STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 823 CONSTRUCTION LAYOUT STAKES AND SURVEY MONUMENTS.

Similar documents
TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

SETTLEMENT INSTRUMENTATION & MONITORING

CHAPTER 12 Revised January 1, 2013 SIGNING AND SEALIN OF PROFESSIONAL SURVEY DELIVERABLES

Survey Ties Guidelines

DESCRIPTION OF WORK:

SECTION 5 DRAFTING STANDARDS

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

CHAPTER 3 PROJECT CONTROL

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

Construction Management Program

SECTION GROUND WATER STORAGE TANKS

SECTION SUPPORT OF EXCAVATION

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION:

FIBER-OPTIC CABLE PLAN CHECK

MOBILE HOME LAW. Revised November 2001

SECTION 724 PIPE CULVERTS

SECTION STORM DRAINAGE TABLE OF CONTENTS

Brevard County Public Works Finance and Contracts Administration

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

SECTION SITE PREPARATION

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SECTION 15 AIR RELEASE VALVE ASSEMBLIES General

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

AIRPORT SECURITY FENCING. A. American Society for Testing and Materials (ASTM):

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

Acceptance Codes APPENDIX - A. Acceptance Criteria

MINIMUM STANDARDS OF ACCURACY, CONTENT AND CERTIFICATION FOR SURVEYS AND MAPS ARTICLE I. TYPES OF SURVEYS

Greater Dayton Regional Transit Authority 4 S. Main Street Dayton, OH 45402

C. Section TESTING LABORATORY SERVICE.

P. ALTERNATE TECHNICAL CONCEPTS FOR CONSTRUCTION, STAGING AND TRAFFIC CONTROL

SECTION 807 PUMP STATION REHABILITATION

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

SECTION 1 GENERAL REQUIREMENTS

SECTION EARTH MOVING

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS

SITE IMPROVEMENT PLANS CHECKLIST

SECTION SHEETING, SHORING AND BRACING

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

WILDCAT CANYON ROAD SPECIFICATION NO SLIDE REPAIR BIDDER'S PROPOSAL (continued)

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Section 100 Contractor Quality Control Program

CONSTRUCTION PERMIT REQUIREMENTS

11 Guardrail. W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use. Modified Guardrail. End Treatments and Transitions

Section 2100-Trenching and Tunneling

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

FUNDAMENTALS OF LANDSCAPE TECHNOLOGY GSD Harvard University Graduate School of Design Department of Landscape Architecture Fall 2006

TRANSFER AND CONVEYANCE STANDARDS OF THE FRANKLIN COUNTY AUDITOR AND THE FRANKLIN COUNTY ENGINEER AS ADOPTED UNDER OHIO REVISED CODE SECTION 319.

SECTION 22 LIGHTNING PROTECTION SYSTEM

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

2. Division 05 Structural Steel Framing for steel framework requirements

The Pipelines Regulations, 2000

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

ITEM # OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

Elev. A = , Elev. B = , horizontal distance = 1625 feet a. 7.7 b..077 c d. 1.28

SECTION GRAVITY SANITARY SEWERS

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

Frequently Asked Questions FAQs

Right-of Way Use Permit Application

BIDDERS MUST OBTAIN ADDENDUM FROM MDOT CONTRACT ADMINISTRATION DIVISION TO BID.

STANDARD SPECIFICATIONS FOR SIGNAGE, STRIPING, AND LIGHTING TOWNSHIP OF STANFORD

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST

SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR

SECTION AS-BUILT DOCUMENTATION

SECTION 611 ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES

TOWNSHIP OF BRIGHTON REQUEST FOR PROPOSALS SANITARY SEWER REPAIRS AND/OR GRINDER PUMP INSTALLATION

SECTION GUARDRAILS

Title 10 DEPARTMENT OF NATURAL RESOURCES Division 35 Land Survey Chapter 1 Cadastral Mapping Standards

Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS

CHAPTER 1181 Improvements

Calvert USA, Inc. Attic Stairs

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

Section 600 Incidental Construction

SECTION STORM DRAIN SYSTEM

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

ROAD SURVEYING Section I. RECONNAISSANCE SURVEY PREPARATION AND SCOPE

COMMERCIAL CONDUIT RULES AND REGULATION

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

Chapter 22. Lump Sum Project Guidelines

Close-Out Documents... 9

STANDARD SPECIFICATIONS SECTION PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

