How to avoid Major Accidents, Contractors in the Oil and Gas Industry. Project Director Jan-Tore Elverhaug November 2012

Similar documents
New contract for jacket to the Johan Sverdrup Process Platform. 8 October 2015 Sverre Myklebust, Executive Vice President, Jackets

PCA Forum & Members Meeting Aker Solutions and ISO15926

The 5th INTERNATIONAL CONFERENCE ON INTEGRATED OPERATIONS

Third quarter results 2014

Third quarter results 2012

Preferred partner. Investor Day London, March 17, 2015 Luis Araujo, CEO Svein Stoknes, CFO

Aker Drilling Riser Brazil

Windfarm Installation Barge. a novel approach to installing foundations in offshore wind

Aker Solutions Splits Into Two Companies

Third quarter results 2012

Materials Management:

Topsides, Floaters & Onshore Facilities

The Kvaerner management system. An introduction to how we manage our business

NORWEGIAN PROJECT MANAGEMENT PRINCIPLES APPLIED IN THE JURONG ROCK CAVERN PROJECT

Guidelines for a PROJECT EXECUTION PLAN

Direkte elektrisk røroppvarming

2nd quarter results August 2011

Safety Integrity Level (SIL) Studies Germanischer Lloyd Service/Product Description

Asset Management Conformity Assessment Fitness for Service QHSE. Oil & Gas Services and Tools. For the benefit of business and people

Northern Norway Subsea Value Chain

Guidelines for FEASIBILITY STUDY

Hazard Operability Studies (HAZOP) Germanischer Lloyd Service/Product Description

TRANSNET PIPELINES. TPL 25 Tarlton Commissioning Plan

& Start-up Directory

HAZARDOUS MATERIALS MANAGEMENT ISSUE 2

Welcome at Aker Wirth

Engineering Procedure

What will it be; define the value

1.040 Project Management

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No

NEWS RELEASE ROXGOLD ANNOUNCES SECOND PROJECT FINANCE DRAWDOWN FOR THE YARAMOKO GOLD PROJECT & PROVIDES DEVELOPMENT UPDATE

WORKFACE PLANNING CONFERENCE WFP IS MAKING IT HAPPEN. PROJECT PLANNING A CASE STUDY Wayne Cusitar, P.Eng., MBA

VENDOR PREQUALIFICATION QUESTIONNAIRE

Procurement and Supply Chain In a Work Face Planning Environment

How To Manage A Project

Fourth Generation Modular Construction

We strive continuously for zero harm to people, the environment, material and non-material assets

Introduction. Anders Runevad, Group President & CEO Marika Fredriksson, Executive VP & CFO

DNO ASA Corporate Presentation and Update

Engineering Capability Presentation 02-Feb-2015

TfNSW Standard Requirements TSR T Technical Management

PROJECT DESIGN DELIVERABLES SEQUENCE (PDD)

Tidal Energy. Wind Energy. Transmission & Distribution Network. Offshore Substation. Onshore Substation. Tidal Stream Energy.

GE Oil & Gas. Industrial modules. Turnkey power-generation and compression solutions to increase efficiency, reliability & power in restrictive areas

Engineering g Procurement. 02-Feb-2015

Project Management Fact Sheet:

TECHNIQUES FOR MANAGING COMPLEX PROJECTS WITH PLANNING AND SCHEDULING SOFTWARE PAUL E HARRIS EASTWOOD HARRIS

G9 Offshore wind health and safety association

Civil & Environmental Engineering

2 ND QUARTER 2016 RESULTS ANNOUNCEMENT

Engineering, Procurement and Construction (EPC) Projects

Human factors engineering in projects

Experience and Qualifications of PROCESS PLANTS CORPORATION

connected excellence in all we do Turnaround Management

Manufacturing footprint, outsourcing and cost out. by Jean-Marc Lechêne, COO

Facility Services PROJECT MANAGEMENT METHODOLOGY FRAMEWORK

NAPCS Product List for NAICS 54134: Drafting Services

ABSTRACT. The Guidelines Section F is related to the Purchasing requirements of NSQ100 (Chapter 7.4). Summary

Norsk Olje og gass Selbusjøen

Technology services for existing facilities

Engineering and technologies Floating LNG

Making Vestas profitable - Ensuring delivery. By Dag Andresen, Executive Vice President and CFO

