WINDOW REGULATOR

POWER LOCK KIT GENERAL INSTALLATION -J04427 REV Kit Number. Models. Additional Parts Required. Kit Contents

Basic Spring Motor Roller Shades

TENSION ISSUES? ROLLER SEE PAGE 7

HP 16/18-Port Cable Management Kit Installation Guide

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

1.8 CRANKSHAFT OIL SEALS

Extra Tall Wide Span Gate

Horizontal Mini Blinds Installation Guide

TOYOTA Tundra BACK-UP CAMERA SYSTEM Preparation

CUSTOM AUXILIARY FORWARD LIGHTING KIT

All-Season Sunroom Sliding Glass Door Installation Instructions

Installation manual Solar Tracker

AM/FM ANTENNA KIT (TOUR-PAK MOUNT)

Ceiling Mounted Folding Attic Ladders Installation Instructions

FRONT TURN SIGNAL RELOCATION KIT

SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE

8' W x 8' H or 10' H Peak Style Shelter Assembly Instructions

BILLET HEADLAMP SHELL

Wall installation for Samsung Galaxy

assembly instructions

4RU High Density Shelf Installation Instructions

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab

Technical data sheet PVC Bi-fold doors

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F250/F-350 Single Wheel 2WD Ford F350 Dually 2WD IMPORTANT NOTES

EZ-Steer Assisted Steering System

WARNING! DO NOT ATTEMPT TO INSTALL THIS KIT IN A POWERED CONVEYOR.

OWNER S MANUAL Table Tennis Table Patent Pending

FLAT ROOF BOX SPAN CARPORTS

CHROME FRONT BRAKE MASTER CYLINDER KIT

Depending on which elastic support you have you can secure the V2 power unit to the following seat bracket tubes: EXTERNAL DIAMETER 27.

Transducer Installation

How to Build a Poker Table

Phoenix Solar AG. Phoenix TectoSun 3 Installation instructions

IN00419 (rev A) Aqua 6 Glide Quadrant and Off-set Quadrant Enclosure

Weatherproof Tournament Table Tennis Table

TracRac G2. Overhead Rack Installation Instructions. TracRac Inc. 994 Jefferson St. FallRiver MA IN-42000_B

AM/FM ANTENNA RELOCATION KIT

TABLE OF CONTENTS. I. TROUBLESHOOTING Section 1.01: Common Problems/Solutions... 2

Owner's Manual & Assembly Instructions

Rear wheel brakes, servicing. Стр. 1 из 45. Note:

Arctic Leash Instruction Manual Alaskan Products Company LLC.

ES-A Series Photovoltaic Panels

MEASURING WHEEL ALIGNMENT

Rating when used as a weight carrying hitch without spring bars:

AKRAPOVIC SLIP-ON EXHAUST SYSTEM for the HONDA CB1000R

INSTRUCTIONS. FLHR/C/S (Road King) FRONT END LOWERING KIT 1WARNING -J03242 REV General. Removal (Left and Right Forks) Kit Number

Wanda Technology Inc. Side Post Aluminum Umbrella OWNER S MANUAL

Transcription:

Mounting systems South system with optimized ballast Assembly instruction

Parts Overview 1 2 Basic profile 60 36 (lengths 6000, 4500, 2995 mm and customization) according to system sketch 3 System mat 400 120 6 mm quantity according to system sketch 4 a c a b c d b d Support 15 South (2 per module), pre-assembled Var. a) for module frames with wide clamping area Var. b) as a) and for higher snow loads Var. c) for module frames with narrow clamping area Var. d) as c) and for higher snow loads 5 Front module fastener 15 (2 per module) Var. a) for module frames with wide clamping area Var. b) as a) and for higher snow loads Var. c) for module frames with narrow clamping area Var. d) as c) and for higher snow loads 6 Wind cover (per module) Slot connector (according to system sketch) Angle 30 30 3 (Lengths 6000, 4500, 2995 mm and customization), pre-assembled with hammer head screws M8 20 and locking nuts, M8 2 Ballast Optimized South Facing System

7 8 Profile connector (according to system sketch) A2, 4-hole with hammer-head screw and locking nuts Expansion connector (according to system sketch) depending on requirements 9 10 Position lock Thin metal screw 6 25 11 12 Protection cap Hammer head screw (set) Ballast Optimized South Facing System 3