GUIDE FOR WATER MAIN EXTENSIONS

Wastewater Capital Projects Management Standard Construction Specification

CHAPTER 4 LEGAL DESCRIPTION OF LAND DESCRIBING LAND METHODS OF DESCRIBING REAL ESTATE

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

Transcription:

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 823 CONSTRUCTION LAYOUT STAKES AND SURVEY MONUMENTS July 20, 2012 823.01 Description 823.02 Materials 823.03 References 823.04 Definitions 823.05 Verification 823.06 Placement, Protection and Restoration of Survey Monuments 823.07 Primary Project Control 823.08 Right-of-Way Staking 823.09 Construction Layout Staking 823.10 Providing Electronic Instrumentation 823.11 Method of Measurement 823.12 Basis of Payment 823.01 Description. This work consists of furnishing, placing, and maintaining construction layout stakes necessary to perform the Work under the Contract. This work also includes verification, placement, protection, and necessary restoration of primary project control monuments, monument assemblies, reference monuments (which include centerline monuments and centerline reference monuments), and Right-of-Way monuments. Ensure that all work associated with setting reference monuments, Right-of-Way monuments, and steel rods in monument assemblies is performed by a Registered Surveyor. Ensure that all other surveying and layout work described below is supervised by a Registered Engineer or a Registered Surveyor. 823.02 Materials. Furnish materials conforming to: Concrete, Class C...499 Cast frames and covers... 711.12, 711.13, or 711.14 Concrete sand (fine aggregate)... 703.02.A Stainless steel bolts...730.10 Steel rods...709.01 Pipe... 706.07, 706.09, or 707.45 823.03 References. In C&MS 107.10, replace the reference to Item 604 with Item 823. In C&MS 624.04, replace the reference to Item 623 with Item 823. On Standard Construction Drawing RM-1.1, replace references to Item 604 with Item 823.

823.04 Definitions A. Survey Monuments. Includes primary project control monuments (including azimuth marks and temporary benchmarks), monument assemblies, centerline monuments, centerline reference monuments, and Right-of-Way monuments. B. Primary Project Control Monument. A surveyed position that is established and constructed according to the Department s Survey and Mapping Specifications. Primary project control monuments will have associated azimuth marks and may have associated temporary benchmarks. C. Monument Assembly. A surveyed position typically set inside pavement that consists of a steel rod housed inside a monument assembly box with a cast frame and cover according to SCD RM-1.1. D. Reference Monuments 1. Centerline Monument. A surveyed position outside of pavement that consists of a steel rod and aluminum cap encased in concrete according to SCD RM-1.1 that defines the centerline. 2. Centerline Reference Monument. A surveyed position outside of pavement that consists of a steel rod and aluminum cap encased in concrete according to SCD RM-1.1, that defines the centerline based on a specific offset from that centerline. E. Right-of-Way Monument. A property boundary monument set according to SCD RM-1.1 to comply with Ohio Administrative Code Section 4733-37, Standards for Boundary Surveys in the State of Ohio and recited in the Right-of-Way deeds to convey the property or easement rights. Right-of-Way monuments are set at property corners, property line intersections, points along the Right-of-Way and angle points on the Right-of-Way. F. Azimuth Mark. A project control monument set at the end points of the project for use as a backsight point. G. Temporary Benchmark. A vertical position transferred from a primary project control monument. 823.05 Verification. Verify the position of all survey monuments shown in the Contract Documents prior to construction activities. Use standard acceptable surveying measurement techniques suitable to meet the requirements of Ohio Administrative Code Section 4733-37, Standards for Boundary Surveys. Prepare and submit to the Engineer a report with the coordinates, station, offset, and a description of each survey monument found before beginning earth moving, resurfacing, or paving activities. Include the size, material, condition, any cap stamping or markings, and note any differences from the plan locations of the survey monuments. If additional survey monuments not shown in the Contract Documents are encountered, protect, reference, and preserve them in the same manner as survey monuments that are shown in the Contract Documents. Include the additional survey monuments in the report.