Training Management Guidelines

Worldwide Technip in Nigeria

Ultrasonic Gas Leak Detection

INNOVATION EMPOWERS. CONSTRUCTABILITY AND CONSTRUCTION PLANNING BY ADOPTING STATE OF THE ART ENGINEERING AND CAD TECHNOLOGY

Goliat Barrier Management

QUALITY MANAGEMENT SYSTEM (QMS) MANUAL

LANSING COMMUNITY COLLEGE TLC BUILDING SERVER ROOM UPGRADES SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT

INTERNATIONAL CONSTRUCTION CONSULTING, LLC PROJECT MANAGEMENT TRAINING PLAN

WEBSITE TERMS OF USE

Performance Based Gas Detection System Design for Hydrocarbon Storage Tank Systems

CER Audit and Inspection System. part of the Petroleum Safety Framework

Guidance note. Risk Assessment. Core concepts. N GN0165 Revision 4 December 2012

CAPABILITY BROCHURE. FORGACS Marine and Defence Brochure 1

Technologies & Management Systems that Work: Current Best Practice in Nuclear New Build

Energy Design Resources Commissioning Plan Outline Template

intergraph Procurement, Fabrication & Construction seminar

Document Management Operations Audit Checklist

HSE management guidelines for working together in a contract environment

RECOMMENDED GUIDELINES FOR THE APPLICATION OF IEC AND IEC IN THE PETROLEUM ACTIVITIES ON THE NORWEGIAN CONTINENTAL SHELF

Tracking project deliverables through a standard definition of Project WBSs. Franco Concari Technip & VP IPMA Italy Luciano De Gaetano Technip Italy

SUPPLY CHAIN PREQUALIFICATION PACKAGE

Project Materials Control

HSE information sheet Industrial radiography - managing radiation risks Ionising Radiation Protection Series No. 1(rev 1)

ITS specification Handover and commissioning process (ITS-10-01)

Bergen Group -positioned for growth

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue

Pareto Securities Oil & Offshore Conference

Risktec Training Catalogue 2016

Hordaland på børs 19 August Bergen Group. prepared for international growth. Pål Engebretsen, CEO

DANISH ENERGY AGENCY S GUIDELINES ON SAFETY- AND HEALTH RELATED CONDITIONS ON OFFSHORE INSTALLATIIONS, ETC. HEALTH & SAFETY CASES

Join the UK Nuclear Renaissance. Procurement & Quality Process

2. Safety, Health, Environment and Quality Management System (SHEQ-MS)

Technology based Project Management Consulting (T-PMC): Innovate to Reduce Costs

Delivery Management Guidelines Delivery Process 2 - Project Management

LNG A Different Approach The Teesside GasPort Project

GRANULAR POLYSILICON TECHNOLOGY

Transcription:

How to avoid Major Accidents, Contractors in the Oil and Gas Industry. Project Director Jan-Tore Elverhaug November 2012

EPC focus 2

Kværner Work scopes: All scope is related to new plants and units/modules for the oil and gas industry, prior to installation for operations. Work is performed according to clients specifications. Scope can consist of: Feasibility and concept studies System definition and detailed engineering Procurement Construction and assembly Commissioning. (normally assistance to clients)

How we work Kvaerners Model (K PEM) is based on best practice from many of the industry s most challenging projects K PEM ensures efficient project execution and risk management, for deliveries on time, on budget and with the agreed quality ED&S September 2008 Slide 4

Opportunity Appraisal Feasibility Studies Concept Selection Concept Definition System Definition System Design & Layout Development Global Design Detail Design Work Preparation Prefabrication Fabrication Transport & Positioning Assembly Mechanical Completion Commissioning Product Transport & Installation Product Take-over Close-Out Service & Assistance Agreements (optional) Warranty, Insurance & Legal Handling Acceptance & Contract Close-out Alternatives Generated Feasible Concepts Selected Concept Selected Concept Complete Critical POs Awarded Layout & Main Structure Frozen Global Design Complete Detailed Design Complete Preparation for Prefabrication Complete Prefabrication & Preparation for Installation Complete Module / Preassemblies Ready for Shipment Module / Preassemblies Positioned Assembly Work Complete Mechanical Complete Systems Commissioned Product Installation Complete Product Take-over Complete Close-out Complete Service & Assistance agreements established Warranty, Insurance & Legal handling completed Work accepted and Contract closed Milestone Stage 1A 1B 1C 1D 2A 2B 2C 3A 3B 3C 3D 4A 4B 4C 5A 5B 5C 5D 6A 6B 6C Feasibility & Concept System Definition Detailing & Fabrication Assembly & Erection System Completion Contract Completion 1A 1B 1C 1D 2A 2B 2C 3A 3B 3C 3D 4A 4B 4C 5A 5B 5C 5D 6A 6B 6C 5 06.11.2012 Kvaerner 2011

Focus area related to Major accidents Risk identification and Risk reduction Experience and knowledge transfer Involvement from all participants in the project Focus on highest risk and most efficient risk reduction activities Design, Product and Technology development Planning and execution of activities. Choose the correct subcontractors / suppliers Gate review to identify status on activities prior to proceed.