Safety instructions This manual contains important information for safe and proper installation and use of the ballastoptimized flat roof installation. Please follow these information and protection notes in this manual. Keep the general legal rules (accident prevention regulations) as well as the safety instructions. Fence off resp. secure the working area before installation starts, for protection against unauthorized access or accident. Perform installation on safe ground! If components of this assembly system have to be changed during installation or at a later date, these structural changes must be cleared with the manufacturer. In case of non-compliance the manufacturer is not liable in the event of damage. Damages of any sort which are resulting from interference by the customer are excluded from the guarantee. Concerning the warranty please note the general terms and conditions of ALTEC Metalltechnik GmbH. During installation work it is necessary to wear proper protective clothing. You have to ensure that all components listed are available. Place the components in order to installation process. For installation two people are needed at least. It may be necessary to free the surfaces from water, snow or dirt. Please store the components dry before installation starts to avoid stains or other damages. The manufacturer is not responsible for damages caused by improper storage/installation or force majeure. It is absolutely necessary to switch off the power supply before working on electrical components! We point out that, for necessary removal of roof-related components / PV systems, applicable regulations must be kept. Please instruct a specialized company in this case. Changes to the roof structure and/ or roofing, which are caused by the PV system, must be released by the building owner or constructor. This concerns all roof components as well as roof constructions. It must be ensured, that the roof static is able to bear the additional loads of the installed system. Based on the building documentation it must be ensured, that the roof structure and roofing is suitable for the project. All issued documents are project-related. These are calculated on static and structural aspects individually for each project. the existing roof covering must be cleaned at least within the area of the basic profiles of pollution (algae, moss, mud, etc.). Optionally we can offer membrane roof cleaner. Without a pre-cleaned roofing ALTEC Metalltechnik GmbH cannot provide any warranty. Tools for installation: Measuring equipment: laser or measuring tape Screwdriver or ratchet with a 13 mm socket for the nuts on the head bolts Installation aid (optional) Roofing film cleanser (optional) 4 Ballast Optimized South Facing System

Assembly instruction Positioning system mats System mat 2 has to be placed under the load point of the base profile 60 36 1 (under front and rear module fastener), with aluminum side on the roof skin. The system mat may not be placed to the terminal of the profiles, as well as it should be avoided to place it in the range of the profile connector/ expansion connector. Note: The width of the modules determines the system s mat intervals. first system mat on top of base rail secure second mat system at distance x to the base rail secure third system mat with distance Y to the base rail secure fourth system mat with repeating distance X at Fix the base rail fifth system mat... Y... (additional repetition) The system is designed for the following module sizes: Module width in mm Module length in mm 982 1638 990 1330 990 1650 991 1665 992 1636 992 1640 992 1640 992 1655 994 1652 1000 1640 1000 1650 1000 1652 1065 1596 1069 1580 1100 1640 x 3. y 2. x 1. X = System mat distance as a function of the module width Y = System mat distance as a function of surface shading 1 2 Ballast Optimized South Facing System 5

Assembly instruction Installation of the base rail and slot connector Extension of the base rail only up to 12 m with slot connector 7 Over 12 m runs between use an expansion connector 8 c. 10 mm spacing Slot connector Expansion connector 1 2 6 Note: Number and position of the base rails and columns connector, refer to the separate drawing which will be issued by with the system before construction begins. 6 Ballast Optimized South Facing System

Assembly instruction Example roof layout plan (detail) Note: Documents are issued before construction starts. Ballast Optimized South Facing System 7

Assembly instruction Position of the supports Please refer to the separate drawing concerning the distance/position of the supports. The support will be fastened by tightening the lock nut with 14 16 Nm. 3 1 8 Ballast Optimized South Facing System

Assembly instruction Mounting the modules Fix module with support: Hang all modules with the inner frame into the first both supports and pull the frame into the holder. same distance same distance Between the modules must be an expansion gap (min. 5 mm, max. 10 mm). min. 5 mm Ballast Optimized South Facing System 9

Assembly instruction Mounting the modules Front module holder: Bring the slip prevention to mounting position. Hook suspension Slip prevention Locking nut Mounting position Anti-twist protection Additional component for higher snow loads Shortened suspension for thinner module frames Attach the hook suspension of the front module holder with the inner module frame, than insert the hammer head screw of the front module holder into the base profile. Now the front module holder has to be pulled against the module frame. Simultaneously the slip prevention has to be pushed in direction to the module until they fit closely in the frame. Finally, the locking nut has to be tightened with 12 15 Nm to ensure the connection. 10 Ballast Optimized South Facing System

Assembly instruction Mounting the modules Define the margin: Marginal modules will be secured against slipping by using the position lock 8. This will be connected at the bottom side of the module, near to the ultimate support. 9 9 Note: The lightning protection of the system must be installed by a specialized company. Ballast Optimized South Facing System 11

Assembly instruction Wind sheet and ballasting Wind deflector attachment: The wind deflector sheet 5 is screwed to the support and the base rail. Top fixing Top fixing 5 Bottom fixing Bottom fixing Connect the wind deflector sheets: The deflector sheets go side by side, overlapping ones are connected together by a thin sheet metal screw. Ballast weighting: Weight elements are protocol according to load arranged. Note: The lightning protection of the system must be installed by a specialist company. 12 Ballast Optimized South Facing System

Ballast Optimized South Facing System 13

ALTEC Metalltechnik GmbH 8/2015 Mistake and technical changes reserve. ALTEC Metalltechnik GmbH Industriegebiet 1 07924 Crispendorf Phone 03663 4210-0 Fax 03663 4210-211 info@altec-metalltechnik.de www.altec-metalltechnik.de