823.06 Placement, Protection and Restoration of Survey Monuments. When specified in the Contract Documents, locate, construct, and position primary project control monuments according to the Department s Survey and Mapping Specifications. Construct all other survey monuments according to SCD RM-1.1. Do not disturb survey monuments, cornerstones, or boundary monuments during construction unless specified in the Contract Documents. Restore all survey monuments damaged or destroyed by construction activities. If the Department must repair, replace, or resurvey the location of any survey monuments, cornerstones, or boundary monuments that are damaged, destroyed, or made inaccessible by the Contractor or its employees, subcontractors, or their agents, then the Engineer will deduct the costs incurred by the Department from the estimates to the Contractor. 823.07 Primary Project Control. Primary project control governs all positioning for Department projects. Use project control information provided in the plans for all project related survey operations. Establish and construct primary project control monuments according to the Department s Survey and Mapping Specifications. 823.08 Right-of-Way Staking. Stake Right-of-Way lines where work will be performed before beginning the work. Stake Right-of-Way lines by placing tall stakes, properly identified and readily discernible, at points of change in width or direction of the Right-of-Way line and at points along the line so that at least two stakes can be seen distinctly from any point on the line. The Engineer will not require the Contractor to set additional stakes to locate a utility line that is not included as a pay item in the contract, or to determine the property line between properties. 823.09 Construction Layout Staking. Furnish construction layout staking as required to construct the project and along both sides of the centerline of construction, 3 feet (1 m) outside of the grading limits at maximum spacing intervals shown in the table below. Replace staking as directed by the Engineer. TABLE 823.09-1 MAXIMUM SPACING OF CONSTRUCTION LAYOUT STAKES Length of project Spacing Length of project Spacing Less than 1/2 mile 200 feet Less than 1 km 50 m 1/2 mile to 1 mile 500 feet 1 km to 2 km 200 m Over 1 mile 1000 feet Over 2 km 500 m Before performing a portion of the Work, submit a copy of the construction layout notes for that portion to the Engineer. The construction layout notes must contain information sufficient for the Engineer to verify the construction layout. The Contractor is responsible for having the finished Work conform to the lines, grades, elevations and dimensions shown on the plans. Any inspection or checking of the Contractor s layout by the Engineer and the acceptance of all or any part of it does not relieve the Contractor of that responsibility. The removal of construction layout stakes at the completion of the Work is a final cleanup item that is required as a condition of full payment for Item 624 Mobilization.

823.10 Providing Electronic Instrumentation. If specified as a pay item, provide the Engineer with electronic instrumentation so that the Department can verify the construction layout, perform check sections, and document pay items. Provide a survey-grade, global navigation satellite system (GNSS) receiver and data collector. Provide equipment that meets the requirements of the Department s Survey and Mapping Specifications. Provide equipment, software, and all three dimensional models needed to verify layout, perform check sections, and document pay items. Train the Engineer on how to use the provided equipment and software and provide technical assistance during the duration of the Work. Upon completion of the Work, the electronic equipment, computer and software will remain the property of the Contractor. If using GNSS methods to construct the project and a pay item for providing electronic instrumentation is not specified, provide the Engineer with the three dimensional models in electronic format when requested. Provide the models at no additional expense to the Department. 823.11 Method of Measurement. Estimated quantities for replacement of Primary Project Control Monuments, Monument Assemblies, Reference Monuments, and Right-of-Way Monuments expected to be destroyed that are within the project construction work limits are included in the Contract Documents. Estimated quantities for new monuments are also included in the Contract Documents. Primary project control monuments, monument assemblies, reference monuments, Right-of- Way monuments, and boundary monuments on or outside the project construction work limits are the Contractor s responsibility to protect and restore as required. The Department will not pay for restoration of these items. 823.12 Basis of Payment. Payment for Construction Layout Stakes includes payment for Right-of-Way staking. The Department will pay for accepted quantities at the contract prices as follows: Item Unit Description 823 Lump Sum Construction Layout Stakes 823 Lump Sum Providing Electronic Instrumentation 823 Each Primary Project Control Monument, Type A 823 Each Primary Project Control Monument, Type B 823 Each Monument Assembly 823 Each Reference Monument 823 Each Right-of-Way Monument

Designer Note: Use this supplemental specification on all construction projects that are scoped after October 15, 2010 and that require layout stakes, Primary Project Control Monuments, Monument Assemblies, Reference Monuments, or Right-of-Way Monuments. This specification replaces CMS Item 623 and Items 604 Monument Assemblies, Reference Monuments, and Right-of-Way Monuments. The Right-of-Way designer will include quantities for proposed monument assemblies and reference monuments in the Right-of-Way plans. Also, the Right-of-Way designer will include quantities to replace any survey monuments that are located within a temporary easement and that they expect the Contractor to destroy during the Work. Carry the quantities for all proposed and replacement survey monuments to the General Summary in the plans. This supplemental specification also adds the language from Proposal Note 623 for providing electronic equipment for construction layout. At the District s request, include a pay item for Providing Electronic Instrumentation. The specification requires the Contractor to provide one GNSS receiver. This is normally adequate. However, if additional receivers are required, include a plan note to require the additional receivers.