Concept selection Which alternative is the preferred? Considering potential for major accidents, natural environment, working environment? Concept definition The basis for an inherently safe design is made: segregation of the facility info safe and hazardous areas, location of LQ/evacuation means, escape route design, process design, ventilation solution, type of power generation etc. Concept risk analysis assesses the major accident risk potential Risk reducing measures (ALARP process) will be assessed continuous Activities reated to Major accident prevention

System Definition Hazard Identification (HAZID) Systematic review to reveal potential hazards related systems/areas HAZOP Hazard and Operability study Systematic review of each sub part of process systems to evaluate hazards and operability Quantitative risk analysis (QRA) ALARP (As low as reasonable practicable) process SIL (safety integrity level) and reliability analysis Human factors analysis Establish/develop safety philosophies and strategies Establish/develop performance standards for safety critical barriers Design of safety barriers BAT (Best available technology) process

Major hazard management - FPSO Example Before Wind direction LQ Turret (fire/ explosion potential) Process area (fire/ explosion potential) After Compr. gas turbines (ign. source) Potential ignition source (turbine air intake) Main power generation Wind direction Potential ignition sources located upwind process area Utility area serves as a barrier between turret/process areas and LQ Electric compressors (reduces ignition probability) 6- Nov- 12 Slide 9

HSE program for construction and completion defined Milestones and Detailed Construction Schedule verified. Team Alignment program continued Updated Project Mgmt Plan implemented HSE risk assessment complete Close out HAZOP action items Final vendor information from all PO s incorporated in System and Area Engineering Layout / 3D model documentation issued for construction Relevant System Engineering documentation issued for construction Material take off finalised and bulk material top up orders placed 2nd priority FC Subcontracts awarded Hook-up/Commissioning Subcontracts inquired Issue P& IDs IFC (QL4) Fabrication drawings and work preparation for prefabrication completed (prefab. job cards). Production of fabrication drawings Preparation of jobcards/work packages Material take off finalised and bulk material top up orders placed Completion requirement incorporated in fabrication documentation Issue Isometrics IFC Materials on site for use Implementation of subcontractors HSE & QA programs reviewed Engineering databases complete All fabrication Bulk Material delivered Shop engineering detailing and work preparation for fabrication Pipe spools, Steel sections and Concrete sections prefabricated. Deep/major foundations & trenches completed. Construction site temporary facilities completed Hook-up/Commissioning Subcontracts awarded HSE program for construction updated to include Assembly/ Erection phase Management Plan documents, schedules and budgets updated for next phase (HSE, Scope, Time, Cost, Quality, People and Team, Communication, Risk and Procurement & Subcontracting) Plan updated (for next phase) Milestone Review held Layout and 3D Model as built mark up of part assemblies/modules All Bulk Material available to support the Assembly / Erection sequence Part assemblies and modules/package units fabricated and mechanically complete Commissioning commenced on selected systems Complete 3D model / Layout design Prepare and check fabrication drawings, material, job cards/work Orders Complete prefabrication work Receive and check equipment Shipment of preassembly/test mounting Module fabrication Module transportation to assembly site Commissioning according to Completion method. 10

HSE requirements for Assembly & MC stages established & implemented Work permit system established Cost, schedule & risk program updated Team Alignment program continued Updated Project Mgmt Plan implemented Temporary Services & Power Distribution in place and Site roads complete up to sub-base. Major equipment, Pre- assemblies & modules transported to site and final positioned. On site fabrication and erection of major vessels and process equipment. Main Structures & Bridges Complete Implementation of HSE requirements verified Major equipment, Pre- assemblies & modules assembly installed. Install Balance of Plant Equipment and interconnecting piping systems. Minor structures, E & I installation and Main insulation complete. Final Labelling & Identification started. Operation & Maintenance Manuals available. HSE program for system completion phase established Management Plans, schedules and budgets updated for next phase (HSE, Scope, Time, Cost, Quality, People and Team, Communication, Risk and Procurement & Subcontracting) Plan updated (for next phase) Phase close-out Milestone Review Relevant as built mark-up complete Construction work mechanical complete & quality records available. Categorised Punch lists for all systems. All systems ready for commissioning and commenced in accordance with system completion schedule Final Insulation, Labelling & Identification complete. Transport and final install the modules and all components and pre-assemblies into a complete Topside, in accordance with the installation method. The work is performed at the assembly yard / onshore plant. The Topside is MC completed, ready for commissioning. 11

HSE requirements implemented Relevant documentation (LCI/DFI/DFO) updated with Asbuilt and commissioning information Team Alignment program continued Updated Project Mgmt Plan implemented Perform and finalise all commissioning activities. Preparations for start-up Temporary items removed. Relevant documents updated with as commissioned information Punch List cleared for start-up HSE requirements implemented Preparation for sail away Perform tow out Complete installation of substructure / moorings / tethers Complete installation of the production facility Document offshore installation/hook-up work MC complete Offshore commissioning Total HSE program implemented Service assistance agreement established Operational responsibilities (if any) formalised Delivery protocol executed-project contract object handed over Mobilise and maintain resources for Contract Close Out Phase All project work completed to enable issue of delivery protocol Punch lists at delivery time established including identification of carry over work including POs and subcontracts Method and schedule to close punch lists (COW) agreed with Client Establish agreements on execution of post start-up performance and HSE measurements and rectifications Management Plan documents asbuilt, with lessons learned All As-built and LCI documentation handed over Key experience figures summarised and transferred to BU/BS Issue of Delivery Protocols and commercial closing of POs and subcontracts Final Account established Final revenue/net margin report issued Relevant documentation, BGs / PCGs and systems handed over to warranty organisation Completion Certificate established. Project Close-out report issued Punch list / COW including PO and subcontractor scope completed Complete and release hand-over documentation Subcontractor and third party invoices closed out Completion of Sub-contracts and POs Final Accounts and Completion Certificates POs assigned to Client if requested Experience/lessons learned reports issued Perform onshore commissioning of the systems in a safe manner, in accordance with pre-defined commissioning plans and procedures. Transport, Install and hook-up the Topside and perform necessary offshore commissioning. Perform the hand-over to operation and close-out the Project. 12

How we work Kvaerners Model (K PEM) is based on best practice from many of the industry s most challenging projects K PEM ensures efficient project execution and risk management, for deliveries on time, on budget and with the agreed quality ED&S September 2008 Slide 13

Activities/systems to verify a safe design PEM Model Quality Management system IDC - All relevant documents/drawings shall be reviewed by relevant disciplines Design verifications (internal) Design reviews (internal) HAZOP Risk analysis including HAZID Other verifications (e.g. SIL) 6- Nov- 12 Slide 14

Copyright and disclaimer Copyright Copyright of all published material including photographs, drawings and images in this document remains vested in Kvaerner and third party contributors as appropriate. Accordingly, neither the whole nor any part of this document shall be reproduced in any form nor used in any manner without express prior permission and applicable acknowledgements. No trademark, copyright or other notice shall be altered or removed from any reproduction. Disclaimer This Presentation includes and is based, inter alia, on forward-looking information and statements that are subject to risks and uncertainties that could cause actual results to differ. These statements and this Presentation are based on current expectations, estimates and projections about global economic conditions, the economic conditions of the regions and industries that are major markets for Kværner ASA and Kværner ASA s (including subsidiaries and affiliates) lines of business. These expectations, estimates and projections are generally identifiable by statements containing words such as expects, believes, estimates or similar expressions. Important factors that could cause actual results to differ materially from those expectations include, among others, economic and market conditions in the geographic areas and industries that are or will be major markets for Kvaerner s businesses, oil prices, market acceptance of new products and services, changes in governmental regulations, interest rates, fluctuations in currency exchange rates and such other factors as may be discussed from time to time in the Presentation. Although Kværner ASA believes that its expectations and the Presentation are based upon reasonable assumptions, it can give no assurance that those expectations will be achieved or that the actual results will be as set out in the Presentation. Kværner ASA is making no representation or warranty, expressed or implied, as to the accuracy, reliability or completeness of the Presentation, and neither Kværner ASA nor any of its directors, officers or employees will have any liability to you or any other persons resulting from your use. 15